This document is an Outside Plant Guidance document for the 81st Communications Squadron at Keesler Air Force Base, dated April 2022. The comprehensive guide provides detailed technical specifications and standards for telecommunications infrastructure installation, focusing on outside plant (OSP) cabling, conduit systems, maintenance holes/hand holes, splicing, grounding, and cable management.

The guide covers critical technical requirements including conduit installation (specifying 4-inch PVC or HDPE pipes), cable routing, splicing techniques, grounding standards, and documentation requirements. Key specifications include using Category 6 UTP cables, following specific color coding for different cable types (e.g., purple for cameras, red for secure communications), implementing 568B termination standards, and ensuring proper cable management with metal raceways and cable trays. Contractors must have BICSI-certified technicians, provide as-built drawings, conduct comprehensive testing, and adhere to TIA/EIA telecommunications standards. The document serves as a detailed technical reference for contractors performing communications infrastructure work at Keesler Air Force Base.

View the file

Other files

File Type Posted
Solicitation Amendment - FA301025R00080004.pdf PDF
Solicitation Amendment FA301025R00080004 SF 30.pdf PDF
Questions and Answers - MAHG 23-1052 Reconfigure KAFB Perimeter Security Fence R9 20250501.pdf PDF
Solicitation Amendment FA301025R00080003 SF 30.pdf PDF
Solicitation Amendment - FA301025R00080003.pdf PDF
Attachment 2-MAHG231052 Reconfigure Keesler Fence F8544 - DRAWING 20250424.pdf PDF
Solicitation Amendment FA301025R00080002 SF 30.pdf PDF
Solicitation Amendment - FA301025R00080002.pdf PDF
Questions and Answers - MAHG 23-1052 Reconfigure KAFB Perimeter Security Fence R8 20250424.pdf PDF
Attachment 1-MAHG231052 Reconfigure Keesler AFB Perimeter Security Fence F8544-SOW Rev7 20250424.pdf PDF
Questions and Answers - MAHG 23-1052 Reconfigure KAFB Perimeter Security Fence Revised 20250423.pdf PDF
Questions and Answers - MAHG 23-1052 Reconfigure KAFB Perimeter Security Fence 20250415.pdf PDF
Attachment 1-MAHG231052 Reconfigure Keesler AFB Perimeter Security Fence F8544-SOW Rev 6 20250415.pdf PDF
Solicitation Amendment - FA301025R00080001.pdf PDF
Solicitation Amendment FA301025R00080001 SF 30.pdf PDF
Attachment 2-MAHG231052 Reconfigure Keesler Fence F8544 - DRAWING 20250415.pdf PDF
MAGH 23-1052 Site Visit Sign in 20250325.pdf PDF
Attachment L-02 MAHG23-1052 Past Performance Questionnaire.pdf PDF
Attachment L-01 MAGH23-1052 Past Performance Reference List.pdf PDF
Solicitation - FA301025R0008.pdf PDF
Attachment 7 - MAHG23-1052 Wage Det. MS20250050_20250103.pdf PDF
Attachment 1 - MAHG231052 Reconfigure Keesler Fence SOW Rev 4 20250307.pdf PDF
Attachment 4 - MAHG231052 Reconfigure Keesler Fence MSS.xlsx XLSX spreadsheet
Attachment 3 - MAHG231052 Reconfigure Keesler Fence SPECS.pdf PDF
Attachment 8 - MAHG 23-1052 Submittal Procedures.pdf PDF
Attachment 5 - MAHG231052 Reconfigure Keesler Fence Manual.pdf PDF
Attachment 2-MAHG231052 Reconfigure Keesler Fence F8544 - DRAWING.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

81st COMMUNICATIONS SQUADRON OUTSIDE PLANT GUIDANCE

This guide is supplemental in nature and not all inclusive.

April 2022 Page 1 of 20

OUTSIDE PLANT GUIDANCE

April 2022

FA301025R0008 MAGH23-1052 Attachment 6

April 2022 Page 2 of 20

Table of Contents

GENERAL

Purpose CS in design review process .3 Contractor Responsibilities

PERMITS

Dig Permit AF Form 103 Confined Space Entry AF Form 1024 CE Work Request AF Form 332

MAINTENANCE HOLES/HAND HOLES (MH/HH)

Man Holes Hand Holes Cable Racks and Cable Rack Supports

UNDERGROUND CONDUIT SYSTEM 8

New Conduits/Ducts 8 Bends and Sweeps 9 Joins and Connectors 10 Pull Tape 1 Plugs and Sealers 1 Spacers 2 Tracer Wire 2 Warning Tape 3 Utility separation 3

SPLICE CONNECTIONS/TERMINATIONS 3

Copper Cable Splices 3 Copper Cable Terminations 3 Fiber Optic Splices 4 Fiber Optic Terminations 14

