Section A - Solicitation/Contract Form
SPECIAL NOTICE
NOTICE OF SOURCE SELECTION
You are hereby notified that a source selection is in progress for Aircraft Maintenance Services at Columbus AFB, MS. The Contracting Officer or his/her representatives are the only persons authorized to contact offerors, and the Contracting Officer is the only person authorized to release information regarding an ongoing Source Selection. Refer questions or communications concerning this solicitation directly to the Contracting Officer, Mr. Brian Elliott at AETC CONS/LGCK, 2021 First Street West, Randolph AFB, TX 78150-4302, tel. (210) 652-4856 and e-mail brian.elliott.10@us.af.mil and the Contract Specialist, Ms. Liz Preston, same address, tel. (210) 652-9226 and e-mail elizabeth.preston@us.af.mil.
NOTICES TO OFFERORS
Funding is budgeted, however, not currently available for this project. This solicitation is issued in good faith and funding is anticipated. The Government’s obligation under this contract is contingent upon the availability of appropriated funds. No legal liability on the part of the Government for any payment may arise until funds are available. Your attention is drawn to Section I Clause, FAR 52.232-18, Availability of Funds. The Government reserves the right to cancel this solicitation if it is determined that no offeror has submitted a proposal that is economically feasible.
All solicitation documents will be electronically posted to www.fbo.gov. It is the responsibility of each offeror to review the web site for notice of amendments, updates or changes to current information.
Mark all proposal submittals or proposal related mailing submitted via the US Postal or other mail carrier, “SOURCE SELECTION SENSITIVE – TO BE OPENED BY ADDRESSEE ONLY”.
The contractor agrees to hold its offered prices firm for the items solicited herein and to accept any resulting contract subject to the terms and conditions stated herein for 240 days from the date set forth in SF33, block 9.
Section B - Supplies or Services and Prices
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Aircraft Maintenance Support
FFP
FFP - 1 Nov 12 - 30 Sep 13. The Contractor shall provide support for aircraft maintenance and back shop.
FOB: Destination
SIGNAL CODE: A
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
T1-A Maintenance
FFP - 1 Nov 12 - 30 Sep 13. Maintenance of T-1A Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 25,604. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
STEPLADDER PRICING
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 0002 T-1A Flying Hours |
| A |
| 19,971.00 |
| 21,506.00 |
| Most Likely Range |
| D |
| 24,580.00 |
| 26,628.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
T-6A Maintenance
FFP - 1 Nov 12 - 30 Sep 13. Maintenance of T-6A Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 49,301. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 0003 T-6A Flying Hours |
| A |
| 38,455.00 |
| 41,412.00 |
| Most Likely Range |
| D |
| 47,329.00 |
| 51,273.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
T-38C SUPT Maintenance
FFP - 1 Nov 12 - 30 Sep 13. Maintenance of T-38C Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 13,731. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 0004 T-38C SUPT |
| A |
| 10,710.00 |
| 11,533.00 |
| Flying Hours |
| B |
| 11,534.00 |
| 12,357.00 |
| Most Likely Range |
| D |
| 13,182.00 |
| 14,280.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
T-38C IFF Maintenance
FFP - 1 Nov 12 - 30 Sep 13. Maintenance of T-38C Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 3,762. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 0005 T-38C IFF |
| A |
| 2,934.00 |
| 3,159.00 |
| Flying Hours |
| B |
| 3,160.00 |
| 3,385.00 |
| Most Likely Range |
| D |
| 3,612.00 |
| 3,912.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Plastic Media Blasting and Acft Painting
FFP - 1 Nov 12 - 30 Sep 13. Aircraft stripping and painting Vance AFB and NAS Patuxent River.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
J85 Engine Support
FFP - 1 Nov 12 - 30 Sep 13. Funded by US Navy/NAS Patuxent River J85 Engine Support.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
TAI Average Possessed Aircraft
Not Priced - 1 Nov 12 - 30 Sep 13. Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft as specified below Sub CLINs.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
000801
Months
T-1A TAI Monthly Adjustment Rate
Not Priced - Payment will be made IAW Section B, Clause B-3, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
000802
Months
T-6A TAI Monthly Adjustment Rate
Not Priced - Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
