RFI_003_17-1702.pdf

PDF 77 KB Posted

Attached to
GLEN 17-1702 Solicitation_Parking Lot Light Poles Federal contract opportunity
Solicitation number
FA255019RA016
Issued by
Department of the Air Force Space Command

About this file

This document contains responses to questions from contractors regarding a solicitation for the repair of parking light poles at Schriever Air Force Base. The solicitation requires contractors to replace any yellowed or cracked lenses on reused fixtures, regardless of degree. Powder coat over galvanized is the preferred finish for new steel poles. Bonds are required per the solicitation under block 12a, and performance and payment bonds must meet FAR Clause 52.228-15. Acceptable fixture replacements identified are 2D1, 2G1, and 2E1. The pre-bid conference will be held on September 13, 2019 at 09:00 at the base visitor's center. Questions must be submitted by September 18, 2019 and responses will be posted by September 23, 2019.

Second set of RFI responses

View the file

Other files for this federal contract opportunity

Other files attached to GLEN 17-1702 Solicitation_Parking Lot Light Poles, newest first.
File Type Posted
Solicitation_Amendment_-_FA255019RA0160001.pdf PDF
Hapco_Poles_&_Damper_Cut_Sheet_(RFI__11).pdf PDF
RFI_001_17-1702_revised_V2_CE_responses.pdf PDF
17-1702_Site_Visit_Meeting.pdf PDF
2_GLEN_17-1702_Specifications.pdf PDF
7_SOW_Supplement_Environmental.pdf PDF
3_GLEN_17-1702_Design_Analysis_(Part_1).pdf PDF
6_Design_Guide_Version_March_2017.pdf PDF
1_GLEN_17-1702_Drawings.pdf PDF
4_GLEN_17-1702_AF66.xls XLS spreadsheet
9_FEP2010.pdf PDF
3_GLEN_17-1702_Design_Analysis_(Part_2).pdf PDF
5_GLEN_17-1702_Work_Phasing_Plan.pdf PDF
8_SAFB_Overreaching_Environmental.pdf PDF
10_Wage_Determination.pdf PDF
00_Solicitation_FA255019RA016.pdf PDF
0_SOW_GLEN_17-1702.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA255019RA016 Repair Parking Light Poles RFI 003

1. Specification 26 56 00 2.3.H states "Pole finishes shall be anodized bronze paint to match existing luminaires". Steel pole basis of design manufacture offers the following available finishes; Galvanized, Powder Coat, or Powder Coat over Galvanized. Can the steel pole finish be clarified based on the manufactures available finishes?

Government Response: Powder Coat over Galvanized is preferred based on manufacturer availability.

2. Specification 26 56 00 2.6.A states that yellowed lenses of reused/relocated fixtures shall be replaced. The degree of how yellowed a lens is, is a subjective term. Can a quantity of yellowed or cracked lenses, that will need to be replaced, be provided?

Government Response: Any identified yellowing or cracking is subject to replacement, regardless of degree.

3. Could you please clarify if any bid or payment/performance bond is required?

Paragraph 3 on FBO states that “Contractors shall be capable of securing bonding for the total proposed amount” but both Block 12a. and 13b. seem to indicate that no bonds of either type will be required.

Government Response: Bonds are required per the Solicitation under 12a. A new SF1442 has been issued to reflect this requirement. Also, FAR Clause 52.228-15 Performance and Payment Bonds--Construction Oct 2010 is included in the solicitation.

4. Question 21. a. asks what fixture to replace the missing fixture and the Government response was 2E. 2E is the fixture designation for an existing fixture to be removed and reinstalled on the new pole. Please provide a new fixture designation to be installed at pole [1]? Note fixture 2E1 is not scheduled on E-105 or any of the sheets.

Government Response: 2D1 is required

5. Question 22.a. asks what fixture to replace the missing fixture and the Government response was 2D. 2D is the fixture designation for an existing fixture to be removed and reinstalled on the new pole. Will the Government provide a 2D fixture or is the contractor responsible to provide the new fixture? Please provide a new fixture designation to be installed at pole [4]? 2D1 would be the most comparable scheduled new fixture already on E-106?

Government Response: 2D1 is acceptable

6. Question 24.a. & b. Governments response is to use fixture 2G. Fixture 2G is an existing fixture to be removed and reinstalled on a new pole. Will the Government provide a 2G fixture or is the contractor responsible to provide a new fixture? Note the existing fixture(s) 2G is/are missing as is the pole. 2G1 would be the most comparable scheduled new fixture already on E-110.