Attachment__4_-_SABER_SPECS.pdf
PDF 3 MB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements (SABER) IDIQ for Goodfellow AFB, TX 76908
- Solicitation number
- FA3030-14-R-0004
About this file
Attachment 4 - SABER Specifications
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
FOR
2014 SABER CONTRACT
February 2014
PREPARED BY:
17TH CIVIL ENGINEER SQUADRON (AETC)
460 E. KEARNEY BOULEVARD
GOODFELLOW AFB, TX 76908-4104
POC: Edward Hudson Kerr
SABER SPECIFICATIONS 2014
PROJECT TABLE OF CONTENTS Page 2
PROJECT TABLE OF CONTENTS Page 1
01 10 01 GENERAL REQUIREMENTS AND WORKING CONDITIONS
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 41 00 REGULATORY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.10 20 QUALITY CONTROL FOR MINOR CONSTRUCTION
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.11 INDOOR AIR QUALITY (IAQ) MANAGEMENT
01 67 00 ENVIRONMENTAL REQUIREMENTS FOR PRODUCTS
01 74 13 PROGRESS CLEANING
01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT
01 75 00 STARTING AND ADJUSTING
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 91 00 COMMISSIONING
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
DIVISION 02 - EXISTING CONDITIONS
02 32 00 SUBSURFACE DRILLING, SAMPLING, AND TESTING
02 41 00 DEMOLITION
02 42 51 CARPET REMOVAL AND RECLAMATION
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 82 14.00 10 ASBESTOS HAZARD CONTROL ACTIVITIES
DIVISION 03 - CONCRETE
03 30 00 03 40 00.0
DIVISION
04 20 00 04 23 00
0 10
CAST-IN-PLACE CONCRETE
PLANT-PRECAST CONCRETE PRODUCTS FOR BELOW
GRADE
CONSTRUCTION
4 - MASONRY
MASONRY
GLASS MASONRY UNITS
5 - METALS
05 12 00 STRUCTURAL STEEL
05 21 13 DEEP LONGSPAN STEEL JOIST FRAMING
05 21 19 OPEN WEB STEEL JOIST FRAMING
05 21 23 STEEL JOIST GIRDER FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 05 73 WOOD TREATMENT
06 10 00 ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY
06 41 16.00 10 LAMINATE CLAD ARCHITECTURAL CASEWORK
06 60 00 PLASTIC FABRICATIONS
PROJECT TABLE OF CONTENTS Page 2
06 61 16 SOLID POLYMER (SOLID SURFACING) FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 14 00 FLUID-APPLIED WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 60 00 FLASHING AND SHEET METAL
07 61 14.00 20 STEEL STANDING SEAM ROOFING
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 11 16 ALUMINUM DOORS AND FRAMES
08 11 69 METAL STORM DOORS
08 14 00 WOOD DOORS
08 56 53 BLAST RESISTANT TEMPERED GLASS WINDOWS
08 71 00 DOOR HARDWARE
08 72 00 ELECTRONIC CARD ACCESS LOCKING SYSTEM (ECALS)
08 81 00 GLAZING
8 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
9 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 00 CERAMIC TILE, QUARRY TILE, AND PAVER TILE
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 65 36 STATIC-CONTROL RESILIENT FLOORING
09 65 66 RESILIENT ATHLETIC FLOORING
09 67 23.13 STANDARD RESINOUS FLOORING
09 68 00 CARPET
09 69 13 RIGID GRID ACCESS FLOORING
09 72 00 WALL COVERINGS
09 90 00 PAINTS AND COATINGS
9 97 13.28 PROTECTION OF BURIED STEEL PIPING AND STEEL BULKHEAD
TIE RODS
DIVISION 10 - SPECIALTIES
10 26 13 WALL AND CORNER GUARDS
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 21 00 WINDOW BLINDS
12 36 00.00 20 MANUFACTURED VANITIES
12 48 13.13 ENTRANCE FLOOR MATS
12 50 00 FURNITURE SYSTEMS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
PROJECT TABLE OF CONTENTS Page 3
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING
23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 25 FACILITY GAS PIPING
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS
26 08 00 APPARATUS INSPECTION AND TESTING
26 09 23.00 40 LIGHTING CONTROL DEVICES
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 23 00.00 40 SWITCHBOARDS
26 27 13.10 30 ELECTRIC METERS
