Columbus Aircraft_Maintenance Site Visit Presentation.pptx
PPTX presentation 278 KB Posted
- Attached to
- Columbus Aircraft Maintenance Services Federal contract opportunity
- Solicitation number
- FA3002-11-R-0007
About this file
Pre-Proposal Conference Briefing Slides
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Welcome to Columbus AFB!
Aircraft Maintenance Services Site Visit & Pre-Proposal Conference
Develop America's Airmen Today ... for Tomorrow
The First Command
CONFERENCE AGENDA
DAY 1
0800 Welcome! Ms. Liz Preston (Contract Specialist)
| Opening Remarks/Mission Brief | Col Matthew Isler (14 FTW Vice Commander) |
| Lt Col Doug Jantzen (14 FTW MX Authority) |
0830 Site Visit (Facilities Tour) Mr. Ken Phelps (Chief, Quality Assurance)
Lunch
1300 Site Visit (Facilities Tour)
DAY 2
| 0800 | Pre-Proposal Brief |
| Solicitation | Ms. Liz Preston |
| Past Performance | Ms. Liz Preston |
| Small Business Participation | Ms. Liz Preston |
| Performance Work Statement | Mr. Ken Phelps |
| Technical Capability | Mr. Oscar Hernandez (Program Manager) |
1000 One-on-One Sessions To be held in the Contracting Squadron Conference Room
COMMUNICATION
All communications regarding this acquisition shall be made through the Procuring Contracting Officer (PCO) or designated representative only The PCO assigned to this acquisition is Mr. Brian Elliott and his designated representative is Ms. Liz Preston Contacts or briefings by participating offerors concerning this acquisition are not permitted outside of the formal source selection process The PCO controls all contact or exchanges with potential offerors and is the only person authorized to release source selection information before and after contract award
SITE VISIT ROEs Group must remain together for security reasons Cell phones must be turned off or on silent Be courteous of incumbent contractor and staff Please refrain from discussions with them while on tour Questions must be submitted in writing Official response will be posted to FBO or via RFP Amendment Include: Company Name, POC, Phone Number Return to: Brian Elliott @ brian.elliott.10@us.af.mil Liz Preston @ elizabeth.preston@us.af.mil
OPENING REMARKS/MISSION BRIEF
Lt Col Doug Jantzen
Functional Authority, 14 Flying Training Wing
Col Matthew Isler
Vice Commander, 14 Flying Training Wing (FTW)
DAY 2
| 0800 | Pre-Proposal Brief |
| Solicitation | Ms. Liz Preston (Contract Specialist) |
| Past Performance | Ms. Liz Preston |
| Small Business Participation | Ms. Liz Preston |
| Performance Work Statement | Mr. Ken Phelps (Chief, Quality Assurance) |
| Technical Capability | Mr. Oscar Hernandez (Program Manager) |
1000 One-on-One Sessions To be held in the Contracting Squadron Conference Room
DISCLAIMERS
This briefing is an overview of proposal requirements Offerors are responsible for carefully reading the requirements of the Solicitation and comply accordingly To the extent there are any inconsistencies between this briefing and the solicitation, the solicitation shall govern These slides are not to be interpreted as a comprehensive description of the requirements of the upcoming solicitation
Solicitation Ms. Liz Preston Contract Specialist
AETC CONS
ACQUISITION APPROACH
Solicitation will result in a single Firm-Fixed-Price Contract 1-year basic period plus Six (6) one-year option periods Basis of Award is using a Trade-off Process where Past Performance is approximately equal to Price Technical Capability and Small Business Participation will be evaluated using ratings of “Acceptable” or “Unacceptable” Award of a contract to a higher priced, higher past performance rated offeror if in the Government’s best interest The Govt. intends to Award without Discussions
CONSIDERATIONS
Performance Based Service Acquisition Service Contract Act of 1965, as amended Collective Bargaining Agreement (CBA) Incumbent and Subcontractor have each negotiated a CBA with IUE-CWA, Industrial Division of the Communications Work of America AFL-CIO CLC and its Local 83770 Provided as RFP Attachment 4 and 5
PROPOSAL MILESTONES
| Actual / Estimated Date | Action |
| TBD | Solicitation Issue (Pending) |
| 19-20 Oct 2011 | Site Visit/Pre-Proposal Conference |
| 16 Nov 2012 | Past Performance Information Sheets |
| 29 Nov 2012 | RFP Due |
| 31 Jul 2012 | Contract Award |
| 01 Oct 2012 | Mobilization Start |
| 01 Nov 2012 | Performance Start |
PROPOSAL SUBMISSION
