This document contains questions and answers related to a solicitation for renovations to Hangar 68 at Eglin Air Force Base in Florida. Key details include that the solicitation involves renovating the fire suppression system in an 80,000 square foot building and includes one base renovation phase across multiple rooms and three optional additional renovation bid options. Renovations may include sitework, utilities, fire suppression upgrade and removal, lead abatement, roofing work, interior partitions, finishes, HVAC, plumbing, restroom renovations, power and lighting. The NAICS code is 236220 and proposals are due by the date specified in Section L of the solicitation. The performance period is 365 days after notice to proceed. Questions must be submitted in writing by the date specified in Section L and responses will be posted within three days.

Received Questions answers as of 04 Nov 19. If you do not see your question on here please send an email to the POCs in the post's description

View the file

Other files

Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HANGAR 68 FA282320R0001 QUESTIONS

NOTE: This dated version supersedes all previous versions of this document. Any unanswered questions below are recorded as received but are still being processed.

*Please note FBO.gov is moving to beta.SAM.gov on 8 Nov 19.

1. Q: Regarding Size standard of $39.5M for NAICS 236220. Considering the size standard, can we assume that businesses with a size standard higher than 39.5 cannot bid this solicitation?

A: The assigned NAICS and size standard must be included with the project. They are not restricting factors for the proposal, as the requirement is Full and Open (unrestricted), allowing for any business, large or small, to bid on this solicitation. It is, however, a factor for subcontractors under the prime, applying to HUBZone preference and subcontracted small businesses in accordance with the accompanying Small Business Subcontracting Plan and relevant clauses in the contract.

2. Q: Is the fire protection specialist required to be on site full time during fire protection activities, or will periodic appearances suffice? If periodic is sufficient, what frequency should appearances be?

A:

3. Q: CLIN-0002AB requires pricing for FF&E, however, there is no furnishings specification.

A:

4. Q: Will the contractor be permitted to place an office trailer near the project site? If so is there a preferred location with access to water and electricity?

A:

5. Q: It was mentioned during the site visit that if new penetrations are made in some of the rooms, EMI recertification would be required. Please provide the room numbers and recertification requirements where this is applicable, as well as construction techniques to bring penetrations into compliance.

A:

6. Q: There appears to be a conflict in requirements for door frame installations in CMU walls in the drawings. FTFA 16-1189 S-400.1 Detail 1 shows a different method than FTFA 16-1189 A101.1 Sheet Note 4 describes. Please clarify.

A:

7. Q: Is it acceptable for contractor to utilize estimating software in lieu of the excel spreadsheet in Attachment G? It can be formatted by CLIN and CSI divisions, and will provide all the information as the excel spreadsheet, and will permit the evaluator to clearly determine our understanding of the requirement.

A:

8.

Pictures of the roof of the Anechoic Chamber:

image4.jpeg image5.jpeg image1.jpeg image2.jpeg image3.jpeg