FA3030-14-R-0004.pdf

PDF 438 KB Posted

Attached to
Simplified Acquisition of Base Engineering Requirements (SABER) IDIQ for Goodfellow AFB, TX 76908
Solicitation number
FA3030-14-R-0004
Issued by

About this file

Please sign and return original and 2 copies of this solicitation.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Simplif ied Acquisition of Base Engineering Requirements (SABER) IDIQ at Goodfellow AFB, TX and the Goodfellow AFB Recreation Camp.

-Enter coeff icient in Section B using type w riter of black ink.

-See Section L regarding site visit information.

-Verbal explanations given before aw ard w ill NOT be binding. Any authorized changes to this solicitation w ill be made in w riting by issuing an amendment(s) to the offeror. Offeror shall acknow ledge receipt of amendment(s) in block 19 of SF Form 1442 or by returning a signed copy of the amendment(s) w ith the offeror.

-Section F regarding period of contract and performance.

-See Section B regarding minimum contract value.

-This acquisition is limited to those w ith a bona f ide business presence in the state of Texas IAW 10 USC 2304(c) (5).

-Disclosure of Magnitude of Construction Projects: The magnitude of this solicitation is more than $10,000,000.

-CO: C20 NAICS: 236220 (SIC:1542) Size Std: $33,500,000.

DANIEL R. KENT (325) 654-4766

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

18-Jun-2014

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________2 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________18 Jul 2014 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

17TH CONTRACTING SQUADRON -FA3030

210 SCHERZ BLVD

BRENDA.SIZEMORE.1@US.AF.MIL

GOODFELLOW AFB TX 76908-4705

FA3030

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

03:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

(325) 654-5052FAX:TEL: (325) 654-3821 TEL: FAX:

FA3030-14-R-0004 150

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

FA3030-14-R-0004

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Basic Period, Under $200K

FFP

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.

FOB: Destination

NSN: Z2JZ-CO-NST-RUCT

SIGNAL CODE: A

NET AMT

0001AA 15 Lot Standard Hours, Non-Secure

FFP

Under $200K

Coefficient __________% FOB: Destination

0001AB 5 Lot Standard Hours, Secure

FFP

Under $200K

Coefficient __________% FOB: Destination

0001AC 1 Lot NonStandard Hours, NonSecure

FFP

Under $200K

Coefficient __________% FOB: Destination

0001AD 1 Lot NonStandard Hours, Secure

FFP

Under $200K

Coefficient __________% FOB: Destination

Basic Period, $200K-$500K

FFP

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.

FOB: Destination

0002AA 5 Lot Standard Hours, Non-Secure

FFP

$200K to $500K

Coefficient __________% FOB: Destination

0002AB 1 Lot Standard Hours, Secure

FFP

$200K to $500K

Coefficient __________% FOB: Destination

0002AC 1 Lot NonStandard Hours, NonSecure

FFP

$200K to $500K

Coefficient __________% FOB: Destination

0002AD 1 Lot NonStandard Hours, Secure

FFP

$200K to $500K

Coefficient __________% FOB: Destination

Basic Period, Over $500K

FFP

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.

FOB: Destination

0003AA 2 Lot Standard Hours, Non-Secure

FFP

Over $500K

Coefficient __________% FOB: Destination

0003AB 1 Lot Standard Hours, Secure over $500K

FFP

Over $500K

Coefficient __________% FOB: Destination

0003AC 1 Lot NonStandard Hours, NonSecure

FFP

Over $500K

Coefficient __________% FOB: Destination

0003AD 1 Lot NonStandard Hours, Secure

FFP

Over $500K

Coefficient __________% FOB: Destination

0004 1 Lot Base Period, Non-Prepriced Items (NPI's)

FFP

Non-Prepriced Items (NPI's) FOB: Destination

OPTION Option Period 1, Under $200K

FFP

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.

FOB: Destination

1001AA 15 Lot OPTION Standard Hours, Non-Secure

FFP

Under $200K

Coefficient __________% FOB: Destination

1001AB 5 Lot OPTION Standard Hours, Secure

FFP

Under $200K

Coefficient __________% FOB: Destination

1001AC 1 Lot OPTION NonStandard Hours, NonSecure

FFP

Under $200K

Coefficient __________% FOB: Destination

1001AD 1 Lot OPTION NonStandard Hours, Secure

FFP

Under $200K

Coefficient __________% FOB: Destination

OPTION Option Period 1, $200K-$500K

FFP

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.

