(CUI) SOW - Bldg 1028 (BDOC) Chilled Water System Replacement (CAO 3 Sep).pdf

PDF 557 KB Posted

Attached to
Buckley SFB - BDOC Chiller Replacement
Solicitation number
FA254326Q0027
Issued by

About this file

This is a Statement of Work (SOW) for the replacement of a chilled water system serving Building 1028 at Buckley Space Force Base, Colorado, dated May 20, 2026.

The contractor must provide all labor, materials, tools, and equipment necessary to replace the degraded chilled water system, including the chiller and all associated distribution components. The new system must be based on Trane-series equipment to support standardization goals. Technical specifications require the chiller to fit within the existing concrete pad dimensions (19'-11" L x 12'-8" W x 6'-8" H), with an operational weight not exceeding 12,000 lbs. The system must integrate into the existing 460V, 60 Hz, 3-Phase electrical supply and comply with UFC 3-501-01. The contractor shall provide piping tie-ins, isolation valves, glycol feeder components, and emergency chilled water tap connections with quick-connect fittings for temporary chiller integration. System capacity will be determined by the existing chiller, Computer Room Air Handlers (CRAHs), and operational sequences. The chilled water distribution system must be flushed and recharged with 30% propylene glycol solution. The refrigerant must comply with UFC 3-401-01 environmental requirements, and sound/vibration control must meet UFC 3-410-01 standards. The new system must integrate with the existing Energy Management Control System (EMCS) per UFC 3-410-01, UFC 3-410-02, and EMCS Standards 26AUG2026. Post-installation commissioning must verify proper system performance.

All work must comply with multiple governing standards including UFC codes, UFGS specifications, OSHA requirements, National Electric Code 2026, International Building Code 2018, and NFPA standards. Qualified labor must include technicians certified and licensed to service chilled water systems with specialized experience on Trane equipment and computer/server room systems. Deliverables include as-builts, O&M manuals, commissioning reports, manufacturer warranty information, and documentation of operational and safety checks. The contractor must comply with stringent Operations Security and Anti-Terrorism/Force Protection requirements at Buckley Space Force Base, including personnel vetting, escort requirements, AT Level I Awareness training, document control, credential protection, information security restrictions, and infrastructure coordination protocols.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

STATEMENT OF

WORK

FOR

B1028 Chilled Water System Replacement

606 S. ASPEN ST.

BUCKLEY SFB, COLORADO

80011

20 May 2026

1.0 Scope of Work

1.1 Overview

The chilled water system serving building 1028 suffers from degraded serviceability, requiring an increase in corrective maintenance. To prevent future downtime caused by sub-component failures and other performance issues, the unit will need to be replaced. Replacing the chilled water system will increase reliability, avoiding any future interruptions to mission.

1.2 Primary Objective

The Contractor shall provide all supplies, materials, tools, equipment, and qualified labor necessary to replace the chilled water system consisting of a chiller and all necessary associated distribution.

1.3 Chilled Water System Replacement

The contractor is responsible for providing all material and qualified labor necessary for the completion of this project. The contractor shall:

• Base the design of the chiller system on Trane-series equipment to support the Government’s goal of equipment standardization.

• Replace the chiller along with all necessary associated distribution.

• Provide and install new Trane chiller system meeting the following technical specifications:

o Physical footprint must fit onto the existing concrete pad (19’ - 11” L x 12 ‘- 8” W x 6 “- 8” H”). If the equipment exceeds these dimensions, the pad shall be extended to accommodate the new equipment.

o The operational weight of the new chiller system must not exceed the existing concrete pad’s load capacity of 12,000 lbs.

o System Capacity to be determined by existing Chiller, CRAHs, and sequence of operations.

o Must integrate into the existing electrical 460V, 60 Hz, 3-Phase power supply and comply with all the applicable requirements in UFC 3-501-01.

o Provide and install all piping tie-ins, isolation valves, glycol feeder and other components required to integrate the new chiller into the existing chilled water distribution system.

o Provide and install emergency chilled water tap connections, isolation valves, and quick-connect fittings to facilitate the rapid integration of a temporary chiller in the event of primary system failure.

o Flush the chilled water distribution system and recharge with a 30% propylene glycol and water solution.

o The refrigerant type must comply with the environmental requirements specified in UFC 3-401-01, Section 2-5.

o Sound and vibration control must comply with the requirements in UFC

3-410-01, Section 2-19.

o Must integrate into existing base Energy Management Control System (EMCS) and meet all applicable requirements in UFC 3-410-01, UFC 3- 410-02 and EMCS Standards 26AUG2026.

• Following installation, commission all new equipment verifying proper system performance.

