PAST_PERFORMANCE_INFORMATION.pdf

PDF 37 KB Posted

Attached to
Maxwell-Gunter BOS Federal contract opportunity
Solicitation number
FA300213R0012
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

Past Performance Information

View the file

Other files for this federal contract opportunity

Other files attached to Maxwell-Gunter BOS, newest first.
File Type Posted
FA3002-13-R-0012_Conformed_Solicitation_Document.docx DOCX document
FA3002-13-R-0012-0008.docx DOCX document
Maxwell_BOS_PWS_-_Amend_8.pdf PDF
FA3002-13-R-0012-0007.docx DOCX document
Maxwell_Memorandum_Amendment_0007.docx DOCX document
MFR_correcting_due_date_in_Amend_0007.docx DOCX document
Amendment_0007_Modification_Document.doc DOC document
CBA_M1_and_USW_Maxwell_AFB_April_14_2016_through_June_30_2018.pdf PDF
Vehicle_Replacement_Comment-Question.pdf PDF
MFR-_Amendment_0006.pdf PDF
Maxwell_BOS_PWS_Revised_Amend_5_(17_Sep_15).pdf PDF
Maxwell_BOS_RFP_(Conformed_Copy).pdf PDF
Attch_4_PAST_PERFORMANCE_INFORMATION.pdf PDF
Attachment_5_-_PPI_Tool_Instructions.pdf PDF
Maxwell_RFP_Amendment_4_Q A.xls XLS spreadsheet
Maxwell_BOS_PWS_5_Aug_15_-_Amendment_0003.pdf PDF
Maxwell-Gunter_Contractor_Workforce_Demographics_.pdf PDF
AFSFMS_Users_Guide_-_June_2008_RevisedMB(13_Nov_08).pdf PDF
MAX_Additional_Operations_Workload_7_Jul_2015.pdf PDF
Real_Property_Report _7115_(22_June_2015)-Amendment_0003.pdf PDF
MFR _Max_Bos _Amendment_0003.pdf PDF
Maxwell_BOS_Technical_Requirements.pptx PPTX presentation
Maxwell_BOS__Past_Performance_(13_May_15).pptx PPTX presentation
Maxwell_BOS_Welcome_(13_May_2015).pptx PPTX presentation
Maxwell_BOS_PWS.pptx PPTX presentation
ppi_tool.accdb —
Maxwell-Gunter_Site_Visit_Letter.pdf PDF
FA3002-13-R-0012_-_Maxwell_RFP_Amend_0001.pdf PDF
SubC_Checklist.pdf PDF
Maxwell_BOS_PWS_9_Apr_15.pdf PDF
Client_authorization_letter.pdf PDF
(Residential).pdf PDF
WD_05-2011_(Rev._-17).pdf PDF
Maxwell-Gunter_Site_Visit_Letter.pdf PDF
Maxwell_Attach_4_Section_J_ManpowerMatrix13_Nov_2014.pdf PDF
Maxwell-Gunter_BOS_RFP_Questions_and_Answers_Form.doc DOC document
Maxwell_BOS_Draft_RFP.doc DOC document
FA3002-13-R-0012_Maxwell_BOS_Pre-Solicitation_Notice_(30_Dec_15).docx DOCX document
Maxwell_BOS_-_Section_L.docx DOCX document
Responses_to_RFI_Comments_on_Maxwell_BOS_DRAFT_PWS_posted_31_Jul_14.xlsx XLSX spreadsheet
Maxwell_Draft_PWS_14_Nov_14.pdf PDF
10_Dec_13_Tier_Pricing_Industry_Q A.pdf PDF
Sample_-_Maxwell_CLIN_X016.xlsx XLSX spreadsheet
General_Transformation_Information.zip ZIP file
CE_Technical_Library_Table_Content.doc DOC document
Tier_Pricing_Documents.zip ZIP file
MOUs_and_MOAs.zip ZIP file
DRAFT_Concept_PI_Clause.docx DOCX document
Initial_Draft_PWS_Q A_-_Maxwell_BOS.xlsx XLSX spreadsheet
PWS_Draft_(v1)_-_File_3_of_3.zip ZIP file
Show all 50