LABELING 4

Cable Tags (Copper/Fiber) 4 Fiber Optic Distribution Panel (FODP) 5

COMM EQUIPMENT/MECHANICAL ROOMS ... 6

Backboards 6 Equipment Cabinets 6

CABLE MANAGEMENT 16

FOC Maintenance Loop 16

GROUNDING AND BONDING 17

Racks/Cabinets 17 Equipment/Mechanical Rooms 18

DELIVERABLES 19

As-Built Drawings 19 Butterfly Drawings 19 Copper Test Results 20 Fiber Test Results 20

April 2022 Page 3 of 20

GENERAL

1. The purpose of this document is to supplement Telecommunications Industry Association/Electronic Industry Alliance (TIA/EIA) commercial standards for outside plant installations on Keesler AFB.

2. New construction or renovations programming outside plant work requires coordination with the 81 CS/SCXP Plans and Programs Office, contact # 377-7500 prior to implementation.

3. All outside plant cabling infrastructure installed on Keesler AFB will conform to TIA/EIA cabling standards and the supplemental guidance contained within this document.

4. Any deviations from this supplement shall be coordinated through 81 CS/SCXP and the applicable maintenance work center for final approval by 81 CS.

5. Contractual responsibilities:

5.1 Contractors selected to complete outside plant work must have at least one experienced\technically certified Building Industry Consulting Service International (BICSI) technician on site.

5.2 Provide as-built drawings for the outside plant cable work accomplished identifying installation/relocation work.

5.3 Provide test results (hand written results will not be accepted) for new\relocated outside plant cabling work accomplished.

5.4 Contractors shall be responsible for restoring work areas to original condition, to include removal of utility marking flags.

5.5 81 CS quality assurance office 81 CS/SCQ will be the approving authority for outside plant cabling work accomplished in new construction or renovations.

April 2022 Page 4 of 20

PERMITS (If required)

The Contractor shall be responsible to coordinate, complete and process all permits required to complete the installation prior to any trenching, horizontal directional boring or modifications to a facility, MH or HH. For example:

Digging permit, AF Form 103 shall be submitted through BCE 14 calendar days in advance of digging activities. The Contractor is responsible for maintaining all markings and for ensuring AF Form 103 remains current.

Confine space entry permit, AF Form 1024 The Contractor shall be prepared to provide proof of their Confined Space Training Program to the base safety office.

The use of an AF Form 1024 may be required.

Base Civil Engineering Work Clearance Request, AF Form 332 shall be submitted through BCE 14 calendar days in advance of planned work.

The Contractor shall trench, excavate, mark and barricade open trenches IAW OSHA Standards.

All utility markings, flags, etc. shall be maintained by the contractor after the responsible work center/shop identifies/locates them and ensure that the AF Form 103 remains current. Contractor shall remove marking flags upon project completion.

The contractor shall take precautions to protect existing infrastructure.

If a utility is severed or damaged due to neglect or if attributed to the fault of the contractor, then the contractor shall repair and return the utility back to the condition it was in prior to the damage.

MAINTENANCE HOLES/HAND HOLES (MH/HH) (If installed)

Communications (not electrical MHs) installed on Keesler AFB shall have an American Association of State Highway and Transportation Officials (AASHTO) rating of H-20 and meet the requirements of EIA/TIA.

MHs/HHs shall be of concrete construction; Polymer concrete (i.e., Quazite) construction is NOT authorized.

6 inches to allow drainage of water from the walls. The gravel bed should extend 8 inches to 12 inches beyond the outer edges of the MH/HH.

It is understood that some MHs/HHs are precast with bonding ribbons or some similar connection, to the manhole rebar and therefore do not require a ground

April 2022 Page 5 of 20 rod. This method of grounding in lieu of a ground rod is satisfactory just as long as the achieved impedance to ground is ten (10) ohms or less.

Coordination with 81 CS/SCXP will be required to identify key information and to identify local grounding procedures.

All Devices with Abloy locks are the standard for KAFB).

Maintenance Holes:

Unless otherwise stated, new MHs shall have minim W x 6 H (Width, Length, and Height).

MHs shall be furnished with telecommunications industry standard cable racks, cable hooks, pulling irons, a sump pan (with removable perforated cover), a ladder, water resistance gaskets, bonding ribbon and a ground rod on the outside of the MH, connected to the MH ground system..

MHs shall have predrilled duct entry holes (sealed with knockouts configured for splayed entry in the end walls) with duct terminators to accept 4-inch I.D.

schedule 40 conduit.

Prefabricated MHs are preferred (Oldcastle Precast is the standard for Keesler

AFB).

Hand Holes:

Unless otherwise stated, new W L H (Width, Length, and Height).

s shall be furnished with telecommunications industry standard cable racks, cable hooks, pulling irons, a sump pan (with removable perforated cover), water resistance gaskets, bonding ribbon and a grounding system.