FOB: Destination

1002AA 5 Lot OPTION Standard Hours, Non-Secure

FFP

$200K-$500K

Coefficient __________% FOB: Destination

1002AB 1 Lot OPTION Standard Hours, Secure

FFP

$200K-$500K

Coefficient __________% FOB: Destination

1002AC 1 Lot OPTION NonStandard Hours, NonSecure

FFP

$200K-$500K

Coefficient __________% FOB: Destination

1002AD 1 Lot OPTION NonStandard Hours, Secure

FFP

$200K-$500K

Coefficient __________% FOB: Destination

OPTION Option Period 1, Over $500K

FFP

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.

FOB: Destination

1003AA 2 Lot OPTION Standard Hours, Non-Secure

FFP

Over $500K

Coefficient __________% FOB: Destination

1003AB 1 Lot OPTION Standard Hours, Secure

FFP

Over $500K

Coefficient __________% FOB: Destination

1003AC 1 Lot OPTION NonStandard Hours, NonSecure

FFP

Over $500K

Coefficient __________% FOB: Destination

1003AD 1 Lot OPTION NonStandard Hours, Secure

FFP

Over $500K

Coefficient __________% FOB: Destination

1004 1 Lot OPTION Option 1, Non-Prepriced Items (NPI's)

FFP

Non-Prepriced Items (NPI's) FOB: Destination

OPTION Option Period 2, Under $200K

FFP

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.

FOB: Destination

2001AA 15 Lot OPTION Standard Hours, Non-Secure

FFP

Under $200K

Coefficient __________% FOB: Destination

2001AB 5 Lot OPTION Standard Hours, Secure

FFP

Under $200K

Coefficient __________% FOB: Destination

2001AC 1 Lot OPTION NonStandard Hours, NonSecure

FFP

Under $200K

Coefficient __________% FOB: Destination

2001AD 1 Lot OPTION NonStandard Hours, Secure

FFP

Under $200K

Coefficient __________% FOB: Destination

OPTION Option Period 2, $200K-$500K

FFP

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.

FOB: Destination

2002AA 5 Lot OPTION Standard Hours, Non-Secure

FFP

$200K-$500K

Coefficient __________% FOB: Destination

2002AB 1 Lot OPTION Standard Hours, Secure

FFP

$200K-$500K

Coefficient __________% FOB: Destination

2002AC 1 Lot OPTION NonStandard Hours, NonSecure

FFP

$200K-$500K

Coefficient __________% FOB: Destination

2002AD 1 Lot OPTION NonStandard Hours, Secure

FFP

$200K-$500K

Coefficient __________% FOB: Destination

OPTION Option Period 2, Over $500K

FFP

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.

FOB: Destination

2003AA 2 Lot OPTION Standard Hours, Non-Secure

FFP

Over $500K

Coefficient __________% FOB: Destination

2003AB 1 Lot OPTION Standard Hours, Secure

FFP

Over $500K

Coefficient __________% FOB: Destination

2003AC 1 Lot OPTION NonStandard Hours, NonSecure

FFP

Over $500K

Coefficient __________% FOB: Destination

2003AD 1 Lot OPTION NonStandard Hours, Secure

FFP

Over $500K

Coefficient __________% FOB: Destination

2004 1 Lot OPTION Option 2, Non-Prepriced Items (NPI's)

FFP

Non-Prepriced Items (NPI's) FOB: Destination

OPTION Option Period 3, Under $200K

FFP

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.

FOB: Destination

3001AA 15 Lot OPTION Standard Hours, Non-Secure

FFP

Under $200K

Coefficient __________% FOB: Destination

3001AB 5 Lot OPTION Standard Hours, Secure

FFP

Under $200K

Coefficient __________% FOB: Destination

3001AC 1 Lot OPTION NonStandard Hours, NonSecure

FFP

Under $200K

Coefficient __________% FOB: Destination

3001AD 1 Lot OPTION NonStandard Hours, Secure

FFP

Under $200K

Coefficient __________% FOB: Destination

OPTION Option Period 3, $200K-$500K

FFP

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.

