Slides_Site_Visit.pdf

PDF 613 KB Posted

Attached to
Modify Control Rooms Bldg 380 Federal contract opportunity
Solicitation number
FA282319RA004
Issued by
Department of the Air Force Materiel Command Test Center

About this file

Site Visit Documentation

View the file

Other files for this federal contract opportunity

Other files attached to Modify Control Rooms Bldg 380, newest first.
File Type Posted
FA282319RA004_QandA_30_may.pdf PDF
Conformed_Solicitation_-_FA282319RA0040007.pdf PDF
A60117AA_TFv2.pdf PDF
Amendment_FA282319RA0040007_SF_30.pdf PDF
Conformed_Solicitation__-_FA282319RA0040006.pdf PDF
Amendment_FA282319RA0040006_SF_30.pdf PDF
FA282319RA004_QandA_13_May_19.pdf PDF
Addenda_Existing_Plans_280_Walls_280.290_Access_Plan_Site_Access.pdf PDF
Revised_Sheets_and_Specs.pdf PDF
Solicitation_Amendment_FA282319RA0040005_SF_30.pdf PDF
Amendment_FA282319RA0040004.pdf PDF
Conformed_FA282319RA0040003_5_Apr_19.pdf PDF
Amendment_FA282319RA0040003.pdf PDF
Site_Visit_Sign-in_Sheet.pdf PDF
FA282319RA004_QandA_01_Apr_19.pdf PDF
FA282319RA004_QandA_25_Mar_19.pdf PDF
Amendment_FA282319RA0040002.pdf PDF
Conformed_Solicitation_FA282319RA004.pdf PDF
FA282319RA004_QandA_21_Mar_19.pdf PDF
Attachment_H_-_Asbestos_Report.pdf PDF
FA282319RA004_QandA_20_Mar_19.pdf PDF
Amendment_FA282319RA0040001.pdf PDF
Attachment_G_-_Site_Visit_Map.pdf PDF
FA282319RA004_QandA_15_Mar_19.pdf PDF
FA282319RA004_QandA_14_Mar_19.pdf PDF
Attachment_B_-_Specifications_FTFA_17-1050.pdf PDF
Attachment_D_-_PPQ.pdf PDF
Attachment_C_-_Wage_Determination_FL190217.pdf PDF
Attachment_A_-_Drawings_FTFA_17-1050.pdf PDF
Attachment_F_-_Base_Access_Memo.docx DOCX document
Solicitation_-_FA282319RA004.pdf PDF
Attachment_E_-_FRQ.pdf PDF
50_Div_Cost.xls XLS spreadsheet
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Distribution Statement D: Distribution authorized to DoD and DoD Contractors Only; March 23, 2018.

Other requests for this document shall refer to 96 RNCS/Engineering Flight, Eglin AFB, Florida 32542.

96 TW

96th Range Control Squadron

Modify Control Rooms Bldg 380 Site Visit

Ron Vanderkooy

96 RNCS/RNCE

25 Mar 2019

I n t e g r i t y - S e r v i c e - E x c e l l e n c e

Other requests for this document shall refer to 96 RNCS/Engineering Flight, Eglin AFB, Florida 32542.

• Central Control Facility (CCF) Real-Time Mission Control Situational Awareness Data Monitoring Analysis Archival and Distribution

• Specialized Real-Time and Post-Mission Data Reduction

• Telemetry, TSPI, Audio, Video, Film Reading and Processing

• Mission Analysis Provides Telemetry and TSPI Analysis Expertise Electronic Warfare Threat Analysis Expertise

96th Range Control Squadron (96 RNCS) Director: Mr. Stan Pitchford

Technical Director: Mr. Ken Crosby

Adhere to principles of CMMI® Level 3 SW Development Services

• Real-Time, Post Flight, and Analysis Software Range Services – Antenna Slaving, Scoring, TSPI Distribution Situational Awareness Stores Separation Data Reduction Arena Tests

TM/TSPI

Over 250 maintained software applications

• SW Dev for 12yr $360M DOD HPC Modernization Program

Development Flight Ms. Sandra Brown, 96 RNCS/RNCDEngineering Flight Mr. Ron VanderKooy, 96 RNCS/RNCE

Operations Flight Mr. Charlie Churillo, 96 RNCS/RNCO

Mission:

• CCF Engineering Support Integrate/Develop CCF Systems & Capabilities Build/Maintain control room infrastructure Maintain Systems/Hardware Life Cycle Management Design/sustain Networks for CCF and support areas Cybersecurity Support Computer Support Services

• AF Lead for Target & Drone Control System System/Software Life Cycle Management

The mission of the 96 RNCS is to deliver decision quality test data ensuring state-of-the-art warfighting capabilities through agile mission support.

http://upload.wikimedia.org/wikipedia/en/6/64/Cisco_logo.svg http://upload.wikimedia.org/wikipedia/commons/4/48/Dell_Logo.svg

Other requests for this document shall refer to 96 RNCS/Engineering Flight, Eglin AFB, Florida 32542.

96 TW

Project Overview

• Bldg 380 Rm 109 previously occupied by 96 Comm Squadron

– Moved to make space for more control rooms

• Architectural & Engineering Firm designed current prints released for RFP

– Rm 280 & 290 (Bid Item A)

– Rm 281, 287/288 (Bid Item B) [NOT IN SCOPE]

– Rm 109 (Bid Item C)

• RNCS outsourced equip design/build/integrate to Wavelink under TETRAS contract

– Design/Build Rm 109 control room

Other requests for this document shall refer to 96 RNCS/Engineering Flight, Eglin AFB, Florida 32542.

96 TW

Rm 109 Master Schedule

Presenter Presentation Notes Offsite integration Onsite integration

Other requests for this document shall refer to 96 RNCS/Engineering Flight, Eglin AFB, Florida 32542.

96 TW

Schedule considerations

• Amendment is in works to request concurrent start on all 3 rooms.

– Rm 280 and 290 are smaller projects and should not be held up by Rm 109 work if possible

Other requests for this document shall refer to 96 RNCS/Engineering Flight, Eglin AFB, Florida 32542.

96 TW

Rm 109 Overview

Other requests for this document shall refer to 96 RNCS/Engineering Flight, Eglin AFB, Florida 32542.

Rm 280/290 Overview

Other requests for this document shall refer to 96 RNCS/Engineering Flight, Eglin AFB, Florida 32542.

Skyfold Wall

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8

File details come from the government source that posted it.