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 01.00 10 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 55 53.00 10 EXTERIOR LIGHTING INCLUDING SECURITY AND CCTV APPLICATIONS
DIVISION 27 - COMMUNICATIONS
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 51 26 MASS NOTIFICATION SYSTEM
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 64.00 10 FIRE DETECTION AND ALARM SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 11 00 CLEARING AND GRUBBING
31 31 16 SOIL TREATMENT FOR SUBTERRANEAN TERMITE CONTROL
31 63 29 DRILLED CONCRETE PIERS AND SHAFTS
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 93 31 PLANTING OF TREES, SHRUBS AND VINES
32 99 01 PAVING DEMOLITION
32 99 02 PAVEMENT - REMOVALS AND REINSTALL
32 99 03 PAVEMENT - FULL DEPTH RECYCLING
32 99 04 PAVEMENT - EXCAVATION
32 99 05 PAVEMENT - EARTHWORK
32 99 06 PAVEMENT - LIME STABILIZED SUBGRADE
32 99 07 PAVEMENT - STABILIZED AGGREGATE BASE COURSE
32 99 08 PAVEMENT - COMPACTION
32 99 09 PAVEMENT - CONCRETE SIDEWALKS, TROOPWALKS, CURBS
AND GUTTERS
32 99 10 PAVEMENT - MICROSURFACING AND SLURRY SEAL
PROJECT TABLE OF CONTENTS Page 4
32 99 11 ASPHALT CEMENT PAVEMENT
32 99 12 PAVEMENT - BITUMINOUS SINGLE/DOUBLE SURFACE TREATMENT
32 99 13 PAVEMENT - TACK COAT
32 99 14 PAVEMENT - PRIME COAT
32 99 15 PAVEMENT MARKINGS
32 99 16 PAVEMENT - COLD MILLING
32 99 17 PAVEMENT - STORM DRAINAGE
32 99 18 PAVEMENT - ESTABLISH TURF
32 99 19 PAVEMENT - IRRIGATION REPAIR
32 99 20 PAVEMENT - PCC FULL DEPTH REPAIR
32 99 21 PAVEMENT - EXPOSED AGGREGATE
32 99 22 PAVEMENT - PRECAST CONCRETE
DIVISION 33 - UTILITIES
33 11 00 WATER DISTRIBUTION
33 30 00 SANITARY SEWERS
33 40 00 STORM DRAINAGE UTILITIES
33 51 13.00 30 NATURAL-GAS LINES
33 61 00 PREFABRICATED UNDERGROUND HEATING/COOLING DISTRIBUTION
SYSTEM
33 71 02.00 20 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
SECTION 01 10 01 Page 1
SECTION TABLE OF CONTENTS
SECTION 01 10 01
GENERAL REQUIREMENTS AND WORKING CONDITIONS
02/14
PART 1 GENERAL
1.1 DEFINITIONS
1.2 SUBMITTALS
1.3 1.4 WORK COVERED BY CONTRACT DOCUMENTS
1.3.1 1.4.1 Project Description
1.3.2 Project Location
1.3.3 1.4.3 Limitation of Government Obligation to Issue Work
1.3.4 1.4.4 Government Installed Work
1.3.5 Task Order Period of Performance
1.4 MINIMUM CONTRACTOR PERFORMANCE CAPABILITIES
1.5 MATERIAL AND WORKMANSHIP
1.6 PROJECT MANAGEMENT SUPPORT
1.7 TECHNICAL DESIGN SUPPORT
1.8 MINIMUM ON-SITE PERSONNEL
1.9 1.4 CONTRACTOR'S OFFICE
1.10 1.5 COMPUTER REQUIREMENTS
1.11 1.6 COMMUNICATION REQUIREMENTS
1.12 PROPERTY CONTROL RECORDS
1.12.1 1.7.1 Government Furnished Material and Equipment
1.12.2 Government Furnished Material and Equipment Delivery Schedule
1.12.3 Delivery Location
1.13 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
1.14 SEQUENCING AND SCHEDULING
1.15 SUPERINTENDENCE BY THE CONTRACTOR
1.16 QUALITY ASSURANCE
1.17 EXISTING WORK
1.17.1 Protection of Government Property
1.17.2 Protection of Historical and Archeological Resources
1.18 WORK PLAN
1.18.1 Standard and Non-Standard Work Hours
1.18.2 Traffic Plan
1.18.3 Work in Occupied Facilities
1.18.4 Adjacent Facilities
1.18.5 Communication Devices and Cables
1.18.6 Planned Utility Outages
1.18.7 Unplanned Utility Outage (Accidental Disruption)
1.18.8 Drinking Water
1.18.9 Phasing Requirements
1.19 ENVIRONMENTAL
1.19.1 Environmental Goals
1.19.2 Environmental Goal Standards
1.19.2.1 US Green Building Council (USGBC) - LEED(tm) Rating System
1.19.2.2 Green Globes US
1.19.2.3 EPA Energy Performance Rating
1.19.3 Hazardous and Special Waste Generated by the Contractor
SECTION 01 10 01 Page 2
1.19.4 Contractor Encountered Hazardous Waste
1.19.5 Asbestos, Mold or Lead
1.19.6 1.17.6 Prohibited Nuisance and Polluting Activities
1.19.7 1.17.7 Release of Fluids to the Sanitary Sewer System
1.19.8 1.17.8 Pesticides (Insecticides, Fungicides, Herbicides, Etc.)