4 Volumes Volume I: Price Proposal, Other Contract Requirements Volume II: Technical Proposal Volume III: Past Performance Information Volume IV: Small Business Participation
Acceptance Period, Block 12 240 calendar days minimum
Proposal Instructions Paragraph E, General Information/Instructions Proposal Organization Chart
Base Entry Visitor Control Procedures Anticipate Delay
THE BID SCHEDULE
CLIN – TYPE DESCRIPTION
| (X)001 – FFP | Aircraft Maintenance Support |
| (X)002 – FFP | T-1A Maintenance |
| (X)003 – FFP | T-6A Maintenance |
| (X)004 – FFP | T-38C SUPT Maintenance |
| (X)005 – FFP | T-38 IFF Maintenance |
| (X)006 – FFP | Plastic Media Blasting and Aircraft Painting |
| (X)007 – FFP | J85 Engine Support |
| (X)008 – FFP | Propulsion Shop including Test Cell |
| (X)009 – FFP | TAI Average Possessed Aircraft |
| (X)010 – Cost NTE | Weekend / Holiday Flying |
| (X)011 – Cost NTE | Travel |
| (X)012 – Cost | Deployments |
| 0013 – FFP | Mobilization |
(X) = (1)001, Base Year / Option Year CLIN
THE BID SCHEDULE (Cont’) CLINs X002 through X005 use a banded pricing approach Seven Flying Hour Bands Groups A through G Band “D” represents most likely range Provide unit price for each band Extended price based on “Median Hour Multiplier/Estimated Flying Hours” Monthly price for CLIN: Extended price for Band “D” divided by 12 Fully explained in Clause B-1
THE BID SCHEDULE (Cont’) Example
| Band | Minimum | Maximum | Median | Unit Price | Extended Price | |
| A | 2,934 | 3,159 | 3,047 | $320 | $975,040 | |
| B | 3,160 | 3,385 | 3,272 | $310 | $1,014,320 | |
| C | 3,386 | 3,611 | 3,498 | $304 | $1,063,392 | |
| Most Likely Range | D | 3,612 | 3,912 | 3,762 | $300 | $1,128,600 |
| E | 3,913 | 4,138 | 4,026 | $298 | $1,199,748 | |
| F | 4,139 | 4,364 | 4,252 | $295 | $1,254,340 | |
| G | 4,365 | 4,590 | 4,477 | $290 | $1,298,330 |
| Band “D” CLIN | Airframe | Multiplier | Rate | Total | Monthly (÷ 12) |
| X005 | T-38C IFF | 3,762 | $300 | $1,128,600 | $94,050 |
OTHER RFP CONSIDERATIONS
Acceptance Period Minimum 240 days (or longer as specified by Offeror) Section B Submit RFP Section B and Cost Model (Attachment 6) in both electronic and paper format Contract Forms SF 33, fill-in clauses, ORCA, TIN, letter appointing person to bind company Other RFP Considerations Compliance with the SCA and CBA, Responsibility Determination Teaming Arrangements and / or Letters of Intent Exceptions to Government’s Terms and Conditions Gov’t retains the right to require strict compliance with the terms and conditions
Responsibility Determination explain how you plan to maintain adequate financial resources for a contract of this magnitude and length explain fiscal plan for covering mobilization, unexpected or emergency situations, and initial performance costs prior to recoupment in the form of monthly invoice payments submission of financial statements for one fiscal year and year-to-date financial information through the last quarter available evidence of internal working/operation capital, if used or financial support from other sources
Added RFP Attachment 16: Workforce Demographic Information provided by the Incumbent
Past Performance Ms. Liz Preston Contract Specialist
PAST PERFORMANCE
Past Performance Evaluation Team (PPET) Accomplishes the past performance evaluation and assigns a performance confidence assessment rating Team will integrate the recency, relevancy, and performance on all efforts evaluated Offerors with no recent/relevant past or present performance history or whose performance record is so limited that no meaningful confidence assessment rating can be reasonably assigned shall receive the rating of “Unknown Confidence (Neutral)”, meaning the rating is treated neither favorably nor unfavorably
Recency Within the past 5 years of RFP issue date Ongoing programs must have begun at least six (6) months from the RFP issuance
Relevancy Data obtained from past and present efforts provided by you Data obtained from other Government/Commercial Sources Negative performance occurring after evaluations have begun will be considered prior to announcing the award decision…could have impact on award decision Relevant performance will be evaluated based on:
Scope Magnitude Complexity
PAST PERFORMANCE (Cont’) Scope: Aircraft maintenance operations for fixed-wing Mission Design Series (MDS) aircraft similar to those aircraft described in this requirement and/or similar commercially designed aircraft. For example, T-1A is similar to commercially designed T-400 aircraft.
