Attachment 3 - MAHG201158 - Appendix B - MSS.xlsx
XLSX spreadsheet 45 KB Posted
- Attached to
- Replace AHU FCU Weather Bldg Federal contract opportunity
- Solicitation number
- FA301024R0015
About this file
This document is an Attachment titled "Appendix B - MSS" which appears to be a Schedule of Material Submittals for a federal construction contract, Solicitation/Contract Number FA301024R0015, to Replace AHU/FCU at Weather Bldg B4332.
The key details are:
- This is a HUBZone small business set-aside contract with an estimated value between $500,000 - $1,000,000.
- The document provides a detailed list of required submittals across general, environmental, and mechanical categories, including items like construction progress schedules, warranties, O&M manuals, permits, test reports, and commissioning documentation.
- Required submission dates and approval/disapproval tracking are included for each submittal item.
- The related federal contract opportunity is for a construction project to replace HVAC equipment at a weather building, with a site visit scheduled for August 14, 2024.
- The contract is being issued by the Department of the Air Force, Air Education and Training Command.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MSS GENERAL
STATUS 0 complete of 7 for a total percentage complete of 0.00%
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT TITLE | SOLICITATION/CONTRACT NUMBER | |
| MAHG 20-1158 | REPLACE AHU/FCU WEATHER BLDG. B4332 | FA301024R0015 | ||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL |
| *INDICATES ITEMS THAT REQUIRE ENGINEER OF RECORD REVIEW | REQUIRED INDICATED BY "X" | ||||||||||||||||||||||||
| Shop Drawings/Plans/Forms | Product Data | Color Selection | Samples | Design Data | Test Reports | Certificates | Manufacturer's Instructions | Manufacturer's Warranty | Operation and Maintenance Data | Closeout Submittals | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBER | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||
| GENERAL | APPROVED | DISAPPROVED | |||||||||||||||||||||||
| Column2 | Column1 | ||||||||||||||||||||||||
| G1* | AS-BUILT DATA | X | FINAL + 21 Days | ||||||||||||||||||||||
| G2 | CONSTRUCTION PROGRESS SCHEDULE - AF3064 | X | Ph 1 NTP+ 3 DAYS | ||||||||||||||||||||||
| G3 | WARRANTIES | X | 10 DAYS BEFORE Final | ||||||||||||||||||||||
| G4 | OPERATION AND MAINTENANCE MANUALS | X | 10 DAYS BEFORE Final | ||||||||||||||||||||||
| G18 | TEMPORARY AIRFIELD CONSTRUCTION WAIVER (APPLICATION WITH SUPPORTING DOCUMENTATION) |
Author: CATIZONE, GAGE CTR AMC 6 CES/CENME:
| Use ONLY if work is on or adjacent to airfield. | X | 65% Design + 5 Days | ||
| G19 | FAA OBSTRUCTION EVALUATION (APPLICATION WITH SUPPORTING DOCUMENTATION) |
Author: Author:
| Use ONLY if FAA Evaluation is required. May be required on the flightline or for work requiring cranes in close proximity to flightline. | X | 65% Design + 5 Days | ||
| G20 | RESTRICTED/CONTROLLED AREA FREE ZONE (APPLICATION WITH SUPPORTING DOCUMENTATION) |
Author: Author:
Use ONLY if Free Zone is required, primarily airfield work. X 60 Days prior to PH 2 Start
Attachment 3 - FA301024R0015
MSS ENVIRONMENTAL
STATUS 0 complete of 39 for a total percentage complete of 0.00%
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT TITLE | SOLICITATION/CONTRACT NUMBER | |
| MAHG 20-1158 | REPLACE AHU/FCU WEATHER BLDG. B4332 | FA301024R0015 | ||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL |
| *INDICATES ITEMS THAT REQUIRE ENGINEER OF RECORD REVIEW | REQUIRED INDICATED BY "X" | ||||||||||||||||||||||||
