FA3030-14-R-0004-Conformed_through_Amendment_0003.pdf
PDF 445 KB Posted
- Attached to
- Simplified Acquisition of Base Engineering Requirements (SABER) IDIQ for Goodfellow AFB, TX 76908
- Solicitation number
- FA3030-14-R-0004
About this file
This conformed copy of the RFP is provided for your convienience and does not require acknowledgement.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA3030-14-R-0004-0003
Simplif ied Acquisition of Base Engineering Requirements (SABER) IDIQ at Goodfellow AFB, TX and the Goodfellow AFB Recreation Camp.
-Enter coeff icient in Section B using type w riter or black ink. Additionally, electronic means of coefficient insertion such as PDF text are acceptable.
-See Section L regarding site visit information.
-Verbal explanations given before aw ard w ill NOT be binding. Any authorized changes to this solicitation w ill be made in w riting by issuing an amendment(s) to the offeror. Offeror shall acknow ledge receipt of amendment(s) in block 19 of SF Form 1442 or by returning a signed copy of the amendment(s) w ith the offeror.
-Section F regarding period of contract and performance.
-See Section B regarding minimum contract value.
-This acquisition is limited to those w ith a bona f ide business presence in the state of Texas IAW 10 USC 2304(c) (5).
-Disclosure of Magnitude of Construction Projects: The magnitude of this solicitation is more than $10,000,000.
-CO: C20 NAICS: 236220 (SIC:1542) Size Std: $33,500,000.
DANIEL R. KENT (325) 654-4766
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
18-Jun-2014
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________2 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________18 Jul 2014 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
17TH CONTRACTING SQUADRON -FA3030
210 SCHERZ BLVD
BRENDA.SIZEMORE.1@US.AF.MIL
GOODFELLOW AFB TX 76908-4705
FA3030
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
03:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
(325) 654-5052FAX:TEL: (325) 654-3821 TEL: FAX:
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA3030-14-R-0004
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Basic Period, Under $200K
FFP
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.
FOB: Destination
NSN: Z2JZ-CO-NST-RUCT
SIGNAL CODE: A
NET AMT
0001AA 15 Lot Standard Hours, Non-Secure
FFP
Under $200K
Coefficient __________ FOB: Destination
0001AB 5 Lot Standard Hours, Secure
FFP
Under $200K
Coefficient __________ FOB: Destination
0001AC 1 Lot NonStandard Hours, NonSecure
FFP
Under $200K
Coefficient __________ FOB: Destination
0001AD 1 Lot NonStandard Hours, Secure
FFP
Under $200K
Coefficient __________ FOB: Destination
Basic Period, $200K-$500K
FFP
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.
FOB: Destination
0002AA 5 Lot Standard Hours, Non-Secure
FFP
$200K to $500K
Coefficient __________ FOB: Destination
0002AB 1 Lot Standard Hours, Secure
FFP
$200K to $500K
Coefficient __________ FOB: Destination
0002AC 1 Lot NonStandard Hours, NonSecure
FFP
$200K to $500K
Coefficient __________ FOB: Destination
0002AD 1 Lot NonStandard Hours, Secure
FFP
$200K to $500K
Coefficient __________ FOB: Destination
Basic Period, Over $500K
FFP
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.
FOB: Destination
0003AA 2 Lot Standard Hours, Non-Secure
FFP
Over $500K
Coefficient __________ FOB: Destination
0003AB 1 Lot Standard Hours, Secure over $500K
FFP
Over $500K
Coefficient __________ FOB: Destination
0003AC 1 Lot NonStandard Hours, NonSecure
FFP
Over $500K
Coefficient __________ FOB: Destination
0003AD 1 Lot NonStandard Hours, Secure
FFP
Over $500K
Coefficient __________ FOB: Destination
0004 1 Lot Base Period, Non-Prepriced Items (NPI's)
FFP
Non-Prepriced Items (NPI's) FOB: Destination
OPTION Option Period 1, Under $200K
FFP
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.
