This email exchange summarizes a question regarding fire alarm and suppression system signal transmission requirements for an Air Force hangar project. The project documents require the fire alarm control unit (FACU) and remote supervised fire alarm control unit (RSFACU) to transmit signals independently to the fire department. However, the question asks for clarification on why all alarm, supervisory and trouble signals would not be transmitted to the fire department in accordance with UFC 3-600-01. The response provides an explanation that the RSFACU transmits the relevant signals for hangar incidents independently of the FACU so that the fire department would still be notified if the FACU was non-operational. It further notes the systems were designed this way to avoid duplicate signals that could cause confusion at the fire department.

The related federal contract opportunity is for design-build HVAC services at Building 1326 at Eglin Air Force Base, Florida. The requirement has an estimated value between $1 million to $500 million. It is a 100% small business set-aside and utilizes best value source selection and award. The performance period is 330 days after notice to proceed. The work includes removal and replacement of HVAC systems, ductwork, controls and fire suppression/alarm modification or replacement.

View the file

Other files for this federal contract opportunity

Other files attached to B1326 HVAC Design Build, Eglin AFB, newest first.
File Type Posted
30 Jun 21 - FTFA161016_Additional RFI Questions.docx DOCX document
Attachment 13 - FTFA 16-106 SOW Amendment 2_B1326_062821.pdf PDF
FTFA161016_Site visit_RFIs_062821.xlsx XLSX spreadsheet
Solicitation Amendment FA282321R00200004 SF 30.pdf PDF
FTFA161016_Site visit_RFIs_062521_Rev.xlsx XLSX spreadsheet
07 May 21_Fire sys Requirements Mar 2021.docx DOCX document
Eglin DDC System and Network with Lockable enclosure and Cybersecurity requirements.docx DOCX document
MNS Eglin Mass Notification System Messages Script (Sep 17).pdf PDF
Technical Training.docx DOCX document
FTFA161016_Site visit_RFIs_062521.xlsx XLSX spreadsheet
07 May 21_Eglin Fire Suppression Specific Criteria April 22 2021.xls XLS spreadsheet
Attachment 12 - BLDG 1326 Drawing Set.pdf PDF
Attachment 10a - SIte Visit Sign In_061421.pdf PDF
Attachment 11d - Mech Rm 2.docx DOCX document
Attachment 11c - Generator area.docx DOCX document
Attachment 11a - Mech Rm 1..docx DOCX document
Attachment 11b - Comm Rm.docx DOCX document
Attachment 4 - Section L with attachments_5.pdf PDF
Solicitation Amendment FA282321R00200003SF30.pdf PDF
Attachment 10 - Site Visit Sign in Sheet_052521.pdf PDF
Solicitation Amendment FA282321R00200002 SF 30.pdf PDF
Attachment 4 - Section L with attachments_4.pdf PDF
50 Div Cost.xls XLS spreadsheet
B1326 Map.JPG JPG image
Attachment 4 - Section L with attachments_3.pdf PDF
Solicitation Amendment FA282321R00200001 SF 30.pdf PDF
Attachment 4 - Section L with attachments_2.pdf PDF
Attachment 4 - Section L with attachments_1.pdf PDF
Attachment 5 - Section M.pdf PDF
Attachment 6 - Eglin Fire Suppression Specific Criteria April 22 2021.pdf PDF
Attachment 7 - Fire sys Requirements Mar 2021.pdf PDF
Attachment 8 - Reference Figure BLDG 1326.pdf PDF
Attachment 2 - FTFA 16-1016 SOW Amendment HVAC B1326.pdf PDF
Attachment 1 - FTFA 16-1016 HVAC B1326 SOW_1.pdf PDF
Attachment 9 - Reference Figure BLDG 1326 RENOVATION 3.pdf PDF
Attachment 3 - Wage Determination.pdf PDF
Solicitation - FA282321R0020.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

From: Cahill, Christopher To: CARRICO, STEPHEN P GS-09 USAF AFMC 96 CES/CEFP Cc: STEPHENS, CASSANDRA GS-12 USAF AFMC 96 CEG/CENMP; GERRITY, KEVIN M CIV USAF AFMC 96

CEG/CENMP; kevinl@icfpinc.com Subject: [Non-DoD Source] RE: Matrix building 110 Date: Thursday, April 8, 2021 9:51:18 AM Attachments: image001.png

Doing well. Will be seeing you soon I suppose. I did get a hair cut, lol.