000803
T-38C (SUPT) Monthly Adjustment Rate
Not Priced - Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
000804
Months
T-38C (IFF) Monthly Adjustment Rate
Not Priced - Payment will be made IAW Section B, Clause B-3, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
Weekend/Holiday Flying
COST
Cost Reimbursable - 1 Nov 12 - 30 Sep 13. Launch, recover, and maintain aircraft on weekends and holidays IAW Clause B-3 and B-4, funded by the ACO as required. Cost reimbursable basis only, no overhead, G&A, or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. NTE - $400,000.00
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
Travel
Cost Reimbursable - 1 Nov 12 - 30 Sep 13. The Government will reimburse the contractor for actual expenses for travel required in support of aircraft maintenance operations, Government-directed training or other travel required in performance of this effort (Clause B-4). Travel costs shall not exceed the JTR allowable costs and must be approved by the Contracting Officer prior to execution. No overhead, G&A or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. NTE: $50,000.00.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
Deployments
Cost Reimbursable/ Funded as needed. 1 Nov 12 - 30 Sep 13. Provide deployments as authorized by the Contracting Officer to perform recovery, servicing, inspections, necessary maintenance and launch of dispersed aircraft (Clause B-4). Cost Reimbursable basis only - no overhead, G&A, or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Mobilization
FFP 1 -31 Oct 12. Contractor shall complete mobilization/transition IAW Clause B-5.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Aircraft Maintenance Support |
FFP
FFP - 1 Oct 13 - 30 Sep 14. The Contractor shall provide support for aircraft maintenance and back shop.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
FFP - 1 Oct 13 - 30 Sep 14. Maintenance of T-1A Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 26,323. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 1002 T-1A Flying Hours |
| A |
| 20,532.00 |
| 22,110.00 |
| Most Likely Range |
| D |
| 25,270.00 |
| 27,376.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
FFP - 1 Oct 13 - 30 Sep 14. Maintenance of T-6A Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 50,176. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 1003 T-6A Maintenance |
| A |
| 39,137.00 |
| 42,147.00 |
| Most Likely Range |
| D |
| 48,169.00 |
| 52,183.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| T-38C SUPT Maintenance |
FFP
FFP - 1 Oct 13 - 30 Sep 14. Maintenance of T-38C Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 14,202. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 1004 T-38C SUPT |
| A |
| 11,078.00 |
| 11,929.00 |
| Flying Hours |
| B |
| 11,930.00 |
| 12,781.00 |
| Most Likely Range |
| D |
| 13,634.00 |
| 14,770.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| T-38C IFF Maintenance |
FFP
FFP - 1 Oct 13 - 30 Sep 14. Maintenance of T-38C Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 3,762. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 1005 T-38C IFF |
| A |
| 2,934.00 |
| 3,159.00 |
| Flying Hours |
| B |
| 3,160.00 |
| 3,385.00 |
| Most Likely Range |
| D |
| 3,612.00 |
| 3,912.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Plastic Media Blasting and Acft Painting |
FFP
FFP - 1 Oct 13 - 30 Sep 14. Aircraft stripping and painting Vance AFB and NAS Patuxent.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| J85 Engine Support |
FFP
FFP - 1 Oct 13 - 30 Sep 14. Funded by US Navy/NAS Patuxent River J85 Engine Support.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| TAI Average Possessed Aircraft |
FFP
Not Priced - 1 Oct 13 - 30 Sep 14. Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft as specified below SubCLINs.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
100801
Months
| OPTION |
| T-1A TAI Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-3, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
100802
Months
| OPTION |
| T-6A TAI Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
100803
| OPTION |
| T-38C (SUPT) Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
100804
Months
| OPTION |
| T-38C (IFF) Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-3, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
| OPTION |
| Weekend/Holiday Flying |
COST
Cost Reimbursable - 1 Oct 13 - 30 Sep 14. Launch, recover, and maintain aircraft on weekends and holidays IAW Clause B-3 and B-4, funded by the ACO as required. Cost reimbursable basis only, no overhead, G&A, or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. NTE - $400,000.00
