This notice announces a change to the solicitation number for the Eastern Western Operational Communications Services (EWOCS) opportunity from FA2521-18-R0029 to FA2521-19-R-A018. The EWOCS requirement includes operational communications services across multiple federal agencies. An updated draft request for proposal was released with the new solicitation number and includes a total small business set-aside. The final request for proposal is anticipated on or around August 30, 2019. Past industry day information, draft documents, and questions and answers can still be found under the previous solicitation number.
Industry Questions & Answers #3
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Set #1
| Contractor Name | RFP Section/ Exhibit/Attachment | Page/Paragraph Number | Other (specify) |
| 1. Question? | |||
| What is the average time on the tickets? | PWS Appendix A | 3.1.1 | |
| Answer: | |||
| Times will vary depending on the project scope and the type of comm being worked. | |||
| 2. Question? | |||
| How much of the preceding 25 projects is in each of the following sections? For example how many in 3.2.1, 3.2.2 etc? | PWS Appendix A | 3.2 | |
| Answer: | |||
| The information is not available. | |||
| 3. Question? | |||
| What is the average time per drawing? | PWS Appendix A | 3.3 | |
| Answer: | |||
| Times will vary depending on the amount of changes to be made to the drawing. Most drawings can be updated in 15 min to 1 hour. | |||
| 4. Question? | |||
| What is the average time per COP? | PWS Appendix A | 3.7.19 | |
| Answer: | |||
| It will depend upon offerors proposed approach to complete the requirement. | |||
| 5. Question? | |||
| What is TRN monitor? | PWS Appendix A | 3.7.39.20.7 | |
| Answer: | |||
| The TRN Monitor does the following. A maintenance TRN involves processing the bottom half of an AFTO Form 350 Repairable Item Processing Tab, through Base Supply when repair of a repair cycle asset item is done with no demand places on Supply for a replacement asset. This lets the supply system know there is a valid need for the asset and allows them to show usage. | |||
| 6. Question? | |||
| 1800 LMR radios, but where are the located? What locations? | PWS Appendix A | 3.8.6.2 | |
| Answer: | |||
| The LMR Radios are located across the base in offices and vehicles. | |||
| 7. Question? | |||
| What is the average time per ticket. | PWS Appendix A | 3.9.1.2 | |
| Answer: | |||
| Approximately 1 hour. | |||
| 8. Question? | |||
| How many devices? What Brand and Vendor? | PWS Appendix A | 3.9.2 | |
| Answer: | |||
| The types of VTCs should be reflected in the GFP listings provided with the solicitation. The GFP listing will be updated with the solicitation amendment. | |||
| 9. Question? | |||
| How many devices? What Brand and Vendor? | PWS Appendix A | 3.9.3 | |
| Answer: | |||
| All available data is in the GFP listing and workload data is in the matrix. The GFP listing will be updated with the solicitation amendment. | |||
| 10. Question? | |||
| Any workload data for this? | PWS Appendix A | 3.9.4 | |
| Answer: | |||
| All available workload data is located in PWS Appendix A. | |||
| 11. Question? | |||
| Any workload data for this? | PWS Appendix A | 3.10.3 | |
| Answer: | |||
| All available workload data is located in PWS Appendix A. | |||
| 12. Question? | |||
| Any workload data for this? | PWS Appendix A | 3.10.5 | |
| Answer: | |||
| All available workload data is located in PWS Appendix A. | |||
| 13. Question? | |||
| Any workload data for this? | PWS Appendix A | 3.10.9 | |
| Answer: | |||
| All available workload data is located in PWS Appendix A. | |||
| 14. Question? | |||
| The periods of performance between the two referenced documents do not align as Section F of the solicitation indicates a fiscal year start date of 01 October 20XX and the CLIN worksheets in the Cost/Price Workbook have a start date of 31 October 20XX. Will the Government update the Cost/Price Workbook CLIN worksheets to align with the fiscal year dates provided in Section F? | Solicitation Section F and Attachment L04_EWOCS_Cost_Price_Workbook | ||
| Answer: | |||
| The EWOCS Cost/Price Workbook has been updated. The updated EWOCS Cost/Price Workbook was provided with the amended solicitation. | |||
| 14. Question? | |||
| Teaming Agreement, Do we need individual teaming agreements, or a single with all Teaming partners? | Section L | ||
| Answer: | |||
| If it is two or more companies forming a partnership or joint venture to act as a potential prime contractor, all of the companies need to sign a single form. If it is a potential prime contractor agreement with one or more other companies to have them act as its subcontractors, it can be an individual agreement. |
&14Section L Attachment L-01 Questions and Answers &14FA2521-13-R-0019
Set #2
| Contractor Name | RFP Section/ Exhibit/Attachment | Page/Paragragh Number | Other (specify) |
| 1. Question? | |||
| All of the ReF Cells from Indirect Rates and Fees are not attached, or are missing. | L-04_EWOCS_Cost_Price_Workbook | Tab X205 | |
| Answer: | |||
| The EWOCS Cost/Price Workbook has been updated. The updated EWOCS Cost/Price Workbook was provided with the amended solicitation. | |||
| 2. Question? | |||