The HHs shall have predrilled duct entry holes (sealed with knockouts configured for splayed entry in the end walls) with duct terminators to accept 4-inch I.D.

schedule 40 conduit.

Prefabricated HHs are preferred (Oldcastle Precast is the standard for Keesler

AFB)

April 2022 Page 6 of 20

Cable Racks and Cable Rack Supports:

Cable racks shall be installed in existing as required. All new HHs shall have a minimum of 2 cable racks on each wall. All new MHs shall have a minimum of 3 cable racks installed on each wall. The use of cable rack stand-offs is required when new racks are installed in MHs.

All cables shall be supported using cable racks, cable hooks and cable rack locking clips.

All splices shall be supported by cable hooks under the splice case, NOT the cables that enter each end of the splice case.

Telecommunications industry standard cable hooks of the appropriate length shall be provided to support cables and splice cases.

All cable hooks shall be secured using cable hook locking clips.

MH/HH Requirements

Cable Rack Cable Hook Hook Locking Clip

Hook Locking Clip Pulling Iron Sump Pan w/Lid

Lock Down Device MH Lid

April 2022 Page 7 of 20

MH/HH Examples of Unacceptable Standards

Installed Above Grade Cable Left On Floor Tracer Wire Not Capped

Plastic Not Removed Debris Left in Hole Debris, Cable & Tracer in Water

MH/HH Examples of Acceptable Standards

Installed at Grade Tracer Tagged and Capped Ropes Tied to Steps

Mx Loop Racked Duct Destination Marked Ducts Properly Sealed

April 2022 Page 8 of 20

UNDERGROUND CONDUIT SYSTEM

The Contractor shall be responsible for any required trenching and/or boring necessary to lay the duct system. Contractor is also responsible for backfilling trench lines and compaction of fill materials with appropriate compaction tools.

Provide a minimum of 12" cover of clean fill above the conduit. Backfill material shall be clean and free from all organic material, clay, marl or unstable materials, debris, lumps, or broken paving. No rocks or stones larger than 3 inches in diameter shall be allowed in backfill. Material for backfill may be material resulting from excavation, if it meets the above requirements.

Directional drilling will be used for major road crossings. Otherwise, crossing of paved surfaces may be performed by pavement cuts and resurfacing with appropriate matching road material (road cuts must be coordinated and pre-approved by 81 CES 14 days in advance).

Ducts will be appropriately protected when placed under paved surfaces.

New Conduits/Ducts:

Installation of underground conduits/ducts shall be IAW EIA/TIA/RUS Bulletin standards.

New conduits/ducts shall be corrosion resistant and 4-inch inside diameter (I.D.)

round or metric equivalent.

Ducts shall be made of EPC-40 Polyvinyl Chloride (PVC) (Schedule 40) IAW NEMA TC-2. For unique situations the ducts shall be EPC-80-PVC (Schedule 80) IAW NEMA TC-2, high density polyethylene (HDPE) SDR 11.5, Galvanized mited to risers.

High density polyethylene (HDPE) SDR 11.5 shall be used when directional boring is used.

HDPE shall NOT be placed directly into a MH/HH without the appropriate PVC Terminator. The preferred method is to transition from HDPE to PVC prior to terminating conduit into these structures.

GIP or stainless steel shall be used under taxiways and runways.

Ducts shall have beveled bell ends and enter the MH/HH perpendicular to the surface of the wall through which it is entering and shall be cut flush with the interior wall of the MH/HH. Ducts and openings around ducts shall be sealed to prevent moisture from entering the maintenance holes.

April 2022 Page 9 of 20

All ducts installed, to include beneath roads, sidewalks, parking areas, other paved surfaces or areas to be paved, etc. shall be installed a minimum of 36" below grade.

The Contractor shall provide other protective measures, concrete cap, etc., in those areas where the minimum ground cover cannot be achieved.

New conduits/ducts shall be permanently labeled on the wall of each Building/MH/HH indicating the connecting Building/MH/HH at the other end of

New single ducts (or a minimum of 1 duct per duct bank) shall be populated with 3 each, 3 inch, 3 cell geotextile/maxcell (1 with tracer wire) for maximum cable placement. Deviations require coordination through 81 CS/SCXP and the responsible maintenance work center for approval.

Upon completion of conduit sections, a test mandrel (6.4mm) smaller than the inside diameter of the conduit shall be pulled through two diagonally opposite ducts to ensure proper alignment. In addition, all ducts shall be cleared of loose materials such as concrete, mud, dirt, stones, etc.