1.19.9 1.17.9 Air Emissions
1.19.10 1.17.11 Indoor Air Quality
1.19.11 1.17.12 Protection of Water Resources
1.19.12 OZONE DEPLETING SUBSTANCES
1.20 PERMITS AND RESPONSIBILITIES
1.20.1 Work Clearance Request
1.20.2 Base Fire Regulations
1.21 PROPERTY CONTROL RECORDS
1.22 WARRANTY
1.23 TESTING
PART 2 WORKING CONDITIONS
2.1 COMPLIANCE WITH LAWS
2.2 BASE AND WORK AREA ACCESS
2.3 SITE INVESTIGATIONS AND CONDITIONS AFFECTING WORK
2.4 FIELD OFFICE AND STORAGE AREAS
2.5 SITE MAINTENANCE
2.6 AVAILABILITY AND USE OF UTILITY SERVICES
2.7 MILITARY FAMILY HOUSING AREAS
2.8 TOILET FACILITIES
2.9 CONCRETE TRUCKS
2.10 ROAD CLOSURES, OPEN CUTTING AND REPAIR
2.11 NO SMOKING
POLICY PART 3 (NOT USED)
-- End of Section Table of Contents --
SECTION 01 10 01 Page 3
SECTION 01 10 01
GENERAL REQUIREMENTS AND WORKING CONDITIONS
02/14
1.1 DEFINITIONS
TO - Task Order.
Definitions pertaining to sustainable development are as defined in ASTM E 2114 and as specified.
a. "Environmentally preferable products" have a lesser or reduced effect on the environment in comparison to conventional products and services. This comparison may consider raw materials acquisition, production, manufacturing, packaging, distribution, reuse, operation, maintenance, or disposal of the product.
b. "Indoor environmental quality" is the physical characteristics of the building interior that impact occupants, including air quality, illumination, acoustics, occupant control, thermal comfort, daylighting, and views.
c. "Operational performance" is the functional behavior of the building as a whole or of the building components.
d. "Sustainability" is the balance of environmental, economic, and societal considerations.
1.2 SUBMITTALS
Submittals called out for in these specifications shall be required and shall be submitted for approval or information using AF Form 3000.
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
When a submittal cannot be provided within the required submission date, Contractor shall submit in writing a letter stating the reasons why and furnishing a new projected submission date.
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Certificates of insurance; G
Surety bonds; G
AF Form 3064, Contract Progress Schedule; G
SECTION 01 10 01 Page 4
AF Form 3065, Contract Progress Report; G
Work Plan; G
Work Clearance Request; G
Environmental Protection Plan; G
Storm Water Pollution Prevention Plan
SD-11 Closeout Submittals
Property Control Records
1.3 1.4 WORK COVERED BY CONTRACT DOCUMENTS
1.3.1 1.4.1 Project Description
Applicable provisions of the contract clauses will govern work under each section of these specifications.
The work covered under this Simplified Acquisition of Base Engineering Requirements Indefinitie Delivery and Indefinite Quantity (SABRE IDIQ) contract consists of the Contractor furnishing all layout, survey, plant, labor, supervision, quality control, materials, equipment, machines, tools, appliances, services, transportation, supplies, and incidentals.
Contractor shall perform all operations required to complete work awarded under the SABER IDIQ contract. Work shall be performed in strict accordance with the plans, specifications, terms and conditions of the contract. More specific details of the work will be provided by the Government for each specific Task Order in the form of an initial concept design.
Each Task Order issued on this contract is for a broad range of real property maintenance, repair, alteration, and minor construction work.
The work is required in support of Base Civil Engineering activities on Goodfellow AFB, Texas to include Goodfellow Recreation Camp, Goodfellow AFB proper, Goodfellow Medical Clinic, Family Housing and all real property under the responsibility of Goodfellow AFB. During the contract period the Government will identify construction tasks and associated design requirements needed to complete each specified project. The Contractor shall be required to maintain a management office on Goodfellow AFB base in which he/she receives Task Orders and provides other technical management services required to accomplish those orders.
The projects shall include tasks in a variety of trades such as carpentry, road repair, pavements, asbestos abatement, lead paint abatement, roofing, excavation, demolition, interior electrical, HVAC, steam fittings, plumbing, sheet metal, painting, concrete masonry, welding, etc.
Specific project requirements will be provided with each Task Order.
Existing dimensions and locations shown on applicable drawings provided by the Government are for approximation purposes only. Failure to verify the dimensions and locations will be at the contractor's risk and shall not relieve the contractor from accomplishing the work required by the contract at the price awarded by the government.
SECTION 01 10 01 Page 5
1.3.2 Project Location
The work will be performed at Goodfellow AFB, Texas or at the Goodfellow AFB Recreation Camp, San Angelo, Tx. Goodfellow Air Force Base is located in Tom Green County, on the southeast side of San Angelo, Texas and is bounded to the north by Highway #388 (Paint Rock Rd.), to the west by Fort McKavitt Rd and Bell Street/Christoval Road, to the south by South Chadbourne St (Hwy. 1223) and to the east by the eastern city limits.
Goodfellow AFB Recreation Camp is located on Lake Nasworthy at 1950 South Concho Drive, San Angelo, Tx.
1.3.3 1.4.3 Limitation of Government Obligation to Issue Work
In addition to other limitations, the Governement is not obligated to issue any particular type of work to the SABER Contractor and reserves the right to accomplish work using Government or other Contractor work forces, as the Government deems necessary or desirable, and to do so will not breach or otherwise violate this Contract.