| All of the ReF Cells from Sub Indirect Rates and Fees are not attached, or are missing. | L-04_EWOCS_Cost_Price_Workbook | Sub Clin X301 | |
| Answer: | |||
| The EWOCS Cost/Price Workbook has been updated. The updated EWOCS Cost/Price Workbook was provided with the amended solicitation. | |||
| 3. Question? | |||
| Which tabs are required for Subbmission 1 and which tabs are required for Subbmission 2 | L-04_EWOCS_Cost_Price_Workbook | ||
| Answer: | |||
| The entire EWOCS Cost/Price Workbook is required for the Preliminary Cost/Price submission (see Section L paragraph 4.2.1.(6)) and the Complete Cost/Price submission (see Section L paragraph 4.2.2.1.7.d.). The wording for Section L paragraph 4.2.1.(6)) has been updated to state, "EWOCS Cost/Price Excel Workbook provided as RFP Attachment L-04 (to include formulas with notional numbers for all elements of cost. For all indirect costs, factors, CERs, etc. include all bases, calculations and backup data to arrive at computed amounts.)" The updated Section L will be provided with the amended solicitation. |
Set #3
| Contractor Name | Point of Contact/ Phone No. | RFP Section/ Exhibit/Attachment | Page/Paragragh Number | Other (specify) |
| 1._EWOCS_PWS.pdf | 5 / 1.6.2 | |||
| 1. Question? | Reference: Remote Technical Support for the customer’s issue |
| Question: Will the Government please define what is mean by "remote" for this Tier? We assume this to mean by virtual means. Is this a correct assumption? | |||
| Answer: | Your assumption is correct. | ||
| 1._EWOCS_PWS.pdf | 6 / 2.0. | ||
| 2. Question? | Reference: Review and develop draft directives, monitor work in progress and coordinate with designated Government interfaces or other contractors when required … | ||
| Question: Please provide the workload factors for these requirements. | |||
| Answer: | All workload factors are in the matrix. Please see PWS Appendix A. | ||
| 1._EWOCS_PWS.pdf | 11 / 2.4.2 | ||
| 3. Question? | Reference: 2.4.2. The Contractor shall work with any follow-on contractor for up to 90 days prior to the end of the contract or close out of activities in order to ensure uninterrupted efforts throughout the assumption of follow-on contractor responsibility. | ||
| Question: Suggest moving this paragraph to section 2.5. Contract Phase-out, where it is more relevant. | |||
| Answer: | Paragraph 2.4.2 has been reworded, and the original wording has been moved to the phase-out section. The updated documents will be included with the amended solicitation. | ||
| 1._EWOCS_PWS.pdf | 12 / 2.4.9 & 2.4.10 | ||
| 4. Question? | Reference: 2.4.9. Validate, program or cancel outstanding work orders during phase-in that are currently awaiting programming within 12 months of contract start. 2.4.10. Submit a plan for day one operational implementation of an integrated data management system to the Government within 45 days of contract award. | ||
| Question: Are the terms ‘Contract Award’ and ‘Contract Start’ the same? | |||
| Answer: | Contract Award is the day contract is awarded - beginning of transition period. Contract start refers to first day of operational assumption. | ||
| 1._EWOCS_PWS.pdf | 16 / 2.6.11 | ||
| 5. Question? | Reference: 2.6.11. Reimbursable/Contractor Acquired Property Report. Submit a summary of all purchases (e.g. software licenses, rental, lease, training, travel, services, material, equipment, supplies, and PMFR). (CDRL A008) |
CDRL Item A008, block 16 refers to PFMR, also not defined
| Question: What does PMFR stand for? | |||
| Answer: | It should be PFMR instead. It stands for Project Funds Management Record. The corrected acronym will be updated in the PWS and the CDRL with the amendment. | ||
| 1._EWOCS_PWS.pdf | 14 / 2.6.3 | ||
| 6. Question? | Reference: Develop financial operating plans to the fourth-level PWS (e.g., 1.1.1.1),… | ||
| Question: We assume that "PWS" as it is stated above is really "CWBS". Is this a correct assumption? | |||
| Answer: | Your assumption is correct. The corrected documents will be included with the amended solicitation. | ||
| 1._EWOCS_PWS.pdf | 18 / 2.7.1.3. | ||
| 7. Question? | Reference: include but not be limited to:... quality management, … quality assurance, property/supply management, … property control, safety management, … safety, | ||
| Question: Please clarify how the government interprets these three pairs of terms from the list in 2.7.1.3. Offerors require this information in order to understand the government's expectations and intent for the data management system. | |||
| Answer: | Question is unclear. This is a list of data we want to see in the IDMS. | ||
| 1._EWOCS_PWS.pdf | 19 / 2.8.2 | ||
| 8. Question? | Reference: At a minimum, the prime contractor will be appraised by the Government at ISO 9001:2015 or ISO/IEC 20000. ... Applicable to PWS Sections 3.11 and 3.12, the prime contractor will be appraised by the Government at IOS 9001:2015 or ISO/IEC 20000 or Capability Maturity Model Integration (CMMI) Development Level 3 (minimum) | ||
| Question: If the offeror already has a formal certification by an independent authority that it meets a cited standard, does the Government intend to perform its own independent appraisal? |
If so, please explain what the offerors must do to support the Government's separate appraisal and when the Government intends to make its appraisal.