FOB: Destination

3002AA 5 Lot OPTION Standard Hours, Non-Secure

FFP

$200K-$500K

Coefficient __________% FOB: Destination

3002AB 1 Lot OPTION Standard Hours, Secure

FFP

$200K-$500K

Coefficient __________% FOB: Destination

3002AC 1 Lot OPTION NonStandard Hours, NonSecure

FFP

$200K-$500K

Coefficient __________% FOB: Destination

3002AD 1 Lot OPTION NonStandard Hours, Secure

FFP

$200K-$500K

Coefficient __________% FOB: Destination

OPTION Option Period 3, Over $500K

FFP

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.

FOB: Destination

3003AA 2 Lot OPTION Standard Hours, Non-Secure

FFP

Over $500K

Coefficient __________% FOB: Destination

3003AB 1 Lot OPTION Standard Hours, Secure

FFP

Over $500K

Coefficient __________% FOB: Destination

3003AC 1 Lot OPTION NonStandard Hours, NonSecure

FFP

Over $500K

Coefficient __________% FOB: Destination

3003AD 1 Lot OPTION NonStandard Hours, Secure

FFP

Over $500K

Coefficient __________% FOB: Destination

3004 1 Lot OPTION Option 3, Non-Prepriced Items (NPI's)

FFP

Non-Prepriced Items (NPI's) FOB: Destination

OPTION Option Period 4, Under $200K

FFP

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.

FOB: Destination

4001AA 15 Lot OPTION Standard Hours, Non-Secure

FFP

Under $200K

Coefficient __________% FOB: Destination

4001AB 5 Lot OPTION Standard Hours, Secure

FFP

Under $200K

Coefficient __________% FOB: Destination

4001AC 1 Lot OPTION NonStandard Hours, NonSecure

FFP

Under $200K

Coefficient __________% FOB: Destination

4001AD 1 Lot OPTION NonStandard Hours, Secure

FFP

Under $200K

Coefficient __________% FOB: Destination

OPTION Option Period 4, $200K-$500K

FFP

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.

FOB: Destination

4002AA 5 Lot OPTION Standard Hours, Non-Secure

FFP

$200K-$500K

Coefficient __________% FOB: Destination

4002AB 1 Lot OPTION Standard Hours, Secure

FFP

$200K-$500K

Coefficient __________% FOB: Destination

4002AC 1 Lot OPTION NonStandard Hours, NonSecure

FFP

$200K-$500K

Coefficient __________% FOB: Destination

4002AD 1 Lot OPTION NonStandard Hours, Secure

FFP

$200K-$500K

Coefficient __________% FOB: Destination

OPTION Option Period 4, Over $500K

FFP

Contractor shall furnish all labor, materials, equipment (to include safety equipment), tools, services, transportation, and supervision to perform all work required in accordance with the specifications, terms, and conditions of the contract. Bare Cost (material, equipment, and labor without any markups for subcontractor, sales tax, overhead, or profit), multiplied by the coefficient are used to arrive at the actual price for a unit of work. The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S.Means costs data books, general & administrative expense; overhead; profit; project direct costs; bond premiums; licenses; certification; protection or moving of Government property; mobilization and demobilization expense; engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder's risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision; paperwork/reports associated with the contract;

consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award.

FOB: Destination

4003AA 2 Lot OPTION Standard Hours, Non-Secure

FFP

Over $500K

Coefficient __________% FOB: Destination

4003AB 1 Lot OPTION Standard Hours, Secure

FFP

Over $500K

Coefficient __________% FOB: Destination

4003AC 1 Lot OPTION NonStandard Hours, NonSecure

FFP

Over $500K

Coefficient __________% FOB: Destination

4003AD 1 Lot OPTION NonStandard Hours, Secure

FFP

Over $500K

Coefficient __________% FOB: Destination

4004 1 Lot OPTION Option 4, Non-Prepriced Items (NPI's)

FFP

Non-Prepriced Items (NPI's) FOB: Destination

SUPPLIES AND SERVICES

(a) Bare Cost Total in the current year’s RSMeans (Computerized Pricing Guide – CPG) cost estimating database compatible with e4Clicks Premier and Assemblies, Facilities and Master Composite (e4Clicks P/N E4CBundle-010) shall be referred to as the Unit Price Book (UPB). Additionally, the Bare Costs listed in the UPB listed above will not be localized.