Magnitude: Past performance effort in terms of multiyear contract value in excess of $100M.
Complexity: May include organizational and intermediate level maintenance; aircraft ground handling, launch and recovery, Pre-flight/Thru-flight/Basic Post flight, Hourly Post Flight, Periodic, and Phase inspections, Time Compliance Technical Orders (TCTOs), Time Change Items (TCIs) and One Time Inspections (OTIs) on aircraft and support equipment and maintenance data inputs in to Maintenance Information Systems (MIS).
Performance Evaluate performance of recent and relevant efforts Assess performance relative to technical requirements in PWS Evaluation will consider history of forecasting and controlling costs, adhering to schedules, (including the administrative aspects of performance), reasonable and cooperative behavior and commitment to customer satisfaction Evaluate adverse performance to consider number and severity of problems and effectiveness of corrective actions
Past Performance Information Sheets Information sheets limited to 5 pages for each contract Submit information on no more than 5 recent contracts you determine to be relevant Submit by 16 Nov 11
Small Business Participation Ms. Liz Preston Contract Specialist
SMALL BUSINESS PARTICIPATION
Participation Plan – All Offerors Commitment to utilize small business Prime contractors who qualify as small business can claim own status when determining goals Subcontracting Plan - Large business only Submit Plan IAW FAR 52.219-9, Alt II and supplements Submit Attachment 7 Goals should correlate with small business participation Liquidated Damages apply The Participation Plan is in addition to, not in place of, the Subcontracting Plan.
Performance Work Statement Mr. Ken Phelps Chief, Contracting Officer Representative
14FTW/MAQ
14th Flying Training Wing’s Mission… Produce Pilots, Advance Airman, Feed the Fight Perform Maintenance on T-1A, T-6A and T-38C aircraft Specialized Undergraduate Pilot Training (SUPT) Introduction to Fighter Fundamentals (IFF) Annually train over 300 U.S./allied military students Annually fly over 60,000 sorties (80,000 Flying hrs)
PERFORMANCE WORK STATEMENT
Goals and Objectives Provide exceptional aviation maintenance service Conduct safe, efficient, and effective aviation service Provide required mission capable aircraft for pilot production Keep Aircraft, Equipment and Facilities within contract/published standards Promote and sustain non-adversarial Contractor/Government relationship Provide exceptional QC over contract requirements and standards Provide fully qualified aircraft maintenance personnel Meet or exceed all local, state, and federal environmental standards Zero environmental Notices of Violation Preserve 14th FTW resources through a proactive safety program Integrate risk management in all operational decisions Zero maintenance casual mishaps Minimize ground safety mishaps
Maintenance Functions Unscheduled & Scheduled Aircraft Maintenance Structural/Machine/Welding/Wheel & Tire/NDI & JOAP Avionics/Electro – Environmental/Pneudraulic/J-85 Propulsion Fuel Shop –New Fuel Barn Corrosion Control – Regional Paint – Wash/Media Blasting/Paint Egress – T-6A Martin Baker US16LA-1/2 & T-38 Martin Baker US16T-1 Aerospace Ground Equipment – CASS/Powered And Non-powered Precision Measurement Equipment Laboratory (PMEL) Transient Aircraft Maintenance Munitions Management, Accountability, Inspection, Storage Handling
Program Functions Quality Control Functional Check Flight Aircraft Weight And Balance Product Improvement Technical Order Distribution Office Crashed, Damaged Or Disabled Aircraft Recovery Maintenance Operation Center Plans/Scheduling/Documentation (Aircraft/Engine/AGE) Maintenance Analysis / Maintenance Training Environmental Protection Government Property Management IMDS Database Manager Records Management & Admin Support Security
Support Agreements
PMEL
118th Tactical Airlift Wing, Nashville, TN Naval Air Test Center, Patuxent River AFOSI, 4th Field Investigations Region, Detachment 406 Defense Commissary Agency, Maxwell AFB AL HQ AFROTC, Maxwell AFB AL Industrial Support Services Industrial Gases Blast Media Waste Tires Cleaning Fluids Filter Change Services
Micro-purchases Contract Funds – Flying Hour Money Only CPFH Rules Apply Purchase Made By Service Provider Reimbursed Monthly From CLIN Government Purchase Card Service Provider Completes GPC Abstract Purchase Request Purchased By 14th FTW/MA Budget Cardholders Contracting Officer Representative 15 COR’s Assigned Fairness & Objectivity Open/Frequent Non-adversarial Communication With Service Provider Supervision
PWS Notable Items Golden Triangle Regional Airport (GTR) operations Located 22 miles southwest of Columbus AFB Considered local flying and part of annual flying hour program Home station maintenance requirements are applicable Off Station Recovery of Disabled Aircraft AOR is East Coast to Mississippi River (including Lafayette, LA) and from the US/Canada boarder south to Key West, FL.