| Answer: | Government will review your independent authority and ensure it meets the required standard. | ||
| 1._EWOCS_PWS.pdf | 35 / 3.1.3 | ||
| 9. Question? | Reference: Table 3.0 Duty Day | ||
| Question: Will the Government please define what is mean by "duty day" and provide same in the Glossary? | |||
| Answer: | Duty Day is location and requirement and location dependent as well as offeror's proposal dependent. | ||
| 1._EWOCS_PWS.pdf | 3 / 3.1.3 | ||
| 10. Question? | Reference: ...by giving the contractor 30-days'.... | ||
| Question: Please clarify is this calendar, work, or duty days | |||
| Answer: | Timeframe is calendar days. The updated PWS will be included with the amended solicitation. | ||
| 1._EWOCS_PWS.pdf | 73 / 3.12.4.1 | ||
| 11. Question? | Reference: The contractor shall perform in-scope routine requirements submitted through the MDA Work Orders system | ||
| Question: Is workload data available for number of work orders processed per year and average time to perform work order execution? Aside from data type work orders, are there any voice or video work order expectations? | |||
| Answer: | All available workload data is in included matrix. Please see PWS Appendix A. | ||
| 1._EWOCS_PWS.pdf | 77 / 3.12.8.2 | ||
| 12. Question? | Reference: Three workstations to support this function will be provided in Building 6510. | ||
| Question: How are the three workstations used in support of this requirement? What Applications are used on these workstations? | |||
| Answer: | That is dependent upon offeror's approach. | ||
| 1._EWOCS_PWS.pdf | 39 / 3.5.3 | ||
| 13. Question? | Reference: Scan all systems and devices for vulnerabilities for 30SW and 45SW and submit findings to units for correction. | ||
| Question: Please clarify the terms "units" within PWS statement 3.5.3? Who are the "units"? | |||
| Answer: | Units refers to customers organizations, i.e., squadron, group, command office. | ||
| 1._EWOCS_PWS.pdf | 43 / 3.5.45.14 | ||
| 14. Question? | Reference: (Note: should the referenced instruction be updated, the contractor shall be required to comply with the superseding instruction.) | ||
| Question: This note requires that the offerors price changes for a revision to requirements that may occur at some future point and that are unknown at this time. Suggest that the Government delete these notes or provide the offerors with groundrules or workload estimates for these undefined requirements. See also 3.5.45.27; 3.5.45.28; 3.5.45.31; 3.12.9.4.1.1.3; 3.12.9.4.1.1.4 | |||
| Answer: | This note will stay. It simply states that the contractor is responsible to comply with any changes that may be made by the Government. Contractors are to propose to the current instructions (DoDIs & AFIs) listed in the PWS package. | ||
| 1._EWOCS_PWS.pdf | 54 / 3.7.39.12 | ||
| 15. Question? | Reference: Develop, document and maintain a continuity book of all procedures required to perform CFP duties. These should include but not limited to: Service Level Agreements (SLAs), Memorandums of Agreement (MOAs), and Memorandums of Understanding (MOUs). | ||
| Question: In the final industry day questions, the gov't answered that (a) there are no SLAs, and (b) all MOAs and MOUs would be provided in the bidder's library. Please provide the MOAs/MOUs. | |||
| Answer: | The Government stated that all available MOAs/MOUs would be provided. No MOAs/MOUs are available. | ||
| 1._EWOCS_PWS.pdf | 85 / App B | ||
| 16. Question? | Reference: If the contractor fails to sufficiently manage any labor-relations situations, also during the transiton period, then acq & retention of key workforce would negatively impact performance & cost | ||
| Question: SSI #8 performance measure appears to be a risk statement. Could the Government please provide the quantiiative measure that is associated with this SSI? | |||
| Answer: | SSI #8 will be corrected. The updated PWS will be included with the amended solicitation. | ||
| 14._CLOIS_TWA_Bridge_Agreement_Signed_2018.pdf | 1/6 | ||
| 17. Question? | Reference: With respect to the Union-represented employees being hired by ASRCC, ASRCC and the Union agree to combine the current TWU bargaining units into a signle bargaining unit and that, effective October 1, 2018, ASRCC will be bound by and compensate its Union-represented employees in accordance with the Primary InDyne Union Agreement and extensions thereto. | ||
| Question: For pricing purposes the offeror needs to a clear list of all CBWA positions. Without the follow-on negotiated agreement or The "Primary InDyne Union Agreement", this is not possible and pricing will be delayed. In the interest of time, will the Government Please provide the "Primay InDyne Union Agreement"? | |||
| Answer: | The InDyne Union Agreement doesn’t include the labor categories needed to execute the requirements on the EWOCS Contract. The InDyne Union Agreement is for requirements that will remain on the CLOIS contract. It is not applicable to EWOCS. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | App A-1 45 / 3.2 | ||
| 18. Question? | Reference: Workload; 60 Projects +/-20% per year at 120 hours per project. 6 MILCONs +/- 20% per year. | ||
| Question: Will the Government pleae provide an example of the MILCON projects to be engineered and the average size, in terms of hours, for each MILCON? | |||
| Answer: | MILCON projects are newly constructed facilities designed by Army Corps of Engineering that include initial communication infrastructure. The EWOCS Contractor will attend 30/60/90% design reviews and provide input and recommended changes to the communication design. Estimate approximately 60 manhours per MILCON. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 45th / 3.3 | ||
| 19. Question? | Reference: Maintain and update communications systems drawings at the 45 SW. Currently there are the following numbers of drawings by location; PAFB - 2215 CCAFS - 1024 Malabar - 2" | ||
| Question: The workload factor provides the number of drawings but fails to provide how many are updated annually and how extensive the updates are on average annually. To determine an appropraite price for this effort this data is necessary. | |||
| Answer: | All drawings are reviewed annually and updated as needed. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 45th / 3.4 | ||
| 20. Question? | Reference: Reference Property Lists. Workload will be related to the number of property accounts created. | ||
| Question: For an accurate Firm Fixed Price, this information is too vague. Please provide the number of property accounts on average expected and the staffing per account. | |||
| Answer: | Duty Day is location and requirement and location dependent as well as offeror's proposal dependent. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 45th / 3.6 | ||
| 21. Question? | Reference: COMSEC SUPPORT | ||
| Question: PWS 3.6., COMSEC Support, has Xs for PAFB and GSUs, but there is no workload information included in column E. Please provide. | |||
| Answer: | You must appoint a Primary and Alternate CRO and SVRO. These can be the same individual if you choose to. The workload will be determined by the amount of keying material and the number of secure phones you maintain within your work area. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 45h / 3.7 | ||
| 22. Question? | Reference: Workload; 12,000 Remedy Tickets per year +/- 20% | ||
| Question: To provide an acuurate estimate for a Firm Fixed Price, the offeror reequires the following information: |
1) We assume that the 12,000 tickets referenced are what you receive at Tier 0. Is this a correct assumption?
