FA3030-14-R-0004-0002_with_attachments.pdf

PDF 111 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) IDIQ for Goodfellow AFB, TX 76908
Solicitation number
FA3030-14-R-0004
Issued by

About this file

Amendment 2 with attachments.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to clarify coefficient entry in SF 1442, Block 10,, remove the "%" symbol from the coefficients on CLINs in Section B, and incorporate a revised seed project Statement of Objectives (SOO) and draw ing dated 8 Jul 14.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Jul-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA3030-14-R-0004

X 9B. DATED (SEE ITEM 11)

18-Jun-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Jul-2014

CODE

17TH CONTRACTING SQUADRON -FA3030

210 SCHERZ BLVD

BRENDA.SIZEMORE.1@US.AF.MIL

GOODFELLOW AFB TX 76908-4705

FA3030 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA3030-14-R-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT NARRATIVE

The purpose of this amendment is to incorporate the following changes:

a. Change Standard Form 1442, Block 10, sentence two from

“-Enter coefficient in Section B using type writer of black ink.” to

“-Enter coefficient in Section B using type writer or black ink. Additionally, electronic means of coefficient insertion such as PDF text are acceptable.”

b. Remove the “%” symbol from the extended descriptions of CLINs 0001 through 4003 as shown below.

C. Delete the Seed Project Statement of Objectives dated 18 Jun 14 and replace with the revised Seed Project Statement of Objectives and related drawing dated 8 Jul 14 as attachments 7 and 8 respectively.

D. No other changes occur as a result of this amendment.

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required performance has changed from Simplified Acquisition of Base Engineering Requirements (SABER) IDIQ at Goodfellow AFB, TX and the Goodfellow AFB Recreation Camp.-Enter coefficient in Section B using type writer of black ink.-See Section L regarding site visit information.-Verbal explanations given before award will NOT be binding. Any authorized changes to this solicitation will be made in writing by issuing an amendment(s) to the offeror. Offeror shall acknow ledge receipt of amendment(s) in block 19 of SF Form 1442 or by returning a signed copy of the amendment(s) with the offeror.-Section F regarding period of contract and performance.-See Section B regarding minimum contract value.-This acquisition is limited to those with a bona fide business presence in the state of Texas IAW 10 USC 2304(c) (5).-Disclosure of Magnitude of Construction Projects:

The magnitude of this solicitation is more than $10,000,000.-CO: C20 NAICS: 236220 (SIC:1542) Size Std:

$33,500,000. to Simplified Acquisition of Base Engineering Requirements (SABER) IDIQ at Goodfellow AFB, TX and the Goodfellow AFB Recreation Camp.-Enter coefficient in Section B using type writer or black ink.

Additionally, electronic means of coefficient insertion such as PDF text are acceptable.-See Section L regarding site visit information.-Verbal explanations given before award will NOT be binding. Any authorized changes to this solicitation will be made in writing by issuing an amendment(s) to the offeror. Offeror shall acknow ledge receipt of amendment(s) in block 19 of SF Form 1442 or by returning a signed copy of the amendment(s) with the offeror.- Section F regarding period of contract and performance.-See Section B regarding minimum contract value.-This acquisition is limited to those with a bona fide business presence in the state of Texas IAW 10 USC 2304(c) (5).- Disclosure of Magnitude of Construction Projects: The magnitude of this solicitation is more than $10,000,000.-CO:

C20 NAICS: 236220 (SIC:1542) Size Std: $33,500,000..

SECTION B - SUPPLIES OR SERVICES AND PRICES

SUBCLIN 0001AA

The CLIN extended description has changed from Under $200K Coefficient __________% to Under $200K Coefficient __________.

SUBCLIN 0001AB

SUBCLIN 0001AC

The CLIN extended description has changed from Under $200KCoefficient __________% to Under $200KCoefficient __________.

SUBCLIN 0001AD

SUBCLIN 0002AA

The CLIN extended description has changed from $200K to $500KCoefficient __________% to $200K to $500KCoefficient __________.

SUBCLIN 0002AB

The CLIN extended description has changed from $200K to $500K Coefficient __________% to $200K to $500K Coefficient __________.