1.3.4 1.4.4 Government Installed Work
If applicable, will be identifed per specific Task Order.
1.3.5 Task Order Period of Performance
The Period of Performance (POP) shall be as specified in the specific Task Order.
1.4 MINIMUM CONTRACTOR PERFORMANCE CAPABILITIES
The Contractor shall provide sufficient project management, design staff, sub-contractor pool and technical support to ensure: quality and completeness of designs and drawings; accuracy of estimates; ability to handle concurrent project requirements; ability to perform work on schedule and complete project on time; and, ability to process submittal, permits, payrolls, reports and other required documentation in a timely manner. The Contractor shall be responsible for development of the Government's initial concept design to a point where the Contractor's project documents including designs, drawings and specifications clearly indicate the proposed method of accomplishing the work, as well as the description, dimensions, and location of all proposed elements of the work. The Contractor's project documents must fully comply with the Government's initial concept design requirements as well as all applicable regulatory code requirements. The Contractor is expected to use recognized industry standard practice in determining their proposed design materials and methods, unless the Government specifies otherwise.
1.5 MATERIAL AND WORKMANSHIP
As prescribed in "FAR 52.236-5 Material and Workmanship":
(a) All equipment, material, and articles incorporated into the work covered by this contract shall be new and of the most suitable grade for the purpose intended, unless otherwise specifically provided in this contract. References in the specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The Contractor may, at its option, use any equipment, material, article, SECTION 01 10 01 Page 6 or process that, in the judgment of the Contracting Officer, is equal to that named in the specifications, unless otherwise specifically provided in this contract.
(b) The Contractor shall obtain the Contracting Officer’s approval of the machinery and mechanical and other equipment to be incorporated into the work. When requesting approval, the Contractor shall furnish to the Contracting Officer the name of the manufacturer, the model number, and other information concerning the performance, capacity, nature, and rating of the machinery and mechanical and other equipment. When required by this contract or by the Contracting Officer, the Contractor shall also obtain the Contracting Officer’s approval of the material or articles which the Contractor contemplates incorporating into the work. When requesting approval, the Contractor shall provide full information concerning the material or articles. When directed to do so, the Contractor shall submit samples for approval at the Contractor’s expense, with all shipping charges prepaid. Machinery, equipment, material, and articles that do not have the required approval shall be installed or used at the risk of subsequent rejection.
(c) All work under this contract shall be performed in a skillful and workmanlike manner. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer deems incompetent, careless, or otherwise objectionable.
1.6 PROJECT MANAGEMENT SUPPORT
As a minimum, the Contractor shall maintain the following management personnel.
A.Contractor's Project Manager (CPM) - CPM shall provide overall contract management including: subcontractor acquisition, oversight and administration; Contractor review of material submittals and shop drawings; permit processing required by Goodfellow AFB and all other applicable federal, state, regional and local entities having jurisdiction; full authority to develop cost proposals; negotiate and sign task orders; supervision of project superintendents; collection, submission and management of all Contractor and sub-contractor personnel documentation required to comply with Goodfellow AFB security requirements; and attendance at all joint Government/Contractor status meetings as well as site visits, pre-performance conferences, pre-final and final inspections. The CPM shall be available during normal duty hours within 30 minutes after notification to meet with the Contracting Officer (CO) at a location designated by the CO. CPM must have a minimum of 5 (five) year previous experience as primary manager of a SABER or SABER type contract or general contracting firm engaged in similar mutliple discipline commercial construction projects.
B. Quality Control and Safety Manager (QCSM)- Contractor shall provide a QCSM to provide quality control and safety management for up to 20 active task orders. The QCSM shall perform a minimum of two daily site visits to each active project site to ensure full compliance with all safety requirements and to verify that the work and materials installed and stored on site are in accordance with the approved construction drawings, shop drawings, and material submittals. The QCSM shall submit daily field notes recording activities at each project site, prepare and coordinate material submittal sheets and shop drawing submittals, prepare quality control reports, attend all pre-final and final inspections, and schedule
SECTION 01 10 01 Page 7 and coordinate testing procedures. The QCSM shall be on-site for the delivery and installation of all time sensitive construction components including but not limited to concrete. QCSM shall be responsible for ensuring that all quality control sampling and testing required on-site (i.e. slump tests and preparation of concrete test cylinders) are prepared/performed in accordance with applicable standards. Attach safety inspection logs to the Contractor's production or quality control report.
Quality control and safety management shall be carried out by someone other than the CPM or Site Superintendent. Refer to Section 01 35 26 in this specification for additonal requirements.