2) What number of tickets come in via phone? Chat? Website Input? and/or customer walkin?
3) Does the Government currrently use any type of "self service" option? If so, what is it?
4) Is there a period of time when the help desk experiences a larger volume of tickets? If so what is the distribution?
Answer: 1) Yes, all tiers are represented.
2) This information is unknown.
3) No, the Government doesn’t have a self service option.
4) This data is unavailable.
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 45th / 3.7 | ||
| 23. Question? | Reference: Workload; 12,000 Remedy Tickets per year +/- 20%. | ||
| Question: How many of the 12,000 Remedy Tickets go to Tier 1? Does the Government use scripting to resolve problems at Tier 1? If so, can the Government please provide a copy or description of each script? | |||
| Answer: | Number of Tier 1 tickets are unknown. The Gov't does not use scripting at Tier 1. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 45th / 3.7 | ||
| 24. Question? | Reference: Workload; 12,000 Remedy Tickets per year +/- 20%. 2,500 CIPS work orders per year +/- 20%. 45SW afterhours support approximately 60 calls per year. Tier 1 support is an average of 15-30 minutes per ticket or incident (Remedy). Issues that take more time should be passed on to a CST for completion. Respond to 70 ASI/Outage messages per month +/-10%. Process AMAC Forms 1 for NDCIs currently averaging 4 a year." |
Question: How many Tier 1 tickets are classified as Priority 1, 2 and 3 at PAFB and CCAFS?
How many Tier 1 tickests are classified as Priority 1, 2 and/or 3 for the GSUs?
| Answer: | This data is unavailable. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 45th / 3.7 | ||
| 25. Question? | Reference: Workload; ... Tier 1 support is an average of 15-30 minutes per ticket or incident (Remedy). ...; | ||
| Question: The Government stipulates that the average Tier 1 support time is 15-30 minutes per ticket or incident. Insofar as the ticketing system, what is the definition of "incident"? Is an incident entered into Remedy as a ticket tracked in the same manner? | |||
| Answer: | An incident is defined as the reason the customer called. The following question is unclear. "Is an incident entered into Remedy as a ticket tracked in the same manner?" Same manner as what? | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 45th / 3.7 | ||
| 26. Question? | Reference: Workload; Tier 1 support is an average of 15-30 minutes per ticket or incident (Remedy). Issues that take more time should be passed on to a CST for completion. | ||
| Question: By these two sentences the Government is implying that the average time of 15-30 minutes is not for all of Tier 1 requirements. The second sentence does not indicate that it is elevated to Tier 2, just given to someone else at Tier 1. Please clarify the average time it takes to close a ticket at Tier 1? | |||
| Answer: | Tier 1 is limited to 15-30 minutes, if not resolved, the ticket is forwarded to Tier 2 as indicated in the workload factors. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 45th / 3.7 | ||
| 27. Question? | Reference: Workload: 12,000 Remedy Tickets per year +/- 20%. | ||
| Question: In order to provide an accurate estiamte, would the Government please provide the number of tickets that get elevated to Tiers 2 and TIer 3 with the average time for resolution at each level? | |||
| Answer: | The Tier level in which a Remedy ticket has been resolved has not been tracked. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 45th / 3.7 | ||
| 28. Question? | Reference: Workload; 2,500 CIPS work orders per year +/- 20% | ||
| Question: Please define how many of the 2,500 work orders are at a Priority 1? How many at Priority 2? How many at Priority 3? How Many At Priority 4? | |||
| Answer: | Priority 1 < 1%, Priority 2 ~ 10% Priority 3 ~ 65% Priority 4 ~ 25% | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 45th / 3.7 | ||
| 29. Question? | Reference: Workload; 2,500 CIPS work orders per year +/- 20%. | ||
| Question: Please provide the average closing time for Priority 1 work orders? Priority 2 work orders? Priority 3 work orders? Priority 4 work orders? | |||
| Answer: | Completion times are identified in table 3.0 of the PWS. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 45th / 3.7 | ||
| 30. Question? | Reference: Workload; Respond to 70 ASI/Outage messages per month +/-10%. | ||
| Question: What is the actual average completion time for ASI/Outage Messages? | |||
| Answer: | Approximately 1 hour. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 45th / 3.7 | ||
| 31. Question? | Reference: Workload; Process AMAC Forms 1 for NDCIs currently averaging 4 a year. | ||
| Question: For an accurate estimate, on average, how many hours does it take to process an AMAC Form? | |||
| Answer: | Approximately 3-4 hours. Additionally, must be tracked to closure of incident. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 45th / 3.7 | ||
| 32. Question? | Reference: Workload; 12,000 Remedy Tickets per year +/- 20%. | ||
| Question: Of the 12,000 Remedy Tickets received? How many are for Voice? How many for Video? How many for Data? | |||
| Answer: | Reference workload data in Appendix A Comm Systems and Services Matrix | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 45th / 3.7 | ||
| 33. Question? | Reference: 2,500 CIPS work orders per year +/- 20%. | ||
| Question: Of the 2,500 CIPS work orders per year how many are for Voice? How many for Video? How many for data? | |||
| Answer: | Reference workload data in Appendix A Comm Systems and Services Matrix | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 45th / 3.8 | ||
| 34. Question? | Reference: row 251, column E says Telephone 950 Remedy tickets per year +/- 10%. | ||
| Question: Please provide a breakdown of telephone types for this workload (e.g., secure vs. non-secure and models, single vs. multi-line, VOIP, Personal Wireless Communication System (PWCS)); as well as the types of actions and the average time to complete each type of action. | |||
| Answer: | The Gov't tracks Remedy tickets by workcenters assigned. This breakdown by telephone type is unavailable. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 45th / 3.8 | ||
| 35. Question? | Reference: Telephone 950 Remedy tickets per year +/- 10%. | ||
| Question: a. Are these tickets a subset of those identified in 3.7? |
b. What Tier(s) do thses tickets represent?