SUBCLIN 0002AC

The CLIN extended description has changed from $200K to $500K Coefficient __________% to $200K to $500K Coefficient __________.

SUBCLIN 0002AD

The CLIN extended description has changed from $200K to $500KCoefficient __________% to $200K to

SUBCLIN 0003AA

The CLIN extended description has changed from Over $500KCoefficient __________% to Over

SUBCLIN 0003AB

The CLIN extended description has changed from Over $500K Coefficient __________% to Over $500K Coefficient __________.

SUBCLIN 0003AC

The CLIN extended description has changed from Over $500K Coefficient __________% to Over $500K Coefficient __________.

SUBCLIN 0003AD

SUBCLIN 1001AA

SUBCLIN 1001AB

SUBCLIN 1001AC

SUBCLIN 1001AD

SUBCLIN 1002AA

The CLIN extended description has changed from $200K-$500KCoefficient __________% to $200K-

SUBCLIN 1002AB

SUBCLIN 1002AC

SUBCLIN 1002AD

SUBCLIN 1003AA

SUBCLIN 1003AB

SUBCLIN 1003AC

SUBCLIN 1003AD

SUBCLIN 2001AA

SUBCLIN 2001AB

SUBCLIN 2001AC

SUBCLIN 2001AD

SUBCLIN 2002AA

SUBCLIN 2002AB

SUBCLIN 2002AC

SUBCLIN 2002AD

SUBCLIN 2003AA

SUBCLIN 2003AB

SUBCLIN 2003AC

SUBCLIN 2003AD

SUBCLIN 3001AA

SUBCLIN 3001AB

SUBCLIN 3001AC

SUBCLIN 3001AD

SUBCLIN 3002AA

SUBCLIN 3002AB

SUBCLIN 3002AC

SUBCLIN 3002AD

SUBCLIN 3003AA

SUBCLIN 3003AB

SUBCLIN 3003AC

SUBCLIN 3003AD

SUBCLIN 4001AA

SUBCLIN 4001AB

SUBCLIN 4001AC

SUBCLIN 4001AD

SUBCLIN 4002AA

SUBCLIN 4002AB

SUBCLIN 4002AC

SUBCLIN 4002AD

SUBCLIN 4003AA

SUBCLIN 4003AB

SUBCLIN 4003AC

SUBCLIN 4003AD

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Attachment 1 - Wage

Determination (Building)

TX140267

3 03-JAN-2014

Attachment 2 Attachment 2 - Wage Determination (Heavy/Highway)

TX140007

3 03-JAN-2014

Attachment 3 Attachment 3 - Wage Determination (Residential) TX140273

3 03-JAN-2014

Attachment 4 Attachment 4 SPECS 1780 Attachment 5 Attachment 5 Base

Access Letter

Attachment 6 Attachment 6 Past Performance Questionaire to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Attachment 1 - Wage

Determination (Building)

TX140267

3 03-JAN-2014

Attachment 2 Attachment 2 - Wage Determination (Heavy/Highway)

TX140007

3 03-JAN-2014

Attachment 3 Attachment 3 - Wage Determination (Residential) TX140273

3 03-JAN-2014

Attachment 4 Attachment 4 SPECS 1780 Attachment 5 Attachment 5 Base

Access Letter

Attachment 6 Attachment 6 Past Performance Questionaire

Attachment 7 Seed Project Statement of Objectives Revision 1

3 08-JUL-2014

Attachment 8 Seed Project Drawing Revision 1

2 08-JUL-2014

(End of Summary of Changes)

FA3030-14-R-0004-0002

Attachment 7 Revision 1, 8 Jul 14

PAGE (1)

SABER

STATEMENT OF OBJECTIVES (SOO)

REPLACE WATER MAINS SOUTH OF FORT LANCASTER

Project # JCGU-09-1010

1.0 PROJECT SCOPE: The work under this task order consists of providing all labor, tools, transportation, supplies, supervision, materials, and associated design with installing new C-900 water main lines and laterals line valves. The work includes, but is not limited to all demolition, masonry, carpentry, plumbing, electrical, and associated tasks/crafts, required to successfully complete this project’s requirements. All work shall be accomplished in strict accordance with the Goodfellow AFB SABER Contract.

