This document is an amendment to a federal solicitation for renovation work at Eglin Air Force Base in Florida. The solicitation seeks proposals to renovate the fire suppression system in an approximately 80,000 square foot hangar involving phased renovations across multiple rooms and three separate bid options. Work may include sitework, utilities, fire suppression upgrade and removal, lead abatement, fire protection, roofing, interior partitions and finishes, HVAC, plumbing, restroom renovations, power, and lighting. The performance period is 365 days after notice to proceed. The amendment adds an additional site visit date of November 12, 2019 and extends the deadline for questions to November 19, 2019, while maintaining the original proposal due date. Offerors must register in SAM and thoroughly review specifications and drawings, submitting all questions in writing by the amended deadline. The solicitation will be available on FBO and no paper copies will be furnished.
Add site visit 12 Nov 19; questions due 19 Nov 19; no extension to solicitation. *Please note FBO.gov is moving to beta.SAM.gov on 8 Nov 19.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
Miscellaneous text in this section has been modified to:
1.0 GENERAL INSTRUCTIONS.
1.1 General Information
1.1.1 The offeror's proposal must include all data and information requested by these Instructions to Offerors and must be submitted in accordance with these instructions. The offer shall be compliant with the requirements as stated in the Specifications and Solicitation. Non-conformance with the instructions provided in these Instructions to Offerors may result in an unfavorable proposal evaluation or rejection of an offer.
1.1.2 The proposal acceptance period is specified in Block 13, SF 1442, of this solicitation. By signing block 20B of the SF 1442, the offeror certifies that the proposal is valid from the due date and time listed in block 13A through the entire period specified in block 13D.
1.1.3 All referenced documents for this solicitation are available on the Federal Business Opportunities website at http://www.fedbizopps.gov. Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.
1.1.4 The Government reserves the right to revise or amend the specifications, drawings, or the solicitation prior to the proposal closing time. Such revisions or amendments will be communicated by amendments to the Request for Proposal (RFP) and posted in Federal Business Opportunities website (www.FBO.gov). If such amendments require material changes in quantities or prices, the proposal closing date may be postponed by enough days to enable offerors to revise their proposals.
In such cases, the amendment will include an announcement of the new closing date and time.
Offerors MUST acknowledge all amendments in their proposal, either by completing SF 1442 Block 18, providing signed copies of the amendments with their proposal (Section III), or by separate letter which includes a reference to the solicitation and amendment numbers.
1.1.5 Questions. The Contracting Officer listed below is the Government's primary point of contact for this acquisition. All questions regarding this solicitation must be submitted in writing. Any questions and subsequent answers will be posted to the Federal Business Opportunities website (www.fbo.gov). It is the offeror's responsibility to continuously monitor the site for updates. The site visits will be held on 29 October 2019 and 12 November 2019, and due to ongoing mission requirements will be the only available site visits. See relevant clauses in solicitation for additional details. To mitigate the risks associated with the cancellation of this solicitation due to untimely submission of questions, all questions must be submitted to the individual(s) listed below in writing no later than close of business 19 November 2019. Offerors must thoroughly review the specifications and drawings before submitting questions. Any questions not submitted in writing, to include any at the site visit, will not be considered an official response and will not form a basis for an extension of the proposal due date.
Contracting Officer: Ronald J. Wilson, ronald.wilson.22@us.af.mil
Contracting Specialist: 1st Lt Michael Cenedella, michael.cenedella.1@us.af.mil
1.1.6 In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain a copy of all unsuccessful proposals. Unless the offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.
1.1.7 Debriefings. The Contracting Officer will promptly notify offerors of any decision to exclude them from the competitive range (if established); whereupon, they may request and receive a debriefing in accordance with FAR 15.505. Offerors excluded from the competitive range may
FA282320R00010001
request a pre-award debriefing or they may choose to wait until after the source selection decision to request a post award debriefing. However, offerors excluded from the competitive range are entitled to no more than one debriefing for each proposal. The Contracting Officer will notify unsuccessful offerors of the source selection decision in accordance with FAR 15.503(b). Upon such notification, unsuccessful offerors may request and receive a debriefing. Offerors desiring a debriefing must make their request in accordance with the requirements of FAR 15.505 or 15.506, as applicable.
1.1.8 Discrepancies. If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the Contracting Officer in writing with supporting rationale as well as the remedies the offeror is asking the Contracting Officer to consider as related to the omission or error. The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.