c. What priority levels do these tickets represent at each Tier?
| Answer: | a) Yes b) Tier 2 c) Priorities 1, 2 and 3. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 30th / 3.8.3 | ||
| 36. Question? | Reference: Personal Wireless Communication System (PCWS) | ||
| Question: rows 283-286, PWS 3.8.3, Personal Wireless Communication System (PWCS), has Xs in the VAFB column, but no workload data is included. Please provide expected workload information. | |||
| Answer: | It should be N/A. This will be corrected in the amendment. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 30th / 3.8.6.3 | ||
| 37. Question? | Reference: 120 maintenance actions per month +/- 15% | ||
| Question: This workload description is too vague. |
Please define the types of maintenance actions (e.g., PMIs, calibrating, frequency modifications and tuning, parts replacement) and average time to complete each type.
| Answer: | Average time to complete is dependent on the issue, equipment type and skill level of the technician. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 30th / 3.9, 3.10.10 | ||
| 38. Question? | Reference: N/A | ||
| Question: The following sections show systems to be supported in the Appendix A 30SW&MDA Systems tab, but are missing workloads in the Appendix A-1 30SW&MDA Services tab: |
in 3.9: CCTV, VTC, IPTV, Visual Imagery & IDS, and in 3.10.10: Access Control & Alarm Systems.
| Answer: | The workload factors have been added. This will be included in the amendment. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | A-1 30th / 3.9.1.2 | ||
| 39. Question? | Reference: 15 Remedy Tickets per year +/- 10% 5 - 10 CIPS workorders per year +/- 20% | ||
| Question: We assume that this workload factor is located in the wrong cell and should have been included in cell 309, 3.9. Is this a correct assumption? | |||
| Answer: | Wrong reference- please resubmit you question. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | all / all | ||
| 40. Question? | Reference: all | ||
| Question: Appendix A is not clear as to what workload will be performed by the EWOCS personnel vs. by the communications squadron personnel. Please clarify so that offerors can understand the lines of demarcation for contract scope and what work the CFP will assign to the communications squadron vs. EWOCS personnel. | |||
| Answer: | Appendix A is all EWOCS contractor responsibility. We do not include requirements for other organizations within this acquisition. | ||
| 1a._PWS_Appendix_A,_Comm_Systems_and_Services_Matrix.xlsx | / App A-1 | ||
| 41. Question? | Reference: Workload; 60 Projects +/-20% per year at 120 hours per project. 6 MILCONs +/- 20% per year; | ||
| Question: Throughout the PWS and Appendix A the Government uses "+/-" to indicate that a workload factor has a range. Many offerors will use the lowest number in an attempt to keep their price low. If the Government wishes to compare equivalent bids, it is suggested that your remove the "+/-" for each estimate and make it a fixed number. | |||
| Answer: | The Government will be leaving the workload factors as they are. | ||
| 2._GFP_Listing.xlsx | N/A / N/A | ||
| 42. Question? | Reference: PWS 2.19.3. The Government will provide a count and list of current government furnished mobile devices as part of the Government Furnished Property list. | ||
| Question: The GFP list does not include this list. Please provide the count and list of mobile devices in the GFP list. | |||
| Answer: | This data is provided in the systems matrix. | ||
| 6._DD_Form_254. | 2 / 10.e. | ||
| 43. Question? | Reference: National Intelligence Information | ||
| Question: It is likely EWOCS contractor personnel will need to attend status briefings, perform maintenance, or conduct operations in areas that require SCI read-ins. This is particularly likely while supporting national launches. Further, Section 13.4 states, "The contractor may require unescorted entry to facilities and areas where special controls have been established to protect classified information of mission critical resources. Unescorted entry into SCIFs requires SCI eligibility (SSBI or equivalent investigation)." Since many main and tenant units have SCIFs, it is likely the contractor will need to access these areas without interrupting mission operations by "bringing down" the clearance level. Should Block 10.e.(1) be checked? | |||
| Answer: | The DD254 has been modified and will be provided with the amendment. | ||
| Exhibit_A_0001-0020_CDRLs.pdf | 1 / A004 | ||
| 44. Question? | Reference: 1. Prepare in accordance with JOCAS II Systems Administration Manual | ||
| Question: Offeror is unable to locate a copy of the JOCAS II Systems Administraton Manual" from third party sources. Will the Government please provide a copy of this manual? | |||
| Answer: | The Government will review and post if available. The CDRL has been reworded. | ||
| Exhibit_A_0001-0020_CDRLs.pdf | A004 / A004 BLK 16 (Block 12) | ||
| 45. Question? | Reference: Block 12 - Five (5) days after contract start. First submission shall match the first submission of the invoice. | ||
| Question: Recommend changing the language to read that the first delivery will be "Five (5) work days after the first invoice submission". | |||
| Answer: | Language will remain as written. | ||
| Exhibit_A_0001-0020_CDRLs.pdf | A005 / A005 BLK 16 (Block 12) | ||
| 46. Question? | Reference: Block 12 - 90 days after contract award | ||
| Question: Please modify first submission in Block 16 for Block 12 to be 90 calendar days after contract start. | |||
| Answer: | Language will remain as written. | ||
| Exhibit_A_0001-0020_CDRLs.pdf | A008 / A008 Block 16 (Block 12) | ||
| 47. Question? | Reference: Block 12; Thirty (30) calendar days after contract start | ||
| Question: Recommend changing the language to 30 calendar days after Phase In completion. | |||
| Answer: | Language will remain as written. | ||
| Exhibit_A_0001-0020_CDRLs.pdf | A005 / Block 16 | ||
| 48. Question? | Reference: This CDRL Contains Cost/Schedule data. | ||