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
COST
Cost Reimbursable - 1 Oct 13 - 30 Sep 14. The Government will reimburse the contractor for actual expenses for travel required in support of aircraft maintenance operations, Government-directed training or other travel required in performance of this effort (Clause B-4.). Travel costs shall not exceed the JTR allowable costs and must be approved by the Contracting Officer prior to execution. No overhead, G&A or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. NTE: $50,000.00. See Clause B-4.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
COST
Cost Reimbursable/ Funded as needed. 1 Oct 13 - 30 Sep 14. Provide deployments as authorized by the Contracting Officer to perform recovery, servicing, inspections, necessary maintenance and launch of dispersed aircraft (Clause B-4). Cost Reimbursable basis only - no overhead, G&A, or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. See Clause B-4.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Aircraft Maintenance Support |
FFP
FFP - 1 Oct 14 - 30 Sep 15. The Contractor shall provide support for aircraft maintenance and back shop.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
FFP - 1 Oct 14 - 30 Sep 15. Maintenance of T-1A Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 26,256. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 2002 T-1A Flying Hours |
| A |
| 20,480.00 |
| 22,054.00 |
| Most Likely Range |
| D |
| 25,206.00 |
| 27,306.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
FFP - 1 Oct 14 - 30 Sep 15. Maintenance of T-6A Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 50,129. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 2003 T-6A Flying Hours |
| A |
| 39,101.00 |
| 42,107.00 |
| Most Likely Range |
| D |
| 48,124.00 |
| 52,134.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| T-38C SUPT Maintenance |
FFP
FFP - 1 Oct 14 - 30 Sep 15. Maintenance of T-38C Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 14,178. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 2004 T-38C SUPT |
| A |
| 11,059.00 |
| 11,909.00 |
| Flying Hours |
| B |
| 11,910.00 |
| 12,759.00 |
| Most Likely Range |
| D |
| 13,611.00 |
| 14,745.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| T-38C IFF Maintenance |
FFP
FFP - 1 Oct 14 - 30 Sep 15. Maintenance of T-38C Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 3,762. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 2005 T-38C IFF |
| A |
| 2,934.00 |
| 3,159.00 |
| Flying Hours |
| B |
| 3,160.00 |
| 3,385.00 |
| Most Likely Range |
| D |
| 3,612.00 |
| 3,912.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Plastic Media Blasting and Acft Painting |
FFP
FFP - 1 Oct 14 - 30 Sep 15. Aircraft stripping and painting Vance AFB and NAS Patuxent River.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| J85 Engine Support |
FFP
FFP - 1 Oct 14 - 30 Sep 15. Funded by US Navy/NAS Patuxent River J85 Engine Support.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| TAI Average Possessed Aircraft |
FFP
Not Priced - 1 Oct 14 - 30 Sep 15. Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft as specified below subCLINs.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
200801
Months
| OPTION |
| T-1A TAI Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-3, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
200802
Months
| OPTION |
| T-6A TAI Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
200803
| OPTION |
| T-38C (SUPT) Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
200804
Months
| OPTION |
| T-38C (IFF) Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-3, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
| OPTION |
| Weekend/Holiday Flying |
COST
Cost Reimbursable - 1 Oct 14 - 30 Sep 15. Launch, recover, and maintain aircraft on weekends and holidays IAW Clause B-3 and B-4, funded by the ACO as required. Cost reimbursable basis only, no overhead, G&A, or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. NTE - $400,000.00
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
COST
Cost Reimbursable - 1 Oct 14 - 30 Sep 15. The Government will reimburse the contractor for actual expenses for travel required in support of aircraft maintenance operations, government-directed training or other travel required in performance of this effort (Clause B-4). Travel costs shall not exceed the JTR allowable costs and must be approved by the Contracting Officer prior to execution. No overhead, G&A or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. NTE: $50,000.00. See Clause B-4.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
COST
