Attachment 3 - MAHG201158 - Appendix B - MSS.xlsx

XLSX spreadsheet 45 KB Posted

Attached to
Replace AHU FCU Weather Bldg Federal contract opportunity
Solicitation number
FA301024R0015
Issued by
Department of the Air Force Air Education and Training Command

About this file

This document is an Attachment titled "Appendix B - MSS" which appears to be a Schedule of Material Submittals for a federal construction contract, Solicitation/Contract Number FA301024R0015, to Replace AHU/FCU at Weather Bldg B4332.

The key details are:

  • This is a HUBZone small business set-aside contract with an estimated value between $500,000 - $1,000,000.
  • The document provides a detailed list of required submittals across general, environmental, and mechanical categories, including items like construction progress schedules, warranties, O&M manuals, permits, test reports, and commissioning documentation.
  • Required submission dates and approval/disapproval tracking are included for each submittal item.
  • The related federal contract opportunity is for a construction project to replace HVAC equipment at a weather building, with a site visit scheduled for August 14, 2024.
  • The contract is being issued by the Department of the Air Force, Air Education and Training Command.

View the file

Other files for this federal contract opportunity

Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MSS GENERAL

STATUS 0 complete of 7 for a total percentage complete of 0.00%

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT TITLESOLICITATION/CONTRACT NUMBER
MAHG 20-1158REPLACE AHU/FCU WEATHER BLDG. B4332FA301024R0015
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
*INDICATES ITEMS THAT REQUIRE ENGINEER OF RECORD REVIEWREQUIRED INDICATED BY "X"
Shop Drawings/Plans/FormsProduct DataColor SelectionSamplesDesign DataTest ReportsCertificatesManufacturer's InstructionsManufacturer's WarrantyOperation and Maintenance DataCloseout SubmittalsREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
GENERALAPPROVEDDISAPPROVED
Column2Column1
G1*AS-BUILT DATAXFINAL + 21 Days
G2CONSTRUCTION PROGRESS SCHEDULE - AF3064XPh 1 NTP+ 3 DAYS
G3WARRANTIESX10 DAYS BEFORE Final
G4OPERATION AND MAINTENANCE MANUALSX10 DAYS BEFORE Final
G18TEMPORARY AIRFIELD CONSTRUCTION WAIVER (APPLICATION WITH SUPPORTING DOCUMENTATION)

Author: CATIZONE, GAGE CTR AMC 6 CES/CENME:

Use ONLY if work is on or adjacent to airfield.X65% Design + 5 Days
G19FAA OBSTRUCTION EVALUATION (APPLICATION WITH SUPPORTING DOCUMENTATION)

Author: Author:

Use ONLY if FAA Evaluation is required. May be required on the flightline or for work requiring cranes in close proximity to flightline.X65% Design + 5 Days
G20RESTRICTED/CONTROLLED AREA FREE ZONE (APPLICATION WITH SUPPORTING DOCUMENTATION)

Author: Author:

Use ONLY if Free Zone is required, primarily airfield work. X 60 Days prior to PH 2 Start

Attachment 3 - FA301024R0015

MSS ENVIRONMENTAL

STATUS 0 complete of 39 for a total percentage complete of 0.00%

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT TITLESOLICITATION/CONTRACT NUMBER
MAHG 20-1158REPLACE AHU/FCU WEATHER BLDG. B4332FA301024R0015
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
*INDICATES ITEMS THAT REQUIRE ENGINEER OF RECORD REVIEWREQUIRED INDICATED BY "X"
Shop Drawings/Plans/FormsProduct DataColor SelectionSamplesDesign DataTest ReportsCertificatesManufacturer's InstructionsManufacturer's WarrantyOperation and Maintenance DataCloseout SubmittalsREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
ENVIRONMENTALAPPROVEDDISAPPROVED
Column2Column1
V1CONTRACTOR HAZARDOUS MATERIALS USAGE TRACKING FORM AND SDS SHEETS FOR NON-EXEMPT HAZMATXPhase I
V2GREEN PROCUREMENT COMPLIANCE FOR FINISHING MATERIALSXNTP Ph 2 + 10 Days
V3CONSTRUCTION AND DEMOLITION DEBRIS TRACKING FORMX50% Construction Complete Stage
V4CONSTRUCTION AND DEMOLITION DEBRIS TRACKING FORMX100% Construction Complete Stage
V5ASBESTOS NESHAP SURVEY AND LEAD-BASED PAINT SCREENING RESULTS

Author: Author:

Required for projects where asestos containing material or suspect material is presentX65% DESIGN
V6ASBESTOS RENOVATION OR DEMOLITION NOTIFICATION FORM

Author: Author:

Required for all facility demolition projects; and for any renovation projects that involve asbestos containing materialsX95% Design + 10 days
V7POST ABATEMENT REPORT

Author: Author:

Required for all projects where asbestos removal/abatement is requiredX10 DAY AFTER ABATEMENT
V8CONTRACTOR UNINTERRUPTIBLE POWER SUPPLY (UPS) TRACKING FORM

Author: Author:

Required for any project that involves installation of a UPSX100% Construction Complete Stage
V9GENSET/FIRE PUMP PRODUCT DATA/TECHNICAL SPECIFICATION SHEETS

Author: Author:

Required for any project that involves installation of an internal combustion engine.X65% DESIGN
V10ENGINE PERFORMANCE DATA SPECIFICATIONS WITH CERTIFIED EMISSION DATA

Author: Author:

Required for any project that involves installation of an internal combustion engine.X65% DESIGN
V11DOCUMENTATION THAT THE ENGINE CONTROLS INCLUDE A NON-RESETABLE HOUR METER

Author: Author:

Required for any project that involves installation of an internal combustion engine.X65% DESIGN
V12USEPA CERTIFICATE OF CONFORMITY FOR INTERNAL COMBUSTION ENGINE

Author: Author:

Required for any project that involves installation of an internal combustion engine.XX65% DESIGN
V13*PERMIT APPLICATION AND FEE - AIR CONSTRUCTIONXX65% DESIGN
V14VISIBLE EMISSIONS TEST (METHOD 9) AND COMPLIANCE REPORT

Author: Author:

Must be completed after installation - a requirement for Air Operating PermitX10 DAYS PRIOR TO FINAL INSPECTION
V15*PERMIT APPLICATION AND FEE - AIR OPERATINGXX10 DAYS PRIOR TO FINAL INSPECTION
V16POL STORAGE TANK APPLICATION AND SUPPORTING DOCUMENTATION

Author: Author:

Required for the installation of any POL storage tank >550 gallons in capacityX65% DESIGN
V17POL STORAGE TANK APPROVED PERMIT, INCLUDING RESPONSES TO REGULATOR COMMENTSX95% DESIGN
V18POL STORAGE TANK FINAL INSPECTION (TEST RESULTS)

Author: Author:

Inspection by County, to include review of test results must be completed for generator to be operatedXXXPRIOR TO FINAL INSPECTION
V19REFRIGERANTS SUBMITTAL FORM

Author: Author:

Required for any projects that remove or replace refridgerant (eg HVAC repair)XX100% Construction Complete Stage
V20*SWFWMD (STORMWATER) PERMIT APPLICATION AND SUPPORTING DOCUMENTATION

Author: Author:

Required for any projects that add/increase impervious surfaces (eg. parking lots, buildings, roadways).X65% DESIGN
V21SWFWMD (STORMWATER) APPROVED PERMIT, INCLUDING RESPONSES TO REGULATOR COMMENTSX95% DESIGN
V22*SWFWMD CERTIFICATE OF COMPLETION (REDLINE AS-BUILTS)

Author: Author:

Required to close out SWFWMD permit. Some type a as-builts are required, and must be signed by EORXXXPRIOR TO FINAL INSPECTION
V23*HCEPC (WASTEWATER) PERMIT APPLICATION AND SUPPORTING DOCUMENTATION

Author: Author:

Required for projects that install or replace lift stations or sewer mains.X65% DESIGN
V24HCEPC (WASTEWATER) APPROVED PERMIT, INCLUDING RESPONSES TO REGULATOR COMMENTSX95% DESIGN
V25*HCEPC (WASTEWATER) CLEARANCE (TEST RESULTS, AS-BUILTS)

Author: Author:

Testing of system and preparation of as-builts (even if redlines) required to close out WW permitsXXPRIOR TO FINAL INSPECTION
V26*TAMPA PORT AUTHORITY PERMIT (IN WATER WORK) APPLICATION AND SUPPORTING DOCUMENTATION

Author: Author:

Required for projects that disturb the bay bottom.X65% DESIGN
V27TAMPA PORT AUTHORITY APPROVED PERMIT (IN WATER WORK), INCLUDING RESPONSES TO REGULATOR COMMENTSX95% DESIGN
V28*USACE/FDEP (WETLANDS) PERMIT APPLICATION AND SUPPORTING DOCUMENTATION

Author: Author:

Required for projects that disturb wetlandsX65% DESIGN
V29USACE/FDEP (WETLANDS) APPROVED PERMIT, INCLUDING RESPONSES TO REGULATOR COMMENTSX95% DESIGN
V30*HCEPC (WETLANDS) PERMIT APPLICATION AND SUPPORTING DOCUMENTATION

Author: Author:

Required for projects that disturb wetlandsX65% DESIGN
V31HCEPC (WETLANDS) APPROVED PERMIT, INCLUDING RESPONSES TO REGULATOR COMMENTSX95% DESIGN
V32*SWFWMD (WETLANDS) PERMIT APPLICATION AND SUPPORTING DOCUMENTATION

Author: Author:

Required for projects that disturb wetlandsX65% DESIGN
V33SWFWMD (WETLANDS) APPROVED PERMIT, INCLUDING RESPONSES TO REGULATOR COMMENTSX95% DESIGN
V34NPDES PERMIT APPLICATION AND SUPPORTING DOCUMENTATION

Author: Author:

Required for projects that disturb 1 acre of land or more. Contractor will secure this permit.X65% DESIGN
V35NPDES APPROVED PERMIT, INCLUDING RESPONSES TO REGULATOR COMMENTSX95% DESIGN
V36*DEPT OF HEALTH (DRINKING WATER) PERMIT APPLICATION AND SUPPORTING DOCUMENTATION

Author: Author:

Required for projects installing potable water mains or lateral lines >2-inches in diameter Author: Author:

Required for projects where asestos containing material or suspect material is present Author: Author:

Required for all facility demolition projects; and for any renovation projects that involve asbestos containing materialsX65% DESIGN
V37DEPT OF HEALTH (DRINKING WATER) APPROVED PERMIT, INCLUDING RESPONSES TO REGULATOR COMMENTSX95% DESIGN
V38*DEPT OF HEALTH (DRINKING WATER) CLEARANCE (TEST RESULTS, AS-BUILTS)

Author: Author:

Bac-T results and as-built drawings are required as part of permit close-out documents Author: Author:

Required for all projects where asbestos removal/abatement is requiredXXXPRIOR TO FINAL INSPECTION
V39SHPO CONSULTATION DESIGN DOCUMENTS

Author: Author:

Required for projects involving historic buildings. CEIE will prepare consultation letters but requires design details including facility elevation drawings to complete consultation letters. Project cannot begin construction until SHPO approval is received.

Author: Author:

Required for any project that involves installation of a UPS Author: Author:

Required for any project that involves installation of an internal combustion engine.

Author: Author:

Required for any project that involves installation of an internal combustion engine.

Author: Author:

Required for any project that involves installation of an internal combustion engine.

Author: Author:

Required for any project that involves installation of an internal combustion engine.

Author: Author:

Must be completed after installation - a requirement for Air Operating Permit Author: Author:

Required for the installation of any POL storage tank >550 gallons in capacity Author: Author:

Inspection by County, to include review of test results must be completed for generator to be operated Author: Author:

Required for any projects that remove or replace refridgerant (eg HVAC repair) Author: Author:

Required for any projects that add/increase impervious surfaces (eg. parking lots, buildings, roadways). X X 65% DESIGN + 10 DAYS

AF66 MECHANICAL

STATUS 0 complete of 16 for a total percentage complete of 0.00%

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT TITLESOLICITATION/CONTRACT NUMBER
MAHG 20-1158REPLACE AHU/FCU WEATHER BLDG. B4332FA301024R0015
TO BE COMPLETED BY PROJECT ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL
*INDICATES ITEMS THAT REQUIRE ENGINEER OF RECORD REVIEWREQUIRED INDICATED BY "X"
Shop Drawings/Plans/FormsProduct DataColor SelectionSamplesDesign DataTest ReportsCertificatesManufacturer's InstructionsManufacturer's WarrantyOperation and Maintenance DataCloseout SubmittalsREQUIRED SUBMISSION DATEDATE RECEIVED IN CONTRACTINGDATE TO CIVIL ENGINEERINGRETURN SUSPENSE DATESUBMITTAL NUMBERDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL APPROVALREMARKS
MECHANICALAPPROVEDDISAPPROVED
Column2Column1
M1*T & B CERTIFICATION*XPhase I
M2*DUCT WORK, DUCT INSULATION AND DUCT CLEANING METHODS/MATERIALS*XXXXPhase I
M3*DUCT ACCESS DOORS*XXXXPhase I
M4*DAMPERS AND ACTUATORS (MOTORIZED, BACKDRAFT, FIRE, GRAVITY ETC)*XXXXPhase I
M5*FAN COIL UNITS AND ASSOCIATED COMPONENTS (THERMOSTATS, ETC)*XXXXPhase I
M6*CONDENSATE PIPING*XXXXPhase I
M7*DUCT LEAKAGE TESTINGXPRIOR TO INSULATION
M8*START UP & TESTING OF HVAC SYSTEMS, CONTROLS, VACUUM AND COMPRESSED AIR SYSTEMS*XXXPRIOR TO PRE-FINAL INSPECTION
M9*T & B REPORT*XXPRIOR TO PRE-FINAL INSPECTION
M10*COMMISSIONING AGENT CERTIFICATIONXPhase I
M20*CONTROLS COMMISSIONING NARRATIVE*XWITH 65% DESIGN
M21*CONTROLS COMMISSIONING PLAN*XX95% DESIGN + 10 DAYS
M11*COMMISSIONING REPORT*XXPRIOR TO FINAL INSPECTION
CHILLED WATER AND HOT WATER SYSTEMS
SITE INSPECTION

File details come from the government source that posted it. Updated .