Amendment 0004 FA301620R00920004.pdf

PDF 522 KB Posted

Attached to
Busway Install Building 2265 Federal contract opportunity
Solicitation number
FA301620R0092
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to Busway Install Building 2265, newest first.
File Type Posted
FA301620R0092 Busway Install B2265 Questions_Answers Rev10Sep2020.docx DOCX document
Questions_Answers FA301620R0092 Busway Install B2265.pdf PDF
Attachment 4 - Wage determination TX20200231 Rev28Aug2020.pdf PDF
Attachment 10 - Section L Rev09Sep2020.pdf PDF
Attachment 13 - One Line Diagram_UPS_Room 20.pdf PDF
Attachment 12 - Electrical Riser_Architectural Drawing.pdf PDF
Attachment 1 - Statement of work_rev08Sep2020.pdf PDF
FA301620R00920003.pdf PDF
Solicitation Amendment 002 FA301620R00920002.pdf PDF
Attachment 10 - Section L Rev18Aug2020.pdf PDF
Solicitation Amendment 001 FA301620R00920001.pdf PDF
Attachment 4 - Wage determination TX20200231.pdf PDF
Attachment 2 - Concept Plans.pdf PDF
Attachment 3 - Weather Data.pdf PDF
FA301620R0092.pdf PDF
Single Source Justification (Brand Name) - Starline Track Busway System -R_Redacted.pdf PDF
Attachment 9 - Construction Cost Estimate Breakdown.xls XLS spreadsheet
Attachment 5 - Schedule of material submittals.pdf PDF
Attachment 7 - Lead and asbestos Report.pdf PDF
Attachment 10 - Section L.pdf PDF
Attachment 11 - Section M.pdf PDF
Attachment 1 - Statement of work.pdf PDF
Attachment 6 - DD1354.pdf PDF
Attachment 8 - Access Request Form.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of this amendment is to:The Purpose of This Amendment Is:

1) Extend the proposal due date to 15 September 2020 at 04:00 P.M. local San Antonio, TX time.

2) Update Section J to incorporate (Attachment 1) SOW Rev08Sep2020

3) Update Section J to incorporate (Attachment 4) Wage determination TX20200231 Rev 28Aug2020

4) Update Section J to Incorporate (Attachment 10) - Section L Rev09Sep2020.

5) Incorporate Attachment 12 - Electrical Riser Architectural Drawing

6) Incorporate Attachment 13 - One Line Diagram UPS Room 20 All other terms of the solicitation remain unchanged.

Section B - Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) were modified:

0001 - 95% Design Drawings - The contractor shall provide the design drawings for review and approval in accordance with Attachment 1 - Statement of work_rev08Sep2020. The period of performance excludes a 14-day government review period.

INFORMATION FROM TO

Description

95% Design Drawings - The contractor shall provide the design drawings for review and approval in accordance with the Statement of Work (dated 10/19).

The period of performance excludes a 14-day government review period.

95% Design Drawings - The contractor shall provide the design drawings for review and approval in accordance with Attachment 1 - Statement of work_rev08Sep2020.

The period of performance excludes a 14-day government review period.

0002 - 100% Design Drawings - The contractor shall provide the design drawings for review and approval in accordance with Attachment 1 - Statement of work_rev08Sep2020. The period of performance excludes a 14-day government review period.

INFORMATION FROM TO

Description

100% Design Drawings - The contractor shall provide the design drawings for review and approval in accordance with the Statement of Work (dated 10/19).

The period of performance excludes a 14-day government review period.

100% Design Drawings - The contractor shall provide the design drawings for review and approval in accordance with Attachment 1 - Statement of work_rev08Sep2020.

The period of performance excludes a 14-day government review period.

0003 - Construction - The contractor is responsible to provide all labor and materials for the Installation of a (Brand Name) Starline busway and breaker panel in accordance with Attachment 1 - Statement of work_rev08Sep2020. The PoP for this CLIN includes the following:

Construction = 30 days Closeout Procedures = 5 days.

INFORMATION FROM TO

Description

Construction - The contractor is responsible to provide all labor and materials for the Installation of a (Brand Name) Starline busway and breaker panel in accordance with the Statement of Work (dated 10/19). The PoP for this CLIN includes the following:

Construction = 30 days Closeout Procedures = 5 days.

Construction - The contractor is responsible to provide all labor and materials for the Installation of a (Brand Name) Starline busway and breaker panel in accordance with Attachment 1 - Statement of work_rev08Sep2020. The PoP for this CLIN includes the following:

Construction = 30 days Closeout Procedures = 5 days.

Section J - List of Attachments

Miscellaneous text in this section has been modified to:

FA301620R00920004

Attachment - Tittle ; Date; Number of Pages Attachment 1 - Statement of Work_rev08Sep2020; 224 pages Attachment 2 - Concept Drawings; No Date; 3 pages Attachment 3 - Weather Data; July 2020; 2 pages Attachment 4 - Wage Determination TX20200231; 8/28/2020; 7 pages Attachment 5 - Schedule of Materials; No Date; 7 pages Attachment 6 - DD1354 (Draft); 04/24/2020; 2 pages Attachment 7 - Lead and Asbestos Report; October 2013; 96 pages Attachment 8 - Access Request Form; No Date; 4 pages Attachment 9 - Construction Cost Estimate Breakdown; No Date; 42 Sheets Attachment 10 - Section L; Aug 18, 2020; 2 pages Attachment 11 - Section M; Rev09Sep2020; 1 page Attachment 12 - Electrical Riser Architectural Drawing; Sept. 9, 2020; 4 pgs Attachment 13 - One Line Diagram_UPS_Room 20; Sept. 9, 2020; 2 pgs

FA301620R00920004

IDCode:
Page: 1
Pages: 3
AmendNo: 0004
EffDate: 9/2/2020
ReqNo: A007824
ProjNo: JBSF6067384
IssCode: FA3016
AdmCode:
IssuedBy: FA3016 502 CONS CL

1655 SELFRIDGE AVE BLDG 5450

CP 210-671-3617

JBSA LACKLAND, TX 78236-5286

United States Carlie Hammontree, Email: Carlie.Hammontree@us.af.mil Telephone: 567-274-7312

AdminBy:
ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: FA301620R0092
SolDate: 8/12/2020
AwardChg:
AwardNo:
AwardDate:
Amended: 1
OffrExt: 1
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G
ChgeOrd:
ChgeOrder:
Modify:
SuppAgre:
SuppAuth:
ModOthr:
OthrSpec:
NoReq: 1
Require:
Copies:
Descript:

SEE CONTINUATION PAGE

ContNameTitle:
CoNameTitle: ANDREW S. SORENSEN

Email: andrew.sorensen.1@us.af.mil Telephone: 210-671-6083

ContDate:
CODate:

File details come from the government source that posted it. Updated .