Crews will be dispatched no later than COB on the 2nd duty day Supply continuous support, to include weekends, until aircraft is FMC Perform required repairs, Preflight/BPO, Thruflight inspections as required, and all required servicing as part of maintenance support
Technical Capability Mr. Oscar Hernandez Program Manager
AETC/A4PM
TECHNICAL CAPABILITY
The proposals shall be evaluated against the following Technical Capability subfactors:
Integration and Changeover (Mobilization) Plan Management Approach Technical Approach Staffing and Workforce Plan During evaluations of each proposal, the Government will assign each subfactor a rating as shown in the next slide. Separate ratings will be assessed for each subfactor. A rating of unacceptable in one or more technical subfactors will constitute an overall rating of unacceptable for the technical evaluation.
| TECHNICAL RATING | DEFINITION |
| Acceptable | Proposal clearly meets the minimum requirements of the solicitation. |
| Unacceptable | Proposal does not clearly meet the minimum requirements of the solicitation. |
Subfactor 1: Integration & Changeover Plan This subfactor is acceptable when the plan describes how the offeror will integrate and changeover its workforce without degradation to the 14 FTW mission.
Provide a detailed description for recruiting, training, and qualifying and/or certifying a sufficient number of personnel during the mobilization period. Include a timeline schedule, which addresses start and completion of each event. (e.g., interviewing, hiring, human resource actions, training, etc)
Provide a detailed plan for providing work procedures, materials, equipment and vehicles
Provide a detailed plan to transfer Government provided equipment, tools and facilities identified in the performance work statement
Identify risks considered to have an adverse impact to cost, schedule and performance relating to this sub-factor and its sub-elements. Provide risk mitigating strategies in a detailed plan to eliminate or reduce the risk
This subfactor is acceptable when the offer provides an acceptable plan to support mission with a trained workforce and in an environment that identifies and corrects deficiencies.
Provide a detailed approach to measure, track, analyze, and report performance trends and deficiencies and a strategy for implementing corrective action to ensure timely and acceptable performance
Demonstrate an understanding for supporting the host base’s Operational Plans, Plans and Support Agreements (e.g., weather evacuation, crashed or damaged aircraft recovery, etc.)
Describe the proposed Quality Control (QC) organization, including lines of authority
TECHNICAL CAPABILITY
Subfactor 2: Management Approach
(Continue)
Describe the organization’s QC Process that would be employed in this effort. Describe the approach to evaluate the quality of maintenance, Specifically:
How the offeror intend to identify and document trends, analyze corrective actions Explain how recurring problems will be prevented with the aid of trend and risk analysis
Address how deficiencies and cross tell information will be shared among employees throughout the maintenance complex
(c) Describe a system for recording computing and assessing performance measurement data and monitoring corrective actions to ensure successful and timely problem resolution
TECHNICAL CAPABILITY
Describe a Tech Order Distribution Process that ensures maintenance guidance is current, accurate, complete and assessable to the correct employees at the time needed
Describe the proposed Foreign Object Damage (FOD) prevention process, a dropped object program and programs for impoundment, weight & balance and One-Time inspections
Describe how the quality control process is linked and support the on going and immediate training program
Describe an approach to ensure data integrity is maintained at a near zero error percentage rate for data systems and forms documentation required in the PWS, (e.g., Integrated Maintenance Data System (IMDS), Aircraft Forms, Vital Records, etc.)