FOB: Destination
1001AA 15 Lot OPTION Standard Hours, Non-Secure
FFP
Under $200K
Coefficient __________ FOB: Destination
1001AB 5 Lot OPTION Standard Hours, Secure
FFP
Under $200K
Coefficient __________ FOB: Destination
1001AC 1 Lot OPTION NonStandard Hours, NonSecure
FFP
Under $200K
Coefficient __________ FOB: Destination
1001AD 1 Lot OPTION NonStandard Hours, Secure
FFP
Under $200K
Coefficient __________ FOB: Destination
OPTION Option Period 1, $200K-$500K
FFP
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.
FOB: Destination
1002AA 5 Lot OPTION Standard Hours, Non-Secure
FFP
$200K-$500K
Coefficient __________ FOB: Destination
1002AB 1 Lot OPTION Standard Hours, Secure
FFP
$200K-$500K
Coefficient __________ FOB: Destination
1002AC 1 Lot OPTION NonStandard Hours, NonSecure
FFP
$200K-$500K
Coefficient __________ FOB: Destination
1002AD 1 Lot OPTION NonStandard Hours, Secure
FFP
$200K-$500K
Coefficient __________ FOB: Destination
OPTION Option Period 1, Over $500K
FFP
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.
FOB: Destination
1003AA 2 Lot OPTION Standard Hours, Non-Secure
FFP
Over $500K
Coefficient __________ FOB: Destination
1003AB 1 Lot OPTION Standard Hours, Secure
FFP
Over $500K
Coefficient __________ FOB: Destination
1003AC 1 Lot OPTION NonStandard Hours, NonSecure
FFP
Over $500K
Coefficient __________ FOB: Destination
1003AD 1 Lot OPTION NonStandard Hours, Secure
FFP
Over $500K
Coefficient __________ FOB: Destination
1004 1 Lot OPTION Option 1, Non-Prepriced Items (NPI's)
FFP
Non-Prepriced Items (NPI's) FOB: Destination
OPTION Option Period 2, Under $200K
FFP
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.
FOB: Destination
2001AA 15 Lot OPTION Standard Hours, Non-Secure
FFP
Under $200K
Coefficient __________ FOB: Destination
2001AB 5 Lot OPTION Standard Hours, Secure
FFP
Under $200K
Coefficient __________ FOB: Destination
2001AC 1 Lot OPTION NonStandard Hours, NonSecure
FFP
Under $200K
Coefficient __________ FOB: Destination
2001AD 1 Lot OPTION NonStandard Hours, Secure
FFP
Under $200K
Coefficient __________ FOB: Destination
OPTION Option Period 2, $200K-$500K
FFP
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.
FOB: Destination
2002AA 5 Lot OPTION Standard Hours, Non-Secure
FFP
$200K-$500K
Coefficient __________ FOB: Destination
2002AB 1 Lot OPTION Standard Hours, Secure
FFP
$200K-$500K
Coefficient __________ FOB: Destination
2002AC 1 Lot OPTION NonStandard Hours, NonSecure
FFP
$200K-$500K
Coefficient __________ FOB: Destination
2002AD 1 Lot OPTION NonStandard Hours, Secure
FFP
$200K-$500K
Coefficient __________ FOB: Destination
OPTION Option Period 2, Over $500K
FFP
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.
FOB: Destination
2003AA 2 Lot OPTION Standard Hours, Non-Secure
FFP
Over $500K
Coefficient __________ FOB: Destination
2003AB 1 Lot OPTION Standard Hours, Secure
FFP
Over $500K
Coefficient __________ FOB: Destination
2003AC 1 Lot OPTION NonStandard Hours, NonSecure
FFP
Over $500K
Coefficient __________ FOB: Destination
2003AD 1 Lot OPTION NonStandard Hours, Secure
FFP
Over $500K
Coefficient __________ FOB: Destination
2004 1 Lot OPTION Option 2, Non-Prepriced Items (NPI's)
FFP
Non-Prepriced Items (NPI's) FOB: Destination
OPTION Option Period 3, Under $200K
FFP
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.