This reservation includes matters of additional or substitute pages of the initial proposal.
1.1.9. The Contracting Officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the Contracting Officer will review this determination and if, in the contracting officer's opinion, adequate price competition exists no additional cost information will be requested and certification under FAR 15.406-2 will not be required. However, if at any time during this competition the contracting officer determines that adequate price competition no longer exists; offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness and affordability of the price.
1.1.10 Who Can Participate. Proposals may be submitted by ALL interested parties pursuant to the following: At the time of initial contract offer and at time of award, each business must be registered at SAM.gov.
2.0 SPECIFIC INSTRUCTIONS
2.1 The following instructions are to aid in the evaluation process.
2.1.1 Offerors are responsible for submitting proposals and any revisions or modifications, so as to reach the Government office designated in this solicitation by the time specified in this solicitation.
Contractors shall submit documentation, unless otherwise specified, electronically to the Government, as described in the following paragraphs:
2.1.1.1 Proposal Format: Offerors shall submit their proposals in electronic format via email or via the DoD SAFE site to the points of contact (POC) listed below. The electronic copies of the proposal shall be submitted in a format readable and usable by Microsoft (MS) Office 2013 Suite (to include:
Word, Excel, and PowerPoint) or in PDF format viewable with standard Adobe Acrobat Reader X.
Hidden fields, comments, macros, etc. shall be omitted, and read passwords on files shall not be used. No picture shots of MS Excel spreadsheets shall be included. All spreadsheets and formulas shall be accessible for review if submitted. The files shall be consistent and uniformly named to allow for easy distinction between required proposal submissions. Inclusion of abbreviated company name in file naming convention is acceptable otherwise use company's CAGE code.
2.1.1.2 Email submission: For points of contact see para. 2.1.1.4, below. Contractors should allow time for the email to be uploaded to the server. Email is received based on the time indicating it was received by the Air Force server.
a) The subject line of all emails that comprise the proposal shall be formatted as follows:
Subject: FA282320R0001/Company Name/Email X of X (insert number of the email and total number of emails)
b) File Size. Individual emails shall not exceed 4MB in size. Offeror shall submit multiple emails as necessary to stay under the 4MB limit. Failure to stay under this limit may cause a rejection of the email.
2.1.1.3 Submission via DoD SAFE. In addition to email, contractors may submit proposals electronically to the Government via the DoD SAFE site (https://safe.apps.mil/). All documents other than MS Excel Worksheets must be submitted and saved in .pdf format, and shall follow the instructions in 2.1.4 below. Title of the documents should include the offerors CAGE code (i.e., "Vol 1 Tech Proposal CAGE#").
2.1.1.4 Points of Contact for Proposal Submissions. Submit proposals to:
ronald.wilson.22@us.af.mil michael.cenedella.1@us.af.mil
2.1.1.5 Submission of Bid Guarantee. An electronic copy of the bid guarantee shall be submitted with the electronic proposal. Offerors shall submit a hard copy of the bid guarantee via mail or hand delivery. Offerors shall deliver or mail the bid guarantee no later than 3-business days after the date established for receipt of proposals. Mail or deliver to the address listed in Block 7 of the SF1442 to the Attention of the points of contact listed in paragraph 1.15 above. Failure to submit a hard copy original of the bid guarantee may render the offer ineligible for award.
2.1.2 Any proposal, modification, or revision, that is received at the designated Government office after the exact time specified for receipt of proposals is "late" and will not be considered unless the Contracting Officer determines the criteria set forth in FAR 15.208 exists.
2.1.3 Proposals shall be complete, clearly presented, and include sufficient detail for effective evaluation as detailed in section M of this solicitation and for substantiating validity of stated claims.
The proposal should not simply rephrase or restate the Government's requirements but rather provide convincing rationale to address how the offeror intends to meet these requirements. Offerors shall assume that the Government has no prior knowledge of the offeror's facilities and/or experience and will base its evaluation on the information presented in the offeror's proposal. Proposals shall be neat, indexed (cross-indexed as appropriate) and assembled in an orderly manner. Elaborate artwork and expensive visual and other presentation aids are neither necessary nor desired. Include only information that is relevant to this source selection.
