23. REVISED SUBMITTAL REGISTER (MarkUp)_11042021.pdf

PDF 106 KB Posted

Attached to
Stoppage Repair West Runway Friction Improvement - 100% WOSB
Solicitation number
FA301622R0002
Issued by

About this file

This submittal register outlines the required submissions for a stoppage repair and west runway friction improvement project at Joint Base San Antonio-Randolph in Texas. The contractor must provide management, tools, materials, equipment and labor to repair the west runway. Submissions include a construction quality control plan, environmental protection plan, safety data sheets, concrete mix designs, asphalt and concrete testing reports, warranties and closeout documentation. The estimated budget for the project is between $1,000,000 to $5,000,000. The solicitation specifies a 120-day period of performance and is reserved for women-owned small businesses through the Women-Owned Small Business program. The Air Force is the contracting agency responsible for award.

View the file

Other files

File Type Posted
TxDOT Seeding for Erosion Control.pdf PDF
Q and A(Amended)-West Runway Friction Improvement_11172021.pdf PDF
Solicitation Amendment FA301622R00020003 SF 30.pdf PDF
TYMX216904 Revised Phasing Plan_11092021.pdf PDF
TYMX216904 - REVISED SOW and SPECS 21-1117.pdf PDF
Solicitation Amendment FA301622R00020002 SF 30.pdf PDF
19. Pavement Detail - 2019 Pavement Evaluation MarkUp.pdf PDF
16. Q&A-West Runway Friction Improvement_11042021.pdf PDF
18. Revised Grinding Map Exhibit_11042021.pdf PDF
21. Electrical Distribution RND.pdf PDF
22. Storm Drain Map RND.pdf PDF
17. TYMX216904 - REVISED SOW and SPECS 21-1104.pdf PDF
Solicitation Amendment FA301622R00020001 SF 30.pdf PDF
20. Boring Detail - 2019 Pavement Evaluation.pdf PDF
5. Grinding and Markings Exhibit.pdf PDF
3. UFC Guidance Temp Displaced Threshold Markings.pdf PDF
1. SOW_10142021.pdf PDF
9. Wage Determination_TX20210007_ 01012021.pdf PDF
13. Contractor Responsibility Questionnaire.docx DOCX document
4. Grading Exhibit.pdf PDF
12. Financial Information Questionnaire.docx DOCX document
7. LBP Inventory Report_09222021.pdf PDF
14. Base Access Request Form.pdf PDF
10. Sample-Cost Estimate Breakdown.xls XLS spreadsheet
2. Phasing Plan.pdf PDF
11. Sample Progress Schedule.xlsx XLSX spreadsheet
15. Location Map (Bldg. 8).pdf PDF
Solicitation - FA301622R0002.pdf PDF
8. RFI Template.xlsx XLSX spreadsheet
6. Submittal Register.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 9 PAGES

Stoppage Repair West Runway Friction Improvement

01 11 00.10 SD-01 Preconstruction Submittals

GSubmittal Register

GSite Specific Safety Plan;

01 14 00 SD-01 Preconstruction Submittals

1.4.1.1 GList of Contract Personnel

1.4.1.2Installation Access

01 32 01.00 10 SD-01 Preconstruction Submittals

3.3.2 GProject Schedule CPM

GPreliminary Project Schedule

GInitial Project Schedule

GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.9 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-03 Product Data

GSafety Data Sheets (SDS)

SD-06 Test Reports

1.4Monthly Exposure Reports

1.12Notifications and Reports

1.12.2 GAccident Reports

SD-07 Certificates

Activity Hazard Analysis (AHA); G

1.9.1Confined Space Entry Permit

1.9.1Hot Work Permit

Certificate of Compliance

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 9 PAGES

01 35 26 License Certificates

GRadiography Operation Planning

Work Sheet

GPortable Gauge Operations

Planning Worksheet

01 45 00.00 20 SD-01 Preconstruction Submittals

1.7.1 GConstruction Quality Control (QC)

Plan

1.17 GIndoor Air Quality (IAQ)

Management Plan

SD-06 Test Reports

Verification Statement

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

2.2.1 GHaul Road Plan

SD-06 Test Reports

2.5Backflow Preventer Tests

SD-07 Certificates

1.4.1Backflow Tester

1.4Backflow Preventers

01 57 20 SD-01 Preconstruction Submittals

1.6ENVIRONMENTAL

PROTECTION PLAN

3.15ENVIRONMENTAL

PROTECTION PLAN

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Lead Submittals have been removed.

