This document is an Addendum to a Request for Proposal (RFP) for the Renovate Blake Gym project. The addendum provides clarifications and changes to the Statement of Work (SOW) and drawings. The key details are:
The contractor shall disconnect, protect, store, and reinstall approximately 14 existing 46-inch TVs mounted in various locations throughout the facility. There is no work required for the gymnasium floor, and the contractor must protect the floor during construction. The addendum also removes a key note from the drawings.
The related federal contract opportunity is a solicitation for the Renovate Blake Gym project, with a total estimated value between $1,000,000 and $5,000,000. This is a Total Small Business set-aside, and an organized site visit is scheduled for May 1, 2024. Award will be made on an all, some, or none basis depending on available funding at the time of award. The period of performance will be based on the CLINs awarded.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1 Date: 15 May 2024
PROJECT NAME: Renovate Blake Gym
LOCATION: Building 1201
PROJECT NUMBER: MAHG191089, WT: #13967122
The following conditions take precedence over conflict conditions in the Specifications, on the
Drawings, and in any other Contract Document. When a change is called for on a Drawing, this change shall carry through all applicable drawings, including all related architectural, civil, structural, mechanical, plumbing and electrical drawings. The Bid/Contract Documents are hereby amended in the following particulars:
Pertaining to the SOW and the equipment list:
1. The contractor shall disconnect approximately 14 existing TVs from their wall mounts, protect and store during construction, reinstall following construction work and verify proper working order. The TVs are approximately 46” diag. in size. They are mounted in the following locations:
• 2 each in the Lobby, mounted approximately 5-6’ above the floor.
• 5 each in Cardio #1, mounted approximately 10-12’ above the floor.
• 2 each in the Parent-Child Cardio, mounted approximately 6’ off the floor.
• 5 each in Cardio #2, mounted approximately 10-12’ above the floor.
Pertaining to the Drawings:
2. Sheet D111: REMOVE key note ‘K’ from the Gymnasium. There is no work to the gym floor. The contractor shall protect the gym floor from damage during construction.
END OF ADDENDUM 1