This document is a Questions and Answers (Q&A) file for the MAHG 23-1052 Reconfigure Keesler AFB Perimeter Security Fence federal contract opportunity. The Q&A provides clarifications on various technical and procedural aspects of the solicitation, including fence specifications, installation requirements, performance period, and contractor responsibilities. Key details include extending the project performance period from 180 to 270 days, confirming a K-4 crash rating for the fence and bollards, specifying camera and access control requirements, and addressing utility and demolition considerations.
The solicitation is a Service-Disabled Veteran-Owned Small Business set-aside with a project magnitude between $1,000,000 and $5,000,000, located at Keesler Air Force Base. The project involves reconfiguring the perimeter security fence, including installing new fencing, cameras, access controls, and demolishing existing structures. Contractors must provide a narrative Quality Control Plan, past performance references, and coordinate closely with the Construction Manager on various technical specifications and site access requirements.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers 15 April 2025 MAHG 23-1052 Reconfigure Keesler AFB Perimeter Security Fence, F8544 FA301025R0008
RFI Question Refere nce Answer
I wanted to check in and request information regarding 4.
Part II – Technical Proposal on page 41 of the
Solicitation. I see that we are required to receive consent.
Could you please let us know if there is an issue with participation or providing consent?
Solicitation
Contractor needs to give consent on page 40 under 5(b)(2)
And just to verify, we need to add Table No. 1 to the proposal package along with an Approach, Construction
Schedule, QCP, List of Major Items, Equipment & QTY’s, Identifying Key Personnel & Subs as well as a
Detailed Past Performance Sheet?
Solicitation
You need to provide consent to the release of your proposal information to the companies listed in Table
1 (page 41). You can provide consent within your technical proposal or by filling out (b)(2) on page 40 of the solicitation. Table 1 (page 41) does not need to be added to the proposal package. The list of items in question #2 is correct, but for Past
Performance you need Attachment L-01 MAGH23- 1052 Past Performance Reference List and
Attachment L-02 MAGH23-1052 Past Performance Questionnaire. See instruction for Past Performance on p. 42 of solicitation for more detailed information.
Request that the “Quality Control Plan” listed as part of the Technical Proposal be removed and made a pre-construction submittal. A narrative is typically required during the Proposal process due to the time and cost required to prepare a site-specific Quality Control Plan(s)
Solicitation
Instructions for (3) on page 42 of solicitation does say "Offeror shall submit a narrative Quality Control
Plan to include the following information: plan overview, matrix of roles and responsibilities, inspections testing required associated with project, recordkeeping and report, and standards for materials and workmanship."
4a
Per paragraph 3.2 Description of Work, Section 3.2.1 states:
“…The Contractor shall be responsible for any errors that might have been avoided by complying with these procedures set forth. Any accessories or incidental items not specifically shown on the Drawings and detailed in the
SOW herein, which are necessary and/or required to complete the work within the intent of these documents, shall be included by the Contractor without additional cost to the Government.”
The contractor can only inspect what can be seen above ground. Will the contractor be responsible for damage to utilities that are not shown on the documents and/or not located correctly? Contractors cannot be responsible for differing site conditions that maybe found during construction. Please clarify.
SOW
The contractor will be responsible for obtaining a Dig Permit for the area of work. The permit will locate all the utilities that they will encounter during the project. If the contractor damages any utilities that are marked, the contractor will be responsible for repairs at their cost. Contractor shall notify Contracting Officer if any unforseen conditions are encountered. Refer to FAR 52.236-2 Differing Site
Conditions
4b
Is it to be assumed that the contractor will be responsible for any errors in the design, drawings and/or specifications...i.e. grades, utility locations & routing of new work, discrepancies between drawings and specs, etc.?
SOW Refer to DFARS 252.236-7001 Contract Drawings and Specifications
Per paragraph 3.2 Description of Work, Section 3.2.2 states:
“Utilities from the work will be provided by the Government unless otherwise noted.”
