Attachment 8 - Renovate Blake Gym - Appendix 3.pdf

PDF 132 KB Posted

Attached to
Renovate Blake Gym
Solicitation number
FA301024R0003
Issued by

About this file

This document is an Appendix to the specifications for the Renovate Blake Gym project, Solicitation Number FA301024R0003. The appendix provides supplemental requirements for the door hardware, including the use of temporary "construction cores" by the contractor, the requirement to provide permanent blank lock cores to the Contracting Officer for keying, and the specifications for the key material and quantities. The related federal contract opportunity is for the Renovate Blake Gym project, a construction effort between $1,000,000 and $5,000,000, set aside for small businesses. The solicitation includes instructions for a mandatory site visit on May 1, 2024 and directs offerors to Sections L and M for proposal preparation and evaluation factors.

View the file

Other files

File Type Posted
Solicitation Amendment FA301024R00030003 SF 30.pdf PDF
Solicitation Amendment - FA301024R00030003.pdf PDF
Attachment 13 - Renovate Blake Gym - Addendum 2.pdf PDF
Solicitation Amendment - FA301024R00030002.pdf PDF
Renovate Blake Gym - Additional Questions and Answers.pdf PDF
Solicitation Amendment FA301024R00030002 SF 30.pdf PDF
Solicitation Amendment FA301024R00030001 SF 30.pdf PDF
Attachment 12 - Renovate Blake Gym - Addendum 1.pdf PDF
Solicitation Amendment - FA301023R00080001.pdf PDF
Renovate Blake Gym - Questions and Answers.pdf PDF
Renovate Blake Gym - Pre-Bid Site Visit Sign-in Sheet.pdf PDF
Attachment 1 - Renovate Blake Gym - Statement of Work.pdf PDF
Section L Attachment L-01 - Renovate Blake Gym - Past Performance Questionnaire.pdf PDF
Attachment 7 - Renovate Blake Gym - Appendix 2.pdf PDF
Attachment 9 - Renovate Blake Gym - Appendix 4.pdf PDF
Attachment 10 - Renovate Blake Gym - Wage Determination MS20240050.pdf PDF
Attachment 11 - Renovate Blake Gym - Submittal Procedure.pdf PDF
Solicitation - FA301024R0003.pdf PDF
Attachment 2 - Renovate Blake Gym - Specifications .pdf PDF
Attachment 3 - Renovate Blake Gym - Drawings Vol 1 .pdf PDF
Attachment 4 - Renovate Blake Gym - Drawings Vol 2 .pdf PDF
Attachment 5 - Renovate Blake Gym - MSS.xls XLS spreadsheet
Attachment 6 - Renovate Blake Gym - Appendix 1 .pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix 3 Rev 30 Jan 2024

FA301024R0003

APPENDIX 3

Project Number: MAHG191089

Project: Repair Blake Gym

SUPPLEMENT TO SPECIFICATIONS:

I. Supplement to Section 08 72 00 Door Hardware:

A. ADD under 2.3.6: Cylinders and Cores:

i. Contractor shall install and use temporary ‘construction cores’. Contractor shall not install permanent cores.

ii. All permanent lock cores should be Small Format Interchangeable Core (Base

Standard).

iii. Provide all permanent blank cores to the Contracting Officer for the Base Locksmith to key and install.

iv. Equip locksets with core cylinders to match existing Base Standard.

v. Metals: Construct lock cylinder parts from brass or bronze, stainless steel, or nickel silver.

B. ADD under 2.3.9: Keys

i. All blank keys shall be provided to the Contracting Officer for the Base Locksmith for keying.

ii. Key Material: Provide keys of nickel silver only.

iii. Key Quantity: Furnish 3 blank keys for each lock.

End of Appendix