C. Site Superintendent - Contractor shall provide site superintendence for up to 20 active Task Orders at a time. Quantity of active task orders per site superintendent shall not exceed five. Site supervision shall include a minimum of twice daily visits to each active project site, submission of detailed semi-monthly progress reports for each task order (including work elements, percentage of work completed during the period with cumulative and total quantities. Site Superintendent shall schedule and coordinate subcontractors and material suppliers and shall attend all site visits, pre-performance conferences, and pre-final and final inspections. Site Superintendent shall ensure advance notice is provided to and approval is received from Contracting Officer prior to delivery and installation of any time sensitive construction components including but not limited to concrete.Site superintendence shall be carried out by someone other than the CPM or QCSM. CPM may fill in temporarily for one absent Site Superintendent at a time and for no more than five consecutive days. Superintendents shall have a minimum of 1 (one) year previous experience as a project superintendent (exclusive of time employed as a tradesman or working foreman) for a general contracting firm overseeing one or more multi-discipline commercial construction projects.
D. Environmental Manager - Contractor shall provide an environmental manager responsible for overseeing the Contractor's conformance to environmental goals for the project and implementing procedures for environmental protection. The environmental manager shall have a minimum of 3 years construction experience on projects of similar size and scope;
minimum 3 years experience with environmental procedures similar to those of this contract; familiarity with Environmental Management Systems (EMSs) such as ISO 14001; familiarity with environmental regulations applicable to constuction operations. Environmental Manager shall oversee Contractor’s compliance with regulatory requirements including but not limited to:
1. Compliance with applicable Federal, State and local environmental regulations, including maintaining required documentation.
2. Implementation of the Waste Management Plan.
3. Implementation of the IAQ Management Plan.
4. Implementation of the Environmental Protection Plan.
5. Training for Contractor personnel in accordance with their position requirements.
6. Monitoring and documentation of environmental procedures.
7. Storm water permits
8. Dredge and fill permits
9. RCRA hazardous and non-hazardous solid waste requirements
10. Oil spill requirements for construction activities
11. Polychlorinated biphenyl (PCB) waste requirements
12. Air quality requirements
13. Asbestos requirements for construction activities
SECTION 01 10 01 Page 8
14. National Environmental Policy Act (NEPA) requirements
15. Endangered Species Act
16. National Historic Preservation Act
17. Air Force Green Procurement Program
The Waste Management Plan and Indoor Air Quality Management Plan (IAQ) may be incorporated into the Environmental Protection Plan. If not incorporated into the Environmental Protection Plan, these plans will be submitted seperately and added to the required submittal list.
1.7 TECHNICAL DESIGN SUPPORT
A. The Contractor's in-house minimal design capabilities are of utmost importance. Areas of required minimal design competence shall include, but are not limited to: architectural, civil, structural, mechanical, electrical, and drafting/surveying capabilities. Minimal design effort is defined as the capability to provide builder's plans of the type routinely developed in commercial practice and/or as provided and supplemented by industry such as pre-engineered building manufacturers, major heating ventilating and air conditioning equipment suppliers, fire suppression system suppliers and similar suppliers and sources. The Contractor's staff should either include at least one registered Professional Engineer (PE) or architect well versed in multi-discipline design and construction or have an established relationship with an A/E firm to provide professional services when required. The Contractor shall have a person proficient in the use of AutoCAD computer aided drafting software on staff at all times. Contractor design personnel shall be proficient in the requirements and application of all codes (building, environmental, safety, etc.) related to the work included in each specific Task Order.
Contractor shall supplement in-house staffing whenever necessary to provide personnel and/or services required to meet code requirements (i.e.
asbestos or lead abatement) related to specific Task Order requirements.
B. Contractor shall provide design support producing an accurate, complete, code compliant, and cost effective product for several task orders simultaneoulsy within the time constraints specified by the Contract and specific Task Order. The Contractor shall be responsible for full development of the Government's intitial concept design to a point where the Contractor's design and construction documents (including drawings) clearly indicate the proposed method of accomplishing the work including description, size, and location of all proposed elements of the work. The Contractors' design must fully comply with the Government's intitial concept design requirements as well as all applicable federal, state, regional, and local governing code requirements. The Contractor shall comply with Goodfellow AFB design standards and shall use recognized industry standard practice in determining the proposed construction materials and methods.
C. The Contractor shall be capable of providing accurate construction surveys required to lay out the project work. Contractor shall provide elevation surveys as required for grading and drainage. Contractor shall provide accurate existing and new survey information including elevations in the as-built drawings.
1.8 MINIMUM ON-SITE PERSONNEL
Contractor shall provide as a minimum the following personnel on-site at all times during normal duty hours.
A. Contractor's Project Manager (CPM) B. Contractor's Site Superintendent (Quantity of personnel shall be
SECTION 01 10 01 Page 9 sufficient to ensure coordination and supervision of work including timely completion of all project documentation and reporting requirements. ) C. Quality Control and Safety Manager
1.9 1.4 CONTRACTOR'S OFFICE
A. Contractor's office shall be located on-base.
B. The items listed below will be furnished for use in the operation of the SABER Contract without cost to the contractor. Any other equipment, such as communications and material handling equipment other than referenced below, and administrative supplies necessary for contractor operation will be furnished by the contractor at the Contractor's expense.
The government furnished items listed below will not be used for any purpose other than fulfilling the requirements of this contract.