1244522579C Highlight

1244522579C Highlight

1244522579C Highlight

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 9 PAGES

01 57 20 G Environmental Permits as applicable; G

3.7.2Equipment Inventory

SD-06 Test Reports

3.1.4.1 GAnalytical Results

01 74 19 SD-01 Preconstruction Submittals

1.9 GWaste Management Plan

SD-11 Closeout Submittals

1.10 SRecords

01 78 00 SD-03 Product Data

1.4.1Warranty Management Plan

Final Cleaning

SD-08 Manufacturer’s Instructions

1.4.1Instructions

SD-11 Closeout Submittals

Construction Contract

Specifications

2.1 GCertification of EPA Designated

Items

2.2 GCertification Of USDA Designated

Items

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.6 GNotification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 9 PAGES

02 41 00 SD-11 Closeout Submittals

Receipts

31 00 00 SD-06 Test Reports

Testing

Borrow Site Testing

SD-07 Certificates

Testing

32 01 11.51 SD-01 Preconstruction Submittals

1.2 GSchedule of work

3.1 GPaint Removal Process Plan

3.4 GWaste Collection, Identification

and Disposal Plan

SD-03 Product Data

1.4Mechanical paint removal equipment

1.5Chemical paint removal equipment

2.1 GPaint Removal Detergents or

Chemicals

SD-06 Test Reports

1.6Test Section Results

32 01 19.61 SD-03 Product Data

2.1Sealants

3.5.2Manufacturer's

Recommendations

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 9 PAGES

32 01 19.61 2.1Sealants

SD-06 Test Reports

2.1Sealants

SD-07 Certificates

3.1Equipment List

SD-08 Manufacturer’s Instructions

2.1Sealants

32 01 29.61 SD-02 Shop Drawings

1.3.3 GShop Drawings

SD-03 Product Data

1.3.1 GConcrete Mix Design

2.1.4.1 GConcrete Mix Design

2.1.10 GRigid Proprietary Repair Products

GPolymeric Proprietary Repair

Products

2.1.5.1 GPigmented Liquid

Membrane-Forming Compound

2.1.5.1 GPigmented Liquid

Membrane-Forming Compound

2.1.10.6Aggregate Service Record

SD-04 Samples

3.5.1 GAbsorbent Curing Material

2.1.8 GJoint Filler

2.1.7 GJoint Sealant

SD-05 Design Data

1.3.1 GConcrete Mix Design

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 9 PAGES

32 01 29.61 2.1.4.1 GConcrete Mix Design

SD-06 Test Reports

1.3.1Test Results

1.3.1.2Gradation

2.1.1.4Gradation

1.3.1.1Cement

2.1.4.1Slump

2.1.4.1Air Content

2.1.10.1Compressive Strength

1.3.2Mixer Calibration and Efficiency

1.3.2Concrete Uniformity

2.1.10.2Bond Strength

GPolymeric Proprietary Repair

Products

SD-07 Certificates

1.3.1.1Cement

1.3.1.2Aggregate

2.1.3Admixtures

3.5.1Absorbent curing material

2.1.5.1Pigmented Liquid

Membrane-Forming Compound

2.1.5.1Pigmented Liquid

Membrane-Forming Compound

2.1.8Joint Filler

2.1.7Joint Sealant

32 05 33 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 9 PAGES

32 05 33 GIntegrated Pest Management

Plan

SD-03 Product Data

GFertilizer

Mulches Topdressing

Organic Mulch Materials

SD-07 Certificates

3.3.1Maintenance Inspection Report

SD-11 Closeout Submittals

Tree Staking and Guying

Removal

32 11 20 SD-03 Product Data

1.4 GPlant, Equipment, and Tools

Waybills and Delivery Tickets

SD-06 Test Reports

2.2.1 GInitial Tests

3.11.1 GIn-Place Tests

32 13 14.13 SD-03 Product Data

2.1.7 GDiamond Grinding Plan

2.9.1 GDowels

2.9.2 GDowel Bar Assemblies

2.11Equipment

3.1.2 GProposed Techniques

SD-05 Design Data

2.13.2 GPreliminary Proposed

Proportioning

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 9 PAGES

32 13 14.13 2.13.2 GProportioning Studies

SD-06 Test Reports

1.4.1 GBatch Plant Manufacturer's

Inspection Report

1.4.1 GSlipform Paver Manufacturer's

Inspection Report

2.1.4.1 GSampling and Testing

2.1.7 GDiamond Grinding of PCC

Surfaces

2.11.2.3 GMixer Performance (Uniformity)

Testing

3.9.1 GRepair Recommendations Plan

SD-07 Certificates

1.4.1 GContractor Quality Control Staff

1.4.3Laboratory Accreditation and

Validation

1.4.3.3 GCommercial Laboratory

2.11NRMCA Certificate of

Conformance

32 17 23 SD-03 Product Data

2.1.1.2 GSurface Preparation Equipment

List

2.1.2 GApplication Equipment List

3.2Exterior Surface Preparation

1.3.1 GSafety Data Sheets

2.2.2.1 GReflective media for airfields

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 9 PAGES

32 17 23 2.2.1 GWaterborne Paint

SD-06 Test Reports

2.2.2.1 GReflective Media for Airfields

2.2.1 GWaterborne Paint

Test Reports

SD-07 Certificates

1.3.2 GQualifications

2.2.2.1Reflective Media for Airfields

2.2.1Waterborne Paint

SD-08 Manufacturer’s Instructions

2.2.1 GWaterborne Paint

32 92 19 SD-07 Certificates

2.1Seed

SD-08 Manufacturer’s Instructions

Erosion Control Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR