RFP_Atch789_SectL_Cost_18Apr07_Revised.xls
XLS spreadsheet 127 KB Posted
- Attached to
- SATOC Federal contract opportunity
- Solicitation number
- FA3002-06-R-0001
About this file
Section L-Revised Pricing Schedule Worksheets
View the file
Other files for this federal contract opportunity
Show all 50
SATOC has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total Evaluated Price
| OFFEROR: | 0 | ||
| SATOC | |||
| TOTAL EVALUATED PRICE | |||
| (For Evaluation Purposes Only) | |||
| TOTAL - HOME OFFICE (ATCH L-7) | $ - 0 | ||
| TOTAL - FIELD (ATCH L-8) | $ - 0 | ||
| TOTAL - SAMPLE TASK (ATCH L-9) | $ 612,453 | ||
| TOTAL EVALUATED PRICE | $ 612,453 |
&RRFP FA3002-06-R-0001
&CSOURCE SELECTION INFORMATION (SEE FAR 2.101 AND 3.104)
FOR OFFICIAL USE ONLY&R18 Apr 07
Atch L-7 HOME OFFICE
| OFFEROR: | HOME OFFICE | ||||||||||||
| FIRM FIXED PRICE FULLY BURDENED LABOR RATES* | |||||||||||||
| CONUS AND OCONUS | |||||||||||||
| Inflation/Escalation | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | For Evaluation Purposes Only | |||
| FY2007 | FY2008 | FY2009 | FY2010 | FY2011 | FY2012 | FY2013 | FY2014 | FY2015 | FY2016 | PRE- | |||
| 1-Oct-06 | 1-Oct-07 | 1-Oct-08 | 1-Oct-09 | 1-Oct-10 | 1-Oct-11 | 1-Oct-12 | 1-Oct-13 | 1-Oct-14 | 1-Oct-15 | AVERAGE | DETERMINED | ||
| Government Labor Classification | 30-Sep-07 | 30-Sep-08 | 30-Sep-09 | 30-Sep-10 | 30-Sep-11 | 30-Sep-12 | 30-Sep-13 | 30-Sep-14 | 30-Sep-15 | 30-Sep-16 | RATE | LABOR HOURS | TOTAL |
| Program Manager - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Project Manager - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Project Manager - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Architect - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Architect - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Architect - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Civil Engineer - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Civil Engineer - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Civil Engineer - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Mechanical Engineer - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Mechanical Engineer - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Mechanical Engineer - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Electrical Engineer - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Electrical Engineer - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Electrical Engineer - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Geotechnical Engineer - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Geotechnical Engineer - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Geotechnical Engineer - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Environmental Engineer - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Environmental Engineer - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Environmental Engineer - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Cost Estimator - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Cost Estimator - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Cost Estimator - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| CADD Operator - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| CADD Operator - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| CADD Operator - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Health & Safety Manager - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Health & Safety Manager - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Health & Safety Manager - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| QA/QC Manager - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| QA/QC Manager - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| QA/QC Manager - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Site Superintendent/Construction Manager - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Site Superintendent/Construction Manager - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Site Superintendent/Construction Manager - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Security Manager - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Security Manager - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Security Manager - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Administrative Assistant - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Word Processor - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Contracts Manager - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Scheduler - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Scheduler - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Project Controls Analyst - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| * Prime and/or Subcontractor Rates | TOTAL - HOME OFFICE | $ - 0 |
&L&"Arial,Bold"&12PROPOSED&C&"Times New Roman,Bold"HOME OFFICE LABOR RATES &C&"Times New Roman,Bold"&12SOURCE SELECTION INFORMATION (SEE FAR 2.101 AND 3.104)&RSolicitation FA3002-06-R-0001
ATTACHMENT L-7
18 APR 07
PAGE &P OF &N
Atch L-8 FIELD
| OFFEROR: | FIELD | ||||||||||||
| 0 | FIRM FIXED PRICE FULLY BURDENED LABOR RATES* | ||||||||||||
| CONUS | |||||||||||||
| Inflation/Escalation | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | 0.0% | For Evaluation Purposes Only | |||
| FY2007 | FY2008 | FY2009 | FY2010 | FY2011 | FY2012 | FY2013 | FY2014 | FY2015 | FY2016 | PRE- | |||
| 1-Oct-06 | 1-Oct-07 | 1-Oct-08 | 1-Oct-09 | 1-Oct-10 | 1-Oct-11 | 1-Oct-12 | 1-Oct-13 | 1-Oct-14 | 1-Oct-15 | AVERAGE | DETERMINED | ||
| Government Labor Classification | 30-Sep-07 | 30-Sep-08 | 30-Sep-09 | 30-Sep-10 | 30-Sep-11 | 30-Sep-12 | 30-Sep-13 | 30-Sep-14 | 30-Sep-15 | 30-Sep-16 | RATE | LABOR HOURS | TOTAL |
| Program Manager - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Project Manager - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Project Manager - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Architect - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Architect - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Architect - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Civil Engineer - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Civil Engineer - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Civil Engineer - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Mechanical Engineer - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Mechanical Engineer - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Mechanical Engineer - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Electrical Engineer - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Electrical Engineer - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Electrical Engineer - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Geotechnical Engineer - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Geotechnical Engineer - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Geotechnical Engineer - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Environmental Engineer - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Environmental Engineer - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Environmental Engineer - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Cost Estimator - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Cost Estimator - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Cost Estimator - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| CADD Operator - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| CADD Operator - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| CADD Operator - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Health & Safety Manager - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Health & Safety Manager - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Health & Safety Manager - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| QA/QC Manager - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| QA/QC Manager - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| QA/QC Manager - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Site Superintendent/Construction Manager - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Site Superintendent/Construction Manager - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Site Superintendent/Construction Manager - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Security Manager - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Security Manager - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Security Manager - Junior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Administrative Assistant - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Word Processor - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Contracts Manager - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Scheduler - Senior | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Scheduler - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| Project Controls Analyst - Mid | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | 0 | $ - 0 |
| * Prime and/or Subcontractor Rates | TOTAL - FIELD | $ - 0 |
&L&"Arial,Bold"&12PROPOSED&C&"Times New Roman,Bold"FIELD LABOR RATES &C&"Times New Roman,Bold"&12SOURCE SELECTION INFORMATION (SEE FAR 2.101 AND 3.104)&RSolicitation FA3002-06-R-0001
ATTACHMENT L-8
18 APR 07
PAGE &P OF &N
Atch L-9 Sample Task Summary
| SATOC Cost Detail Report - Attachment L-9 | |||
| Proposed Costs | |||
| Project Name: | Sample Task Equipment Storage Facility | ||
| Project Location: | Undisclosed Location, North Alabama | ||
| Date of Estimate: | |||
| Offeror: | |||
| Summary of Costs | |||
| Amount* | |||
| Labor (Inclusive of all burdens) | $0 | ||
| Travel | |||
| Direct Travel Costs: | $0 | ||
| G&A: | 0.00% | $0 | |
| Fee: | 0.00% | $0 | |
| Sub-Total: | $0 | ||
| Other Direct Costs | |||
| Directs: | $612,453 | ||
| G&A: | 0.00% | $0 | |
| Fee: | 0.00% | $0 | |
| Sub-Total: | $612,453 | ||
| Bond | 0.00% | $0 | |
| Total Contract Amount for Project: | $612,453 | ||
| * Amount is computed by formula, do not input data in this column. |
&CSOURCE SELECTION INFORMATION (SEE FAR 2.101 AND 3.104)&RSolicitation FA3002-06-R-0001 Attachment L-9
18 APR 07
Note: Contractor to fill in all yellow highlighted areas of Atch L-9 for this sample project.
L-9 Labor
| SATOC Cost Detail Report - Attachment L-9 Cont'd | ||||
| Proposed Costs - Labor | ||||
| Category (Field Personnel) | Qnty | Unit | Unit Price* | Amount** |
| Program Manager - Senior | HR | $0.00 | $0 | |
| Project Manager - Senior | HR | $0.00 | $0 | |
| Project Manager - Mid | HR | $0.00 | $0 | |
| Architect - Senior | HR | $0.00 | $0 | |
| Architect - Mid | HR | $0.00 | $0 | |
| Architect - Junior | HR | $0.00 | $0 | |
| Civil Engineer - Senior | HR | $0.00 | $0 | |
| Civil Engineer - Mid | HR | $0.00 | $0 | |
| Civil Engineer - Junior | HR | $0.00 | $0 | |
| Mechanical Engineer - Senior | HR | $0.00 | $0 | |
| Mechanical Engineer - Mid | HR | $0.00 | $0 | |
| Mechanical Engineer - Junior | HR | $0.00 | $0 | |
| Electrical Engineer - Senior | HR | $0.00 | $0 | |
| Electrical Engineer - Mid | HR | $0.00 | $0 | |
| Electrical Engineer - Junior | HR | $0.00 | $0 | |
| Geotechnical Engineer - Senior | HR | $0.00 | $0 | |
| Geotechnical Engineer - Mid | HR | $0.00 | $0 | |
| Geotechnical Engineer - Junior | HR | $0.00 | $0 | |
| Environmental Engineer - Senior | HR | $0.00 | $0 | |
| Environmental Engineer - Mid | HR | $0.00 | $0 | |
| Environmental Engineer - Junior | HR | $0.00 | $0 | |
| Cost Estimator - Senior | HR | $0.00 | $0 | |
| Cost Estimator - Mid | HR | $0.00 | $0 | |
| Cost Estimator - Junior | HR | $0.00 | $0 | |
| CADD Operator - Senior | HR | $0.00 | $0 | |
| CADD Operator - Mid | HR | $0.00 | $0 | |
| CADD Operator - Junior | HR | $0.00 | $0 | |
| Health & Safety Manager - Senior | HR | $0.00 | $0 | |
| Health & Safety Manager - Mid | HR | $0.00 | $0 | |
| Health & Safety Manager - Junior | HR | $0.00 | $0 | |
| QA/QC Manager - Senior | HR | $0.00 | $0 | |
| QA/QC Manager - Mid | HR | $0.00 | $0 | |
| QA/QC Manager - Junior | HR | $0.00 | $0 | |
| Site Superintendent/Construction Manager - Senior | HR | $0.00 | $0 | |
| Site Superintendent/Construction Manager - Mid | HR | $0.00 | $0 | |
| Site Superintendent/Construction Manager - Junior | HR | $0.00 | $0 | |
| Security Manager - Senior | HR | $0.00 | $0 | |
| Security Manager - Mid | HR | $0.00 | $0 | |
| Security Manager - Junior | HR | $0.00 | $0 | |
| Administrative Assistant - Mid | HR | $0.00 | $0 | |
| Word Processor - Mid | HR | $0.00 | $0 | |
| Contracts Manager - Mid | HR | $0.00 | $0 | |
| Scheduler - Senior | HR | $0.00 | $0 | |
| Scheduler - Mid | HR | $0.00 | $0 | |
| Project Controls Analyst - Mid | HR | $0.00 | $0 | |
| Total Field: | - 0 | Total Field: | $0 | |
| Category (Home Office Personnel) | Qnty | Unit | Unit Price* | Amount** |
| Program Manager - Senior | HR | $0.00 | $0 | |
| Project Manager - Senior | HR | $0.00 | $0 | |
| Project Manager - Mid | HR | $0.00 | $0 | |
| Architect - Senior | HR | $0.00 | $0 | |
| Architect - Mid | HR | $0.00 | $0 | |
| Architect - Junior | HR | $0.00 | $0 | |
| Civil Engineer - Senior | HR | $0.00 | $0 | |
| Civil Engineer - Mid | HR | $0.00 | $0 | |
| Civil Engineer - Junior | HR | $0.00 | $0 | |
| Mechanical Engineer - Senior | HR | $0.00 | $0 | |
| Mechanical Engineer - Mid | HR | $0.00 | $0 | |
| Mechanical Engineer - Junior | HR | $0.00 | $0 | |
| Electrical Engineer - Senior | HR | $0.00 | $0 | |
| Electrical Engineer - Mid | HR | $0.00 | $0 | |
| Electrical Engineer - Junior | HR | $0.00 | $0 | |
| Geotechnical Engineer - Senior | HR | $0.00 | $0 | |
| Geotechnical Engineer - Mid | HR | $0.00 | $0 | |
| Geotechnical Engineer - Junior | HR | $0.00 | $0 | |
| Environmental Engineer - Senior | HR | $0.00 | $0 | |
| Environmental Engineer - Mid | HR | $0.00 | $0 | |
| Environmental Engineer - Junior | HR | $0.00 | $0 | |
| Cost Estimator - Senior | HR | $0.00 | $0 | |
| Cost Estimator - Mid | HR | $0.00 | $0 | |