Bends and Sweeps:

Accomplish changes in the direction of runs exceeding a total of 10 degrees, either vertically or horizontally, by long sweeping bends having a minimum radius of 20 feet. All bends between MHs shall be a minimum of ten times (10X) the diameter of the duct size (i.e., 4 inch duct = 40 inches) with the sum of bends in all directions not exceeding a total of 90 degrees where practical. Coordination with 81 CS/SCXP is required if runs have bends that total more than 90 degrees.

Long sweeps may be made up of one or more curved or straight sections and/or combinations thereof. Bends made manually shall not reduce the internal diameter of the conduit.

The following definitions apply:

o 90-degree bend: Any radius bends in a piece of pipe that changes the direction of the pipe by 90 degrees.

April 2022 Page 10 of 20 o Kick: A bend in a piece of pipe, usually less than 45 degrees, made to change the direction of the pipe.

o Offset: Two bends usually having the same degree of bend, made to avoid an obstruction blocking the run of the pipe.

o 90- 90-degree bend (e.g., 24 inches is standard for 4-inch conduit).

o Back-to-back 90-degree bend: Any two 90-degree bends placed closer together than 10 feet in a conduit run. Utilize radius-manufactured bends to the maximum extent possible.

Sweeping 90 Elbow 90

Joints and Connectors:

Ducts shall be joined (with glue/cement) in such a manner as to be water tight.

Joints shall form a sufficiently smooth interior surface between joining sections so that cables shall not be damaged when pulled past the joint.

Joints between dissimilar types of ducts (PVC, HDPE, galvanized steel pipe (GSP), EB, DB, etc.) shall use the appropriate connectors designed for the purpose of providing a seal between the ducts and preventing damage to cables pulled through these joints.

and, at a minimum, the mating surfaces shall be wiped clean before they are joined.

April 2022 Page 11 of 20

Pull Tape:

All newly installed ducts left vacant shall have a waterproof, corrosion resistant, pre-lubricated flat woven polyester pull tape installed with sequential footage markings, (1250 lb. pulling strength) for future cable installations.

The pull tape shall extend into the maintenance holes/handholes and be secured to a cable rack or pulling iron, etc.

Plugs and Sealers:

All ducts, sub-ducts, HDPE roll pipes and, inner-ducts, whether main or subsidiary runs, shall be plugged using universal duct plugs or removable putty sealants in all MHs, HHs, and building entrances.

Outdoor-rated ducts (sub-ducts, etc.) entering a building will be fire-stopped IAW

NFPA 101, 8.3.4.2.1

Foam spray is not an acceptable sealant on Keesler AFB.

Duct Plug Duct Seal Firestop

April 2022 Page 12 of 20

Spacers:

If the ducts are installed by trenching or excavation, spacers shall be placed at five

(5) foot intervals along the entire length of the duct run.

Tracer Wire:

At least one duct or roll pipe shall have a tracer wire or be otherwise locatable from the surface. NOTE: Maxcell with a Tracer Wire is the preferred method.

The tracer wire shall be exposed; free from the conduit, capped with a wire nut and must NOT be connected to grounds.

The tracer wire shall be secured and routed to the MH/HH neck to a point where maintenance personnel may access the wire without having to enter the MH/HH.

For buildings/communications rooms, attach the tracer wire to backboard above duct entrance.

to xxx Do Not Remove (where xxx is the other end of the wire).

April 2022 Page 13 of 20

Warning Tape:

Cable warning tape shall be buried below the surface and follow the duct route when excavation is the method of duct installation. The tape shall be a minimum of wide and orange in color with the appropriate warning message.

Utility separation:

When communications ducts cross either power duct or buried power cable, maintain a minimum separation of 3 inches of concrete or 12 inches of well-tamped earth between the two or 12 inches of well tamped earth when parallel; for pipes (e.g., gas, water, oil) maintain 6 inches when crossing or 12 inches when parallel.

SPLICE CONNECTIONS/TERMINATIONS

Copper Cable Splices:

All copper cable splicing shall be performed in accordance with EIA/TIA/RUS Bulletin Standards for Splicing Copper and Fiber Cable. The contractor shall use pic-a-bonds for cables 200-pair and below and 3M 710 splice connectors, or equivalent, for all cables larger than 200-pair.

All copper cable OSP underground splices shall be encased in an appropriate size and type enclosure and installed IAW manufacturer installation guidelines (Ex.

Preformed Line Stainless Steel Splice Enclosure or equivalent).

For Copper OSP no service loop/slack shall be allowed at the terminal or within the MH/HH. Direct buried cables shall be spliced above ground only in a buried distribution terminal or cabinet for ease of maintenance.

April 2022 Page 14 of 20

Copper Cable Terminations:

All OSP copper cable shall be terminated on a protected Building Entrance Terminal (BET) 110 type/710 splice connectors or 388 central office connectors with primary protector blocks equipped with 5-pin solid state or gas protector module accessories installed.

Fiber Optic Splices:

Intermediate cable splices shall be minimized and consist of fusion splices in a high quality re-enterable splice case.