| Question: Please confirm that this report is only for cost reimbursable CLINs. If so confirmed, please update Block 16 to exclude FFP CLINs. | |||
| Answer: | No, it's for all. | ||
| Exhibit_A_0001-0020_CDRLs.pdf | CDRL A008 / Performance and Cost Report, block 4 | ||
| 49. Question? | Reference: DI-FNCL-80912/T | ||
| Question: DI-FNCL-80912 was recently updated and superceded by an A version. Suggest updating the CDRL. | |||
| Answer: | Contractor is expected to use the latest version of any regulations or directions. The CDRL has been updated. | ||
| Exhibit_M_0001-0004_CDRLs.pdf | / EWOCS M004 Cyber Incident Response and Reproting Plan | ||
| 50. Question? | Reference: 5. CONTRACT REFERENCE PWS Paragraph 3.12.10.6 | ||
| Question: Clarify Inconsistencies between the CDRL M004 contract reference PWS Paragraph 3.12.10.6 citation and where M004 is listed in the actual PWS (3.12.9.7). Additional clarification needed on the title of the CDRL, PWS 3.12.9.7 calls out the Disaster Recovery Continuity of Operations Plan (DR/COP) but M004 is called Cyber Incident Response and Reporting Plan. | |||
| Answer: | This will be corrected. It should be a Cyber Incident Response and Reporting Plan. |
| L-01_-_EWOCS_Section_L.pdf | 5 / 1.2.1 | ||
| 51. Question? | Reference: Contractor Responsibility Information no later than the date and time listed in block 9 of the SF 33 to permit early determination of pre-award survey needs. | ||
| Question: Please confirm that the due date for the CRI is 4 Nov. | |||
| Answer: | As listed in block 9 of the 18 September 2019 version of the SF 33, the due date is 4 November 2019. | ||
| L-01_-_EWOCS_Section_L.pdf | 6 / 1.3 Proposal Preparation and Organization, Table 1.3 Proposal Organization | ||
| 52. Question? | Reference: Volume II Past Performance Information Original and 1 copy – 50 page maximum | ||
| Question: Please exclude the Consent Letter from the page limitation. | |||
| Answer: | The Consent/Client Letters will not count against the page count requirements. This information will be updated in the RFP amendment. | ||
| L-01_-_EWOCS_Section_L.pdf | 5 / 1.3.a. | ||
| 53. Question? | Reference: Offerors are required to meet all solicitation requirements, ... in addition to those identified as evaluation factors or subfactor | ||
| Question: It is assume that the Government is referring to the Section L factors or subfactors rather than the "evaluation factors or subfactors" as Section L dictates the requirements to which we should respond. Is this a correct assumption? | |||
| Answer: | The Government is referring to all evaluation factors or subfactors. They are listed in Section L & M. | ||
| L-01_-_EWOCS_Section_L.pdf | 9, 10 / 2.1, 2.1.2.1 | ||
| 54. Question? | Reference: 2.1. Factor 1 –Technical Specific Instructions: The Technical Volume should be specific, complete, and address your technical solution for meeting or exceeding the Government’s minimum performance or capability requirements of each technical subfactor. Legibility, clarity, and coherence are very important. Your responses to the Technical Capability Factor will be evaluated against the assessment criteria defined in Section M, Evaluation Factors for Award. Using the instructions provided below, provide as specifically as possible the actual methodology you would use for accomplishing/satisfying these subfactors. By your proposal submission you are representing that your firm will perform all the requirements specified in the RFP. It is not necessary or desirable for you to say so in the proposal. Do not merely reiterate the objectives or reformulate the requirements specified in the RFP. Note: The Offeror shall address in the proposal the requirements which are expected to be performed on Day One of the contract period of performance which are listed in PWS Appendix A, Communication Systems and Services Matrix. 2.1.2.1. Provide a program management approach to provide comprehensive communications services from traditional operations to dynamic requirements (which include launch environment and MDA communications services). Provide a program management approach to be fully operational in every area of the PWS on day one of full performance of the contract as specified in Appendix A, Communications Systems and Services Matrix. (IAW PWS para 2.0, 2.1, 2.2, 2.3, 2.4, 2.6, 2.7, 2.8, 2.9, 2.10, 2.11, 2.12, 2.13, 2.16, 2.17, 2.18, 3.12.4.3, and Appendix A) | ||
| Question: We assume that ‘Day One of the contract period of performance’ is the first day of Phase In (or 1 Jul) and ‘Day one of full performance of the contract’ is 1 Oct. Is this the correct assumption? If it is, would the Govewrnment please provide this definition in the Glossary. | |||
| Answer: | Yes, this is the correct assumption. There is not a glossary included in the solicitation. | ||
| L-01_-_EWOCS_Section_L.pdf | 9 / 2.1.1.2 | ||
| 55. Question? | Reference: (IAW PWS para. ... 3.11.2… | ||
| Question: PWS 3.11.2 covers numerous topics that are not related to the rest of the section L 2.1.1.2 topics, including innovation and development, connectivity and information flow, troubleshooting end-to-end communications, configuration management support, interface and demarcation point documentation, and Range of the Future. |
Suggest this proposal instruction cite 3.11.2.5, which addresses A&A via the RMF and cybersecurity specifically.
| Answer: | The Government has decided to leave this as it is. | ||
| L-01_-_EWOCS_Section_L.pdf | 9 / 2.1.1.2 | ||
| 56. Question? | Reference: approach to perform vulnerability management, COMSEC operations and management, and Assessment and Authorization (A&A) via Risk Management Framework (RMF) process ... (IAW PWS para. ... 3.12 | ||
| Question: PWS section 3.12 covers numerous topics that are not related to the rest of the section L 2.1.1.2 security topics, including Meetings and Reviews;, briefing support; MDA work orders; configuration management; operations, maintenance, and sustainment; and facility access and record-keeping. |
Suggest removing PWS 3.12 from L 2.1.1.2, as it would be redundant with L 2.1.4.