2.1.4 Organization/Number of Copies/Page Limits.
2.1.4.1 Proposal Volumes:
Volume I: Technical Proposal;
Volume II (a), Past Performance;
Volume II (b), Signed Teaming Agreement (if applicable);
Volume III, Price Proposal (Executed RFP Documents/Contractor Responsibility);
Volume IV, Small Business Participation Plan;
Volume V, Subcontracting Plan (Applicable to Large Businesses Only)
2.1.4.2 Page Size, Format and Limit. Specific guidance regarding the content of each volume will be discussed further below. Page limitations shall be treated as maximums. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal. When Evaluation Notices (ENs) are necessary, the Government will issue them by electronic means to prospective offerors.
Page limitations may be placed on responses to these ENs and such limitations will be provided at the time the EN is issued.
2.1.4.2.1 A page is defined as each face of an 8 1/2" X 11" sheet of paper containing information.
Pages in excess of the maximum page limits defined below will be removed from the proposal and will not be evaluated. For the purposes of formatting, typing shall not be less than 10 pitch. Pages shall be numbered sequentially by volume.
Volume I - Technical Proposal: See paragraphs 2.2.3 and 2.2.4 for Page Limit/Format Criteria
Volume II (a) - Past Performance: See paragraph 2.3 for Page Limit/Format Criteria
Volume II (b) - Signed Teaming Agreement: No Page limit
Volume III - Price Proposal and Contractor Responsibility: No Page Limit
Volume IV - Small Business Participation Plan: No Page Limit
Volume V - Subcontracting Plan: Set page limit, no additional pages
2.1.4.2.2 All pages of each part shall be appropriately numbered and identified with the Request for Proposal (RFP) number. Pages in excess of the maximum will be removed from the proposal and will not be evaluated.
2.1.4.3 Cost of Pricing Related Data. All cost or pricing data shall be addressed ONLY in the Cost/ Price Proposal Volume.
2.1.4.4 Indexing. Each volume shall contain a more detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections. Indexing is not included in the page limitations.
2.1.4.5 Proposal Acceptance Period. The proposal acceptance period is specified in Block 13d of the Standard Form 1442 of the Solicitation.
2.2 Volume I - Technical Proposal.
2.2.1 Subfactor 1: Construction Progress Schedule. Prepare and submit a practicable construction progress schedule showing all necessary work elements to complete the project identified under this solicitation. The Contract Progress schedule must include all Bid Options. At a minimum, the Contract Progress Schedule must include mobilization, submittals, demolition, major work elements by specification division (A major work element is defined as those elements identified in the specifications as a Division, e.g. Division 26 - Electrical.), final inspection, demobilization, and close-out documents. The schedule must be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the performance period. The submitted schedule must be developed using project scheduling software such as MS Project, Primavera, or any other comparable form. Offerors should only include the work elements necessary to complete the required work. This list is provided as a guide and is not all inclusive or exclusive. It is the offeror's responsibility to identify all necessary work elements.
2.2.1.1 Each offeror's progress schedule must address the following:
a) Identification of separate work elements.
b) Order of work elements to include project phasing.
c) Identification of start and end dates for each Phase of the project as indicated in the Specifications and Drawings (Phases A-D). For the purposes of the proposal assume a start work date of 1 January 2020. The phases as indicated are not required to be completed in sequential order. Work on the separate phases may run concurrently.
d) Number of days for each work element.
e) Identification of Long Lead Time Materials. Long lead items, such as, major HVAC equipment, electrical equipment, pre-engineered buildings, etc., must be specifically identified in the technical proposal. If there are no Long Lead Time Materials, the proposal must state that there are no Long Lead Time Materials.
f) Identification of work elements in the critical path.
2.2.1.2 The proposed schedule must include the activities which are consistent with those described within the project specifications and drawings and must not exceed the Government's maximum allowable performance period including Options (if any), as noted in FAR Clause 52.211-10. Typing shall not be less than 10 pitch. No Page Limit.
2.2.1.3 Offerors are encouraged to provide, as necessary, additional information to clarify their technical proposal. Additional information is limited to five (5) page, as defined at paragraph 2.1.4.2.1, and will be considered as part of their technical proposal. If exceeded, the excess pages will not be read or considered in the evaluation of the proposal.
2.2.1.4 Failure to submit a Construction Progress Schedule will result in immediate elimination from the competition.
2.2.2 Subfactor 2: 50 Division Cost Estimate Worksheet - Offerors shall submit four (4) separate 50 Division Cost Estimate Worksheets, one for each individual Project/CLIN in accordance with the instructions listed below in paragraph 2.5.6 of Technical Volume III, Price Proposal. Offer will be complete, accurate, and sufficiently detailed to demonstrate a clear technical understanding of the requirement. Evaluation of this area will be addressed under the Price Factor and the Technical Factor. Failure to provide separate proposals for each Project/CLIN will result in immediate removal from the competition for non-compliance with the solicitation instructions.