2.0 MATERIAL AND DEBRIS REMOVAL: All demolished materials and debris shall become the property of the Contractor and shall be disposed of/or recycled off base at the Contractor’s expense in accordance with local, state, and federal environmental laws and regulations.

3.0 CONTRACTOR FURNISHED MATERIALS: Contractor shall furnish all materials to accomplish the work described in this SOO.

4.0 PROJECT DESCRIPTION: The following requirements are intended to describe the general scope of the project, but in no way limits the contract with respect to the extent of the work indicated in the specifications or on the drawing, and are subject to the terms and conditions of the contract. It is the intent and meaning of this document that the Contractor shall provide new water main and laterals lines valves, bores under streets, connections, sidewalks, pavement/base course repairs, and establish turf that is complete with all items and appurtenances necessary, reasonably incidental, or customarily included, even though each item is not specifically called out.

DEMOLITION:

General requirements

1) Contractor shall remove topsoil where needed.

2) Contractor shall demolish concrete sidewalk where needed.

3) Contractor shall demolish concrete/asphalt paving/curbing and base course where needed.

3) Contractor shall remove landscaping rock to a site approved by the Contracting Officer for re-installation later in this project.

PAGE (2)

NEW WORK:

Architectural:

1) Contractor shall provide new hydro mulch (seeding) for excavated areas.

2) Contractor shall excavate for water mains and laterals connections.

3) Contractor shall compact trench and sand or gravel bedding per SABER Spec’s.

4) Contractor shall provide new sections of sidewalk/curb and gutter where removed from excavation site.

5) Contractor shall provide new landscaping felt and re-install rock where needed.

6) Contractor shall provide new base course where needed.

7) Contractor shall provide new concrete/hot-mix/hot lay asphalt for street repair where needed.

Plumbing:

1) Contractor shall provide and install new 8” C-900 pipe.

2) Contractor shall provide and install new resilient wedge-gate valves with fusion epoxy coating.

3) Contractor shall provide and install sacrificial anodes 32 lb. on each valve. No test stations required.

4) Contractor shall provide repair to irrigation systems (as needed).

5) Contractor shall provide new sand bedding for 8” C-900 water main.

6) Contractor shall provide and install new connections and valves on lateral lines.

7) Contractor shall provide boring or trenching under streets for new water main lines.

8) Contractor shall provide steel case for pipe borings (as needed).

9) Contractor shall provide new uni-lugs bolts on all C-900 fittings.

10) Contractor shall provide all disinfectant on new water line.

11) Contractor shall provide all water testing and test results.

PAGE (3)

12) Contractor shall provide new irrigation repairs to existing systems.

13) Contractor shall provide new water line marking tape and tracer wire on new water main.

14) Contractor shall provide and install 4ea new fire hydrants.

Electrical:

1) Contractor shall provide electrical wiring repair to irrigation systems (as needed).

5.0 SPECIAL CONSIDERATIONS: Work shall be performed in a manner to create minimum disturbance and inconvenience to the Goodfellow AFB, the personnel visiting, and working around the construction areas. As a minimum the Contractor shall give the Contracting Officer advance 14 day notice in writing for any utility outages affecting buildings, any part of GAFB. This project will be completed in several phases so there is minimum disturbance and inconvenience to Goodfellow AFB personnel.

6.0 GENERAL QUALITY CONTROL TESTING: The Contractor is responsible for all quality control testing. All testing shall be performed at no additional cost to the Government.

No work requiring testing will be permitted until the required tests have been identified and approved by the Contracting Officer.

7.0 SUBMITTALS: The Contractor shall provide the following submittals to the Contracting Officer for approval/disapproval:

1) As-Built Drawings

2) C-900 pipe and connectors

3) Concrete strength/slump tests and asphalt, prime coat, and base material.

4) DD Form 1354 Checklist

5) Water Main Valves and Sacrificial Anodes

6) Fire Hydrants

7) Water Test Results

END OF STATEMENT OF OBJECTIVES

Attachment 8

Attachment 8

FA3030-14-R-0004-0002
SOO Replace Water Mains South Fort Lancaster Revision 1 8 Jul 14
FY14 SABER Seed Drawing Revision 1 8 Jul 14

File details come from the government source that posted it. Updated .