Attachment 1 - PWS Remove and Replace Bridge_Updated 23 MAR 26.docx

DOCX document 44 KB Posted

Attached to
JBSA Lackland Remove and Replace Golf Cart Bridge
Solicitation number
FA301626Q0043
Issued by

About this file

This is a Performance Work Statement (PWS) for the removal and replacement of the Hole 18 Golf Cart Bridge (B490) at Joint Base San Antonio (JBSA) Lackland. The contractor shall provide all management, tools, equipment, and labor necessary to deliver a structurally sound, pre-fabricated bridge compliant with the Americans with Disabilities Act (ADA) that safely accommodates pedestrians and golf carts. The bridge structure must be prefabricated steel with a black preventative compound coating, steel railings with corrosion-resistant powder finish, minimum width of 8 feet, minimum length of 85 feet, and minimum railings height of 42 inches with an 8-ton load capacity. Bridge decking may be constructed of pressure-treated Douglas Fir wood. Site preparation work includes removal and hauling of the existing bridge, preparation of concrete abutments, installation of concrete approaches for ADA compliance, landscape shoring, and vegetation removal. The period of performance is 120 days, and the contractor is responsible for site cleanup, restoration, silt barrier installation to prevent creek runoff, and daily worksite cleanup. The contractor must provide all equipment and vehicles, which must be in good operable condition with proper safety certifications and subject to government inspection.

The contractor shall comply with all OSHA safety requirements, federal and state environmental laws, base security procedures, and traffic regulations. Normal hours of operation are 7:30 a.m. to 4:30 p.m., with potential deviations at no additional cost to the government. The contractor must establish an on-site contract manager available within one hour during duty hours, maintain a distinctive company-identified appearance for personnel, and coordinate base passes through 502d Civil Engineering. The contractor shall submit a work schedule within 10 days of contract award and provide operation and maintenance manuals and assembly drawings for the bridge. All government property must be safeguarded and secured daily. The contractor is prohibited from performing work during federal holidays and shall reschedule any work interrupted by base closures. The contractor must provide manufacturer warranty documentation extending beyond one year and submit accident investigation reports within five calendar days of any occurrence involving government property damage or personnel injury.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

Remove and Replace Golf Cart Bridge JBSA, Lackland 23 March 2026

1. DESCRIPTION OF SERVICES:

The contractor shall provide all management, tools, equipment, and labor necessary to ensure that the removal and replacement of the existing: Hole 18 Golf Cart Bridge (B490) at Joint Base San Antonio (JBSA) Lackland (LAK) also referred to as Site A, in a manner that will provide a structurally sound pre-fabricated bridge to allow the safe conveyance of pedestrians/golf carts and be compliant with the Americans with Disabilities Act (ADA). The bridge structure can be modular or in whole pieces for assembly of the structure on-site to abutments.

Site A: Hole 18 Golf Cart Bridge (B490) at Joint Base San Antonio (JBSA) Lackland (LAK)

SITE PREPARATION: Work shall include any site preparations such as removal and hauling off-site of the existing bridge platforms, preparation of concrete abutments for new bridge installations, installing concrete approaches as needed for ADA compliance and any necessary landscape shoring and any retaining wall blocks. Any vegetation affecting the installation of the bridge shall be removed by Contractor.

BRIDGE STRUCTURE: Prefabricated steel bridge structure must have a black preventative compound applied. Rails shall be made of steel and must have corrosion resistant powder finish. width of the bridge shall be at least 8ft wide. Length shall be at least 85’ long Bridge railings should be at least 42” high. The bridge should have at least an 8-ton load capacity.

BRIDGE DECKING: Bridge decking can be made of pressure treated Douglas Fir wood to resist moisture, fungal decay and insects for extended lifespan.

PERIOD-OF-PERFORMANCE: 120 days

CURRENT SITE CONDITIONS: Currently the bridge sits over a shallow creek that is holding water. The bridge is in an area with some overgrowth of small trees and brush. Please refer to the images provided under Attachment – LAK Bridge Site Photos for current site conditions.

1.1 CLEANUP & SITE RESTORATION: The contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation. Any accumulation of removed soil shall be spread and leveled to match existing grade. Silt barriers shall be installed to prevent the runoff of soil into the creek. The Contractor shall cleanup worksite at the end of each workday. The Contractor shall clean up debris and restore site to its original condition.

1.2. CONTRACTOR-FURNISHED EQUIPMENT/VEHICLES. The contractor shall provide and maintain all equipment and vehicles necessary to perform the requirements of this contract. Contractor vehicles shall be used solely for the intended purpose of performing services in this performance work statement during normal hours of operation.

1.2.1 EQUIPMENT CONDITION. All equipment used in the performance of this contract shall be in good operable condition and carry a U/L (Underwriters Laboratory) listing. Equipment found to be unsafe and unable to function as designed shall not be used for the performance of this contract. The CO or Contracting Officer’s Representative (COR) may inspect the contractor’s equipment and vehicles at any time and direct the removal of any unsafe or unusable equipment or vehicle from the installation.

1.2.3 EQUIPMENT QUANTITIES. The contractor shall provide adequate amounts of equipment, items and vehicles to effectively fulfill the scope of this contract. In addition, the contractor shall maintain or have backup capability to provide continued service in the event primary equipment or vehicles are down for extended maintenance or repairs. Equipment failure shall not alleviate the contractor from performing any requirement contained in this contract.