Maxwell-Gunter BOS has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE INFORMATION

(Section L Attachment 5)

Submit information on contracts that you consider relevant in demonstrating your ability to perform the Maxwell-Gunter AFB BOS requirement. Include rationale supporting your assertion of relevance. For a description of the characteristics or aspects the Government will consider in determining relevance, see Section M of the RFP. To be considered recent, performance must have occurred within the three (3) years immediately preceding the solicitation release date. Furthermore, there must be a minimum of three (3) months performance within the recency window and only performance occurring inside of the 3-year window will be considered. Past performance information that fails this condition will not be evaluated.

Offerors may include efforts accomplished to resolve problems encountered on the referenced contract as well as efforts to identify and manage program risk. Merely having problems does not automatically equate to an Unacceptable rating since the problems encountered may have been on a more complex program, or an Offeror may have subsequently demonstrated the ability to overcome the problems. The Offeror should clearly demonstrate management actions employed in overcoming problems and the effects of those actions, in terms of improvements achieved or problems rectified.

Provide the information requested in this submittal for each contract/program being described. Limit the number of efforts submitted to six (6) and the length of each submission to no more than seven (7) pages.

This cover page should be deleted when submitting the Past and Present Performance Information Sheet.

A. Offeror Name (Company/Division): ___________________ CAGE Code: ___________________ DUNS Number: ___________________

(NOTE: If the company or division performing this effort is different than the offeror or the relevance of this effort to the instant acquisition is impacted by any company/corporate organizational change, note those changes. Refer to the "Organizational Structure Change History" you provided as part of your Past Performance Volume.)

B. Program Title: ___________________

C. Contract Title: ___________________

1. Contract Agency or Customer ______________________

2. Contract Number ______________________

3. Contract Type ______________________

4. Period of Performance ______________________

5. Original Contract $ Value ______________________ (Do not include unexercised options)

6. Current Contract $ Value ______________________(Do not include unexercised options)

If amounts for 5 and 6 above are different, provide a brief description of the reason

Brief Description of Effort as ___Prime or ___Subcontractor (Please indicate whether it was development and/or production, or other acquisition phase and highlight portions considered most relevant to current acquisition)

Completion Date

1. Original date: ________________________

2. Current Schedule: ________________________

3. Estimate at Completion: ________________________

4. How Many Times Changed: ________________________

5. Primary Causes of Change: ________________________

D. Primary Customer Points of Contact: (For Government contracts, provide current information on all three individuals, in the format shown below. For commercial contracts, provide points of contact fulfilling these same roles.)

1. Program Manager: Name _____________________ Office _____________________ Address _____________________ Telephone _____________________ Email _____________________

2. Contracting Officer: Name _____________________ Office _____________________ Address _____________________ Telephone _____________________

Email _____________________

3. Administrative Contracting Officer: Name _____________________ Office _____________________ Address _____________________ Telephone _____________________ Email _____________________

E. Address any technical (or other) area about this contract/program considered relevant to the proposed effort.

F. Quality and Satisfaction Rating: Provide any objective information (e.g., metrics, customer surveys, independent surveys) which demonstrates customer satisfaction with overall job performance and quality of completed service.

G. If applicable, explain corrective actions taken in the past, if any, for substandard performance and any current performance problems such as cost overruns, extended performance periods etc.

H. Describe the nature or portion of the work on the proposed effort to be performed by the business entity being reported here. Also, estimate the percentage of the total proposed effort to be performed by this entity and whether this entity will be performing as the prime, subcontractor, or a corporate division related to the prime (define relationship). Ensure to describe how the experience of the past efforts can be reasonably attributed to the proposed effort, when the proposal clearly demonstrates the resources (e.g.

financial resources, overall oversight and management, or other resources) of the parent or affiliated division will meaningfully affect performance of the instant acquisition.

File details come from the government source that posted it. Updated .