(a) Land - Space to install office. Typically 100' x 100' but will vary depending on availability and proximity to utilities.
(b) Utilities (Water, electricity, and sewer). Contractor is responsible for costs incurred to connect and disconnect from utilities. Refer to paragraph titled "Availability and Use of Utility Services in this Section of the Specifications.
(c) Outside storage space, as designated by the Contracting Officer.
C. The Government shall provide a space for the Contractor to set their office trailer to conduct business on this SABER contract. Contractor shall be responsible for all expenses associated with connection to and disconnection from utilities. No other business transactions, of any type, may be conducted out of that office. The Contractor is responsible for providing a commercial telephone service. Any other equipment, such as communications and material handling equipment, and administrative supplies necessary for contractor operation will be furnished at the Contractor's expense.
D. The Contractor shall maintain their office area in a clean condition and free from clutter. The Contractor shall furnish thier own housekeeping and janitorial services for the SABER office space. The Contractor is required to maintain the facilities in a neat appearance at all times.
E. The Government is not liable for the theft, vandalism or damage of any Contractor supplies or equipment. Contractor shall be responsible for securing their office facilities.
1.10 1.5 COMPUTER REQUIREMENTS
A. Hardware - The Contractor shall provide, install and maintain their own computer hardware as required for all management, communication, cost estimating, scheduling and other tasks to the Contractor's obligations under the SABER contract.
B. The Contractor will provide, install and maintain their own software required for management, communication, cost estimating, scheduling and other tasks to the Contractor's obligations under the SABER contract.
SECTION 01 10 01 Page 10
1) Cost Estimating Software - The Government utilizes 4Clicks estimating software with RSMeans Cost Data. The Contractor's cost estimating software must be capable of providing electronic data file transfer capability to the Contracting Officer that is 100% compatible with the Government's estimating software. The Contractor's cost database must utilize RSMeans Cost Data of the version required at award of the SABER contract and updated at Contractor's expense for each Option Period. Standard of 100% compatibility will require that the Contractor's software provide electronic data files to the Contracting Officer that do not require any manipulation or modification by the Government in order to be imported directly into the Government's software for technical and cost estimating evaluation purposes. The Contractor's software shall be capable of providing hard copy reports in the format and detail directed by the Contracting Officer.
2) Computer Aided Drafting Software - The Government utilizes AutoCAD
SECTION 01 10 01 Page 11 computer aided drafting software. The Contractor shall provide to the Contracting Officer electronic drawings that are 100% compatible with AutoCAD software. Standard of 100% compatibility will require that the Contractor's software provide electronic data files to the Contracting Officer that do not require any manipulation or modification by the Government in order to be fully utilized in AutoCAD software. This applies to all standard AutoCAD features including but not limited to layering, fonts, formats, data linkage, colors, blocks, fill patterns, tables, backgrounds, etc.
1.11 1.6 COMMUNICATION REQUIREMENTS
A. Telephone - The Contractor shall provide and maintain a two way voice communication system for all supevisory personnel and the SABER office. Cell phones meet this requirement. The Contractor's office telephone number and supervisor cell phone numbers shall be set up to ensure that the Government will not incur any toll charges during communication with these devices when called locally from Goodfellow
AFB.
B. Daily Correspondence - A Contractor employee shall visit the 17th Contracting Squadron, Bldg 707, at least once each workday for distribution of correspondence.
C. The Contractor shall establish and maintain electronic mail (e-mail) capability along with the capability to open various electronic attachments in Microsoft, Adobe Acrobat, and other similar formats.
Within 10 days after contract award, the Contractor shall provide the Contracting Officer a single (only one) e-mail address for official electronic communications from the Contracting Officer related to this contract including, but not limited to contract documents, invoice information, request for proposals, and other correspondence. The Contracting Officer may also use email to notify the Contractor of base access conditions when emergency conditions warrant, such as hurricanes, terrorist threats, etc.
D. It is the Contractor's responsibility to make timely distribution of all Contracting Officer initiated e-mail with its own organization including field office(s). The Contractor shall promptly notify the Contracting Officer, in writing, of any changes to this email address.
1.12 PROPERTY CONTROL RECORDS
1.12.1 1.7.1 Government Furnished Material and Equipment
If applicable, per specific Task Order requirements the Government may furnish some quantities of materials and equipment for installation by the Contractor. The Contractor shall abide by Federal Acquistion Regulation (FAR)52.245-1 and 52.245-9 in the handling of all Government provided material and equipment.
Some quantities may be estimates and will be identified as such. It is the intention of the Government to furnish all quantities of the estimated items required to complete the work as specified and the various quantities will be adjusted when necessary.
Quantities not identified as estimates are all that will be furnished by the Government. Contractor shall furnish any additional quantities required.
SECTION 01 10 01 Page 12
1.12.2 Government Furnished Material and Equipment Delivery Schedule
Notify the Contracting Officer in writing at least 30 calendar days in advance of the date on which the Government furnished materials and equipment are required. Pick up materials and equipment no later than 30 calendar days after such date. When materials and equipment are not picked up by the 30th day, the Contractor will be charged for storage at a reasonable rate set by the Contracting Officer per 100 pounds or cubic feet per month or fraction thereof.