2.0 GOVERNMENT FURNISHED PROPERTY AND SERVICES

2.1 GOVERNMENT FURNISHED FACILITIES. No Government facility will be provided for performance of this contract. The Contractor shall provide their own facility/office off the premises of this installation and within the metropolitan area to conduct business, store supplies, and equipment.

2.2 SECURITY, FIRE AND MEDICAL SERVICES. The Government will provide police and fire protection. In the event of a medical emergency, base ambulance service for transporting an injured employee to a local hospital is available on a cost reimbursement basis.

3.0 GENERAL INFORMATION

3.1 HOURS OF OPERATION. The contractor shall perform the services required under this contract during the following hours. The contractor is not required to perform services on Federal Holidays.

3.1.1 NORMAL BASE HOURS. Base hours of operation are 7:30 a.m. through 4:30 p.m. The contractor may find it necessary to deviate from the normal base hours of operation, to ensure timely completion of work under this PWS at no additional cost to the government.

3.2 FEDERAL HOLIDAYS

· New Year’s Day - 1 January

· Martin Luther King Day - 3rd Monday in January

· Washington’s Birthday - 3rd Monday in February

· Memorial Day - last Monday in May

· Juneteenth - 19 June

· Independence Day - 4 July

· Labor Day - Monday, September 7th

· Columbus Day - 2nd Monday in October

· Veteran’s Day - 11 November

· Thanksgiving Day - 4th Thursday in November

· Christmas Day - 25 December

If these holidays fall on Saturday, the preceding Friday will be observed. If these holidays fall on Sunday, the following Monday will be observed. If a holiday falls on a scheduled service day, the contractor will be responsible for rescheduling services for the first day post the holiday observance.

3.3 BASE CLOSURES. Work scheduled but not accomplished because of base closure due to weather, exercises, or actual alert, will be accomplished as soon as possible after reopening the base.

3.4 CONTRACTOR/EMPLOYEE BASE PASS AND IDENTIFICATION, SPECIAL

CLEARANCES AND VEHICLE PASSES. The contractor shall comply with all requirements and procedures IAW AFFARS 5352.242-9000, Contractor Access to Air Force Installations. All documentation shall be submitted at the pre-performance conference. 502 Civil Engineering will coordinate passes for the contractor and team. The contractor shall provide a schedule for all work to be performed within 10 days of award of contract. Contractor shall coordinate base passes with 502d CES POC.

3.5 TRAFFIC LAWS. The contractor and its employees shall comply with base traffic regulations.

3.6 WEAPONS, FIREARMS AND AMMUNITION. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned or privately owned vehicle while on JBSA Lackland.

3.7 REPORTING REQUIREMENTS. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information.

3.8 PHYSICAL SECURITY. The contractor shall be responsible for safeguarding all government property and controlled forms provided for contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.

3.9 CONTRACT MANAGER. The contractor shall establish and maintain an office through which the contract manager or alternate(s) can be contacted during work hours. The contract manager or alternate shall be available during normal duty hours to meet on the installation within 1 hour with the government personnel designated by the CO to discuss problem areas. The contractor shall provide the COR/CO telephone number(s) where validation results and complaints can be reported. The contractor shall also provide to the COR/CO the names and phone/pager numbers of contractor POCs for after business hours including nights, weekends, and holidays. This information will be kept updated by the contractor whenever personnel changes occur. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract.

3.10 PERSONNEL. Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the company name or logo. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection. The government is authorized to restrict the employment under the contract of any contractor employee or prospective contractor employee, who is identified as a potential threat to the health, safety, security, general wellbeing, or operational mission of the installation and its population.

3.11 SCHEDULES. The contractor shall stay within timeframe of schedule that was submitted with proposal. Changes to the schedule shall be immediately identified and reported to the 502d CES inspector. All work shall be completed and must be accepted by the government before closeout of the contract.

3.12 ENVIRONMENTAL COMPLIANCE. The contractor shall comply with all applicable federal, state, and local environmental laws and regulations.

3.13 CONTRACTING OFFICER (CO) AND CONTRACTING OFFICER

REPRESENTATIVE (COR). The CO will appoint a primary and alternate representative for management of the day-to-day activities of the contract. The identity, title, and authority of this representative will be provided in writing to the contractor after contact award.

3.14 SAFETY REQUIREMENTS AND REPORTS. The contractor shall perform work in a safe manner as required by OSHA Safety and Health Requirements. Provide a verbal report to the CO as soon as possible of each occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact. Provide a completed copy of required Accident Investigation Reports to the CO within five calendar days of each occurrence.

3.15 OPERATION AND MAINTENANCE. The Contractor shall provide operation and maintenance Manuals and assembly drawings for each bridge.

3.16 WARRANTY. The contractor shall provide documentation for any manufacturer warranties extending beyond the one-year period, and include the manufacturer’s contact name, phone number, and address where warranty claims can be submitted.

4.0 APPENDICES. The government will make all publications, forms, references and report formats listed available. Publications can be accessed on-line at http://www.e-publishing.af.mil/. Supplements or amendments to listed publications from any organizational level may be issued during the life of the contract. The contractor shall immediately implement those changes in publications.

ABBREVIATIONS AND ACRONYMS

ADA - Americans with Disabilities Act AF – (U.S) Air Force AFI – Air Force Instruction CLIN- Contract Line-Item Number CO – Contracting Officer COR – Contracting Officer’s Representative

File details come from the government source that posted it. Updated .