This document outlines requirements for an amendment to a statement of work and a related federal contract opportunity. The amendment requires that all HVAC equipment associated with replacing the HVAC system in Building 1326 at Eglin Air Force Base must be TRANE brand to ensure compliance with the Air Force's HVAC standardization policy. The original statement of work dated May 12, 2020 applies in all other respects.
The federal contract opportunity is a 100% small business set-aside for the design-build of replacing the HVAC system in Building 1326 at Eglin Air Force Base, Florida. The North American Industry Classification System code is 238220 and the estimated value is between $1,000,000 to $500,000,000. The performance period is 330 days from notice to proceed. The project includes removal and replacement of the HVAC system, ductwork, air handling units, controls, and associated equipment, as well as modifications to the existing fire suppression and alarm systems.
View the file
Other files for this federal contract opportunity
Show all 37
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment to the Statement of Work for
FTFA 16-
Design / Build Services To: Replace HVAC System B. 1326
Cassandra Stephens
Table of Contents
1. Amendment………………………………………………………………………………………………….. 3
AMENDMENT to the STATEMENT OF WORK for
Design/Build Services for FTFA 16-1016 Repair HVAC System B. 1326 Eglin Air Force Base, Florida
07 Jul 20
1 PURPOSE:
1.1 This amendment to the statement of work (SOW) for the design/build contract to repair the
HVAC system in building 1326, sets for the requirements for the heating, ventilation and air conditioning (HVAC) equipment. All HVAC equipment associated with the execution of the project shall be TRANE equipment. This is to ensure compliance with the Air Force’s HVAC standardization policy.
1.2 All other requirements outlined in the original SOW, dated 12 May 20, shall apply.