This document contains a schedule of material submittals and a solicitation for replacing parking lot light poles at Glen Air Force Base. The schedule outlines 17 submittal line items required from the contractor, including project plans, structural and electrical components, O&M manuals, as-built drawings, and warranties. Key due dates range from award through project completion.
The solicitation seeks replacement of parking lot light poles at Glen Air Force Base under contract number FA255019RA016. A pre-bid site visit will be held on September 13, 2019, with questions due by September 18, 2019. Contractors must be bondable and not debarred. The selected contractor must provide signed SF1442 and acknowledge any amendments. Proposals are due as specified in the SF1442.
AF66, Material Submittal Schedule, for GLEN 17-1702 Parking Lot Light Poles solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_003_17-1702.pdf | ||
| Solicitation_Amendment_-_FA255019RA0160001.pdf | ||
| RFI_001_17-1702_revised_V2_CE_responses.pdf | ||
| 17-1702_Site_Visit_Meeting.pdf | ||
| Hapco_Poles_&_Damper_Cut_Sheet_(RFI__11).pdf | ||
| 1_GLEN_17-1702_Drawings.pdf | ||
| 00_Solicitation_FA255019RA016.pdf | ||
| 0_SOW_GLEN_17-1702.pdf | ||
| 2_GLEN_17-1702_Specifications.pdf | ||
| 7_SOW_Supplement_Environmental.pdf | ||
| 3_GLEN_17-1702_Design_Analysis_(Part_1).pdf | ||
| 6_Design_Guide_Version_March_2017.pdf | ||
| 9_FEP2010.pdf | ||
| 3_GLEN_17-1702_Design_Analysis_(Part_2).pdf | ||
| 5_GLEN_17-1702_Work_Phasing_Plan.pdf | ||
| 8_SAFB_Overreaching_Environmental.pdf | ||
| 10_Wage_Determination.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
Submittal 1
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT NAME | SOLICITATION /CONTRACT NUMBER | |||||||||||||||||||
| GLEN 17-1702 | Replace parking Lot Light Poles | |||||||||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | |||||||||||||||||||||
| LINE NUMBER | LINE ITEM | CERTIFICATE OF COMPLIANCE | AS-BUILT DRAWINGS | COLOR SELECTION | MANUFATURUR'S RECOMMENDATION | CATALOG DATA | O&M RECOMMENDATIONS | CALCULATIONS | WARRANTY | DRAWINGS | REPORT | TEST RESULTS | REQUIRED SUBMISSION DATE | DATE TO CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | APPROVED | DISAPPROVED | CONTRACTOR SUBMITTAL | FINAL APPROVAL | REMARKS |
| GENERAL | ||||||||||||||||||||||
| 1 | Project Specific MSDS Sheets | 1 | AWARD+30 | |||||||||||||||||||
| 2 | Form-3064 Contract Progress Schedule | 1 | AWARD+30 | |||||||||||||||||||
| 3 | Form-3065 Contract Progress Report | 1 | AWARD+30 | |||||||||||||||||||
| 4 | Health, Safety, and Environment Plan(s) | 1 | AWARD+30 | |||||||||||||||||||
| Contractor's QC Plan | 1 | AWARD+30 | ||||||||||||||||||||
| Fatory Calculation for Poles | 1 | AWARD+30 | ||||||||||||||||||||
| 5 | Work Phase Plan | 1 | AWARD+30 | |||||||||||||||||||
| STRUCTURAL | ||||||||||||||||||||||
| 6 | Grout Mix/Product Data for Base | 1 | AWARD+30 | |||||||||||||||||||
| 7 | Reinforcing Steel Mill Certifications | 1 | AWARD+30 | |||||||||||||||||||
| 8 | Slump Test results & Concrete Truck Tickets | 1 | 7 days after work | |||||||||||||||||||
| 9 | 7-Day Concrete Compressive Strength Test | 1 | 1 | 7 days after work | ||||||||||||||||||
| MECHANICAL | ||||||||||||||||||||||
| 10 | Pole eraction plan | 1 | NTP + 30 | |||||||||||||||||||
| 11 | Lighting fixture installation plan | 1 | NTP + 30 | |||||||||||||||||||
| ELECTRICAL | ||||||||||||||||||||||
| 12 | Wires | 1 | NTP + 30 | |||||||||||||||||||
| 13 | Swtches | 1 | NTP + 30 | |||||||||||||||||||
| 14 | Panels | 1 | NTP + 30 | |||||||||||||||||||
| 15 | Breakers | 1 | NTP + 30 | |||||||||||||||||||
| 16 | Lighting poles | 1 | NTP + 30 | |||||||||||||||||||
| 17 | Lighting Fixtures | 1 | NTP + 30 | |||||||||||||||||||
| CLOSEOUT | ||||||||||||||||||||||
| 18 | O&M Maintainance data, manuals and Manufacturer's Warranties | 1 | at completion | |||||||||||||||||||
| 19 | As Built Submittal | 1 | at completion |
&L&9Project Submittal Form AF-66