Cost Reimbursable/ Funded as needed. 1 Oct 14 - 30 Sep 15. Provide deployments as authorized by the Contracting Officer to perform recovery, servicing, inspections, necessary maintenance and launch of dispersed aircraft (Clause B-4). Cost Reimbursable basis only - no overhead, G&A, or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. See Clause B-4.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Aircraft Maintenance Support |
FFP
FFP - 1 Oct 15 - 30 Sep 16. The Contractor shall provide support for aircraft maintenance and back shop.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
FFP - 1 Oct 15 - 30 Sep 16. Maintenance of T-1A Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 26,197. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 3002 T-1A Flying Hours |
| A |
| 20,434.00 |
| 22,004.00 |
| Most Likely Range |
| D |
| 25,149.00 |
| 27,245.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
FFP - 1 Oct 15 - 30 Sep 16. Maintenance of T-6A Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 49,757. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 3003 T-6A Flying Hours |
| A |
| 38,810.00 |
| 41,795.00 |
| Most Likely Range |
| D |
| 47,767.00 |
| 51,747.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| T-38C SUPT Maintenance |
FFP
FFP - 1 Oct 15 - 30 Sep 16. Maintenance of T-38C Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 14,073. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 3004 T-38C SUPT |
| A |
| 10,977.00 |
| 11,820.00 |
| Flying Hours |
| B |
| 11,821.00 |
| 12,665.00 |
| Most Likely Range |
| D |
| 13,510.00 |
| 14,636.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| T-38C IFF Maintenance |
FFP
FFP - 1 Oct 15 - 30 Sep 16. Maintenance of T-38C Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 3,762. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 3005 T-38C IFF |
| A |
| 2,934.00 |
| 3,159.00 |
| Flying Hours |
| B |
| 3,160.00 |
| 3,385.00 |
| Most Likely Range |
| D |
| 3,612.00 |
| 3,912.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Plastic Media Blasting and Acft Painting |
FFP
FFP - 1 Oct 15 - 30 Sep 16. Aircraft stripping and painting Vance AFB and NAS Patuxent River.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| J85 Engine Support |
FFP
FFP - 1 Oct 15 - 30 Sep 16. Funded by US Navy/NAS Patuxent River J85 Engine Support.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| TAI Average Possessed Aircraft |
FFP
Not Priced - 1 Oct 15 - 30 Sep 16. Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft as specified below subCLINs.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
300801
Months
| OPTION |
| T-1A TAI Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-3, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
300802
Months
| OPTION |
| T-6A TAI Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
300803
| OPTION |
| T-38C (SUPT) Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
300804
Months
| OPTION |
| T-38C (IFF) Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-3, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
| OPTION |
| Weekend/Holiday Flying |
COST
Cost Reimbursable - 1 Oct 15 - 30 Sep 16. Launch, recover, and maintain aircraft on weekends and holidays IAW Clause B-3 and B-4, funded by the ACO as required. Cost reimbursable basis only, no overhead, G&A, or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. NTE - $400,000.00
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
COST
Cost Reimbursable - 1 Oct 15 - 30 Sep 16. The Government will reimburse the contractor for actual expenses for travel required in support of aircraft maintenance operations, government-directed training or other travel required in performance of this effort (Clause B-4). Travel costs shall not exceed the JTR allowable costs and must be approved by the Contracting Officer prior to execution. No overhead, G&A or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. NTE: $50,000.00. See Clause B-4.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
COST
Cost Reimbursable/ Funded as needed. 1 Oct 15 - 30 Sep 16. Provide deployments as authorized by the Contracting Officer to perform recovery, servicing, inspections, necessary maintenance and launch of dispersed aircraft (Clause B-4). Cost Reimbursable basis only - no overhead, G&A, or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. See Clause B-4.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Aircraft Maintenance Support |
FFP
FFP - 1 Oct 16 - 30 Sep 17. The Contractor shall provide support for aircraft maintenance and back shop.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
FFP - 1 Oct 16 - 30 Sep 17. Maintenance of T-1A Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 26,180. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 4002 T-1A Flying Hours |