Please provide a list of utilities that will be provided by the Government.
SOW
Utilities are not being provided for contractor use.
See Attachment 1-MAHG231052 Reconfigure Keesler AFB Perimeter Security Fence F8544-SOW
Rev 6 20250415 (3.2.2)
Per Section 3.2.4.2 NEW CONSTRUCTION, #13 Install as indicated on drawings: “m. Security camera provided by Security Forces”
Please provide specifications for the camera(s) being provided. Along with any pertinent information needed for the contractor to meet installation requirements.
SOW
The camera will be an existing camera at White Ave.
Gate. The contractor is to communicate with CM on the location of camera and installation. See Keynote
1 on E-103.
See Aattachment 9 for camera information.
The camera is weather proof and it will be connected via ethernet, see E-502 and E-503 for information on wiring for camera.
Per Paragraph 3.3 PERFORMANCE TIME, Section 3.3.1- 3.3.3:
“3.3.1 Performance will begin 10 days after Award and end 180 days later.
3.3.2 No Work shall begin until all Submittals related to
that work have been received and approved.
3.3.3 Punch list items noted in the closeout process shall
be fixed before the end of the Period of Performance or the project will be considered past due.”
Would the Government consider extending the contract performance time? A duration of 180 calendar days does not allow for enough time when all factors of the project are considered…i.e. getting contracts & subcontracts issued/executed, submittals submitted/approved, lead time on materials, developing & applying for project SWPPP
& permit, completion of the scope of work with restricted work days/times and closeout process.
SOW
The POP will be increased to 270 days total to provide the contractor with more time to complete the project. See Attachment 1-MAHG231052 Reconfigure Keesler AFB Perimeter Security Fence
F8544-SOW Rev 6 20250415 (3.3.1)
Per Paragraph 4.5 STORM WATER MANAGEMENT, All Sections:
Reference is made that the contractor is responsible for all necessary paperwork, including the Storm Water Pollution
Prevention Plan (SWPPP) to apply for a storm water permit with from MDEQ.
Start of contact time 10 days after award does not allow enough time to develop, submit and receive a SWPPP for this project. Please consider allowing additional time for the contractor to secure the proper permits prior to the start of contract performance time.
SOW
The POP will be increased to 270 days total to provide the contractor with more time to complete the project. See Attachment 1-MAHG231052 Reconfigure Keesler AFB Perimeter Security Fence
F8544-SOW Rev 6 20250415 (3.3.1)
The SOW mentions the demolished equipment such as the traffic poles, traffic lights, and traffic cabinet at White
Avenue and Judge Sekul intersection are to be returned to the Government.
Please confirm the removed guard shacks, wedge barriers, sump pumps, HPUs, and bollards are not to be returned to the Government and can be hauled off-site.
SOW
The SOW and Drawings callout all items that need to be returned to the Government. If the item is not called out, it does not need to returned.
10 Please provide the location of where the returned equipment will need to be taken to.
Location will be coordinated with Construction Manager. Location will be on Keesler property, furthest location will be behind hospital in Oak Park.
Will an alternate for the outer perimeter fence be accepted as long as it matches the aesthetics of the existing site fence?
Yes, an alternate fence will be accepted as long as it meets the same aesthetics and meets K-4 or ASTM
2656 (M30) requirements.
12 Will the proposed fence require privacy panels to match the existing fence at the Judge Sekul Entrance? No, privacy panels are not needed.
During the site visit, it was noted that there were substantial root systems along the proposed fence line.
Please advise if there are any specific restrictions on potential damage of existing root systems.
Majority of the trees that are along the fenceline will be removed. The other trees in the proposed fence line are outside the minimum distance requirement.
14 Is the proposed fencing to meet a required wind rating? If so, please provide Vmph and exposure category.
Using the standard fence design that was provided to the contractors will be sufficient for bidding purposes. We want to match the fencing that is existing.