2.3 Volume II (a) --Past Performance Information. Offerors shall provide a maximum of five (5) total references on completed or current contracts (including Federal, State, local government and private) to demonstrate their ability to perform the proposed work as identified within the Specifications.
The Government's evaluation of past performance information will take into account only past performance information regarding the prime contractor's relevant experience, or subcontractors that will perform major or critical aspects (25% or more of the total project price). See Teaming Agreements, para 2.4, when such information is relevant to the instant acquisition.
2.3.1 Provide a summary of the previous contracts described above, not to exceed 1 (one) page of past performance information per reference. The summary should explain what aspects of each contract are deemed recent and relevant as related to the requirements of this solicitation and in accordance with Section M. Failure to provide required relevancy description may impact the confidence rating, (i.e. aspects of previous projects should match work elements identified in the solicitation/specification). The summary should not exceed 1 (one) page per reference (maximum total of five (5) pages) and include:
a) Name of project (Contract number, if applicable)
b) Name and address of customer or Government agency
c) Name, telephone, fax number and/or email of customer contact or contracting officer
d) Dollar value
e) Period of performance/Completion date
f) Brief description of work performed, and why the effort is relevant
g) Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions
2.3.2 RECENCY is defined as projects performed within the last six (6) years of the issue month of the solicitation. All references for work not performed within six (6) years of the issue month of the solicitation will not be evaluated.
2.3.3 RELEVANCY is defined as projects involving the type of construction and work elements described in the attached Specifications and Drawings.
2.3.4 Past/Present Performance Questionnaires.
2.3.4.1 Offerors shall complete Attachment D, Past/Present Performance Questionnaire and mail, fax, or email the attached Past/Present Performance Questionnaire to all past performance references and instruct them to return the completed questionnaire directly to the individual indicated in paragraph 2.3.4.1.1 below by email. Evaluators are only allowed to use the Attachment D, Past/ Present Performance Questionnaire. Past/Present Performance Questionnaire submissions do not count against the page limits specified at para 2.1.4.2.1, Volume II (a). Altered or substituted questionnaires will not be evaluated. Also, Past Performance Questionnaires will only be accepted from Project Owners or their authorized representatives. Past Performance Questionnaires will not be accepted from Prime Contractors, Subcontractors, or Manufacturers. Offerors are responsible to ensure questionnaires are transmitted to their references and to indicate which references the questionnaire was sent to (see paragraph 2.3.4.1.1 below).
2.3.4.1.1 Inform your references that they shall forward questionnaires directly to the address(es) below. Questionnaires shall be addressed to the Contracting Officer. Questionnaires must be received not later than the closing date of the solicitation. Offerors are responsible for ensuring their references transmit the questionnaire to the Contracting Office at the below emails addresses:
michael.cenedella.1@us.af.mil ronald.wilson.22@us.af.mil
2.3.4.2 In lieu of a Past/Present Performance Questionnaire, if a project is currently available in the Past Performance Information Retrieval System (PPIRS) (now, Contract Performance Assessment Reporting System (CPARS), the contractor shall attach the evaluation to the questionnaire with the relevant contract/solicitation number and submit, along with the rest of the proposal package, to the Contracting Office no later than the official closing date and time of the solicitation.
2.3.5 Lack of any past performance will not automatically disqualify an offeror. See Section M for how lack of past performance will be evaluated.
2.3.6 If the offeror claims there is no past performance, then that status must be identified to the Contracting Officer not later than the date and time proposals are due from all offerors.
2.3.7 The Government shall consider past performance information on contracts obtained from other sources when evaluating the offeror's past performance.
2.3.8 If Teaming Agreements are contemplated, the teaming members must provide complete information as to relevant and recent past performance information on previous teaming agreements.
If this is a first time teaming effort, each party to the teaming agreement must provide information on all relevant contracts as specified in paragraph 2.3.1. The maximum number of past performance references for the entire team shall not exceed a total of ten (10). See additional documentation requirements for Teaming Agreements in Volume II (b) paragraph 2.4 below.
2.4 Volume II (b) - Teaming Agreements (include only if applicable). Submit original and one (1) copy of signed Teaming Agreement.
2.4.1 If Teaming Agreements are contemplated they must comply with the appropriate Federal Regulations (13 C.F.R. Part 121 (Size Regulations), Part 124 (8(a) & SDB), Part 125 (Government
Contracting Programs), and/or Part 126 (HUBZone). The Government will recognize the integrity and validity of contractor teaming agreements; provided, the agreements are identified and company relationships are fully disclosed in an offer. Teaming agreements will be incorporated into the contract. Failure to clearly define roles and/or provide a teaming agreement with a proposal shall make teaming agreements and related subcontractor past performance ineligible for evaluation and consideration of award. Teaming Agreements must provide the following information as part of their proposal, Volume II (b), not later than the date/time proposals are due:
2.4.1.1 Clearly establish roles of each party (who is prime and who is subcontractor, who is responsible for what tasks, contract administration, proposals, work management, etc.)
2.4.1.2 Provide for protection of competition-sensitive proprietary information (subcontractor past performance cannot be disclosed to the prime offeror without the subcontractor's consent). Provide a letter from all subcontractors that will perform major or critical aspects of the requirement, consenting to the release of their past performance information to the prime contractor, only if it is being used as part of the past performance evaluation.
2.4.1.3 Identify each member's share of the prospective contract, e.g. 50/50, 51/49, etc.
2.4.1.4 Exclusivity. Assurance that the team member will not be replaced for the duration of the contract, any exceptions should be identified. Assurance that the team members are not teaming with another firm for the same procurement.
2.4.1.5 Statement of acknowledgement that the Prime Contractor is responsible for adhering to contract terms and conditions and daily management. The Prime Contractor is obligated to negotiate in good faith and responsible for conveying mandatory government terms and conditions to subcontractors.
2.4.1.6 The prime contractor shall remain fully responsible for contract performance, regardless of any teaming agreement between the prime contractor and its subcontractors.
2.5 Volume III - Price Proposal and Proposal Documents:
2.5.1 Submit the Standard Form 1442 as specified below.
2.5.2 Complete blocks 14, 15, 16, 17, 19, and 20a-c of the SF 1442, Solicitation, Offer, and Award.
An authorized official of the firm submitting the offer must sign and date the SF 1442 in block 20a-c.
(In doing so, the offeror accedes to the contract terms and conditions as written in the RFP, Sections A through K).
2.5.3 Insert proposed prices in Section B for each Contract Line Item.
2.5.4 Complete remaining sections through Section K. Representations and certifications shall be included in Section K or the System for Award Management (SAM). Ensure that both the FAR and DFARS representations and certifications are completed.
2.5.5 Submit the Financial Responsibility Questionnaire (Attachment E) with the top portion only completed.
2.5.6 Price Proposal - Offerors shall provide a price breakdown for each Project/CLIN utilizing Attachment G, the 50 Division Cost Estimate Worksheet. Use the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. Offerors shall input the major work elements by specification division and provide pricing for those major work elements within each division sheet. The information from the division sheets may not be all inclusive. Offerors are allowed to include any missing items from each division and are allowed to fill in other divisions that are not listed in the prefilled division sheets. Offer will be complete, accurate, and sufficiently detailed to demonstrate a clear understanding of the requirement. Offeror's are cautioned not to utilize Lump Sum or Total Pricing when pricing each individual specification division. Failure to breakout major work elements within a specification division may result in an unfavorable evaluation. The burden of proof for credibility of proposed pricing rests with the offeror. Evaluation of this area will be addressed under the Price Factor and the Technical Factor. *NOTE: Each CLIN must have one 50 Division Cost Estimate Worksheet, a total of four, one per project number, including bid options.
2.6 Volume IV- Small Business Participation Plan
2.6.1. The Offeror must complete and submit the Small Business Participation Plan Form (Attachment H).
2.6.2. All offerors (both large and small businesses) will be evaluated on the level of proposed participation of U.S. Small businesses in the performance of the contract relative to the objectives and goals established herein. The Offeror's proposal must meet the minimum mandatory Total Small Business Participation Goal of 37% of total contract value (through collective small business participation from any type of small business or sub-category small business). The subcategory small business goals are as follows:
Service Disabled Veteran-Owned Small Business.............2%;
HUBZone Small Business.........................................2%;
Small Disadvantaged Business....................................3%;
Women-Owned Small Business..................................5%.