Only splice closures intended for underground applications shall be used in the underground system. The Contractor shall use standard re-enterable fiber splice closures. The closures shall have adequate strength to protect the splice and maintain cable shield electrical continuity in the below ground environment.

The Government quality inspector shall have the opportunity to inspect the inside of the splice case before closure, pressure testing, and encapsulation is performed.

A coil of 25 feet of cable shall be provided on each cable entering and leaving a splice case in a MH or HH.

Fiber Optic Terminations:

Fiber optic cable termination will be accomplished with SC (UPC) connectors, with no splicing (home run installation), no cassettes and no jumpers/pigtails.

LABELING

The Contractor shall label all equipment and cables they install and cables identified for re-use in accordance with EIA/TIA Standards and as directed by 81 CS/SCXP.

Cable Tags:

All tags shall be permanently labeled, easily visible and corrosion resistant.

Install cable tags in all maintenance holes/hand-holes, cable vaults, pull boxes and building entrance terminal locations.

When cables pass through a maintenance-hole, put a tag on the cable, approximately 2 feet from each duct entrance.

Information on the cable tag shall identify cable by Size, Type, Cable Number and Count. Tagging and labeling of new cables shall be IAW the following:

Fiber-Optic Cable Tag Copper Cable Tag

April 2022 Page 15 of 20

Building fiber is being installed for ITB 6901 to Building Number 1101 Number of Strands and Cable Type

Fiber Optic Distribution Panel (FODP):

Each FODP shall be stenciled/marked with black ink or paint or adhesive backed decals in letters and numbers. The cover of all new FODPs shall be labeled to conform to the system used by local maintenance personnel to identify FODPs that terminate fiber.

If the manufacturer has not identified the sequence in which ports on FODPs are counted, the Contractor shall provide designation labels/strips to identify the sequence in which they are counted.

Each splice tray shall be marked to identify the fiber count contained in the splice tray. The marking shall identify the FODP by number (building number), cable number, and count.

Example (FODP Label):

Building FODP is installed in Building FO Cable Connects to Number of Strands and Cable Type

COMM EQUIPMENT/MECHANICAL ROOMS

Backboards:

FO 1101

6901-1101

1-36 SM or MM

FODP 1101

FO 1101 6901

1-36 SM or MM

April 2022 Page 16 of 20

Fire rated Backboards (void-free interior grade A-C plywoo shall be provided on three (3) walls in all telecommunication rooms.

Backboards shall be fire rated by manufacturing process. Fire Stamp shall be clearly visible. Otherwise, non-fire rated plywood must have 2 coats of UL 723 fire retardant paint applied on all 6 sides.

Equipment Cabinets:

All new equipment cabinets shall be lockable and compatible with existing lockable cabinets. Coordinate with the 81 CS/SCXP to ensure a common lock/key in all cabinets matching existing locks/keys.

Equipment cabinets shall have sufficient ventilation, cable pathway access, and space to allow for maintenance and operation of the equipment.

Wall mounted cabinets shall have a fire rated or painted plywood backboard (same as above) and be securely attached to the wall.

Rail settings within cabinets must be secured, be in a level condition and be positioned so all installed hardware and cables interfacing the hardware do not obstruct the closing of doors when door is in its final position.

Existing/previously installed cabinets shall be re-used to the maximum extent possible.

CABLE MANAGEMENT

The Contractor shall ensure a neat and orderly installation utilizing proper cable management IAW current applicable standards.

FOC Maintenance Loop:

The Contractor shall install a minimum of a 25 foot fiber optic cable maintenance loop at every MH/HH location, starting/ending in the first maintenance hole outside each end building.

The maintenance loop shall be properly labeled with a cable tag and securely supported by two cable hooks. Cable hooks are to be positioned so the highest one supports the underside of the top of the coil and the bottom hook supports the underside of the bottom of the coil.

-built-drawings.

April 2022 Page 17 of 20

GROUNDING AND BONDING (TIA-607-B) (If required)

All grounds will be labeled IAW ANSI/TIA Standards (see below for example).

Grounding and Bonding (Racks/Cabinets):

All new and existing racks/cabinets housing equipment, ladder rack and cable tray shall be bonded and grounded to the Equipotential Ground Plane IAW EIA/TIA Standards.

Equipment cabinets shall be capable of containing any standard equipment shelves for communications equipment per the current EIA/TIA Standards.

The Contractor shall test any new or extended ground at the cabinet/rack and at the new grounding/bonding points.

Cabinets, racks and other enclosures shall not be bonded serially, each shall have its own dedicated bonding conductor IAW EIA/TIA Standards.

The government reserves the right to test and validate newly installed grounds to ensure they meet compliance.

