ATCH_13__Subcontracting_Plan_Checklist.pdf

PDF 588 KB Posted

Attached to
AFICA Air Combat Training System (ACTS) Services Federal contract opportunity
Solicitation number
FA3002-18-R-0010
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

ATCH 13 Subcontracting Plan Checklist

View the file

Other files for this federal contract opportunity

Other files attached to AFICA Air Combat Training System (ACTS) Services, newest first.
File Type Posted
Contractor_Acknowledgement_of_Amendment_2.pdf PDF
ATCH_1_PWS_12_Jun_18_Amendment_2.pdf PDF
ATCH_7_Appendix_6_Workload_Est-Amendment_2.pdf PDF
FA3002-18-R-0010-0002.pdf PDF
Q&As_Amendment_2.pdf PDF
Contractor_Acknowledgement_of_Amendment_1.pdf PDF
Q&As__7_Jun_18.pdf PDF
FA3002-18-R-0010_Amendment_1.pdf PDF
ATCH_1_PWS__4_Jun_18_Amendment_1.pdf PDF
Summary_of_Changes-RFP_Amendment_1.pdf PDF
ATCH_11_Section_L_Amendment_1.pdf PDF
ATCH_18_CBA_23_July_-15_Apr_19.pdf PDF
ATCH_2_Appendix_1_Def_&_Abb.pdf PDF
ATCH_3_Appendix_2__Publications.pdf PDF
ATCH_11_Section_L.pdf PDF
FA3002-18-R-0010.pdf PDF
ATCH_17_PPQ.pdf PDF
ATCH_6_Appendix_5_GF_Fac.pdf PDF
ATCH_7_Appendix_6_Workload_Est.pdf PDF
ATCH_4_Appendix_3_Site_Loc_Maj_Sys.pdf PDF
ATCH_15_-_Subcontractor_Consent_Letter.pdf PDF
ATCH_19_Holloman_WD_2015-5455_Rev_Jan_10_2018.pdf PDF
ATCH_1_PWS__16_May_18.docx.pdf PDF
ATCH_16_Past_Performance_Information_Sheet.pdf PDF
ATCH_9_Appendix_8_GF_Services.pdf PDF
ATCH_10_Appendix_9_Addl_Info.pdf PDF
ATCH_12_Section_M.pdf PDF
ATCH_14_-_Client_Authorization_Letter.pdf PDF
ATCH_20_DD254.pdf PDF
ATCH_5_Appendix_4_GFP.pdf PDF
ATCH_8_Appendix_7_Final_Rep,_Plns,_Appt.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Individual Subcontracting Plan Checklist and Review

Solicitation/Contract Number: Date:

Contractor: PCO:

Office Symbol & Phone:

• If the contractor is participating in the Comprehensive Subcontracting Plan Test Program, individual plans are NOT required.

• The cumulative value of the basic contract and options is used to determine whether a subcontracting plan is required.

• Options require separate goals. See FAR 52.219-9(c) and 19.704(c).

• If there is a (…) Master Subcontracting Plan in effect for this contractor, items 4 through 17 below do not apply. Note: Master plans are effective for three years after approval by the contracting officer, but contractors must maintain and update the plans as necessary.

Changes must be approved by the contracting officer. See FAR 19.704(b).

• Is this a commercial plan? Yes No See Far 19.704(d).

The PCO/buyer will review the subcontracting plan and coordinate as required with the contractor and the cognizant contract administration office.

After review, the PCO/buyer will complete/sign the checklist and provide the original checklist and a copy of the subcontracting plan to the local Air Force Small Business Office (SB). The SB will review the plan and obtain advice and recommendation from the SBA Procurement Center Representative (PCR). After review and coordination, the SB will notify the PCO/buyer of the results of the review before the start of negotiations.

Y=acceptable; U=not acceptable; N=not included; NI=needs improvement; N/A=does not apply

Does Plan Include: PCO SB SBA Reference

1. Total Subcontracting Dollars:

Total Contract Value:

Sub

Contract

Total

Contract

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

Total $ to SB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

Total $ to SDB (includes 8a) ( %)

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

Total $ to WOSB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

Total $ to Service Disabled VOSB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

Total $ to Veteran OSB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

Total $ to HUBZone SB

FAR 52.219-9(d)(2), 19.704(a)(2), 19.705

2. Goals listed as a Percentage of Total subcontract value.

Goals listed as a Percentage of Total contract value.