| A |
| 20,420.00 |
| 21,990.00 |
| Most Likely Range |
| D |
| 25,133.00 |
| 27,227.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
FFP - 1 Oct 16 - 30 Sep 17. Maintenance of T-6A Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 50,223. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 4003 T-6A Flying Hours |
| A |
| 39,174.00 |
| 42,186.00 |
| Most Likely Range |
| D |
| 48,214.00 |
| 52,232.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| T-38C SUPT Maintenance |
FFP
FFP - 1 Oct 16 - 30 Sep 17. Maintenance of T-38C Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 14,039. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 4004 T-38C SUPT |
| A |
| 10,950.00 |
| 11,792.00 |
| Flying Hours |
| B |
| 11,793.00 |
| 12,634.00 |
| Most Likely Range |
| D |
| 13,477.00 |
| 14,601.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| T-38C IFF Maintenance |
FFP
FFP - 1 Oct 16 - 30 Sep 17. Maintenance of T-38C Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 3,762. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 4005 T-38C IFF |
| A |
| 2,934.00 |
| 3,159.00 |
| Flying Hours |
| B |
| 3,160.00 |
| 3,385.00 |
| Most Likely Range |
| D |
| 3,612.00 |
| 3,912.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Plastic Media Blasting and Acft Painting |
FFP
FFP - 1 Oct 16 - 30 Sep 17. Aircraft stripping and painting Vance AFB and NAS Patuxent River.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| J85 Engine Support |
FFP
FFP - 1 Oct 16 - 30 Sep 17. Funded by US Navy/NAS Patuxent River J85 Engine Support.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| TAI Average Possessed Aircraft |
FFP
Not Priced - 1 Oct 16 - 30 Sep 17. Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft as specified below subCLINs.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
400801
Months
| OPTION |
| T-1A TAI Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-3, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
400802
Months
| OPTION |
| T-6A TAI Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
400803
| OPTION |
| T-38C (SUPT) Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
400804
Months
| OPTION |
| T-38C (IFF) Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-3, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
| OPTION |
| Weekend/Holiday Flying |
COST
Cost Reimbursable - 1 Oct 16 - 30 Sep 17. Launch, recover, and maintain aircraft on weekends and holidays IAW Clause B-3 and B-4, funded by the ACO as required. Cost reimbursable basis only, no overhead, G&A, or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. NTE - $400,000.00
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
COST
Cost Reimbursable - 1 Oct 16 - 30 Sep 17. The Government will reimburse the contractor for actual expenses for travel required in support of aircraft maintenance operations, government-directed training or other travel required in performance of this effort (Clause B-4). Travel costs shall not exceed the JTR allowable costs and must be approved by the Contracting Officer prior to execution. No overhead, G&A or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. NTE: $50,000.00. See Clause B-4.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
COST
Cost Reimbursable/ Funded as needed. 1 Oct 16 - 30 Sep 17. Provide deployments as authorized by the Contracting Officer to perform recovery, servicing, inspections, necessary maintenance and launch of dispersed aircraft (Clause B-4). Cost Reimbursable basis only - no overhead, G&A, or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. See Clause B-4.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Aircraft Maintenance Support |
FFP
FFP - 1 Oct 17 - 30 Sep 18. The Contractor shall provide support for aircraft maintenance and back shop.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
FFP - 1 Oct 17 - 30 Sep 18. Maintenance of T-1A Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 26,180. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 5002 T-1A Flying Hours |
| A |
| 20,420.00 |
| 21,990.00 |
| Most Likely Range |
| D |
| 25,133.00 |
| 27,227.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
FFP - 1 Oct 17 - 30 Sep 18. Maintenance of T-6A Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 50,223. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 5003 T6A Flying Hours |
| A |
| 39,174.00 |
| 42,186.00 |
| Most Likely Range |
| D |
| 48,214.00 |
| 52,232.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| T-38C SUPT Maintenance |
FFP
FFP - 1 Oct 17 - 30 Sep 18. Maintenance of T-38C Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 14,039. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 5004 T-38C SUPT |