(b) PRICING COEFFICIENTS: The purpose of applying the coefficients to direct prepriced costs from the UPB is to compensate the contractor for his burden costs and profit for performance. The Offeror’s coefficient must be sufficient to cover all costs including but not limited to all costs listed in R.S. Means costs data books listed in paragraph (a), above, general & administrative expense; overhead; profit; project direct costs; bond premiums;

licenses; certification; protection or moving of Government property; mobilization and demobilization expense;

engineering/technical design support services; daily cleanup; payroll taxes (FICA, state and Federal unemployment taxes, employee training taxes, etc.); gross receipts tax; general conditions (superintendent salaries, builder’s risk insurance, etc.); site and home office overhead; wage determination differential; special clothing or equipment for workers; all insurance for all employees; portable toilets; flag persons; safety equipment; additional supervision;

paperwork/reports associated with the contract; consultant fees; on and off site storage; and all contingencies, as well as costs associated with compliance with environmental, labor and tax laws and all other contract requirements, as no allowances will be made after contract award. The coefficients will not be localized and are not subject to economic price adjustments. The coefficients will remain unchanged under the terms and conditions of the contract.

The categories of pricing coefficients in this contract are based on work hours, location of the work and bare cost dollar value. If a task order includes work that has more than one applicable pricing coefficient category, then the coefficient will be determined based on the preponderance of the work and applied to the total direct costs.

(c) Hours of Work shall be defined as follows:

(1) Standard Working Hours (also referred to as Normal Duty Hours). The Contractor shall normally perform tasks during the standard working period of 7:30 a.m. to 4:30 p.m., Monday through Friday, excluding federal holidays and Family Days (see Section F, paragraph entitled “NORMAL WORK HOURS”). The Contractor may elect, at his option and at no additional cost to the Government, to work hours other than standard working hours provided that (a) the request is submitted in writing at least three (3) full work days in advance of the desired date, and (b) the Contracting Officer approves the request. Non-standard hours worked at the convenience of the Contractor and with the approval of the Contracting Officer will be at a standard hours coefficient.

(2) Non-Standard Working Hours. Non-standard working hours are defined as the period from 4:30 p.m. to 7:30 a.m., Monday through Friday, as well as weekends and federal holidays. Items of work to be accomplished during non-standard hours shall be clearly identified in contractor technical/cost proposals, including justification for the request. Non-standard hours, worked without the express approval of the Contracting Officer, will be at the coefficient for standard hours. Non-Standard work hours requested by the Government will be stated on the Request for Proposal. Task Orders subject to an accelerated construction schedule may also have the non-standard working hours coefficient applied to the Task Order (TO) items.

(d) Work Areas shall be defined as follows:

(1) Secured Area. USAF Controlled access areas are the higher-level security areas. Presence within these controlled access areas is by escort; and the movement of authorized personnel in and out of these areas is limited.

Contractor personnel are permitted access to these areas on a need basis only.

(2) Non-Secured Area. The lowest level of security exists in general access areas. These areas are all of Goodfellow AFB outside of the USAF Controlled areas.

(e) Clauses and provisions in this document will be numbered in sequence, but will not necessarily appear in consecutive order.

(f) Sections K, L and M will be deemed incorporated in the resultant award, by reference.

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

$125,000.00 $16,000,000.00

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

$15,000.00 $750,000.00

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

0001AA

0001AB

0001AC

0001AD

0002AA

0002AB

0002AC

0002AD

0003AA

0003AB

0003AC

0003AD

1001AA

1001AB

1001AC

1001AD

1002AA

1002AB

1002AC

1002AD

1003AA

1003AB

1003AC

1003AD

2001AA

2001AB

2001AC

2001AD

2002AA

2002AB

2002AC

2002AD

2003AA

2003AB

2003AC

2003AD

3001AA

3001AB

3001AC

3001AD

3002AA

3002AB

3002AC

3002AD

3003AA

3003AB

3003AC

3003AD

4001AA

4001AB

4001AC

4001AD

4002AA

4002AB

4002AC

4002AD

4003AA

4003AB

4003AC

4003AD

Section C - Descriptions and Specifications

DESCRIPTION/SPECIFICATIONS

SPECIFICATIONS: SIMPLIFIED ACQUISITION OF BASE ENGINEERING REQUIREMENTS CONTRACT

The Technical Specifications are numbered and organized by the 2010 edition of the Construction Specifications Institute’s (CSI) Master Format. All specifications are filed in Divisions 1 through 33 as per CSI guidelines. See Attachment 4 – Specifications.

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0001AA Destination Government Destination Government 0001AB Destination Government Destination Government 0001AC Destination Government Destination Government 0001AD Destination Government Destination Government 0002 Destination Government Destination Government 0002AA Destination Government Destination Government 0002AB Destination Government Destination Government 0002AC Destination Government Destination Government 0002AD Destination Government Destination Government 0003 Destination Government Destination Government 0003AA Destination Government Destination Government 0003AB Destination Government Destination Government 0003AC Destination Government Destination Government 0003AD Destination Government Destination Government 0004 Destination Government Destination Government 1001 Destination Government Destination Government 1001AA Destination Government Destination Government 1001AB Destination Government Destination Government 1001AC Destination Government Destination Government 1001AD Destination Government Destination Government 1002 Destination Government Destination Government 1002AA Destination Government Destination Government 1002AB Destination Government Destination Government 1002AC Destination Government Destination Government 1002AD Destination Government Destination Government 1003 Destination Government Destination Government 1003AA Destination Government Destination Government 1003AB Destination Government Destination Government 1003AC Destination Government Destination Government 1003AD Destination Government Destination Government 1004 Destination Government Destination Government 2001 Destination Government Destination Government 2001AA Destination Government Destination Government 2001AB Destination Government Destination Government 2001AC Destination Government Destination Government 2001AD Destination Government Destination Government 2002 Destination Government Destination Government 2002AA Destination Government Destination Government 2002AB Destination Government Destination Government 2002AC Destination Government Destination Government 2002AD Destination Government Destination Government

2003 Destination Government Destination Government 2003AA Destination Government Destination Government 2003AB Destination Government Destination Government 2003AC Destination Government Destination Government 2003AD Destination Government Destination Government 2004 Destination Government Destination Government 3001 Destination Government Destination Government 3001AA Destination Government Destination Government 3001AB Destination Government Destination Government 3001AC Destination Government Destination Government 3001AD Destination Government Destination Government 3002 Destination Government Destination Government 3002AA Destination Government Destination Government 3002AB Destination Government Destination Government 3002AC Destination Government Destination Government 3002AD Destination Government Destination Government 3003 Destination Government Destination Government 3003AA Destination Government Destination Government 3003AB Destination Government Destination Government 3003AC Destination Government Destination Government 3003AD Destination Government Destination Government 3004 Destination Government Destination Government 4001 Destination Government Destination Government 4001AA Destination Government Destination Government 4001AB Destination Government Destination Government 4001AC Destination Government Destination Government 4001AD Destination Government Destination Government 4002 Destination Government Destination Government 4002AA Destination Government Destination Government 4002AB Destination Government Destination Government 4002AC Destination Government Destination Government 4002AD Destination Government Destination Government 4003 Destination Government Destination Government 4003AA Destination Government Destination Government 4003AB Destination Government Destination Government 4003AC Destination Government Destination Government 4003AD Destination Government Destination Government 4004 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-12 Inspection of Construction AUG 1996 52.246-13 Inspection--Dismantling, Demolition, or Removal of

Improvements

AUG 1996

Section F - Deliveries or Performance

NORMAL WORKING HOURS

The contractor shall schedule all work to commence between the hours of 7:30 AM and 4:30 PM, Monday through Friday, except on the Federal holidays and days designated as “Family Days” by Air Education and Training Command (AETC) as listed below.

This is the start of the file's text. The full file is on GovTribe.