1.12.3 Delivery Location
The materials and equipment will be located at a site on-base designated by the Contracting Officer for Contractor to pick up and transport to work site..
1.13 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION
(a) The Contractor shall keep on the work site a copy of the drawings and specifications and shall at all times give the Contracting Officer access thereto. Anything mentioned in the specifications and not shown on the drawings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference between drawings and specifications, the specifications shall govern. In case of discrepancy in the figures, in the drawings, or in the specifications, the matter shall be promptly submitted to the Contracting Officer, who shall promptly make a determination in writing. Any adjustment by the Contractor without such a determination shall be at its own risk and expense. The Contracting Officer shall furnish from time to time such detailed drawings and other information as considered necessary, unless otherwise provided.
(b) Wherever in the specifications or upon the drawings the words “directed,” “required,” “ordered,” “designated,” “prescribed,” or words of like import are used, it shall be understood that the “direction,” “requirement,” “order,” “designation,” or “prescription,” of the Contracting Officer is intended and similarly the words “approved,” “acceptable,” “satisfactory,” or words of like import shall mean “approved by,” or “acceptable to,” or “satisfactory to” the Contracting Officer, unless otherwise expressly stated.
(c) Where “as shown,” “as indicated,” “as detailed,” or words of similar import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise. The word “provided” as used herein shall be understood to mean “provide complete in place,” that is “furnished and installed.”
(d) Shop drawings means drawings, submitted to the Government by the Contractor, subcontractor, or any lower tier subcontractor pursuant to a construction contract, showing in detail (1) the proposed fabrication and assembly of structural elements, and (2) the installation (i.e., fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the contractor to explain in detail specific portions of the work required by the contract. The Government may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.
SECTION 01 10 01 Page 13
(e) The Contractor shall coordinate all shop drawings and review them for accuracy, completeness, and compliance with contract requirements and shall indicate its approval thereon as evidence of such coordination and review. Shop drawings submitted to the Contracting Officer without evidence of the Contractor’s approval may be returned for resubmission. The Contracting Officer will indicate an approval or disapproval of the shop drawings and if not approved as submitted shall indicate the Government’s reasons therefor. Any work done before such approval shall be at the Contractor’s risk. Approval by the Contracting Officer shall not relieve the Contractor from responsibility for any errors or omissions in such drawings, nor from responsibility for complying with the requirements of this contract, except with respect to variations described and approved in accordance with (f) of this clause.
(f) If shop drawings show variations from the contract requirements, the Contractor shall describe such variations in writing, separate from the drawings, at the time of submission. If the Contracting Officer approves any such variation, the Contracting Officer shall issue an appropriate contract modification, except that, if the variation is minor or does not involve a change in price or in time of performance, a modification need not be issued.
(g) The Contractor shall submit to the Contracting Officer for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. Three sets (unless otherwise indicated) of all shop drawings, will be retained by the Contracting Officer and one set will be returned to the Contractor.
As applicable per specific task order requirements, the Government may provide when available project concept and as-built drawings in electronic format. Typical Government format for electronic drawings are Adobe (pdf) or AutoCAD (dwg). Many of the older as-built drawings were in hard copy format only and these drawings were electronically scanned into Adobe (pdf) format.
Contractor shall immediately check furnished drawings and notify the Government of any discrepancies. Contractor shall be responsible for confirming all dimensions and other documentation relied upon by the Contractor in the performance of the work.
Data contained on Government furnished electronic drawing files or hard copy drawings shall not be used for any purpose other than as a convenience in the preparation of construction data for the referenced project. Any other use or reuse shall be at the sole risk of the Contractor and without liability or legal exposure to the Government. The Contractor shall make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the Government, its agents or sub consultants that may arise out of or in connection with the use of these electronic files. The Contractor shall, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.
Government furnished electronic as-built drawing files or hard copy as-built drawings are not construction documents. Differences may exist
SECTION 01 10 01 Page 14 between the files and the corresponding construction documents. The Government makes no representation regarding the accuracy or completeness of the electronic files, nor does it make representation to the compatibility of these files with the Contractors hardware or software.
In the event that a conflict arises between the signed and sealed construction documents prepared by the Government and the furnished CADD files, the signed and sealed construction documents shall govern. The Contractor is responsible for determining if any conflict exists. Use of these CADD files does not relieve the Contractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordinate the work of all contractors for the project.
If the Contractor uses, duplicates and/or modifies these electronic drawing files for use in producing construction drawings and data related to this contract, all previous indicia of ownership seals, logos, signatures, initials and dates) shall be removed.
Contractor generated drawings (shop, record and as-built) shall be in AutoCAD dwg format conforming to the version currently in use by the Government. The current version shall be verified through the
Contractor shall provide drawings in accordance with the current Goodfellow AFB Construction Drawing Standards. A copy of the current standard is available through the Contracting Officer.