| Shop Drawings/Plans/Forms | Product Data | Color Selection | Samples | Design Data | Test Reports | Certificates | Manufacturer's Instructions | Manufacturer's Warranty | Operation and Maintenance Data | Closeout Submittals | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBER | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||
| ENVIRONMENTAL | APPROVED | DISAPPROVED | |||||||||||||||||||||||
| Column2 | Column1 | ||||||||||||||||||||||||
| V1 | CONTRACTOR HAZARDOUS MATERIALS USAGE TRACKING FORM AND SDS SHEETS FOR NON-EXEMPT HAZMAT | X | Phase I | ||||||||||||||||||||||
| V2 | GREEN PROCUREMENT COMPLIANCE FOR FINISHING MATERIALS | X | NTP Ph 2 + 10 Days | ||||||||||||||||||||||
| V3 | CONSTRUCTION AND DEMOLITION DEBRIS TRACKING FORM | X | 50% Construction Complete Stage | ||||||||||||||||||||||
| V4 | CONSTRUCTION AND DEMOLITION DEBRIS TRACKING FORM | X | 100% Construction Complete Stage | ||||||||||||||||||||||
| V5 | ASBESTOS NESHAP SURVEY AND LEAD-BASED PAINT SCREENING RESULTS |
Author: Author:
| Required for projects where asestos containing material or suspect material is present | X | 65% DESIGN | ||
| V6 | ASBESTOS RENOVATION OR DEMOLITION NOTIFICATION FORM |
Author: Author:
| Required for all facility demolition projects; and for any renovation projects that involve asbestos containing materials | X | 95% Design + 10 days | ||
| V7 | POST ABATEMENT REPORT |
Author: Author:
| Required for all projects where asbestos removal/abatement is required | X | 10 DAY AFTER ABATEMENT | ||
| V8 | CONTRACTOR UNINTERRUPTIBLE POWER SUPPLY (UPS) TRACKING FORM |
Author: Author:
| Required for any project that involves installation of a UPS | X | 100% Construction Complete Stage | ||
| V9 | GENSET/FIRE PUMP PRODUCT DATA/TECHNICAL SPECIFICATION SHEETS |
Author: Author:
| Required for any project that involves installation of an internal combustion engine. | X | 65% DESIGN | ||
| V10 | ENGINE PERFORMANCE DATA SPECIFICATIONS WITH CERTIFIED EMISSION DATA |
Author: Author:
| Required for any project that involves installation of an internal combustion engine. | X | 65% DESIGN | ||
| V11 | DOCUMENTATION THAT THE ENGINE CONTROLS INCLUDE A NON-RESETABLE HOUR METER |
Author: Author:
| Required for any project that involves installation of an internal combustion engine. | X | 65% DESIGN | ||
| V12 | USEPA CERTIFICATE OF CONFORMITY FOR INTERNAL COMBUSTION ENGINE |
Author: Author:
| Required for any project that involves installation of an internal combustion engine. | X | X | 65% DESIGN | |||||
| V13* | PERMIT APPLICATION AND FEE - AIR CONSTRUCTION | X | X | 65% DESIGN | ||||
| V14 | VISIBLE EMISSIONS TEST (METHOD 9) AND COMPLIANCE REPORT |
Author: Author:
| Must be completed after installation - a requirement for Air Operating Permit | X | 10 DAYS PRIOR TO FINAL INSPECTION | |||||
| V15* | PERMIT APPLICATION AND FEE - AIR OPERATING | X | X | 10 DAYS PRIOR TO FINAL INSPECTION | |||
| V16 | POL STORAGE TANK APPLICATION AND SUPPORTING DOCUMENTATION |
Author: Author:
| Required for the installation of any POL storage tank >550 gallons in capacity | X | 65% DESIGN | ||||
| V17 | POL STORAGE TANK APPROVED PERMIT, INCLUDING RESPONSES TO REGULATOR COMMENTS | X | 95% DESIGN | |||
| V18 | POL STORAGE TANK FINAL INSPECTION (TEST RESULTS) |
Author: Author:
| Inspection by County, to include review of test results must be completed for generator to be operated | X | X | X | PRIOR TO FINAL INSPECTION | ||
| V19 | REFRIGERANTS SUBMITTAL FORM |
Author: Author:
| Required for any projects that remove or replace refridgerant (eg HVAC repair) | X | X | 100% Construction Complete Stage | ||
| V20* | SWFWMD (STORMWATER) PERMIT APPLICATION AND SUPPORTING DOCUMENTATION |
Author: Author:
| Required for any projects that add/increase impervious surfaces (eg. parking lots, buildings, roadways). | X | 65% DESIGN | ||||
| V21 | SWFWMD (STORMWATER) APPROVED PERMIT, INCLUDING RESPONSES TO REGULATOR COMMENTS | X | 95% DESIGN | |||
| V22* | SWFWMD CERTIFICATE OF COMPLETION (REDLINE AS-BUILTS) |
Author: Author:
| Required to close out SWFWMD permit. Some type a as-builts are required, and must be signed by EOR | X | X | X | PRIOR TO FINAL INSPECTION | ||
| V23* | HCEPC (WASTEWATER) PERMIT APPLICATION AND SUPPORTING DOCUMENTATION |
Author: Author:
| Required for projects that install or replace lift stations or sewer mains. | X | 65% DESIGN | ||||
| V24 | HCEPC (WASTEWATER) APPROVED PERMIT, INCLUDING RESPONSES TO REGULATOR COMMENTS | X | 95% DESIGN | |||
| V25* | HCEPC (WASTEWATER) CLEARANCE (TEST RESULTS, AS-BUILTS) |
Author: Author:
| Testing of system and preparation of as-builts (even if redlines) required to close out WW permits | X | X | PRIOR TO FINAL INSPECTION | ||
| V26* | TAMPA PORT AUTHORITY PERMIT (IN WATER WORK) APPLICATION AND SUPPORTING DOCUMENTATION |
Author: Author:
| Required for projects that disturb the bay bottom. | X | 65% DESIGN | ||||
| V27 | TAMPA PORT AUTHORITY APPROVED PERMIT (IN WATER WORK), INCLUDING RESPONSES TO REGULATOR COMMENTS | X | 95% DESIGN | |||
| V28* | USACE/FDEP (WETLANDS) PERMIT APPLICATION AND SUPPORTING DOCUMENTATION |
Author: Author:
| Required for projects that disturb wetlands | X | 65% DESIGN | ||||
| V29 | USACE/FDEP (WETLANDS) APPROVED PERMIT, INCLUDING RESPONSES TO REGULATOR COMMENTS | X | 95% DESIGN | |||
| V30* | HCEPC (WETLANDS) PERMIT APPLICATION AND SUPPORTING DOCUMENTATION |
Author: Author:
| Required for projects that disturb wetlands | X | 65% DESIGN | ||||
| V31 | HCEPC (WETLANDS) APPROVED PERMIT, INCLUDING RESPONSES TO REGULATOR COMMENTS | X | 95% DESIGN | |||
| V32* | SWFWMD (WETLANDS) PERMIT APPLICATION AND SUPPORTING DOCUMENTATION |
Author: Author:
| Required for projects that disturb wetlands | X | 65% DESIGN | ||||
| V33 | SWFWMD (WETLANDS) APPROVED PERMIT, INCLUDING RESPONSES TO REGULATOR COMMENTS | X | 95% DESIGN | |||
| V34 | NPDES PERMIT APPLICATION AND SUPPORTING DOCUMENTATION |
Author: Author:
| Required for projects that disturb 1 acre of land or more. Contractor will secure this permit. | X | 65% DESIGN | ||||
| V35 | NPDES APPROVED PERMIT, INCLUDING RESPONSES TO REGULATOR COMMENTS | X | 95% DESIGN | |||
| V36* | DEPT OF HEALTH (DRINKING WATER) PERMIT APPLICATION AND SUPPORTING DOCUMENTATION |
Author: Author:
Required for projects installing potable water mains or lateral lines >2-inches in diameter Author: Author:
Required for projects where asestos containing material or suspect material is present Author: Author:
| Required for all facility demolition projects; and for any renovation projects that involve asbestos containing materials | X | 65% DESIGN | ||||
| V37 | DEPT OF HEALTH (DRINKING WATER) APPROVED PERMIT, INCLUDING RESPONSES TO REGULATOR COMMENTS | X | 95% DESIGN | |||
| V38* | DEPT OF HEALTH (DRINKING WATER) CLEARANCE (TEST RESULTS, AS-BUILTS) |
Author: Author:
Bac-T results and as-built drawings are required as part of permit close-out documents Author: Author:
| Required for all projects where asbestos removal/abatement is required | X | X | X | PRIOR TO FINAL INSPECTION | ||
| V39 | SHPO CONSULTATION DESIGN DOCUMENTS |
Author: Author:
Required for projects involving historic buildings. CEIE will prepare consultation letters but requires design details including facility elevation drawings to complete consultation letters. Project cannot begin construction until SHPO approval is received.