FOB: Destination
3001AA 15 Lot OPTION Standard Hours, Non-Secure
FFP
Under $200K
Coefficient __________ FOB: Destination
3001AB 5 Lot OPTION Standard Hours, Secure
FFP
Under $200K
Coefficient __________ FOB: Destination
3001AC 1 Lot OPTION NonStandard Hours, NonSecure
FFP
Under $200K
Coefficient __________ FOB: Destination
3001AD 1 Lot OPTION NonStandard Hours, Secure
FFP
Under $200K
Coefficient __________ FOB: Destination
OPTION Option Period 3, $200K-$500K
FFP
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.
FOB: Destination
3002AA 5 Lot OPTION Standard Hours, Non-Secure
FFP
$200K-$500K
Coefficient __________ FOB: Destination
3002AB 1 Lot OPTION Standard Hours, Secure
FFP
$200K-$500K
Coefficient __________ FOB: Destination
3002AC 1 Lot OPTION NonStandard Hours, NonSecure
FFP
$200K-$500K
Coefficient __________ FOB: Destination
3002AD 1 Lot OPTION NonStandard Hours, Secure
FFP
$200K-$500K
Coefficient __________ FOB: Destination
OPTION Option Period 3, Over $500K
FFP
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.
FOB: Destination
3003AA 2 Lot OPTION Standard Hours, Non-Secure
FFP
Over $500K
Coefficient __________ FOB: Destination
3003AB 1 Lot OPTION Standard Hours, Secure
FFP
Over $500K
Coefficient __________ FOB: Destination
3003AC 1 Lot OPTION NonStandard Hours, NonSecure
FFP
Over $500K
Coefficient __________ FOB: Destination
3003AD 1 Lot OPTION NonStandard Hours, Secure
FFP
Over $500K
Coefficient __________ FOB: Destination
3004 1 Lot OPTION Option 3, Non-Prepriced Items (NPI's)
FFP
Non-Prepriced Items (NPI's) FOB: Destination
OPTION Option Period 4, Under $200K
FFP
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.
FOB: Destination
4001AA 15 Lot OPTION Standard Hours, Non-Secure
FFP
Under $200K
Coefficient __________ FOB: Destination
4001AB 5 Lot OPTION Standard Hours, Secure
FFP
Under $200K
Coefficient __________ FOB: Destination
4001AC 1 Lot OPTION NonStandard Hours, NonSecure
FFP
Under $200K
Coefficient __________ FOB: Destination
4001AD 1 Lot OPTION NonStandard Hours, Secure
FFP
Under $200K
Coefficient __________ FOB: Destination
OPTION Option Period 4, $200K-$500K
FFP
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.
FOB: Destination
4002AA 5 Lot OPTION Standard Hours, Non-Secure
FFP
$200K-$500K
Coefficient __________ FOB: Destination
4002AB 1 Lot OPTION Standard Hours, Secure
FFP
$200K-$500K
Coefficient __________ FOB: Destination
4002AC 1 Lot OPTION NonStandard Hours, NonSecure
FFP
$200K-$500K
Coefficient __________ FOB: Destination
4002AD 1 Lot OPTION NonStandard Hours, Secure
FFP
$200K-$500K
Coefficient __________ FOB: Destination
OPTION Option Period 4, Over $500K
FFP
Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;
consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.