Detail shows no new fence, gates, or guard shack are to be installed after demolition at the White Avenue Entrance.
Please confirm.
Detail 1, C-
Confirmed, no new fence, gates, or guard shack will be installed after demolition at the White Avenue
Entrance. Construct as indicated in drawings.
Detail shows no new fence, gates, or guard shack are to be installed after demolition at the Judge Sekul Entrance.
Please confirm.
Detail 2, C-
Confirmed, no new fence, gates, or guard shack will be installed after demolition at the Judge Sekul Entrance. Construct as indicated in drawings.
This detail shows approximately a 30' gap between the cable fence anchor posts in which there will be no crash protection. Please advise.
Detail 4, C-
That is correct, cabling will not be installed in the 30' section.
See Attachment 2-MAHG231052 Reconfigure Keesler Fence F8544 - DRAWING 20250414:
Drawing C-103 Key Note 3. Cabling to end at Post #8 and continue at Post #9.
The proposed crash rated bollards shown in this detail are shown to be installed directly adjacent to the proposed crash fence. Please provide the intent for this design.
Detail 2, C-
Construct as indicated in drawings.
The intent for the crash rated bollards is to provide more security at that specific location as it is the most vulnerable area.
Is base specific guidance provided on the removal and disposal of hydraulic fluid in reference to the barrier/HPU demo?
Remove and dispose off site per applicable requirments according to State/Federal Laws in accordance with 40 CFR part 239-282
The utility site plan indicates an electrical run going through the middle of the proposed bollard run at the Judge Sekul Entrance. Depending on the depth of the existing electrical pathways, this could present an issue when installing the bollards. Please advise.
C-104 According to City Light and Power, the electrical line has been abandoned.
21 Please confirm the proposed fence picket spacing is to be 3-1/4" as shown in Detail 1.
Detail 1, C-
Detail 1/C-502 picket spacing is based on existing impasse fencing on KAFB. Picket spacing for approved equal fencing shall follow manufacturers recommendations and may vary from the design basis. Submitted product must be equal to specified fencing.
Drawing E-502, Electrical keynote 2 is requiring the contractor to provide and install card readers per the manufacture specifications. The specification for the project or the drawing doesn’t provide information for the access controls. Please provide the type of access controls that are required to be provide by the contractor?
Drawi ng
E-502
See SOW Section 3.2.4.2 Line number 11 for card reader details
23 Will the contractor be required to provide software, printers, servers and access cards for the access controls? No, the contractor is to provide the card reader only.
24 Will the contractor be required to provide on site training for the access controls?
Yes, the contractor will need to coordinate with the Construction Manager after the installation of the card readers to provide training to the personnel that need it. See Attachment 1-MAHG231052
Reconfigure Keesler AFB Perimeter Security Fence F8544-SOW Rev 6 20250415 (5.2.3)
Drawing E-103 and electrical key note 1 is calling for a camera to be minimum 15 feet away from the perimeter fence amd mount camera on existing structure if possible.
There is no existing structure for the camera mounting.
What is the approved standalone mounting method the government and security forces will require for the camera to be mounted on? What height is the camera to be mounted? Please provide detail drawing with pole type and foundations size and type for stand lone camera mounting.
E-103
The camera should be mounted on the aluminum walkway cover mentioned in C-102 Civil Keynote
#6. The specific location of the camera on the canopy will be determined in the field. The contractor shall coordinate with the CM to install one of the canopy post 2' down so that the canopy can be grounded.
26 Will the standalone pole for the camera require to be grounded? See above, no pole needed
Drawing E-103 is showing a road bore from the concrete pad for panel 1 to communication manhole HH-136-C.
What size road bore conduit is required?
E-103 Please refer to Attachment 6 - MAHG23-1052
Reconfigure Keesler Fence Wiring and Conduit Guide
Drawing E-103 is showing a road bore from the concrete pad for panel 1 to communication manhole HH-136-C.
