Solicitation Amendment - FA301626Q00430002.pdf
PDF 4 MB Posted
- Solicitation number
- FA301626Q0043
About this file
This is a Request for Quote (RFQ) for the removal and replacement of a golf cart bridge at JBSA Lackland, issued by the 502d Contracting Squadron/Procurement and Bids & Awards office. The acquisition is set aside for 100% small business concerns, with solicitation number FA301626Q0043. Quotations must be submitted by email to Miranda Garza no later than 11:00 AM CST on Friday, April 17, 2026, with all technical questions due by Thursday, April 2, 2026 at 12:00 PM CST. The requirement includes removal of an existing 18-hole golf cart steel utility bridge (Site A, Building 8490) and installation of a new prefabricated bridge that is structurally sound, ADA-compliant, and capable of safely conveying pedestrians and golf carts.
The contract will be awarded to the technically acceptable lowest-priced quoter based on evaluation of Technical Factor #1 (Technical Approach and Timeline). All quotes must be FOB Destination with a 60-day firm price period. The contractor must demonstrate the ability to begin performance within ten days of contract award and complete the 120-day period of performance from receipt of the prefabricated bridge from the manufacturer (May 1 to October 20, 2026). Technical submissions must include site preparation methodology, bridge specifications (length, height, load capacity, material, finish), decking materials, cleanup and restoration approach, and a realistic timeline showing phase-in and equipment lead times. A mandatory site visit is scheduled for Tuesday, March 31, 2026 at JBSA Luke East Visitor Control Center, with requests to attend due by March 25, 2026. Payment will be processed through WAWF electronic invoicing, and contractors must maintain current System for Award Management (SAM) registration.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFQ
FA301626Q0043
Page 1 of 24 AMENDMENT 2 JBSA Lackland Remove and Replace Golf Cart Bridge (The quote shall be effective 60 days after submission)
This announcement constitutes the only solicitation; Offers are being requested and a separate written solicitation will not be issued. Solicitation number is FA301626Q0043 and is issued as a Request for Quote (RFQ). This acquisition is set aside for 100% small business concerns. This solicitation incorporated provision and clauses by reference. The full text of provisions and clauses may be accessed electronically at www.acquisition.gov
This requirement is for JBSA Lackland Remove and Replace Golf Cart Bridge. Please respond to this RFQ by emailing your response to: Miranda Garza no later than 11:00AM CST, 17 April 2026 – Friday to be considered timely. All questions must be submitted in writing by email no later than Thursday, 2 April 2026 at 12:00PM CST. Responses to questions will be posted by the Government on the SAM.gov, contracting opportunities website as received. Questions submitted after this date/time will not be considered.
Please provide the information below:
All quotes must be FOB Destination Payment Terms: _________________________ Delivery / Period of Performance Timeframe: ________________________
Company Name: _________________________ UEI #______________________________ Cage Code: __________________________ POC: __________________________________ Telephone #__________________________ E-Mail Address: _________________________ Tax ID#: ____________________________ Warranty Information:____________________________________________________ Do you have capacity to invoice electronically through WAWF?(Yes/No)___________
The quoter shall provide a quote for the requirement below
(1) By responding to this RFQ, the quoter accepts all terms and conditions contained herein.
(2) The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs. The contractor shall not request, nor will the Government make, payments for any preliminary measurement, quotes, bids, site visit, time or proposal cost incurred.
FAR 52.212-1 Instructions to Offerors—Commercial Products and Commercial Services Addendum.
(A) Submission of offers:
The Offeror’s quote shall provide a detailed technical plan that includes: the approach, methodology and proposed solution to satisfy the requirements included in the Statement of Work.
(b) Period for Acceptance of Offers. The offeror agrees to hold the prices in its quote firm for 60 calendar days from the date specified for receipt of quotes, unless another time period is specified in an addendum to the solicitation.
(c) Late Quotes/Responses: In accordance with FAR 52.212-1(c).
(d) Contract award. The Government intends to evaluate offers and award a contract without interchanges with Offerors. Therefore, the Offeror’s initial offer should contain the Offeror’s best terms. However, the Government reserves the right to conduct interchanges, if necessary. The Government may reject any or all offers if such action
RFQ FA301626Q0043
is in the public interest, accept other than the lowest offer, and waive informalities and minor irregularities in offers received.
