Existing
Switchboard SB2
Rm 0010 RM 0020
New
Transformer
X7
150kva K-13
2-½” EMT w/ 4-
#4/0 and #4
Ground
New 200kva UPS
(2) - 3" EMT w/ 4 – 350 MCM and 1 - #1 Ground
IN
S
T A
L L
A T
IO
N
I N
F O
R M
A T
IO
N
I N
F R
A S
T R
U C
T U
R E
M O
D E
R N
IZ
A
T
IO
N P
R O
G R
A M
I3 M
P D
O
IM
R E
L O
C A
T
IO
N A
T F
O R
T S
A M
H O
U S
T O
N T
E X
A S
O N
E L
IN
E
D
IA
G R
A M
B U
IL
D
IN
G
S
IP
R
D A
T A
C E
N T
E R
U P
S
A1 RISER DIAGRAM
(2) - 3" EMT w/ 4 – 350 MCM and 1 - #1 Ground
New
Panel
X7
600A
B u s w a y
A
B u s w a y
A
B u s w a y
A
B u s w a y
A
2-½” EMT w/ 4 - #4/0 and 1 - #4 Ground
Panel
X7
CKT
225/3
225/3
CKT
BKR
CIRCUIT DESCRIPTION
20/1
SPACE
SPACE
SPACE
SPACE
SPACE
SPARE
BUSWAY # 5
BUSWAY # 6
CKT
BKR
CKT
20/1Fire Suppression System
SPACE
SPACE
SPACE
SPACE
SPACE
BUSWAY # 7
BUSWAY # 8
225/3
225/3
CIRCUIT DESCRIPTION
GE TYPE AQP PANELBOARD
600A, 208Y/120V
3P4W 22KAIC SC FULLY RATED
COPPER BUS
NEMA 1 ENCLOSURE
SURFACE MOUNTED
600/3 MAIN
DATA CENTER(SIPR) RM 1009
GENERAL NOTES
1. TRANSFORMER WILL BE BONDED TO BUILDING STEEL.
2. STARLINE DEVICES WILL BE TURNED OVER TO NEC FOR THEIR USE.
3. CONFIGURATION ON UPS WILL BE FINALIZED BY MANUFACTURER
PRE-INSTALLATION VISIT.
4. STARLINE BUSWAY WILL BE INSTALLED ABOVE SIPR RACKS PER
APPROVED DRAWINGS.
5. UPS WILL BE PROVIDED WITH FACTORY START-UP.
E-1RD
SHEET
WCEI
| Binder1 |
| TAB-1_One Line Diagram_UPS_Room 20 |
| 2265 Data Center One Line.vsd |
| Page-1 |
| Binder1.pdf |
| Attachment 2 - Concept Plans |
| C-101 RISER DIAGRAM |
File details come from the government source that posted it. Updated .