This document appears to be the AF3064 CONTRACT PROGRESS SCHEDULE form for a federal contract opportunity. The key details are:

The contract number is FA301024R0016 for the Naval Air Station - Pensacola Fiber Installation project, with a total contract value between $500,000 and $1,000,000. The project is a Total Small Business set-aside. An organized site visit will be held on August 7, 2024. The period of performance will be based on the awarded CLIN(s), and the government reserves the right to award Option CLIN 0002 at any time before September 30, 2024. The document provides instructions for completing the AF3064 form, which includes entering details such as the contract number, starting/completion dates, work elements and associated percentages, and signatures from the contractor and government.

View the file

Other files

File Type Posted
Solicitation Amendment - FA301024R00160003.pdf PDF
Attachment 13 - Technical Questions and Answers (REVISED 29 Aug 24).pdf PDF
Solicitation Amendment FA301024R00160003 SF 30.pdf PDF
Solicitation Amendment FA301024R00160002 SF 30.pdf PDF
Attachment 13 - Technical Questions and Answers (REVISED 27 Aug 24).pdf PDF
Solicitation Amendment - FA301024R00160002.pdf PDF
Solicitation Amendment - FA301024R00160001.pdf PDF
Solicitation Amendment FA301024R00160001 SF 30.pdf PDF
Attachment 13 - Technical Questions and Answers.pdf PDF
Attachment 12 - 1852 Floor Plan.pdf PDF
Attachment 11 - Meter Change Form.pdf PDF
NASP FOC Project Site Visit Sign-In Sheet.pdf PDF
Attachment 2 - SOO Bldg 746 Comm Room NAS P 5 May 23.pdf PDF
Attachment 3 - MAHG 23-00002 Submittal Procedures.pdf PDF
Attachment 6 - Material Submittals Schedule.xlsx XLSX spreadsheet
Solicitation - FA301024R0016.pdf PDF
Attachment 7 - KEESLER PREMISE WIRING GUIDANCE Revision G Aug 2023.pdf PDF
Attachment 4 - Past Performance Questionnaire.pdf PDF
Attachment 8 - Floor Plan Info for Bldg 746.pdf PDF
Attachment 5 - MAHG 23-00002 5 Line Reference - Past Performance Reference List.pdf PDF
Attachment 9 - Wage Determination.pdf PDF
Attachment 1 - SOO 20230517 FOC B603 to B1852 B4148.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT PROGRESS SCHEDULEForm Approved
(See Contractor's Instructions on Reverse)OMB NO. 0704-0188
Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to Department of Defense, Washington Headquarters Services, Directorate for information, Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project 0704-0188, Washington DC 20503. Please DO NOT RETURN your form/questionnaire to either of these addresses. Send your completed form/questionnaire to: SAF/AQCP, 1060 Air Force Pentagon, Washington DC 20330-1060.
1. CONTRACT NO.8. PROJECT TITLE10. APPROVAL RECOMMENDED BY:
FA301024R0016DATE SIGNEDINSTALLATIONS ENGINEERS' SIGNATURE
2. STARTING DATE
3. COMPLETION DATE9. SUBMITTED BY: (Enter Company Name Here)
4. PURCHASE REQUEST NO.DATE SIGNEDCONTRACTOR'S NAME (Last, First, Middle Initial)CONTRACTOR'S SIGNATURE11. APPROVED BY:
5. PROJECT NO.DATE SIGNEDCONTRACTING OFFICER'S SIGNATURE
6. ACTUAL STARTING DATEADDRESS (Street, City, State, Zip Code)
7. ACTUAL COMPLETION DATE
Block 12, Schedule Information
LINE NO.WORK ELEMENTS%(D) MONTHLY SCHEDULE (to include percentage of work performed for each Line No.)
(A)(B)(C)1-Oct1-Nov1-Dec1-Jan1-Feb1-Mar1-Apr1-May1-Jun1-Jul1-Aug1-Sep1-Oct1-Nov1-Dec1-Jan1-Feb1-Mar
1
COMPLETION OF THE PROJECT0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%0.0%
AF Form 3064, 20030901 PREVIOUS EDITION IS OBSOLETE

Page &P of &N

AF3064 Instructions

AF Form 3064 Instructions
Block 1Contract NumberEnter contract number AF3064 is being accomplish for
Block 2Starting DateEnter anticipated start date
Block 3Completion DateEnter anticipated completion date
Block 4Purchase Request No.Enter Purchase Requisition No. (normally found within CLIN description of contract)
Block 5Project No.Enter Project No. (normally found within CLIN description of contract)
Block 6Actual Starting DateEnter Actual Start Date (provided on Notice to Proceed, when issued)
Block 7Actual Completion DateEnter Completion Date (provided on Notice to Proceed, when issued)
Block 8Project TitleEnter Project Title
Block 9Submitted ByEnter Company Name next to "SUBMITTED BY:"

Enter Contractor POC name under "Contractor's Name" using format provided Enter Contractor Address under "Address" using format provided Date Signed (enter date once AF3065 has been reviewed and finalized Contractor's Signature (Convert AF3065 to PDF and sign once it has been reviewed/finalized)

Block 10CES / Vectrus SignatureTo be completed by CES / Vectrus personnel after Block 9 has been completed
Block 11CO SignatureTo be completed by 81 CONS / CO after Block 10 has been completed
Block 12Schedule InformationEnter information within the sub-blocks as necessary
Block 12ALine No.Numerical numbering used for identification of each work element and completion %
Block 12BWork ElementsEnter description for each main work element performed under this contract

(The descriptions used in this section will also be used on the AF3065) Block 12C Percentage of Total Contract Enter percentage of work that each work element identified in Block 12B represents of the total contract For instance: Line 1 equals 5% of the total contract (normally based on price of work element vs total contract) Block 12D Percentage by Month Enter percentage of work to be accomplished each Month for each work element.

For instance: Line 1 is accomplished the first Month then enter 5% in that week's column If Line 2 will take multiple months to accomplish then enter the % to be completed each month in the respective month column Completion of the Project Percentages in this row calculate automatically based on information entered in Block 12C and Block 12D