April 2022 Page 18 of 20

Grounding and Bonding (Equipment/Mechanical Rooms):

In the Equipment room/Mechanical room in which the cable is to be terminated, there is either a telecommunications main grounding busbar (TMGB) or a telecommunications grounding busbar (TGB).

the Contractor shall provide it and bond it to the electrical service equipment (power) ground.

The grounding conductor shall be tagged with a nonmetallic tag as close as practicable to the point of termination in a readable position. The information on the tag shall cont If this connector or wire is loose or must be removed, please contact the Base Communications Squadron wording.

All ground connections will have a clear margin of bare metal-to-metal contact IAW ANSI/EIA/TIA Standards.

H grounded in accordance with RUS/NEC Standards. The resistance for OSP grounding shall be nominally 10 ohms or less.

April 2022 Page 19 of 20

All new installed shall include bonding ribbon and grounding system.

Ground rods will be installed externally and connected to MH/HH grounding system.

NOTE - The surface mounted bonding ribbon may only be omitted when the following conditions apply:

o MHs are designed and constructed with an integral ground system with all ironwork bonded together.

o MHs are identified as containing an integral ground system with a

DELIVERABLES

As-Built Drawings:

The 81 CS/SCXP shall supply existing system drawings, and the Contractor shall provide updated drawings in Visio for building and rack elevation; Visio and .pdf for OSP. These drawings shall depict the entire pathway and details of the installation, including but not limited to: labeling, cables, inner-ducts and maintenance holes/handholes, conduits, maintenance loops, distances, bores, trenches, building entrances. Detailed butterfly drawings will also be required. If the existing cable diagram or butterfly drawings are not available; the contractor shall create the missing cable diagram/ butterfly drawings to include all the components used in this project. The Contractor shall record/deliver geospatial data of new outside plant distribution system.

Butterfly Drawings:

The Contractor shall record and submit butterfly, cable path and building penetration drawing information for all new installations including butterfly drawings for all maintenance holes and pull boxes that contain new or reused FOC. Drawings shall record the path and arrangement of new and reused fiber optic cables, splices, and the arrangement duct banks, ducts, inner-duct and shall show maintenance hole orientation with respect to geodetic north. Drawings shall be submitted in an easily read electronic format such as pdf. Scanned data sheets or legible sketches are acceptable.

Copper Test Results:

Testing of new copper cables shall be conducted on 100% of pairs and shall identify any discrepancies. All new copper installations shall be free from any and

e. The test results shall be documented, corrections implemented and retesting conducted and documented as required. In addition, documentation shall be presented to show

April 2022 Page 20 of 20 the length of the cable between telecommunications rooms. Testing shall be per industry standards. Specific testing procedures will be provided to the contractor by the owning maintenance work center

Fiber Test Results:

All testing shall be accomplished IAW all applicable industry standards.

Attenuation testing for optical fiber shall be performed and documented 1) from manufacturer, 2) upon delivery acceptance/prior to installation, 3) after cable placement/post installation and 4) after all splicing/end terminations have been completed. Any errors or above allowable loss readings will be repaired to bring the faulted fibers to within acceptable parameters. No additional splicing will be allowed in lieu of fiber end-to-end replacement due to manufacturer or installation damage. All strands are to be usable and free of errors providing 100% cable usage. Test Results: Certification of the cable(s) being tested is required to ensure it meets/exceeds requirements.

PREMISE WIRING GUIDANCE

Revision , A 2023

81st COMMUNICATIONS SQUADRON PREMISE WIRING GUIDANCE

Revision , 2023 Page 2 of 13

GENERAL

1. The purpose of this document is to supplement Telecommunications Industry Association/Electronic Industry Alliance (TIA/EIA) commercial standards for premise wiring (Local Area Network cabling) on Keesler AFB.

2. New construction or renovations programming premise wiring work requires coordination with the 81 CS/SCXP Plans and Programs Office, contact # 377- 7500 prior to implementation.

3. All premise wiring installed on Keesler AFB will conform to TIA/EIA wiring standards listed at the end of this document and the supplemental guidance contained in the attachments within this document.

4. Any deviations from the attached standards and this supplement should be coordinated and approved by the 81 CS/SCXP.

5. Contractual responsibilities:

5.1 Contractors selected to complete premise wiring work must have at least one experienced\technically certified Building Industry Consulting Service International (BICSI) technician on site.

5.2 Provide as-built drawings for the premise wiring work accomplished identifying installation/relocation work.

5.3 Provide test results for new\relocated premise wiring work accomplished.

5.4 Contractors shall be responsible for restoring work areas to original condition.

5.5 81 CS quality assurance office 81 CS/SCQ will be the approving authority for premise wiring work accomplished in new construction or renovations.

