10. Sample-Cost Estimate Breakdown.xls
XLS spreadsheet 67 KB Posted
- Solicitation number
- FA301622R0002
About this file
This document contains a cost estimate breakdown template and details of a federal contract solicitation. The solicitation is for stoppage repair and friction improvement on the west runway at Joint Base San Antonio-Randolph in Texas. The contractor shall provide management, tools, materials, equipment and labor to complete the runway repairs within 120 calendar days. The estimated value of the contract is between $1,000,000 and $5,000,000. The solicitation is set aside for women-owned small businesses and is being issued by the 502nd Contracting Squadron at JBSA-Randolph on behalf of the Air Education and Training Command of the Department of the Air Force. No award will be made until funding is available, and the government reserves the right to cancel the solicitation before or after the closing date. The cost estimate breakdown template provides a sample format for lining items, quantities, costs and totals for a construction project.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Details
| CONSTRUCTION COST ESTIMATE BREAKDOWN | ||||||||||
| CONTRACTOR | ADDRESS: | |||||||||
| General Construction Subtotal | ||||||||||
| 502 Civil Engineering Squadron | General Construction Labor Burden | |||||||||
| Prepared by: Olugbenga J Falomo | 100.00% | RSMeans San Antonio, TX CCI | ||||||||
| General Construction Subcontractor Overhead | ||||||||||
| General Construction Subcontractor Profit | ||||||||||
| Prepared by: Jeffery C. Parks II | General Construction Prime Contractor Overhead | |||||||||
| General Construction Prime Contractor Profit | ||||||||||
| General Construction Prime Contractor Bonding | ||||||||||
| General Construction Contingency | ||||||||||
| CONTRACT FOR (Work to be performed) | This cost proposal is valid for ____________365__________________days | Proposed Project Amount | ||||||||
| Renovation of Hanger 12 & Hanger 64 | The period of performance to perform this work is ____178_______ days. | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER | WORK LOCATION | ||||||||
| F3PH2A1022AW01 | TYMX215706 | JBSA - Randolph | ||||||||
| LINE | ||||||||||
| NO. | ITEM DESCRIPTION | UNIT OF | ||||||||
| MEASURE | MATERIAL COSTS | LABOR COSTS | EQUIPMENT COSTS | OTHER COSTS | LINE |
TOTAL
| 100000 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | RSM16eMCOM B | ||||
| 2 | 01-11-31-10-0100 Architectural fees, for alteration work, to $500,000, add to new construction fee | Project | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | RSM16eMCOM B | |
| 3 | 01-11-31-20-0060 Construction management fees, for work to $100,000 | Project | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | RSM16eFAC B | |
| 4 | 01-11-31-20-0060 Construction management fees, for work to $100,000 | Project | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | RSM16eFAC B | |
| 5 | 01-11-31-30-0200 Engineering fees, electrical, minimum | Contrct | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | RSM16eMCOM B | |
| 6 | 01-11-31-30-0200 Engineering fees, electrical, minimum | Contrct | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | RSM16eMCOM B | |
| 7 | 01-11-31-30-0900 Engineering fees, landscaping and site development, maximum | Contrct | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | RSM16eMCOM B | |
| 8 | 01-21-53-50-0850-L Factors, cost adjustments, add to construction costs for particular job requirements, dust protection, add, maximum | Costs | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | RSM16eMCOM B | |
| 9 | 01-21-53-50-0850-L Factors, cost adjustments, add to construction costs for particular job requirements, dust protection, add, maximum | Costs | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | RSM16eMCOM B | |
| 10 | 01-31-13-20-0020 Field personnel, clerk, average | Week | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | RSM16eMCOM B | |