I wonder if you are just looking at a piece of the puzzle? The FACU and RSFACU work together as one system even though they are two control panels. The signals you are concerned with are transmitted to the fire department. These signals are generated in the RSFACU and transmit independent of the FACU. See the UFC Table 5-1 matrix. I think this is Monaco BT-X.

There are 5-10 pairs of wires from the FACU to the BT-X for things like smoke detectors, pull stations and tamper switches. Then there is another 5 pair of wires from the RSFACU to the BT-X for foam start and other RSFACU signals.

The only reason the RSFACU also sends the signal to the FACU is because we know anyone investigating a signal will start at the FACU. Well, and on the alarms the RSFACU doesn’t have the notification ability for speakers and strobes.

The reason the FACU doesn’t repeat the signal to the fire department is so they don’t get duplicate signals which might create confusion.

The logic comes out of the AECOM and Burns & McDonnell hangar assessments of ~900 AF and ANG hangars. A significant number of FACU’s were simply turned off do to lacking repairs. In those cases the RSFACU if transmitting signals independent of the FACU at least for hangar bay incidents the fire department would still be notified.

While there are many code requirements where the logic is hard to find this is one area that was thought through at least a little bit.

Chris Cahill, PE* \ Burns & McDonnell Associate Fire Protection Engineer Phone: 952.656.3652 ccahill@burnsmcd.com www.burnsmcd.com *Registered in: MN

Some people were called to war. You are being called to sit on your couch. YOU CAN DO

THIS!

mailto:ccahill@burnsmcd.com mailto:stephen.carrico@us.af.mil mailto:cassandra.stephens.3@us.af.mil mailto:kevin.gerrity@us.af.mil mailto:kevin.gerrity@us.af.mil mailto:kevinl@icfpinc.com mailto:ccahill@burnsmcd.com http://www.burnsmcd.com/ https://www.burnsmcd.com/insightsnews/industries/construction?utm_campaign=CORP_NationalConstruction&utm_source=OutlookSignatures_Web-InsightsNews-Industry-Construction

From: CARRICO, STEPHEN P GS-09 USAF AFMC 96 CES/CEFP <stephen.carrico@us.af.mil> Sent: Thursday, April 8, 2021 6:18 AM To: Cahill, Christopher <ccahill@burnsmcd.com> Cc: STEPHENS, CASSANDRA GS-12 USAF AFMC 96 CEG/CENMP <cassandra.stephens.3@us.af.mil>;

GERRITY, KEVIN M CIV USAF AFMC 96 CEG/CENMP <kevin.gerrity@us.af.mil>; kevinl@icfpinc.com Subject: FW: Matrix building 110

Chris, hope all is well with you. As you can see on my attached comments I requested we receive all Alarms, Supervisory and Troubles at Dispatch IAW UFC 3-600-01. I understand your direction to use matrix in UFC 4-211-01 but cannot understand rationale for not sending all Alarms, Supervisory and Trouble Signals to dispatch IAW reference provided. Can you please explain so I can understand and avoid any confusion with review of future Hangar projects on behalf of Eglin Fire Department.

From: Kevin Lacy <kevinl@icfpinc.com> Sent: Wednesday, April 7, 2021 10:16 AM To: CARRICO, STEPHEN P GS-09 USAF AFMC 96 CES/CEFP <stephen.carrico@us.af.mil> Cc: GERRITY, KEVIN M CIV USAF AFMC 96 CEG/CENMP <kevin.gerrity@us.af.mil>; STEPHENS, CASSANDRA GS-12 USAF AFMC 96 CEG/CENMP <cassandra.stephens.3@us.af.mil> Subject: [Non-DoD Source] Matrix building 110

Steve

Per our conversation, please see attached comments.

Thanks

Kevin Lacy Industrial-Commercial Fire Protection 1209-C Highway 613 Lucedale, MS 39452

Cell: 601-508-7978 Email: kevinl@icfpinc.com

Kevin Lacy mailto:kevinl@icfpinc.com mailto:stephen.carrico@us.af.mil mailto:kevin.gerrity@us.af.mil mailto:cassandra.stephens.3@us.af.mil mailto:kevinl@icfpinc.com

File details come from the government source that posted it. Updated .