Attachment_B_Tech_Specs_for_Drapery_Contract_PRF2MRAA6036AW02.pdf
PDF 19 KB Posted
- Attached to
- Draperies Federal contract opportunity
- Solicitation number
- FA3016-16-N-0113
About this file
Technical Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_07-07-2016.docx | DOCX document | |
| Questions_and_Answers__06-30-2016_REVISED.pdf | ||
| Questions_and_Answers_06-30-2016.docx | DOCX document | |
| Attachment_B_Tech_Specs_Adjustment_PRF2MRAA6036AW02.pdf | ||
| Statement_of_Work_PR_F2MRAA6036AW02.pdf | ||
| RFQ__FBO.pdf | ||
| Attachment_C_Floor_Plan_B3631_3635.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX B
TECHNICAL SPECIFICATIONS-WINDOW TREATMENTS
• DRAPERIES
• HARDWARE
• INSTALLATION
I. DRAPERY SPECIFICATIONS
• All draperies to be pinch pleated, blackout lined, with three finger pleats
• Drapery fullness shall be a minimum of 2-1. 2-1 fullness means that the width of the fabric when measured across the bottom of the drapery shall be at least twice the width of the drapery when measured across the pleats at the top of the drapery.
• Drapes shall be one-way baton draw as specified, wall or ceiling mounted as required, and if requested, shall extend beyond each side of the window to allow for stack space.
Unless otherwise specified in writing, one way draw drapes shall have one 4-inch return.
• All joining seams shall be overcast with a safety lock stitch and straight stitch using a Rimaldi or Merrow serging machine. Printed fabrics shall be matched in the seams.
• All draperies shall be tabled to assure even hems. Side hems to be 1 ½ inch double turned and blind stitched. Top and bottom hems to be 4 inch permanent and washable crinoline (buckram). All pleats shall be bar tacked using a programmable straight-line lockstitcher, spot tacked with triple tack stitch, and shall be uniform in size and equally distant from one another.
• #T-54000 two piece, UV resistant, adjustable curtain hook shall be sewn into each pleat.
• Covered #2 weights shall be sewn into each corner and seam. All draperies shall be fan folded and individually wrapped in plastic bags.
• Thread shall be polyester wrapped polyester matching the drapery fabric in color. Use of monofilament is prohibited.
• Blackout lining shall have a double folded one inch single straight stitched bottom hem and a four inch single turned header sewn into the top of the drapery. Lining shall be sewn to within one half inch from the bottom of the face material.
II. DRAPERY HARDWARE SPECIFICATIONS
• All hardware shall be assembled for use with conventional pleated heading system. All rods will have cords removed, and over the top baton adaptor attached. Color of rods is White. After installation, the drapery headings are to stand erect. Rods shall provide smooth traversing.
III. MEASURING/INSTALLATION/REMOVAL
• It shall be the complete responsibility of the contractor to obtain accurate dimensions at the job site and to examine all conditions as they relate to this installation. The contractor shall use skilled drapery installers(s) to perform installation. All work shall be accomplished in a neat and professional manner following established trade practices.
• The contractor shall be responsible for removing and disposing of the existing window treatments and hardware. The contractor shall trim, level and secure all hardware using
APPENDIX B
TECHNICAL SPECIFICATIONS-WINDOW TREATMENTS
fasteners appropriate to the mounting surface. The contractor shall adjust all products to insure a smooth and proper fit and operation.
• The contactor shall leave the area clean and free of all debris resulting from this installation. The installation crew shall coordinate all installation schedules with the Installation Technical Representative. Coordination must be completed at a minimum of 15 business days prior to installation date. Additionally, the ITR shall conduct final government inspection with the contactor prior to final departure from the job site.
File details come from the government source that posted it. Updated .