1.14 SEQUENCING AND SCHEDULING
A. The Contractor shall submit four (4) copies of AF Form 3064, Contract Progress Schedule and four (4) copies AF Form 3065, Contract Progress Reportin accordance with FAR 52.236-15, Schedules for Construction Contracts. The AF Form 3064, Contract Progress Schedule shall be submitted for approval within five (5) days after Notice to Proceed (NTP). If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
B. Update and submit four (4) copies of AF Form 3064, Contract Progress Schedule at monthly intervals or when the schedule has been revised. The updated schedule shall be kept current, reflecting actual activity progress and plan for completing the remaining work. Submit copies of purchase orders and confirmation of delivery dates as directed by the Contracting Officer.
C. The Contractor shall submit four (4) copies of AF Form 3065, Contract Progress Report with each payment request.
D. If, in the opinion of the Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the Government. In this circumstance, the Contracting Officer may require the Contractor to increase the number of shifts, overtime operations, days of work, and/or the amount of construction plant, and to submit for approval any supplementary schedules as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
E. The Contractor shall schedule work concurrently on all active TO's, without extending performance periods due to insufficient resources. The
SECTION 01 10 01 Page 15
Contractor will not move crews around constantly while making minimal progress on numerous projects. This is perceived as having an inadequate work force to fulfill the requirements of the contract.
F. When specifically requested by the Government prior to completion of negotiations for a TO, the work shall, so far as practicable, be done in phases, definite sections or confined to limited areas which shall be completed before work in other areas is begun. These areas shall be clearly annotated on the Contractor's construction drawings. The work areas may be occupied or unoccupied.
G. Delivery of materials and equipment shall be made with a minimum of interference to Government operations and personnel.
H. Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
Refer to Section 01 33 00 for additonal submittal requirements.
1.15 SUPERINTENDENCE BY THE CONTRACTOR
At all times during performance of this contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor.
1.16 QUALITY ASSURANCE
Refer to Section 01 45 00.10 20 Quality Control for Construction.
1.17 EXISTING WORK
1.17.1 Protection of Government Property
The Contractor shall:
(a) Preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.
(b) Protect from damage all existing improvements and utilities (1) at or near the work site, and (2) on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, SECTION 01 10 01 Page 16 resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
Plants which are damaged during construction shall be replaced at no expense to the government with a 1 year warranty following replacement.
Replacement plantings shall be accomplished between November 1 and April
1. Damaged trees shall be replaced with Class I trees, a minimum 2" caliper. Damaged shrubs or hedges shall be replaced with plants of equal size, type, and value.
The Contracting Officer or designated representative will determine the extent of damage in accordance with National Arborist Association Standards, and American Standard for Nursery Stock.
The Contractor shall take appropriate actions to protect the condition of existing paved surfaces. No open cutting of any paved surface will be allowed without prior written approval from the Contracting Officer.
1.17.2 Protection of Historical and Archeological Resources
All known Historical, Archaeological, and Cultural Resources, if any, within the Contractors work area will be designated on the contract Technical Exhibits. The Contractor shall take precautions during the contract to preserve all resources, as they existed at the time of contract award and comply with the Archaeological and Historic Preservation Act (AHPA) and the Archaeological Resources Protection Act (ARPA). The Contractor shall provide all protective devices such as off limit markings, fencing, barricades or other devices as designated on the contract Technical Exhibits and shall be responsible for preservation of the sites during this contract.
All items having any apparent historical or archaeological interest outside of designated areas that are discovered in the course of any construction activities shall be carefully preserved. The Contractor shall protect the find in-place by leaving the archaeological find undisturbed and by using flags to mark a 50-foot radius area around the find. The find shall be immediately reported to the Contracting Officer so that the proper authorities may be notified. All work shall be stopped in the immediate area of the discovery until directed by the Contracting Officer to resume work. Any work required to preserve or protect these finds shall be accomplished before work resumes.
1.18 WORK PLAN
The Contractor shall submit a Work Plan in writing with appropriate drawings for approval by the Contracting Officer fourteen (14) calendar days in advance of Notice to Proceed. The Work Plan shall include as a minimum:
a) Contractor's initial sequence and scheduling plan.
1) Sequence of Procedure.
2) Work Schedule.
b) Traffic Plan.
c) Construction Site Plan
The plan shall address Contractor employee and company vehicle parking, SECTION 01 10 01 Page 17 means of access to the facility, interior and exterior space for storage of materials and equipment and use of facility approaches, corridors, elevators and stairways.
Refer to paragraph titled "Construction Site Plan" in Section 01 50 00
TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS.
1.18.1 Standard and Non-Standard Work Hours
Hours of work shall be as defined in the Contract.
(1) Standard Working Hours (also referred to as Normal Duty Hours).
The Contractor shall normally perform tasks during the standard working period of 7:30 a.m. to 4:30 p.m., Monday through Friday, excluding federal holidays and Family Days. The Contractor may elect, at his option and at no additional cost to the Government, to work hours other than standard working hours provided that (a) the request is submitted in writing at least four (4) full work days in advance of the desired date, and (b) the Contracting Officer approves the request.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .