Attachment 6 - Material Submittals Schedule.xlsx
XLSX spreadsheet 26 KB Posted
- Attached to
- Naval Air Station - Pensacola Fiber Installation
- Solicitation number
- FA301024R0016
About this file
This document appears to be an attachment to a federal contract opportunity, specifically a Material Submittals Schedule for the NAS Pensacola FOC Project, Solicitation/Contract Number FA301024R0016. The schedule outlines the various material items, their required submittal types (e.g., shop drawings, samples, technical data), the number of copies required, the due dates for submittals, and the review and approval process.
The related federal contract opportunity is for the Naval Air Station - Pensacola Fiber Installation project, a set-aside for small businesses with a project value between $500,000 and $1,000,000. The contract has a base period and an optional period, with the option CLIN potentially being awarded before September 30, 2024. The contract is being issued by the Department of the Air Force Air Education and Training Command.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| Project Number: | |||
| Project Title: | |||
| NAS Pensacola FOC Project | Solicitation / Contract Number: |
FA301024R0016, Attachment 6
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| Number of Copies Required (if not electronically submitted) | Remarks | |||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Warranty-Manufacturer and/or Workmanship | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date |
fergusog: Enter the due date from the Contractor (MM/DD/YY) Date Received in Contracting fergusog: Enter the date received from the Contractor. (MM/DD/YY) Date to Civil Engineering fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY) Return Suspense Date fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
Submittal Numbers fergusog: Enter the Submittal Number
| Date Contractor | ||
| Notified | Contractor Resubmittal |
fergusog: Enter Resubmittal Number Final Approval fergusog: Enter the submittal final approval date
(MM/DD/YY)
Approved fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number Disapproved fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
| 7 |
| 8 |
| 9 |
| 10 |
| 11 |
| 12 |
| 13 |
| 14 |
| 15 |
| 16 |
| 17 |
| 18 |
| 19 |
| 20 |
| 21 |
| 22 |
| 23 |
| 24 |
| 25 |
&"Verdana,Bold"&12Schedule of Material Submittals &12Print on Legal size paper ( 8 x 14 ).
&P of &N
File details come from the government source that posted it. Updated .