| A |
| 10,950.00 |
| 11,792.00 |
| Flying Hours |
| B |
| 11,793.00 |
| 12,634.00 |
| Most Likely Range |
| D |
| 13,477.00 |
| 14,601.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| T-38C IFF Maintenance |
FFP
FFP - 1 Oct 17 - 30 Sep 18. Maintenance of T-38C Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 3,762. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 5005 T-38C IFF |
| A |
| 2,934.00 |
| 3,159.00 |
| Flying Hours |
| B |
| 3,160.00 |
| 3,385.00 |
| Most Likely Range |
| D |
| 3,612.00 |
| 3,912.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Plastic Media Blasting and Acft Painting |
FFP
FFP - 1 Oct 17 - 30 Sep 18. Aircraft stripping and painting Vance AFB and NAS Patuxent River.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| J85 Engine Support |
FFP
FFP - 1 Oct 17 - 30 Sep 18. Funded by US Navy/NAS Patuxent River J85 Engine Support.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| TAI Average Possessed Aircraft |
FFP
Not Priced - 1 Oct 17 - 30 Sep 18. Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft as specified below subCLINs.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
500801
Months
| OPTION |
| T-1A TAI Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-3, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
500802
Months
| OPTION |
| T-6A TAI Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
500803
| OPTION |
| T-38C (SUPT) Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
500804
Months
| OPTION |
| T-38C (IFF) Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-3, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
| OPTION |
| Weekend/Holiday Flying |
COST
Cost Reimbursable - 1 Oct 17 - 30 Sep 18. Launch, recover, and maintain aircraft on weekends and holidays IAW Clause B-3 and B-4, funded by the ACO as required. Cost reimbursable basis only, no overhead, G&A, or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. NTE - $400,000.00
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
COST
Cost Reimbursable - 1 Oct 17 - 30 Sep 18. The Government will reimburse the contractor for actual expenses for travel required in support of aircraft maintenance operations, government-directed training or other travel required in performance of this effort (Clause B-4.). Travel costs shall not exceed the JTR allowable costs and must be approved by the Contracting Officer prior to execution. No overhead, G&A or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. NTE: $50,000.00. See Clause B-4.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
COST
Cost Reimbursable/ Funded as needed. 1 Oct 17 - 30 Sep 18. Provide deployments as authorized by the Contracting Officer to perform recovery, servicing, inspections, necessary maintenance and launch of dispersed aircraft (Clause B-4). Cost Reimbursable basis only - no overhead, G&A, or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. See Clause B-4.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Aircraft Maintenance Support |
FFP
FFP - 1 Oct 18 - 30 Sep 19. The Contractor shall provide support for aircraft maintenance and back shop.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
FFP - 1 Oct 1 - 30 Sep 19. Maintenance of T-1A Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 26,180. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 6002 T-1A Flying Hours |
| A |
| 20,420.00 |
| 21,990.00 |
| Most Likely Range |
| D |
| 25,133.00 |
| 27,227.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
FFP
FFP - 1 Oct 18 - 30 Sep 19. Maintenance of T-6A Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 50,223. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 6003 T-6A Flying Hours |
| A |
| 39,174.00 |
| 42,186.00 |
| Most Likely Range |
| D |
| 48,214.00 |
| 52,232.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| T-38C SUPT Maintenance |
FFP
FFP - 1 Oct 18 - 30 Sep 19. Maintenance of T-38C Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 14,039. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 6004 T-38C SUPT |
| A |
| 10,950.00 |
| 11,792.00 |
| Flying Hours |
| B |
| 11,793.00 |
| 12,634.00 |
| Most Likely Range |
| D |
| 13,477.00 |
| 14,601.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| T-38C IFF Maintenance |
FFP
FFP - 1 Oct 18 - 30 Sep 19. Maintenance of T-38C Aircraft. Price per flying hour - See Clause B-1. Estimated Flying Hours/Median Multiplier: 3,762. Provide a unit price for each of the stepladder pricing below. The total amount for this CLIN is calculated by multiplying the unit price associated with the band that includes the Median Hour Multiplier.