FAR 52.219-9(d)(1), 19.704(a)(1), 19.705---------------------------------------- AFFARS 5319.704(a)(1)

3. A description of the principal supplies/services to be subcontracted with sufficient detail to evaluate whether or not SB can do the work.

(Include large business, nonprofit, and not-for-profit work.)

FAR 52.219-9(d)(3), 19.704(a)(3), 19.705

4. A description of the method used to develop goals. FAR 52.219-9(d)(4), 19.704(a)(4), 19.705

5. A description of the method used to locate potential suppliers. FAR 52.219-9(d)(5), 19.704(a)(5), 19.705

6. Do the goals include indirect costs? FAR 52.219-9(d)(6), 19.704(a)(6), 19.705

If indirect costs are included in the goals, does the plan include a description of the cost allocation method?

FAR 52.219-9(d)(6), 19.704(a)(6), 19.705

7. Name and duties of contractor’s subcontracting plan administrator. FAR 52.219-9(d)(7), 19.704(a)(7), 19.705

8. Description of the efforts the offeror will make to assure that SBs have an equitable opportunity to compete for subcontracts.

FAR 52.219-9(d)(8), 19.704(a)(8), 19.705

9. Flow Down assurances. FAR 52.219-9(d)(9), 19.704(a)(9), 19.705

Appropriate subcontract clauses will be used. FAR 52.219-9(d)(9), 19.704(a)(9), 19.705

Subcontractors will be required to submit a similar plan. FAR 52.219-9(d)(9), 19.704(a)(9), 19.705

FA3002-18-R-0010, Air Combat Training System

Attachment 13

Does Plan Include: PCO SB SBA Reference

10. Assurance prime contractor will submit required reports and cooperate in studies and surveys.

FAR 52.219-9(d)(10), 19.704(a)(10), 19.705

11. Recitation of types of records maintained to show compliance with plan.

FAR 52.219-9(d)(11), 19.704(a)(11), 19.705

12. Assurances that the Offeror will make a good faith effort to acquire articles, equipment, supplies, services, or materials, or obtain the performance of construction work from the small business concerns that it used in preparing the bid or proposal.

FAR 52.219-9(d)(12)

13. Assurances that the Contractor will provide the Contracting Officer with a written explanation if the Contractor fails to acquire articles, equipment, s upplies, services or materials or obtain the performance of construction work as described in (d)(12) of this clause.

FAR 52.219-9(d)(13)

14. Has information and coordination from the ACO been obtained? FAR 19.706, DFARS 219.706(a)(i)

15. Assurances that the offeror will pay its small business subcontractors on time and in accordance with the terms and conditions of the subcontract, and notify the contracting officer if the offeror pays a reduced or an untimely payment to a small business subcontractor

FAR 52.242-5

16. If the SDB goal for the basic contract is less than 5%, is approval one level above contracting officer attached?

DFARS 219.705-4

17. For modifications, is approval attached if the SDB goal is less than 5%? (If SDB goal was below 5% for the basic contract and the reasons have not changed, a new approval is not required)

DFARS 219.705-4

18. Assurances that the Contractor will not prohibit a subcontractor from discussing with the Contracting Officer any material matter pertaining to payment to or utilization of a subcontractor.

FAR 52.219-9(d)(14)

19. Assurances that the offeror will pay its small business subcontractors on time and in accordance with the terms and conditions of the underlying subcontract, and notify the contracting officer when the prime contractor makes either a reduced or an untimely payment to a small business subcontractor.

FAR 52.219-9(d)(15), 52.242-5

Buyer/PCO Comments:

Buyer/PCO Signature and Date:

SB Comments:

Air Force Small Business Office Signature and Date:

SBA PCR Comments:

If box is checked, SBA does not have a copy of the current Master Subcontracting Plan on File. Please provide one.

SBA Procurement Center Representative Signature and Date:

SBA will internally report this subcontracting plan, as submitted, as acceptable not acceptable modified on _____________ to be acceptable before award.

SBA may contact the PCO/buyer regarding status of the subcontracting plan at time of award.

FA3002-18-R-0010, Air Combat Training System

Attachment 13

Individual Subcontracting Plan Checklist and Review
Solicitation/Contract Number: Date:
Contractor: PCO:
Office Symbol & Phone:
Y=acceptable; U=not acceptable; N=not included; NI=needs improvement; N/A=does not apply

File details come from the government source that posted it.