2.7. Volume V - Subcontracting Plan (Applicable to Large Businesses Only)
2.7.1 Separate from the Small Business Participation Plan. Large Business concerns must also submit a Subcontracting Plan as required by FAR 52.219-9 Small Business Subcontracting Plan
- Alternate II (DEVIATIONS 2018-O0018 and 2019-O0005). The Subcontracting Plan will not be rated by the Source Selection Team (SSET), but rather reviewed by the Small Business Advisor and the Contracting Officer for acceptability. Proposals submitted in response to this solicitation shall include a subcontracting plan that separately addresses subcontracting with small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns. If the offeror is submitting an individual contract plan, the plan must separately address subcontracting with small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns, with a separate part for the basic contract and separate parts for each option (if any). The plan shall be included in and made a part of the resultant contract. The subcontracting plan shall be negotiated within the time specified by the Contracting Officer. Failure to submit and negotiate a subcontracting plan shall make the offeror ineligible for award of a contract.
2.7.2 In accordance with Defense Federal Acquisition Regulations, DFARS 215.304(c)(i), when an evaluation assesses the extent that small businesses are specifically identified in proposals, the small businesses considered in the evaluation shall be listed in any subcontracting plan submitted pursuant to FAR 52.219-9, Alternate II (DEVIATIONS 2018-O0018 and 2019-O0005) and DFARS 252.219-7003 Small Business Subcontracting Plan (DoD Contracts)-Basic (Dec 2018). The assessment will consider if the plan adequately responds to each of the required elements of the FAR 52.219-9, Alternate II (DEVIATIONS 2018- O0018 and 2019-O0005) and if the commitments listed in the Offeror's Subcontracting Plan are comparable to the commitments addressed in the Offeror's Small Business Participation Plan submitted in Volume IV, Factor 4.
2.8. Relationship between Instructions and Evaluation. Your attention is directed to the functional relationship between Sections L and M of this solicitation. Section L provides information for the purpose of organizing the proposal and is not intended to be all inclusive. Section M describes evaluation factors for award. The Government evaluation of proposals will cover areas identified in Section M, proposals should address all such areas of evaluation.
The following clauses were modified:
52.236-27 Alternate I - Site Visit (Construction). Feb 1995 hereby reads as follows:
As prescribed in 36.523, insert a provision substantially the same as the following:
Site Visit (Construction) (Feb 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation.
Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: Michael Cenedella
Address: 308 West D Avenue, Eglin AFB, FL 32542
Telephone: 850-882-0250
Email: michael.cenedella.1@us.af.mil
Alternate I (Feb 1995). If an organized site visit will be conducted, substitute a paragraph substantially the same as the following for paragraph (b) of the basic provision:
(b) Two organized site visits have been scheduled for:
29 October 2019 at 0800 CST and
12 November 2019 at 0800 CST
(c) Participants will meet at ___Hangar 68 and must request pass access to base via email through POC listed above by providing name and Date of Birth of individuals attending the visit___.
(End of Provision)
| IDCode: |
| Page: 1 |
| Pages: 9 |
| AmendNo: 0001 |
| EffDate: 11/4/2019 |
| ReqNo: F1T2BR9109A001 |
| ProjNo: FTFA 16-1189 |
| IssCode: FA2823 |
| AdmCode: |
| IssuedBy: FA2823 AFTC PZIO |
CP 850 882 2474
308 WEST D AVE BLDG 260 STE 130
EGLIN AFB, FL 32542-5418
United States Michael Cenedella, Email: michael.cenedella.1@us.af.mil Telephone: 882-0250
AdminBy:
See Item 6
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA282320R0001 |
| SolDate: 10/28/2019 |
| AwardChg: |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G |
| ChgeOrd: |
| ChgeOrder: |
| Modify: |
| SuppAgre: |
| SuppAuth: |
| ModOthr: |
| OthrSpec: |
| NoReq: Off |
| Require: |
| Copies: |
| Descript: The purpose of this amendment is to add another opportunity for a site visit to clause 52.236-27, Alternate I. The new date is 12 November 2019 at 0800. This will change the due date for questions from 12 November 2019 to 19 November 2019. Due date for proposals will remain the same. |
| ContNameTitle: |
| CoNameTitle: Ronald Wilson |
Email: ronald.wilson.22@us.af.mil Telephone: 882-3144
| ContDate: |
| CODate: |
File details come from the government source that posted it. Updated .