FOB: Destination
4003AA 2 Lot OPTION Standard Hours, Non-Secure
FFP
Over $500K
Coefficient __________ FOB: Destination
4003AB 1 Lot OPTION Standard Hours, Secure
FFP
Over $500K
Coefficient __________ FOB: Destination
4003AC 1 Lot OPTION NonStandard Hours, NonSecure
FFP
Over $500K
Coefficient __________ FOB: Destination
4003AD 1 Lot OPTION NonStandard Hours, Secure
FFP
Over $500K
Coefficient __________ FOB: Destination
4004 1 Lot OPTION Option 4, Non-Prepriced Items (NPI's)
FFP
Non-Prepriced Items (NPI's) FOB: Destination
SUPPLIES AND SERVICES
(a) Bare Cost Total in the current year’s RSMeans (Computerized Pricing Guide – CPG) cost estimating database compatible with e4Clicks Premier and Assemblies, Facilities and Master Composite (e4Clicks P/N E4CBundle-010) shall be referred to as the Unit Price Book (UPB). Additionally, the Bare Costs listed in the UPB listed above will not be localized.
(b) PRICING COEFFICIENTS: The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The Offeror’s coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S. Means costs data books listed in paragraph (a), above, general & administrative expense; overhead; profit; project direct costs; bond premiums;
licenses; certification; protection or moving of Government property; mobilization and demobilization expense;
engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder’s risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision;
paperwork/reports associated with the contract; consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. The coefficients will not be localized and are not subject to economic price adjustments. The coefficients will remain unchanged under the terms and conditions of the contract.
The categories of pricing coefficients in this contract are based on work hours, location of the work and bare cost dollar value. If a task order includes work that has more than one applicable pricing coefficient category, then the coefficient will be determined based on the preponderance of the work and applied to the total direct costs.
(c) Hours of Work shall be defined as follows:
(1) Standard Working Hours (also referred to as Normal Duty Hours). The Contractor shall normally perform tasks during the standard working period of 7:30 a.m. to 4:30 p.m., Monday through Friday, excluding federal holidays and Family Days (see Section F, paragraph entitled “NORMAL WORK HOURS”). The Contractor may elect, at his option and at no additional cost to the Government, to work hours other than standard working hours provided that (a) the request is submitted in writing at least three (3) full work days in advance of the desired date, and (b) the Contracting Officer approves the request. Non-standard hours worked at the convenience of the Contractor and with the approval of the Contracting Officer will be at a standard hours coefficient.
(2) Non-Standard Working Hours. Non-standard working hours are defined as the period from 4:30 p.m. to 7:30 a.m., Monday through Friday, as well as weekends and federal holidays. Items of work to be accomplished during non-standard hours shall be clearly identified in contractor technical/cost proposals, including justification for the request. Non-standard hours, worked without the express approval of the Contracting Officer, will be at the coefficient for standard hours. Non-Standard work hours requested by the Government will be stated on the Request for Proposal. Task Orders subject to an accelerated construction schedule may also have the non-standard working hours coefficient applied to the Task Order (TO) items.
(d) Work Areas shall be defined as follows:
(1) Secured Area. USAF Controlled access areas are the higher-level security areas. Presence within these controlled access areas is by escort; and the movement of authorized personnel in and out of these areas is limited.
Contractor personnel are permitted access to these areas on a need basis only.
(2) Non-Secured Area. The lowest level of security exists in general access areas. These areas are all of Goodfellow AFB outside of the USAF Controlled areas.
(e) Clauses and provisions in this document will be numbered in sequence, but will not necessarily appear in consecutive order.
(f) Sections K, L and M will be deemed incorporated in the resultant award, by reference.
