This document contains questions and responses related to a solicitation for design-build HVAC services at Building 1326 at Eglin Air Force Base in Florida. The solicitation seeks proposals to remove and replace the HVAC system, including ductwork, air handlers, controls and associated equipment, and to modify or replace the existing fire suppression and alarm system. It confirms the HVAC system and air cooled chiller will be larger than existing. Responses provide contact information for electrical service questions, clarify fire protection and mass notification system requirements, set performance periods of 420 calendar days total with 180 for design and 240 for construction, and confirm policy regarding Trane equipment.

View the file

Other files for this federal contract opportunity

Other files attached to B1326 HVAC Design Build, Eglin AFB, newest first.
File Type Posted
FTFA161016_Site visit_RFIs_062821.xlsx XLSX spreadsheet
Attachment 13 - FTFA 16-106 SOW Amendment 2_B1326_062821.pdf PDF
Solicitation Amendment FA282321R00200004 SF 30.pdf PDF
FTFA161016_Site visit_RFIs_062521_Rev.xlsx XLSX spreadsheet
FTFA161016_Site visit_RFIs_062521.xlsx XLSX spreadsheet
07 May 21_Eglin Fire Suppression Specific Criteria April 22 2021.xls XLS spreadsheet
07 May 21_Fire sys Requirements Mar 2021.docx DOCX document
Eglin DDC System and Network with Lockable enclosure and Cybersecurity requirements.docx DOCX document
MNS Eglin Mass Notification System Messages Script (Sep 17).pdf PDF
08 Apr 21_Chris Cahill_ FA Matrix explanation.pdf PDF
Technical Training.docx DOCX document
Attachment 12 - BLDG 1326 Drawing Set.pdf PDF
Attachment 11a - Mech Rm 1..docx DOCX document
Attachment 11b - Comm Rm.docx DOCX document
Attachment 10a - SIte Visit Sign In_061421.pdf PDF
Attachment 11d - Mech Rm 2.docx DOCX document
Attachment 11c - Generator area.docx DOCX document
Solicitation Amendment FA282321R00200003SF30.pdf PDF
Attachment 4 - Section L with attachments_5.pdf PDF
Attachment 10 - Site Visit Sign in Sheet_052521.pdf PDF
Solicitation Amendment FA282321R00200002 SF 30.pdf PDF
Attachment 4 - Section L with attachments_4.pdf PDF
50 Div Cost.xls XLS spreadsheet
B1326 Map.JPG JPG image
Attachment 4 - Section L with attachments_3.pdf PDF
Solicitation Amendment FA282321R00200001 SF 30.pdf PDF
Attachment 4 - Section L with attachments_2.pdf PDF
Solicitation - FA282321R0020.pdf PDF
Attachment 2 - FTFA 16-1016 SOW Amendment HVAC B1326.pdf PDF
Attachment 4 - Section L with attachments_1.pdf PDF
Attachment 5 - Section M.pdf PDF
Attachment 6 - Eglin Fire Suppression Specific Criteria April 22 2021.pdf PDF
Attachment 7 - Fire sys Requirements Mar 2021.pdf PDF
Attachment 8 - Reference Figure BLDG 1326.pdf PDF
Attachment 1 - FTFA 16-1016 HVAC B1326 SOW_1.pdf PDF
Attachment 9 - Reference Figure BLDG 1326 RENOVATION 3.pdf PDF
Attachment 3 - Wage Determination.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Additional RFI Questions:

30 Jun 21

1. There is an existing overhead transformer bank feeding overhead into the building. The UFC only allows a maximum 75KVA (3-25KVA transformers) to be used on a pole. A new electrical service would require the pole mounted transformers to be substantially larger than what is allowed by the UFC. It is also unknown what size transformers Chelco is able to provide aerially. Please provide further direction as how to proceed with overhead transformers, or please give direction on changing the overhead primary and secondary to underground. [Response: The point of contact for this question is Chris Eddy; office 850-307-1229; cell 850-307-7880.]

2. The existing Elec/Mech room has limited room to install new electrical panels. The existing electrical panels have existing equipment in front of the panels, which is a code violation. Will this need to be brought up to code? [Response: If the existing panels have to be effected as a part of this project than they will have to be brought up to code. If the panels are not a part of this project and they do not have to be touched than they remain as they are.]

3. Can a new electrical service panel and associated equipment be installed on the exterior of the building? [Response: Yes]

4. During the walkthrough, it was mentioned that the Maintenance Operations Center must stay operational 24/7. It appears to be connected to a generator. Please confirm the HVAC for this area is on the generator power and whether this area will require any additional backup during main building power outages.

5. During the walkthrough, it was mentioned that the Maintenance Operations Center must have an HVAC system separate from the Main Bldg HVAC. It appears that the existing 5 ton unit is sufficient and would be replaced “like for like”. Please confirm. [If it is confirmed via load calculations that the system size required is 5 ton, then a “like for like” replacement is acceptable. Otherwise, the system shall be replaced with new based on the load for the space served.]

6. Since space is a premium, would Eglin consider only one chilled water pump and one hot water pump to match existing in lieu of new UFC requirements for redundant pumps? [Pumping to be IAW UFC requirement]

7. Since space is a premium, would Eglin consider OA treatment via the new chilled water air handlers in lieu of a dedicated outside air system (DOAS)? [OA treatment IAW UFC requirement]

8. SOW states to modify or install new fire suppression and alarm. Please confirm whether a new mass notification system is required. [Yes. A new fire protection system for this facility is required which will include suppression, detection and mass notification IAW UFC 3-600-01 and UFC 4-021-01]

9. It was evident in the June walkthrough that the HVAC could not meet the demand in several areas of the building. We know that the new HVAC system and Air cooled chiller will be larger than the existing. There is not enough information at this time to confirm if the existing 225 Amp electrical service will be sufficient for the new HVAC. The assumption at this time is that a new service will be required. Does Eglin have any demand data for this building to share or shall we contact CHELCO for a cost to upgrade the electrical service to Bldg. 1326? [Response: Yes contact CHELCO to receive demand data]

10. Please confirm whether or not the Air Force standardization policy for Trane equipment only applies to Air Cooled Chillers. It was our understanding that Air Handlers, VAV boxes, Boilers, etc. could be by other manufacturers? [Air handlers and chiller equipment shall be Trane; other equipment can be by different manufacturers]

11. The SOW requires construction to be performed with the building fully occupied. Would the Government consider a longer construction period of performance than 150 days? Also, will night and weekend work be allowed? [The period of performance will be to 420-calendar days total; 180 design, 240 construction. Night and weekend work will by request only. A minimum of a 14 days’ notice is required for approval of night and/or weekend work.]