Revision , 2023 Page 3 of 13

RACKS/CABINETS (If installed)

Cabinets/Racks will be labeled on the front and rear at the top and bottom on a permanent part of the cabinet/rack. Text on labels shall be machine printed without serifs, uppercase and large enough to be read while standing near the cabinet/rack. The label color will contrast with surface upon which it is affixed (white on a dark surface, black on a light surface)(ANSI/TIA/EIA-606-A-1 section 11).

RACK 1 RACK 1

RACK 1 RACK 1

Revision , 2023 Page 4 of 13

Premise Power Requirements

SWITCH TYPE POWER REQUIREMENT

Cisco 9600, 9400 type Two NEMA Locking L6-30 female Plug connectors.

Cisco 9200, 9300 type Four NEMA 5-20R

* Coordinate with 81 CS/SCXP to determine switch requirement.

Revision , 2023 Page 5 of 13

CABLING

All copper cables, connectors, ports, jacks, outlets, and patch panels shall be TIA/EIA Category 6 rated and must be compatible with Panduit Mini-Com UTP RJ45 TG Jack Modules.

Cat 6 UTP

Cat 6 FTP

Cat 6A UTP

CABLE COLOR CODING

All installations and renovations will use the following cable color code:

Cameras �

Public Address (PA) Systems � gray

Secure Comm (encrypted) � red

Data/Voice - blue

Cat 5e UTP

Revision , 2023 Page 6 of 13

TERMINATIONS

All premise cabling supporting a Local Area Network will be terminated using 568B standards. Terminations will be made to available patch panel slots using the standard outlined below and appropriate labeling applied. If no patch panel slots are available a new patch panel will be installed. Deviation from this requirement will be considered on a case-by-case basis i.e., where space for a patch panel is not available.

Pairs will not be untwisted more than .5 inch. Cable jacket will not be stripped back more than 1 inch. No nicks on the inner conductors.

Revision , 2023 Page 7 of 13

CABLE MANAGEMENT

The Contractor shall ensure a neat and orderly installation utilizing proper cable management IAW current applicable standards. Data drops shall be routed in a manner to ensure the cables are protected and aesthetically pleasing along the cable path. Metal raceways (cable ladder or wire basket) shall be installed and/or utilized in all communication rooms.

Cable trays shall be installed and/or utilized in all communication rooms.

Cables will be independently supported off the ceiling with supports no more than 60 inches apart.

Cable route should avoid fluorescent light ballasts, electrical cables and motors.

Revision , 2023 Page 8 of 13

CABLE MANAGEMENT (continued)

Cable jackets must not be distorted. Velcro or nylon are acceptable � Velcro is better at protecting cable geometry. Staples will not be used.

Any building penetrations (to include wall, ceiling, or floor), shall be in compliance with National Fire Protection Agency (NFPA) regulations and coordinated with CSC�s structural office and fire department.

Revision , 2023 Page 9 of 13

LABELING

All labeling shall be machine generated, without serifs, uppercase and large enough to be easily read (ANSI/TIA/EIA-606-A-1 section 11).

The naming scheme shall also be coordinated with the 81st Communications Squadron (81 CS/SCXP).

Outlet(s)

Patch Panel(s)

Example of RACK 1 PANEL 1 located in TR 110 and connecting to Room 32 Outlets 1 and 2.

Example of a single quad data outlet located in room 32 and terminating in TR 110, Rack 1, Panel 1 and starting in port #1 of the patch panel

Example of a second quad data outlet located in room 32 and terminating in TR 110, Rack 1, Panel 1 and starting in port #5 of the patch panel

32-1 A B C D

32-2 A B C D

Revision , 2023 Page 10 of 13

LABELING (continued)

Cables - All cables will be labeled on both ends with encoded identifiers per (ANSI/TIA/EIA-606-A-1 section 11).

(located within 12 inches of faceplate) (located within 12 inches of patch panel)

110-1-1-1 32-1-A

32-1-B

110-1-1-3 32-1-C

110-1-1-4 32-1-D

RACK 1

Example of a single quad data outlet located in room 32 and terminated in TR 110, Rack 1, Panel 1 and starting in port #1 of the patch panel

110-1-1-2

Revision , 2023 Page 11 of 13

GROUNDING (TIA-607-B) (If installed)

All grounds will be labeled (ANSI/TIA-607-B para 7.8) (if installed).

All ground connections will have a clear margin of bare metal-to-metal contact (ANSI/TIA-607-B para 7.6).

Cabinets, racks and other enclosures shall not be bonded serially, each shall have their own dedicated bonding conductor (ANSI/TIA-607-B para 7.1.4).