Alternatively, narrow the scope to PWS 3.12.9 which addresses MDA cybersecurity specifically.
| Answer: | The Government has decided to leave this as it is. | ||
| L-01_-_EWOCS_Section_L.pdf | 9 / 2.1.1.4 | ||
| 57. Question? | Reference: 2.1.1.4. Provide an approach to perform video operations, operate and maintain visual imagery and intrusion detection systems, and operate and maintain access control and alarm systems. (IAW PWS para. ... 3.12) | ||
| Question: The topics of visual imagery and alarms are not mentioned in PWS 3.12. The only 3.12 citations related to video, IDS, or access control and alarms are: |
3.12.6.1 mentions "a stand-alone closed circuit TV system providing video from all five MDA launch facilities (LF-02, LF-03, LF-21, LF-23, and LF-24) and displays in Buildings 6510 and 1768." ;
3.12.8.2.1.2.2 mentions "Ensure proper access control and monitoring procedures are in accordance with DoD, USAF, AFSPC, and 30 SW directives." and
3.12.9.4.1.1.1. is a very long paragraph and only mentions "Review and report ... Intrusion Detection and Prevention Systems (IDS/IPS) activity. " We suggest that this instruction either exclude PWS 3.12 completely and move all discussion of MDA services to subfactor 4, or limit the PWS reference the those three relevant 3.12 elements listed above rather than repeating the offeror's approach to all 3.12 in mulitple subfactors.
| Answer: | The Government has decided to leave this as it is. | ||
| L-01_-_EWOCS_Section_L.pdf | 10 / 2.1.2.1. and 2.1.2.2. | ||
| 58. Question? | Reference: (IAW PWS para ... 2.17… | ||
| Question: Offerors are instructed to provide their approach to performing PWS paragraph 2.17, Training, twice. Please eliminate one of the citations to avoid redundancy within this page limited proposal volume. | |||
| Answer: | The Government has decided to leave this as it is. | ||
| L-01_-_EWOCS_Section_L.pdf | 10 / 2.1.2.4. | ||
| 59. Question? | Reference: Provide a program management approach to prepare, maintain, and report traceability of costs showing linkage between the Contractor Work Breakdown Structure (CWBS) (to the fourth level), CLIN, PWS, and labor categories. (IAW PWS para. 2.0 - 2.19, 3.0 - 3.12, PWS Appendix A, and Section B of the RFP) | ||
| Question: Please clarify that the offerors need not include a CWBS in their proposals, given the language in PWS 2.6.3 about partnering with the government on the "CWBS explanations". Please clarify that the PWS and solicitation sections cited refer to the content of the CWBS rather than instructing the offerors to repeatedly provide descriptions of our approach to performing the PWS and CLINs. |
Suggested rewording:
Provide a program management approach to prepare, maintain, and report costs using a Contract Work Breakdown Structure (CWBS) that provides traceability among: the CWBS; the PWS para. 2.0 - 2.19, 3.0 - 3.12, and Appendix A (to the fourth level); the CLINs in Section B of the RFP; and the labor categories in the offeror's staffing plan. (IAW PWS para 2.6.3) It is not necessary to include the detailed CWBS, dictionary, and traceability matrix in the proposal.
If the Government requires the CWBS, dictionary, and/or traceability matrix be included in the proposal, please exclude it from the volume page limit because it could consume nearly the entire 100 pages in order to address the entire PWS.
| Answer: | The Government is requesting a sample CWBS to be included in the proposals for the requirements needed on day 1 of full performance of the contract. The PWS and solicitation sections cited refer to the content of the CWBS. | ||
| L-01_-_EWOCS_Section_L.pdf | 11 / 2.1.4.1. | ||
| 60. Question? | Reference: Provide an approach to provide responsiveness to operations & maintenance, sustainment, and configuration management support to communications systems. (IAW PWS para. 3.12) | ||
| Question: PWS para. 3.12 includes numerous efforts that are not directly related to operations & maintenance, sustainment, and configuration management and/or are already addressed in other subfactors, such as meetings and reviews, briefing support, and interoperability requirements. Suggest refining the PWS citation for L 2.1.4.1 to be: 3.12.1, 3.12.4.1, 3.12.4.2, 3.12.5, 3.12.6, and 3.12.11 | |||
| Answer: | The Government has decided to leave this as it is. | ||
| L-01_-_EWOCS_Section_L.pdf | 14 / 4.2.1 | ||
| 61. Question? | Reference: (5) Rates and factors for Prime and Major Subcontractors valued more than 15% for the entire effort to include options on a total cost basis. | ||
| Question: How does the Government define "total cost basis". Is this all CLINs without Fee? Is this Price for FFP CLINS and Cost for CPFF? Is this the total of CLINs to include one with Government Provided Numbers? | |||
| Answer: | It is the proposed total contract price for the entire 7 years to include all CLINs. | ||
| L-01_-_EWOCS_Section_L.pdf | 17 / 4.2.2.1.6 | ||
| 62. Question? | Reference: If the subcontractor considers its information proprietary, it may be submitted directly to the PCO by the same date and time the prime contractor’s proposal is due. | ||
| Question: Please confirm that the proposal due date as referenced here is when the EN responses are due. | |||
| Answer: | The Initial Submission (to include the subcontractor tabs in the cost/price workbook) is due no later than the date and time listed in block 9 of the SF 33. The items listed in Section L paragraph 4.2.2.1.6. is due with Initial EN Submission. | ||
| L-01_-_EWOCS_Section_L.pdf | 18 / 4.2.2.1.7.f. | ||
| 63. Question? | Reference: f. Labor Rates Listing; Utilizing the Cost/Price Workbook, the offeror shall propose all labor categories which may be utilized during the contract. Complete the column for wage rate, labor burdens and other applicable indirect rates and fee for each category for each Government Fiscal Year. ... The Labor Rate Listings will become a part of the contract at the time of award for use when task orders are negotiated. The offeror shall submit the Labor Rate Listings which include prime and subcontractor rates separated based on labor rates for ER, WR, and MDA requirements. | ||
