Attachment 13 - MAHG201158 - Addendum 1.pdf
PDF 80 KB Posted
- Attached to
- Replace AHU FCU Weather Bldg Federal contract opportunity
- Solicitation number
- FA301024R0015
About this file
This document is an Addendum to the Request for Proposal (RFP) for the project to Replace AHU/FCU Weather Bldg 4332 at Keesler AFB, Mississippi, under Solicitation Number FA301024R0015. The Addendum provides clarification and additional requirements to the Statement of Work, including that the contractor must remove and reconnect duct detectors, and follow all applicable UFC/UFGS and NFPA guidelines when installing equipment and ducting.
The overall federal contract opportunity is for a construction project with an estimated value between $500,000 - $1,000,000, set aside for HUBZone certified small businesses. An organized site visit is scheduled for August 14, 2024. Funds are not currently available, and the government reserves the right to cancel the solicitation. Offerors must follow the proposal preparation and evaluation instructions in Sections L and M of the solicitation.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM 1 Date: August 26, 2024
PROJECT NAME: Replace AHU/FCU Weather Bldg 4332
LOCATION: Bldg. 4332 - Keesler AFB, Mississippi
PROJECT NUMBER: MAHG201158
WORK ORDER #: 83514
This Amendment is hereby part of the Contract Documents. The following conditions take precedence over conflict conditions in the Specifications, on the Drawings, and in any other
Contract Document. When a change is called for on a Drawing, this change shall carry through all applicable drawings, including all related architectural, civil, structural, mechanical, plumbing and electrical drawings. The Contract Documents are hereby amended in the following particulars:
This addendum is in reference to pre-bid questions and answers. The following is to be added to the Statement of Work:
3.2.4.3 PROVIDE AND INSTALL NEW:
I. Contractor is to remove duct detectors that are in the transition ducting. When new transition ducting is installed, contractor is to reconnect removed duct detectors and test to ensure functionality has been maintained. If at any time the removed duct detector becomes inoperable while removed, the contractor will replace the duct detector with a new one that is compatible with the existing fire alarm at no additional cost to the government.
J. Contractor is to follow all current UFC/UFGS and NAPA guidelines while installing all equipment and ducting.
END OF ADDENDUM 1
Attachment 13
FA301024R0015
File details come from the government source that posted it. Updated .