| 11 | 01-31-13-20-0020 Field personnel, clerk, average | Week | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | RSM16eMCOM B | |
| 12 | 01-31-13-20-0020 Field personnel, clerk, average | Week | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | RSM16eMCOM B | |
| 13 | 01-31-13-20-0100 Field personnel, field engineer, minimum | Week | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | RSM16eMCOM B | |
| 14 | 01-31-13-20-0100 Field personnel, field engineer, minimum | Week | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | RSM16eMCOM B | |
| 15 | 01-31-13-20-0100 Field personnel, field engineer, minimum | Week | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | RSM16eMCOM B | |
| 16 | 01-31-13-20-0120 Field personnel, field engineer, average | Week | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | RSM16eFAC B | |
| 17 | 01-31-13-20-0160 Field personnel, general purpose laborer, average | Week | $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | RSM16eMCOM B | |
| 18 | 01-31-13-20-0160 Field personnel, general purpose laborer, average | Week | RSM16eMCOM B | |||||||
| 19 | 01-31-13-20-0180 Field personnel, project manager, minimum | Week | RSM16eFAC B | |||||||
| 20 | 01-31-13-20-0180 Field personnel, project manager, minimum | Week | RSM16eFAC B | |||||||
| 21 | 01-31-13-20-0220 Field personnel, project manager, maximum | Week | RSM16eMCOM B | |||||||
| 22 | 01-31-13-20-0240 Field personnel, superintendent, minimum | Week | RSM16eFAC B | |||||||
| 23 | 01-31-13-20-0240C Field personnel, Quality Control, minimum | Week | CUSTOM B | |||||||
| 24 | 01-31-13-20-0240C Field personnel, Quality Control, minimum | Week | CUSTOM B | |||||||
| 25 | 01-31-13-20-0260 Field personnel, superintendent, average | Week | RSM16eMCOM B | |||||||
| 26 | 01-31-13-20-0280 Field personnel, superintendent, maximum | Week | RSM16eMCOM B | |||||||
| 27 | 01-31-13-30-0200 Insurance, all-risk type, minimum | Job | RSM16eFAC B | |||||||
| 28 | 01-31-13-30-0200 Insurance, all-risk type, minimum | Job | RSM16eFAC B | |||||||
| 29 | 01-32-13-50-0700 Scheduling, rule of thumb, CPM scheduling, including cost control, small job, $10,000,000 | Job | RSM16eFAC B | |||||||
| 30 | 01-32-33-50-0020 Photographs, 8" x 10", 4 shots, 2 prints each, standard mounting | Set | RSM16eFAC B | |||||||
| 31 | 01-32-33-50-0020 Photographs, 8" x 10", 4 shots, 2 prints each, standard mounting | Set | RSM16eFAC B | |||||||
| 32 | 01-32-33-50-0020-0300 Photographs, for I.D. slugs, add to all above (Modified using 01-32-33-50-0300) | Set | RSM16eFAC B | |||||||
| 33 | 01-32-33-50-0020-0300 Photographs, for I.D. slugs, add to all above (Modified using 01-32-33-50-0300) | Set | RSM16eFAC B | |||||||
| 34 | 01-45-23-50-4720 Testing and inspecting services, soil testing, density and classification of undisturbed sample | Ea. | RSM16eMCOM B | |||||||
| 35 | 01-45-23-50-4735 Testing and inspecting services, soil testing, soil density, nuclear method, ASTM D2922 | Ea. | RSM16eMCOM B | |||||||
| 36 | 01-45-23-50-5570 Testing and inspecting services, technician for inspection, per day, concrete | Ea. | RSM16eMCOM B | |||||||
| 37 | 01-51-13-50-0030 Temporary power equip (pro-rated per job), service, overhead feed, 3 use, 100 Amp | Ea. | RSM16eMCOM B | |||||||
| 38 | 01-52-13-20-0020-0890 Office and storage space, for delivery, delivery each way (Modified using 01-52-13-20-0890) | Ea. | RSM16eFAC B | |||||||
| 39 | 01-52-13-20-0350 Office and storage space, office trailer, furnished, no hookups, 32' x 8', rent per month | Ea. | RSM16eFAC B | |||||||
| 40 | 01-52-13-20-0450 Office and storage space, office trailer, furnished, no hookups, 50' x 10', rent per month | Ea. | RSM16eMCOM B | |||||||
| 41 | 01-52-13-20-0450-0700 Office and storage space, for air conditioning, rent per month, add (Modified using 01-52-13-20-0700) | Ea. | RSM16eMCOM B | |||||||
| 42 | 01-52-13-20-0450-0890 Office and storage space, for delivery, delivery each way (Modified using 01-52-13-20-0890) | Ea. | RSM16eMCOM B | |||||||
| THIS COST ESTIMATE BREAKDOWN IS USED AS A SAMPLE |