B. FAR 52.212-2— Evaluation—Commercial Products and Commercial Services Addendum
(1) 502d CONS/PKAB will issue a purchase order to the responsible quoter whose quote will be the most advantageous to the Government. The following shall be used to evaluate quotes: The technically acceptable lowest priced quote will be determined to represent the best value. Technical acceptability will be determined by an evaluation of the quoted requirements that meet the technical criteria that are contained in this RFQ.
The Government will rank all quotes based on an initial assessment of offeror’s total evaluated prices. If the Government receives 3 or fewer initial quotes, all quotes will be evaluated for Technical Acceptability.
If the Government receives more than 3 initial quotes, the Government will only select the 3 lowest priced quotes and then evaluate them for Technical Acceptability. The Government reserves the right to evaluate additional quotes for technical acceptability if in the Government’s best interest. If additional quotes are evaluated for technical acceptability they will be selected in the order of price. Award will be made to the responsible vendor whose quote is the lowest evaluated price among technically acceptable quotes.
Acceptable: Quote clearly meets the minimum requirements of the solicitation.
Unacceptable: Quote does not meet the minimum requirements of the solicitation.
Technical Factor # 1 – Technical Approach Standard: The Offeror shall submit a “Technical Approach and timeline” that demonstrates a clear, effective, and safe methodology for the removal and replacement of the bridge in a manner that will provide a structurally sound prefabricated bridge to allow the safe conveyance of pedestrians/golf carts and be compliant with the Americans with Disabilities Act (ADA). At a minimum, the plan should:
(a) Demonstrate a methodology for site preparation
(b) Provide specifications of the bridge structure: Length, height, load capacity, material, and finish type
(c) Specify bridge decking materials used
(d) Approach to daily cleanup and site restoration
The Offeror shall clearly state and/or demonstrate the ability to start performance no more than ten (10) days after contract award. At a minimum, the timeline should:
(a) Include a realistic timeline to begin work to include phase in/equipment lead time
(b) Demonstrate the ability to perform services in accordance with the Performance Work Statement and period-of-performance of 120 days from receipt of the prefabricated bridge from manufacturer.
The standard has been met when: The offeror provides a “Technical Approach and timeline” that clearly and comprehensively demonstrates a feasible, efficient, and safe methodology for meeting all requirements of the PWS, including but not limited to, ADA compliance and reasonable care to avoid damaging existing surrounding buildings, equipment, and vegetation. The Offeror clearly identifies the ability to meet the ten (10) day requirement for contract performance after award.
4. Basis for Award. 502d CONS/PKAB will award a purchase order resulting from this RFQ to the responsible quoter whose quote conforming to the RFQ will be most advantageous to the Government.
RFQ FA301626Q0043
5. Mandatory Registrations. To be eligible for award, registration with the System for Award Management (SAM) must be current (legacy for On-line Registration and Certifications Application (ORCA) and Central Contractor Registration (CCR) registrations). To register or update former CCR and Reps & Certs that are not current go to https://www.sam.gov/portal/public/SAM/ and provide mandatory information.
6. Site Visit: A site visit is scheduled for Tuesday, 31 March 2026 at JBSA Lackland, TX. The meeting place will be the JBSA Luke East Visitor Control Center (VCC) located at Building 1196, 2602 Luke Blvd, JBSA-Lackland, TX 78236. Departure to the site will be promptly at 9:00 am CST. Recommend arriving 30 minutes earlier to sign in, wait in line and retrieve your pass at the visitor center. The Government WILL NOT provide transportation to travel between the sites. Interested parties are required to have a copy of a valid REAL ID Driver’s License, vehicle registration and insurance on hand in order to receive a base pass.
If the drivers license has not been updated to the REAL ID, interested parties will need a passport along with a drivers license. If this type of documentation is not provided a base pass will not be issued and attendance will not be granted.
* Interested parties shall send a request to attend the Site Visit to:
Contract Specialist (CS) – Miranda Garzaat email: miranda.garza.2@us.af.mil Contracting Officer (CO) - Lauren Macias at email: lauren.macias.1@us.af.mil
* Requests to attend the Site Visit shall be received NO LATER THAN Wednesday, 25 March 2026 at 10:00 am CST and sent to both email addresses detailed above.
* Contractors who already have base access are required to notify CO & CS via email of planned attendance and check in at the Visitors Center.
http://www.sam.gov/portal/public/SAM/ http://www.sam.gov/portal/public/SAM/ mailto:lauren.macias.1@us.af.mil
| LAK Golf Bridge Cover Page_Amendment 2 |
| MERGE SF 30 |