Drawing C102 (See attached drawing) from the MS Cyber and Technology Center bid documents appears to be showing that communication manhole being demo as part of the civil demo. Is manhole HH-136-C being demo or remaining?
E-103 Manhole HH-136-C is not being demolished under project MAHG23-1052.
Drawing E-502 is call for a 2’’ conduit from the communication manhole to the control cabinet. Under
New Conduit/Ducts on page 8 of 20 of the 81st
Communications Squadron outside plant guidance is require new duct to be 4-inch inside diameter round. Is the
2’’ road bore conduit the correct size conduit?
E-502
No, please refer to Attachment 6 - MAHG23-1052 Reconfigure Keesler Fence Wiring and Conduit
Guide.
See Attachment 2-MAHG231052 Reconfigure Keesler Fence F8544 - DRAWING 20250414.
DRAWING E-502 General Sheet Notes #7 has also been updated.
Will the contractor be required to provide and install 3-inch 3 cell maxcell duct with tracer wire in the conduit from the communication manhole to the controller cabinet per the Communications Squadron outside plant guidance is require new duct?
Yes, per guidance provided in Attachment 6 - MAHG23-1052 Reconfigure Keesler Fence Wiring and Conduit Guide
31 Please confirm the K rating (or crash rating) of the new fencing and any associated bollards.
The crash rating for the bollards and fence is K-4.
The system shall also be in compliance with ASTM
F2656 (M30).
32 Please confirm the base electronic security contractor and provide contact information.
Advantor (Tamper Switch only) - Contact information will be provided at pre-con.
33 Please confirm the base access controls contractor and provide contact information if different.
Keesler does not utilize an access control contractor for card readers as specified in this project. All contact information for relevant POC's will be provided to the Ktr post award.
Is there available infrastructure, ports, licenses, recording and headend gear to support the new electronic security features and controls.
Infrastructure and ports are existing. However, the licenses, recording and headend gear to support the new electronic security features and controls shall be coordinated with CM.
35 Is there available infrastructure, ports, licenses, recording and headend gear to support the new cameras.
The only equipment that will be provided is the camera. The recording will be done through the ethernet connection shown in E-502. The contractor will provide power to the camera via the control box.
The contractor will need to communicate with the CM and 81 CS when making the connections. See
General Notes on E-502 and E-503.
Drawing C-501 showing a detail that appears to be an Ameristar Impasse II cabled System does meet any crash rating. The cables DO NOT have the proper spacing and are located too low on the fence. There are 3 rated systems on Keesler AFB. Below are the ratings and the requirements that must be kept for each specific K- rating.
From the three listed Ameristar Systems listed below, which system or rating would the scope of work need to be based upon?
a. K-4 rated system 15,000 lb. vehicle@ 30 mph. This system can have spans of rated Fence line of 29 feet in length and up to a 40 foot in length and will maintain this rating. This is a 2-cable system.
b. K-8 rated system 15,000 lb. vehicle@ 40 mph this system has to be maintain at a 32-foot span only between the Anchor posts. This is also a 2-cable system. If you have a run that is that is below 29 feet or larger than 36 feet it will require to have a Ameristar bollard system behind the that line of fence.
c. K-12 rated system 15,000 lb. vehicle @50 mph This system must be kept to 32' runs to maintain the crash rating. This system requires 3 cables on the fence and rebar cages on the Anchor Posts Footers. If any run is less than 29 feet or over 36 feet, this will require an Ameristar Bollard system behind that run of fence. Any place that you have a section of 4' or less no cable or bollards are required.
Drawi ng C-
K-4 rated system is the system that the scope of work needs to be based upon. The system shall also be in compliance with ASTM F2656 (M30).
The bollard system behind the fence is not needed.
Drawing sheet C-501 is for reference only, contractor is to follow the manufacturer requirements for the fencing.