1.4 Contractor-Furnished Items

The contractor is responsible for providing all necessary qualified labor, materials and equipment, including but not limited to:

• Tools and specialized equipment needed to install a new chilled water system.

2.0 Governing Standards

All work shall be performed in strict accordance with the manufacturer's specifications and the latest editions of the following codes and standards:

• UFC 3-401-01 Mechanical Engineering

• UFC 3-410-01 HVAC Systems

• UFC 3-410-02 Direct Digital Control For HVAC

• UFC 3-501-01 Electrical Engineering

• UFC 3-520-01 Interior Electrical Systems

• UFC 1-200-01 General Building Requirements

• UFC 3-600-01 Fire Protection Engineering for Facilities w/ Change 6

• UFC 4-010-06 Cybersecurity of Facility Related Control Systems

• UFGS 01 35 26 Governmental Safety Requirements

• UFGS 23 05 11 Common Work Results for HVAC

• OSHA .29 CFR 1926.501: Duty to Have Fall Protection

• OSHA 3146-05R 2015: Fall Protection in Construction

• UFGS 23 05 93 Testing, Adjusting and Balancing for HVAC

• UFGS 23 64 00 Chilled Water Systems

• UFGS 23 09 00 Instrumentation and Control for HVAC

• UFGS 25 05 13 – Electronic Security System Infrastructure

• National Electric Code (NEC) 2026

• International Building Code (IBC) 2018

• National Fire Protection Association (NFPA) 70, 90A, and 101.

• State and Local Building Code Standards

3.0 Technical & Compliance Requirements

3.1 Definition of Qualified Labor

The contractor must ensure all technicians are certified and licensed to service, repair, and install chilled water systems in accordance with the standards listed in Section 2.0.

Furthermore, all technicians must possess specialized certification and experience with the following specific equipment:

• TRANE chilled water systems

• Specialized Chilled water systems for computer / server rooms

4.0 Reporting & Deliverables

Upon project completion, the contractor shall submit a final report containing the following detailed information:

• As-builts of newly installed system

• Newly installed equipment’s O&M manuals

• Commissioning report

• Manufacturer warranty info.

• A summary of all operational and safety checks performed.

5.0 OPSEC & Anti-Terrorism/ Force Protection Requirements

The Contractor shall review and adhere to all Operations Security & Anti- Terrorism / Force Protection measures listed in this section IAW BSFB’s most current AT Plan. Project managers from the 460th CES will verify that all contractors have reviewed and understand the following requirements.

• Entry, Escorts & Training: Prior to authorizing entry to SBD@2the 460th SFS will verify the trustworthiness of all personnel through National Crime Information Center and other local files checks.

Authorized personnel will escort contractors as required. Contractors needing access to critical information or indicators must complete OPSEC training, provided at no cost by OPSEC Coordinators.

All contractors entering the installation will be accomplish AT Level I Awareness (FP) training.

• Training can be found in the following link:

https://www.jcs.mil/JKO/Latest-News/JKO-Customer- Spotlights/Article/2945182/antiterrorism-training-on-jko-offers-broad-reach/

• Document Control: Contractors must return all infrastructure materials (building plans, diagrams, blueprints, maps, etc.) provided during the contract to the 460th Civil Engineer Squadron (460 CES) for proper accounting and disposal.

• Credential Protection: Personnel not permanently assigned to Buckley Space Force Base (BSFB) must secure their base access credentials (passes, badges, etc.) at all times while off the installation.

• Information Security: To maintain operational security, contractors are strictly prohibited from:

• Discussing project details, documents, or system outages/downtimes with anyone not directly involved in the contract execution.

• Photographing any documents, blueprints, maps, or materials obtained during the project.

• Broadcasting or posting work details, locations, or photos on any social media platforms.

• Infrastructure: The project manager will coordinate with the 460th CES prior to connecting any equipment to base infrastructure to include the following. Additionally, at no point will the contractor connect to any base communication/internet network.

• Base Fire Hydrants

• Power Sources

• Communication ports

• Mandatory Compliance: All personnel performing work on the installation will comply with the following:

• Real World AT/FP measures.

• Traffic Laws

• Prohibitions against bringing firearms or weapons on the installation.

• Travel directly to worksite from entry control point and avoid deviating from approved routes.

• Avoid leaving worksite without escort/approval to avoid trespassing into restricted / sensitive areas of the installation.

ATTACHMENTS:

Attachment 1: EMCS Standards 21 Jan 26

EMCS

Modernization SOW

Attachment 2: Chiller

Technical Systems (Model: 30A0LM20-PT, Serial: 02-17-125822-001-001)

Attachment 3: CRAHs 1 and 2

Data Aire (Model: GFCU-04634, Serial: 2016-3226-A, 20163225-A)