Author: Author:
Required for any project that involves installation of a UPS Author: Author:
Required for any project that involves installation of an internal combustion engine.
Author: Author:
Required for any project that involves installation of an internal combustion engine.
Author: Author:
Required for any project that involves installation of an internal combustion engine.
Author: Author:
Required for any project that involves installation of an internal combustion engine.
Author: Author:
Must be completed after installation - a requirement for Air Operating Permit Author: Author:
Required for the installation of any POL storage tank >550 gallons in capacity Author: Author:
Inspection by County, to include review of test results must be completed for generator to be operated Author: Author:
Required for any projects that remove or replace refridgerant (eg HVAC repair) Author: Author:
Required for any projects that add/increase impervious surfaces (eg. parking lots, buildings, roadways). X X 65% DESIGN + 10 DAYS
AF66 MECHANICAL
STATUS 0 complete of 16 for a total percentage complete of 0.00%
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT TITLE | SOLICITATION/CONTRACT NUMBER | |
| MAHG 20-1158 | REPLACE AHU/FCU WEATHER BLDG. B4332 | FA301024R0015 | ||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL |
| *INDICATES ITEMS THAT REQUIRE ENGINEER OF RECORD REVIEW | REQUIRED INDICATED BY "X" | ||||||||||||||||||||||||
| Shop Drawings/Plans/Forms | Product Data | Color Selection | Samples | Design Data | Test Reports | Certificates | Manufacturer's Instructions | Manufacturer's Warranty | Operation and Maintenance Data | Closeout Submittals | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBER | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | ||||||
| MECHANICAL | APPROVED | DISAPPROVED | |||||||||||||||||||||||
| Column2 | Column1 | ||||||||||||||||||||||||
| M1* | T & B CERTIFICATION* | X | Phase I | ||||||||||||||||||||||
| M2* | DUCT WORK, DUCT INSULATION AND DUCT CLEANING METHODS/MATERIALS* | X | X | X | X | Phase I | |||||||||||||||||||
| M3* | DUCT ACCESS DOORS* | X | X | X | X | Phase I | |||||||||||||||||||
| M4* | DAMPERS AND ACTUATORS (MOTORIZED, BACKDRAFT, FIRE, GRAVITY ETC)* | X | X | X | X | Phase I | |||||||||||||||||||
| M5* | FAN COIL UNITS AND ASSOCIATED COMPONENTS (THERMOSTATS, ETC)* | X | X | X | X | Phase I | |||||||||||||||||||
| M6* | CONDENSATE PIPING* | X | X | X | X | Phase I |
| M7* | DUCT LEAKAGE TESTING | X | PRIOR TO INSULATION | |||
| M8* | START UP & TESTING OF HVAC SYSTEMS, CONTROLS, VACUUM AND COMPRESSED AIR SYSTEMS* | X | X | X | PRIOR TO PRE-FINAL INSPECTION | |
| M9* | T & B REPORT* | X | X | PRIOR TO PRE-FINAL INSPECTION | ||
| M10* | COMMISSIONING AGENT CERTIFICATION | X | Phase I | |||
| M20* | CONTROLS COMMISSIONING NARRATIVE* | X | WITH 65% DESIGN | |||
| M21* | CONTROLS COMMISSIONING PLAN* | X | X | 95% DESIGN + 10 DAYS | ||
| M11* | COMMISSIONING REPORT* | X | X | PRIOR TO FINAL INSPECTION | ||
| CHILLED WATER AND HOT WATER SYSTEMS | ||||||
| SITE INSPECTION |