TECHNICAL CAPABILITY
Describe an approach to effectively manage the Plans, Scheduling and Documentation (PS&D) function to include required maintenance inspections and time change requirements
Describe an approach to effectively manage the Maintenance Operations Center to include responses to emergencies, surges and exercises to mission requirements
Describe the organization’s methodology to track and manage budget expenditures within the limitations identified in Schedule B and the PWS
Describe the organization’s methodology for prevention and enforcement of a drug free workforce
Identify risks considered to have an adverse impact to cost, schedule and performance relating to this sub-factor and its sub-elements. Provide risk mitigating strategies in a detailed plan to eliminate or reduce the risk
This subfactor is acceptable when the offeror provides an acceptable plan that addresses the offeror’s overall approach to performing the aircraft maintenance mission.
Describe how PWS requirements for all service areas will be accomplished and integrated
Describe the procedures/approaches to scheduled and unscheduled maintenance, on/off equipment repairs and component removal and replacement
Describe an approach to safely execute off-station recovery of aircraft in a timely manner while continuing to execute mission requirements at home station
Identify risks considered to have an adverse impact to cost, schedule and performance relating to this sub-factor and its sub-elements. Provide risk mitigating strategies in a detailed plan to eliminate or reduce the risk
TECHNICAL CAPABILITY
Subfactor 3: Technical Approach
This subfactor is acceptable when the offeror demonstrates the company’s overall approach to aircraft maintenance organization staffing plan. The offeror provides an acceptable plan:
Provide an organizational structure, including charts and rationale for the proposed organization, to include roles, responsibilities, and relationships for each organizational element, (.g., branch, work center, shop. A complete Staffing/Skill (job classification) /Shift Summary Matrix (Section J, Attachment 8) will also be provided
If proposed, describe the organization’s methodology to cross utilize personnel within each functional area throughout the workforce
Approach to address backup for “one deep” positions with personnel who are trained and certified ensuring continuous contract performance
TECHNICAL CAPABILITY
Subfactor 4: Staffing and Workforce Plan
4) Provide manpower determination process to include:
Man-hour availability factors (or Full-Time Equivalents (FTE)) to include breakout of productive and non-productive hour computations for the basic and all option years
Methodology used to determine workforce by work center (office, shop, work area), skill (job classification), and shift(s) to include weekends
Methodology used to determine projected overtime man hours to include number of hours proposed and percentages above productive hours
(d) Explanation of any manpower adjustments beyond contract start date
5) Provide a description of staffing to meet changing, unscheduled, urgent and surge requirements
Describe the process for sustaining trained and qualified personnel, including training management and instructor staffing approaches that ensure employees are fully trained, task proficient and task certified throughout the life of the contract
Describe the approaches for formal classroom and hands-on training programs and certification processes for entry level and transition employees
8) Describe an approach to recruit and retain an experienced, motivated labor pool for the life of the contract
Describe an approach for CBA’s and contingencies that will ensure there will be no interruption of services due to labor disruption and disputes or call up of reservists by executive order
Identify risks considered to have an adverse impact to cost, schedule and performance relating to this sub-factor and its sub-elements. Provide risk mitigating strategies in a detailed plan to eliminate or reduce the risk
TECHNICAL CAPABILITY
TECHNICAL PROPOSAL
What makes an acceptable proposal Tell us the
| How | Your technical approach | ||
| Who and how many | Your workforce | ||
| What | The services you will provide | ||
| When | (If applicable) |
Acceptable -- Meets specified minimum performance or capability requirements necessary for acceptable contract performance
Questions Ms. Liz Preston Contract Specialist
Assist in development of highest quality RFP
Address perceived safety, security, performance risk or cost issues associated with this work
Company information from questions/comments regarding RFP will be confidential. Questions/Comments will be sanitized and posted to FBO website
QUESTION AND ANSWER SESSION
One-on-One Sessions Ms. Liz Preston Contract Specialist
ONE-ON-ONE SESSIONS
Held in the 14 CONS Conference Room
Government panel comprised of:
Contracting Officer Administrative Contracting Officer Program Manager Quality Assurance
Sessions limited to 20 minutes
Summary
SUMMARY
Brian Elliott, Liz Preston or a designated official will be the only individuals authorized to contact an offeror
Please submit questions as soon as possible to:
Brian Elliott brian.elliott.10@us.af.mil Liz Preston elizabeth.preston@us.af.mil
Offerors are strongly advised to thoroughly examine their proposals for accuracy, full documentation, clear explanations and compliance with all requirements of the RFP prior to submission to PCO image3.jpeg image4.jpeg image5.jpeg image1.jpeg image2.jpeg
File details come from the government source that posted it. Updated .