Drawing sheet C-103 will be used for schematic purposes only, please disregard the coordinate points for post locations and follow the manufactuer requirements to meet K-4/M30.
All of the above Ameristar systems include Ameristar accessories and hardware that have been tested which are carbon steel with their Armor-Galv. Black coating. They do not use Stainless steel due the strength. Would this be acceptable?
Material may vary by manufacturer, fence must meet K-4/M30 rating and aesthetically match the existing fence.
38 Will Keesler have personnel onsite to provide utility locates for utilities inaccessible to 811 One Call?
811 is directed to Keesler and all known utilities will be located.
39 Please identify acceptable areas for contractors’ laydown/staging/storage yard.
The location will be coordinated with the Construction Manager to be located adjacent to jobsite.
Has a Hazardous Materials Analysts Report been performed on the structures/building that are to be demolished? If so, please provide a copy.
A Hazardous Materials Analysis Report showed buildings were negative for asbestos.
Please provide the year of construction for structures/buildings that are to be demolished. Are any of these structures/buildings older than 1978?
Guard shacks were both built in 1961. Asbestos testing results were negative.
What classification does this project fall under for limits of subcontracting? i.e. General Construction, Specialty
Trade, etc.
General Construction
43 Can you provide the past manufacturer/supplier of the existing ornamental fence? Ameristar
What is the proposed route for construction traffic? i.e.
trucks for removal of demo debris, material deliveries, concrete & asphalt deliveries
The contractor will need to use the Division St. gate for base access and egress. As of now 20250409 any contractors and contractor employees are being required to pass though the commercial gate. Please be prepared for longer wait times.
45 Where are the materials that are to be removed & returned to the Government to be delivered?
Location will be coordinated with Construction Manager. Location will be on Keesler property, furthest location will be behind hospital in Oak Park.
46 Are there any packaging/crate requirements for materials/equipment that is to be returned?
No, the materials/equipment that will be returned to the Government will not have any packaging requirements.
47 Please provide a Geotech report and water table level for this project. That information is not available.
What are the contractors requirements for maintaining accessibility to building 4605? Is it anticipated that a temporary access will be needed? Per Sheet C-401, General Sheet Notes #1…States that the demolition at White Ave & Judge Sekul is to take place after the perimeter fence is installed, therefore eliminating access currently being used for building 4605.
C-401
Contractor is required to provide a traffic control plan that will show how access to B4605 will be maintained throughout the duration of the project.
Once fenceline is closed, access to B4605 will be through White Ave. gate during demoltion phase.
Please clarify General Note #7 on Sheet C-100…Is the contractor required to provide separate individuals for the roll(s) of Project Superintendent, Quality Control Representative and Safety Representative. Will sharing of responsibilities be allowed?
At least two people need to be appointed: 1 superintendent and 1 safety/quality person.
Can we confirm that the new fiber optic cable is to be ran on the outside of the base and perimeter fence, and not the inside of the base? See picture below E-103 Yes, the new fiber optic run will be ran outside the base and perimeter fence.
During site walk, it was mention the fence post are to be core drilled in the locations where new fence will be installed on the existing sidwalk, please advise.
As mentioned at the site walk, core drilling will be required in locations where there is existing sidewalk.
Clarification on access controls and other optional equipment. The specifications in Attachment 3, for the turnstile, are very broad. Programmable keypads are mentioned, along with "Solar Roof System", "indicator lights for pedestrian traffic", and also, "ADA turnstile gates". The Scope of work ask for a "Cheetah high assurance smart card reader, etc. Please clarify what access controls and other accessories are needed for turnstile.
The turnstile needs to have a Two Factor Authentication card reader installed. The card reader does not have to be the Cheetah High assurance smart card reader, but needs to meet all the requirements.
See SOW Section 3.2.4.2 Line 6 & 11 for details on the turnstile and card reader and see response 33.
Q & A for Contractors
File details come from the government source that posted it. Updated .