NET AMT
| STEPLADDER NAME |
| GROUP |
| FROM QUANTITY |
| TO QUANTITY |
| UNIT PRICE |
| 6005 T-38C IFF |
| A |
| 2,934.00 |
| 3,159.00 |
| Flying Hours |
| B |
| 3,160.00 |
| 3,385.00 |
| Most Likely Range |
| D |
| 3,612.00 |
| 3,912.00 |
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Plastic Media Blasting and Acft Painting |
FFP
FFP - 1 Oct 18 - 30 Sep 19. Aircraft stripping and painting Vance AFB and NAS Patuxent River.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| J85 Engine Support |
FFP
FFP - 1 Oct 18 - 30 Sep 19. Funded by US Navy/NAS Patuxent River J85 Engine Support.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| TAI Average Possessed Aircraft |
FFP
Not Priced - 1 Oct 18 - 30 Sep 19. Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft as specified below subCLINs.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
600801
Months
| OPTION |
| T-1A TAI Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-3, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
600802
Months
| OPTION |
| T-6A TAI Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
600803
| OPTION |
| T-38C (SUPT) Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-2, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
600804
Months
| OPTION |
| T-38C (IFF) Monthly Adjustment Rate |
FFP
Not Priced - Payment will be made IAW Section B, Clause B-3, at the monthly rate per aircraft.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
| OPTION |
| Weekend/Holiday Flying |
COST
Cost Reimbursable - 1 Oct 18 - 30 Sep 19. Launch, recover, and maintain aircraft on weekends and holidays IAW Clause B-3 and B-4, funded by the ACO as required. Cost reimbursable basis only, no overhead, G&A, or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. NTE - $400,000.00
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
COST
Cost Reimbursable - 1 Oct 18 - 30 Sep 19. The Government will reimburse the contractor for actual expenses for travel required in support of aircraft maintenance operations, government-directed training or other travel required in performance of this effort (Clause B-4). Travel costs shall not exceed the JTR allowable costs and must be approved by the Contracting Officer prior to execution. No overhead, G&A or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. NTE: $50,000.00. See Clause B-4.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lump Sum
COST
Cost Reimbursable/ Funded as needed. 1 Oct 18 - 30 Sep 19. Provide deployments as authorized by the Contracting Officer to perform recovery, servicing, inspections, necessary maintenance and launch of dispersed aircraft (Clause B-4). Cost Reimbursable basis only - no overhead, G&A, or profit will be paid. No fringe benefits will be paid with the exception of FICA and Worker's Compensation Insurance. See Clause B-4.
ESTIMATED COST
SECTION B CLAUSES
B-1. BANDED PRICING CLINs (X002, X003, X004, X005)
a. CLINs X002 – X005 provide the unit price for flying hour maintenance services and utilize a banded price structure. Prior to the performance period, HQ AETC/A3 will issue an annual program allocation document. This allocation will provide the required flying hours for each flying training course and air frame. An example of the FY13 allocation is shown as follows:
FLYING HOUR PROGRAM
COLUMBUS AFB
| FHP for: |
| 2013 |
| T-1A |
| T-6A |
| T-38C |
| T-38C IFF |
PAI
UTE
ASD
Total Hours
FHP – Flying Hour Program, PAI -- Primary Aircraft Inventory, UTE – Utilization, ASD – Average Sortie Duration, PAA – Primary Authorized Aircraft
b. The Government will establish a Firm Fixed Price for the Flying Hour Maintenance Services CLINs by multiplying the negotiated flying hour maintenance unit price for the flying hour band by the median hour multiplier for the band. Using the T-38C IFF allocation above for an example, the fixed price would be found as shown. The maintenance rates per flying hour used below are notional examples for T-38C IFF:
Maintenance Price Per Flying Hour
| Flying Hour Band |
| From Minimum Quantity |
| To Maximum Quantity |
| Median Hour Multiplier |
| Unit Price |
| Extended Price |
| A |
| 2,934 |
| 3,159 |
| 3,047 |
| $320 |
| $975,040 |
| B |
| 3,160 |
| 3,385 |
| 3,272 |
| $310 |
| $1,014,320 |
| C |
| 3,386 |
| 3,611 |
| 3,498 |
| $304 |
| $1,063,392 |
| Most Likely Range |
| D |
| 3,612 |
| 3,912 |
| 3,762 |
| $300 |
| $1,128,600 |
| E |
| 3,913 |
| 4,138 |
| 4,026 |
| $298 |
| $1,199,748 |
| F |
| 4,139 |
| 4,364 |
| 4,252 |
| $295 |
| $1,254,340 |
| G |
| 4,365 |
| 4,590 |
| 4,477 |
| $290 |
| $1,298,330 |
T-38C IFF – 3,762 falls within Flying Hour Band “D”
Band “D”
CLIN
Airframe Multiplier Rate
Total
Monthly (÷12)
X005
T-38C IFF
3,762
$300
$1,128,600
$94,050
c. EXAMPLE: MID YEAR ADJUSTMENTS THAT MOVE THE PAA INTO A DIFFERENT BAND:
Occasionally, the Government may adjust the flying hour allocation during the course of the year. This may be done to factor in changes in student load or the course syllabus. When this occurs and the change results in the cumulative annual allocation moving from one price band into another price band, the Government will notify the contractor of the change and will issue a contract modification that employs the new maintenance unit price per flying hour. The change in price will become effective 30 calendar days after notification of revised flying hours by the contracting officer. This will allow the contractor to make necessary changes to staffing and skills mix required to meet the remainder of the flying training mission. The revised pricing will not impact the rates used earlier in the performance period (the change will not be retro-active). Using the prices in the example above, the following is an example of a change that decreases the T-38C IFF hours 6 months into a 12-month contract performance period.