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$125,000.00 $16,000,000.00
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
$15,000.00 $750,000.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
0001AA
0001AB
0001AC
0001AD
0002AA
0002AB
0002AC
0002AD
0003AA
0003AB
0003AC
0003AD
1001AA
1001AB
1001AC
1001AD
1002AA
1002AB
1002AC
1002AD
1003AA
1003AB
1003AC
1003AD
2001AA
2001AB
2001AC
2001AD
2002AA
2002AB
2002AC
2002AD
2003AA
2003AB
2003AC
2003AD
3001AA
3001AB
3001AC
3001AD
3002AA
3002AB
3002AC
3002AD
3003AA
3003AB
3003AC
3003AD
4001AA
4001AB
4001AC
4001AD
4002AA
4002AB
4002AC
4002AD
4003AA
4003AB
4003AC
4003AD
Section C - Descriptions and Specifications
DESCRIPTION/SPECIFICATIONS
SPECIFICATIONS: SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS CONTRACT
The Technical Specifications are numbered and organized by the 2010 edition of the Construction Specifications Institute’s (CSI) Master Format. All specifications are filed in Divisions 1 through 33 as per CSI guidelines. See Attachment 4 – Specifications.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0001AA Destination Government Destination Government 0001AB Destination Government Destination Government 0001AC Destination Government Destination Government 0001AD Destination Government Destination Government 0002 Destination Government Destination Government 0002AA Destination Government Destination Government 0002AB Destination Government Destination Government 0002AC Destination Government Destination Government 0002AD Destination Government Destination Government 0003 Destination Government Destination Government 0003AA Destination Government Destination Government 0003AB Destination Government Destination Government 0003AC Destination Government Destination Government 0003AD Destination Government Destination Government 0004 Destination Government Destination Government 1001 Destination Government Destination Government 1001AA Destination Government Destination Government 1001AB Destination Government Destination Government 1001AC Destination Government Destination Government 1001AD Destination Government Destination Government 1002 Destination Government Destination Government 1002AA Destination Government Destination Government 1002AB Destination Government Destination Government 1002AC Destination Government Destination Government 1002AD Destination Government Destination Government 1003 Destination Government Destination Government 1003AA Destination Government Destination Government 1003AB Destination Government Destination Government 1003AC Destination Government Destination Government 1003AD Destination Government Destination Government 1004 Destination Government Destination Government 2001 Destination Government Destination Government 2001AA Destination Government Destination Government 2001AB Destination Government Destination Government 2001AC Destination Government Destination Government 2001AD Destination Government Destination Government 2002 Destination Government Destination Government 2002AA Destination Government Destination Government 2002AB Destination Government Destination Government 2002AC Destination Government Destination Government 2002AD Destination Government Destination Government
2003 Destination Government Destination Government 2003AA Destination Government Destination Government 2003AB Destination Government Destination Government 2003AC Destination Government Destination Government 2003AD Destination Government Destination Government 2004 Destination Government Destination Government 3001 Destination Government Destination Government 3001AA Destination Government Destination Government 3001AB Destination Government Destination Government 3001AC Destination Government Destination Government 3001AD Destination Government Destination Government 3002 Destination Government Destination Government 3002AA Destination Government Destination Government 3002AB Destination Government Destination Government 3002AC Destination Government Destination Government 3002AD Destination Government Destination Government 3003 Destination Government Destination Government 3003AA Destination Government Destination Government 3003AB Destination Government Destination Government 3003AC Destination Government Destination Government 3003AD Destination Government Destination Government 3004 Destination Government Destination Government 4001 Destination Government Destination Government 4001AA Destination Government Destination Government 4001AB Destination Government Destination Government 4001AC Destination Government Destination Government 4001AD Destination Government Destination Government 4002 Destination Government Destination Government 4002AA Destination Government Destination Government 4002AB Destination Government Destination Government 4002AC Destination Government Destination Government 4002AD Destination Government Destination Government 4003 Destination Government Destination Government 4003AA Destination Government Destination Government 4003AB Destination Government Destination Government 4003AC Destination Government Destination Government 4003AD Destination Government Destination Government 4004 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996 52.246-13 Inspection--Dismantling, Demolition, or Removal of
Improvements
AUG 1996
Section F - Deliveries or Performance
NORMAL WORKING HOURS
The contractor shall schedule all work to commence between the hours of 7:30 AM and 4:30 PM, Monday through Friday, except on the Federal holidays and days designated as “Family Days” by Air Education and Training Command (AETC) as listed below.