| Cost Estimator - Junior | HR | $0.00 | $0 | |
| CADD Operator - Senior | HR | $0.00 | $0 | |
| CADD Operator - Mid | HR | $0.00 | $0 | |
| CADD Operator - Junior | HR | $0.00 | $0 | |
| Health & Safety Manager - Senior | HR | $0.00 | $0 | |
| Health & Safety Manager - Mid | HR | $0.00 | $0 | |
| Health & Safety Manager - Junior | HR | $0.00 | $0 | |
| QA/QC Manager - Senior | HR | $0.00 | $0 | |
| QA/QC Manager - Mid | HR | $0.00 | $0 | |
| QA/QC Manager - Junior | HR | $0.00 | $0 | |
| Site Superintendent/Construction Manager - Senior | HR | $0.00 | $0 | |
| Site Superintendent/Construction Manager - Mid | HR | $0.00 | $0 | |
| Site Superintendent/Construction Manager - Junior | HR | $0.00 | $0 | |
| Security Manager - Senior | HR | $0.00 | $0 | |
| Security Manager - Mid | HR | $0.00 | $0 | |
| Security Manager - Junior | HR | $0.00 | $0 | |
| Administrative Assistant - Mid | HR | $0.00 | $0 | |
| Word Processor - Mid | HR | $0.00 | $0 | |
| Contracts Manager - Mid | HR | $0.00 | $0 | |
| Scheduler - Senior | HR | $0.00 | $0 | |
| Scheduler - Mid | HR | $0.00 | $0 | |
| Project Controls Analyst - Mid | HR | $0.00 | $0 | |
| Total Home Office: | - 0 | HR | $0 | |
| Total Labor: | - 0 | Total Labor: | $0 | |
| * All Labor Rates are Loaded and include G&A and Profit | ||||
| * The labor rate for each category will be the average rate from Section L Attachments 7 & 8. | ||||
| ** Amount is computed by formula, do not input data in this column. |
&LSOURCE SELECTION INFORMATION (SEE FAR 2.101 AND 3.104)&RSolicitation FA3002-06-R-0001 Attachment L-9
18 APR 07
L-9 Travel
| SATOC Cost Detail Report - Attachment L-9 Cont'd | ||||
| Proposed Costs - Travel ** | ||||
| Description | Qnty | Unit | Unit Price | Amount* |
| List Origin/Destination: | ||||
| Perdiem - Lodging | DAY | $0 | ||
| Perdiem - Meals | DAY | $0 | ||
| Mileage | MILES | $0 | ||
| Airfare | R/TRIPS | $0 | ||
| Rental Car | DAY | $0 | ||
| Total Trip | $0 | |||
| Description | Qnty | Unit | Unit Price | Amount* |
| List Origin/Destination: | ||||
| Perdiem - Lodging | DAY | $0 | ||
| Perdiem - Meals | DAY | $0 | ||
| Mileage | MILES | $0 | ||
| Airfare | R/TRIPS | $0 | ||
| Rental Car | DAY | $0 | ||
| Total Trip | $0 | |||
| Description | Qnty | Unit | Unit Price | Amount* |
| List Origin/Destination: | ||||
| Perdiem - Lodging | DAY | $0 | ||
| Perdiem - Meals | DAY | $0 | ||
| Mileage | MILES | $0 | ||
| Airfare | R/TRIPS | $0 | ||
| Rental Car | DAY | $0 | ||
| Total Trip | $0 | |||
| Total Travel: | $0 | |||
| * Amount is computed by formula, do not input data in this column. | ||||
| ** If additional travel is required, offerors may insert more tables. | ||||
| However, please ensure that the formula in the Total Travel amount | ||||
| cell includes the total of all proposed trips and that the Total Travel | ||||
| amount is properly linked to the Sample Task Summary. |
&LSOURCE SELECTION INFORMATION (SEE FAR 2.101 AND 3.104)&RSolicitation FA3002-06-R-0001 Attachment L-9
18 APR 07
L-9 Other Direct Costs
| SATOC Cost Detail Report - Attachment L-9 Cont'd | ||||||||
| Proposed Costs - Other Direct Costs | ||||||||
| In-house Other Direct Costs | ||||||||
| Description | Qnty | Unit | Unit Price | Materials | Labor | Equipment | Other | Amount* |
| $0 | ||||||||
| $0 | ||||||||
| $0 | ||||||||
| In-house total: | $0 | |||||||
| Subcontracts Other Direct Costs | ||||||||
| Description | Qnty | Unit | Unit Price | Materials | Labor | Equipment | Other | Amount* |
| PACES Construction Rpt | $ 289,816.00 | $ 304,383.00 | $ 18,254.00 | $612,453 | ||||
| $0 | ||||||||
| $0 | ||||||||
| Subcontract total: | $612,453 | |||||||
| Total Other Direct Costs: | $612,453 | |||||||
| * Amount is computed by formula, do not input data in this column. |