Notice to Contractor: Due to a change in student loads, the Government must adjust the annual program allocation as follows:
T-38C IFF
From 3,762
To: 3,405
Reduced by 357
This change in flying hours results in movement from flying hour band “D,” to Flying Hour band “C”
The price for CLIN X005 is changed to read as follows:
Band “D”
CLIN
Airframe Multiplier Rate
Total
Monthly (÷12)
X005
T-38C IFF
3,762
$300
$1,128,600
$94,050
To:
Band “C”
CLIN
Airframe Multiplier Rate
Total
Monthly (÷12)
X005
T-38C IFF
3,498
$304
$1,063,392
$88,616
Total CLIN Price Changed
From:
$1,128,600
To:
$1,095,996 (6 months at $94,050)
(6 months at $88,616)
d. Should the Government require a cumulative annual quantity of flying hours that falls below the lowest possible flying hour band or above the highest possible flying hour band for any of these Flying Hour Maintenance Services CLINs, the contracting officer will negotiate a unit price and add additional flying hour bands as required.
B-2. TOTAL ACTIVE INVENTORY (AVERAGE POSSESSED) AIRCRAFT CLIN (X008)
a. The number of total active inventory (TAI) aircraft by Mission/Design/Series (MDS)(T-1A, T-6A, T-38C SUPT and T-38C IFF), listed in the PWS, Appendix 3BA, represents the government’s best current estimate of the number of aircraft that the contractor will maintain during the course of this contract. However, subject to the limitations of the general scope and level of workload as described in the Performance Work Statement (PWS) and Appendices, it is understood that a particular aircraft may be replaced by another aircraft of the same type, and the number of aircraft categorized as backup, aerospace vehicle inventory or attrition reserve may change from time to time. Except as outlined in this clause, such changes, within reasonable threshold, are considered to be normal, and neither party shall be entitled to an equitable adjustment simply by virtue of such fluctuations.
b. By MDS, if the number of TAI aircraft increase or decrease by more than the percentage listed in the table below (without a corresponding cumulative increase or decrease in the “AETC Flying Hour/Sortie Allocation” hours) for more than 90 consecutive days, the price shall be adjusted in CLINs X010 in accordance with the “Changes” clause in this contract.
| Number of TAI Aircraft |
| +/- Percentage |
c. The following example is based on the current TAI aircraft by MDS. For purposes of such adjustment, different MDS will be treated separately. Using the Chart below, the following examples of each MDS apply:
Without a corresponding cumulative increase or decrease in flying hours, an increase/decrease of four (4) T-1A aircraft will not justify a price adjustment; however, an increase/decrease of five (5) T-1A aircraft would justify a price adjustment.
Without a corresponding cumulative increase or decrease in flying hours, an increase/decrease of five (5) T-6A aircraft will not justify a price adjustment; however, an increase/decrease of six (6) T-6A aircraft would justify a price adjustment.
Without a corresponding cumulative increase or decrease in flying hours, an increase/decrease of four (4) T-38C SUPT aircraft will not justify a price adjustment; however, an increase/decrease of five (5) T-38C SUPT aircraft would justify a price adjustment.
Without a corresponding cumulative increase or decrease in flying hours, an increase/decrease of two (2) T-38C IFF aircraft will…
This is the start of the file's text. The full file is on GovTribe.