Revision , 2023 Page 12 of 13

Premise Wiring References

NUMBER TITLE WEBSITE OR LOCATION

BICSI TDM Manual Building Industries Consulting Services International (BICSI) Telecommunications Distribution Methods (TDM) Manual http://www.bicsi.org/

NFPA 70 (2008) National Fire Protection Association (NFPA), National Electric Code (NEC) http://www.nfpa.org/

29 CFR 1910.268 Occupational Safety and Health Standards, Telecommunications http://www.osha.gov

ANSI American National Standards Institute (ANSI) and Internet Standards Resources http://www.ansi.org/

TIA Telecommunications Industry Association (TIA): TIA Standards See Commodity Specific Appendices and Individual Task Orders https://tiaonline.org/

TIA-526-7 (Jul 2015) Measurement of Optical Power Loss of Installed Single-Mode Fiber Cable Plant https://global.ihs.com/csf_hom e.cfm?&csf=TIA

TIA-568.0

(Mar 2020)

Generic Telecommunications Cabling for Customer Premises https://global.ihs.com/csf_hom e.cfm?&csf=TIA

TIA-568 SET (Mar 2020)

Commercial Building Telecommunications Cabling Standard https://global.ihs.com/csf_hom e.cfm?&csf=TIA

TIA-568.2

(Sep 2018)

Balanced Twisted-Pair Telecommunications Cabling and Components Standard http://www.tiaonline.org/

TIA-568.3 (Oct 2016) Optical Fiber Cabling and Components Standard https://global.ihs.com/csf_hom e.cfm?&csf=TIA

ASTM D4566-20 Standard Test Methods for Electrical Performance Properties of Insulations and Jackets for Telecommunications Wire and Cable http://webstore.ansi.org/

TIA-569 (May 2019) Telecommunications Pathways and Spaces https://global.ihs.com/csf_hom e.cfm?&csf=TIA

TIA-570 (Jul 2018) Residential Telecommunications Cabling Standard https://global.ihs.com/csf_hom e.cfm?&csf=TIA

TIA-598 (Jul 2014) Optical Fiber Cable Color Coding https://global.ihs.com/csf_hom e.cfm?&csf=TIA

TIA-606 (Oct 2021) Administration Standard for Telecommunications Infrastructure https://global.ihs.com/csf_hom e.cfm?&csf=TIA

Revision , 2023 Page 13 of 13

TIA-607

(Jul 2019)

Commercial Building Grounding and Bonding Requirements for Telecommunications https://global.ihs.com/csf_hom e.cfm?&csf=TIA

TIA/EIA-758 (Mar 2012)

Customer-Owned Outside Plant Telecommunications Infrastructure Standard https://global.ihs.com/csf_hom e.cfm?&csf=TIA

EIA/ECA-310 (Dec 2005)

Racks, Panels and Associated Equipment https://standards.globalspec.c om/std/195405/EIA/ECA-310

ICEA S-80-576 (2002) Category 1 & 2 Individually Unshielded Twisted Pair Indoor Cables for Use in Communications Wiring Systems https://www.techstreet.com/ice a/searches/33123596

ICEA S-83-596-2016 Fiber Optic Premises Distribution Cable https://www.techstreet.com/ice a/subgroups/54441

GR-409, Issue 2 (Nov 2008)

Generic Requirements for Indoor Fiber Optic Cable https://telecom-info.njdepot.ericsson.net/site-cgi/ido/docs.cgi?ID=21553131 5SEARCH&DOCUMENT=gr

GR-20, Issue 4 (July 2013)

Generic Requirements for Optical Fiber and Optical Fiber Cable https://telecom-info.njdepot.ericsson.net/site-cgi/ido/docs.cgi?ID=21553131 5SEARCH&DOCUMENT=gr

NEMA TC 2-2020 Electrical Polyvinyl Chloride (PVC) Conduit http://www.nema.org/stds/tc2.cfm

NEMA TC 6&8-2020 PVC Plastic Utilities Duct for Underground Installations http://www.nema.org/stds/tc6_8.c fm

NEMA TC 9-2020 Fittings for PVC Plastic Utilities Duct for Underground Installation http://www.nema.org/stds/tc9.cfm

RUS Bulletin 1751F-

Underground Plant Design https://www.rd.usda.gov/sites/ default/files/UTP_Bulletins_17 51F-643.pdf

RUS Bulletin 1751F-

Underground Plant Construction https://www.rd.usda.gov/sites/ default/files/UTP_Bulletins_17 51F-644.pdf

RUS Bulletin 1753F-

801(PC-5A)

RUS Standard for Service Installations at Customer Access Locations https://www.rd.usda.gov/sites/ default/files/UTP_Bulletins_17 53F-801.pdf

RUS Bulletin 1753F-

401 (PC-2)

RUS Standards for Splicing Copper and Fiber Optic Cable https://www.rd.usda.gov/sites/ default/files/UTP_Bulletins_17 53F-401.pdf

RUS Bulletin 1753F- 601a

RUS Specifications for Fiber Optic Cables (PE-90a) https://www.rd.usda.gov/files/ UTP_Bulletins_1753F- 601a.pdf