| Question: Would the Government please confirm that the rates listed in these worksheets are for both FFP and CPFF Rates? | |||
| Answer: | Yes | ||
| L-01_-_EWOCS_Section_L.pdf | 2 / General Instructions f. | ||
| 64. Question? | Reference: The Offeror shall define all labor categories as Junior, Journeyman, and Senior based on years of experience, education, and duties/responsibilities as follows | ||
| Question: In addition to Junior, Journeyman, and Senior, the Government has listed a Subject Matter Expert (SME). Is this a continuation of the aforementioned labor category subdividsion or something else? If somethin else, would the Government provide insight into where these SMEs might be needed? | |||
| Answer: | It is a continuation. The offerors approach to fulfill EWOCS requirements will determine whether or not they would like to propose a SME. | ||
| L-01_-_EWOCS_Section_L.pdf | 2 / General Instructions f. | ||
| 65. Question? | Reference: Note; The Offeror may deviate from the definitions above when responding to the solicitation so long as the deviations are clearly identified in their proposal. For example, a Contractor might label an employee as “Senior”, but the employee does not have a MA/MS degree. Likewise, a Contractor might label an employee as “Junior” even though the employee has more than 3 years’ experience. Deviations shall be clearly identified in proposals. | ||
| Question: This note talks about deviations for "employees". Does the Government wish to use this deviation by "employee" or by "Labor Category"? | |||
| Answer: | Labor Category. Section L of the solicitation has been updated to state labor category, and it will be provided with the amended solicitation. | ||
| L-01_-_EWOCS_Section_L.pdf | 2 / General Instructions f. | ||
| 66. Question? | Reference: Deviations shall be clearly identified in proposals. | ||
| Question: Where within the proposal should these deviations be identified? | |||
| Answer: | In the Technical Volume. | ||
| L-01_-_EWOCS_Section_L.pdf | 1 / L-1 | ||
| 67. Question? | Reference: The Government will conduct an initial evaluation of all proposal volumes upon receipt and develop ENs that will be forwarded to offerors immediately after the PCO makes a competitive range determination and opens discussions. This provides offerors with the opportunity to revise proposals and address any noted deficiencies prior to delivering their complete cost/price submission. | ||
| Question: This statement appears to imply that the Full Cost/Price Volume will not receive ENs. Is this the Government's intent or are you saying that there will be subsequent ENs that address it? | |||
| Answer: | These are separate paragrahphs. The first paragraph is discussing the two part cost/price volume, and the next two paragraphs are discussing the source selection process from initial receipt of proposals to award. The last paragraph states, "Subsequent ENs may be issued throughout the discussion portion of the evaluation." | ||
| L-01_-_EWOCS_Section_L.pdf | 1 / L-I | ||
| 68. Question? | Reference: This provides offerors with the opportunity to revise proposals and address any noted deficiencies prior to delivering their complete cost/price submission. | ||
| Question: This implies that the Government will accept changes to the price after the submission of the Preliminary Cost/Price Proposal. Is this a correct interpretation? | |||
| Answer: | Yes | ||
| L-02_-_EWOCS_Section_M.pdf | 5 / 2.2.3.2. | ||
| 69. Question? | Reference: The proposed approach demonstrates a complete organizational chart with staffing plan which identifies manning levels, labor categories, personnel certifications and training requirements for 45 SW, 30 SW, and MDA. | ||
| Question: (a) Does this instruction mean that the organization chart itself must identify manning levels, labor categories, personnel certifications and training requirements (requiring the organization chart to become very large in order to include all the data), or can the manning levels, etc. be in a separate staffing plan subsection in a tabular format? |
(b) Manning levels will vary over the phase-in period and throughout the full performance period depending on the work required in the executed task orders. (b.1) Which CLINs, PWS elements, and locations (30 SW, 45 SW, MDA) should the staffing plan include? (b.2) What should offerors assume about task order manning levels and work content?
Answer: (a) The staffing plan should identify manning levels, labor categories, personnel certifications and training requirements for 45 SW, 30 SW, and MDA.
(b) (b.1) Section M paragraph 2.2.3.2. states, "2.2.3.2. The proposed approach demonstrates a complete organizational chart with staffing plan which identifies manning levels, labor categories, personnel certifications and training requirements for 45 SW, 30 SW, and MDA." The manning levels should include phase-in as well as the requirements which are expected to be performed on Day One of the contract period of performance which are listed in PWS Appendix A, Communication Systems and Services Matrix.
(b.2) Can you please rephrase? The Government doesn't understand what you are asking.
| L-02_-_EWOCS_Section_M.pdf | 7 / 3.1.2 | ||
| 70. Question? | Reference: ...focusing on performance that is relevant to the Technical subfactors and Cost/Price for those requirements they are proposed to perform. | ||
| Question: The offeror assumes that we may price effort for each subfactor using any or all aspects of our teaming structure even if they were not used to justify a relevancy rating. Is this a correct assumption? See also Pg 7, Section 3.1.2.2 | |||
| Answer: | Section M 3.1.2 paragraphs have been updated and Cost/Price factor has been removed. The updates will be included with the RFP Amendment. | ||
| L-02_-_EWOCS_Section_M.pdf | 13 / 5.4 | ||
| 71. Question? | Reference: 5.4. Mission Essential Contractor Services The Mission-Essential Contractor Services Plan IAW DFARS 252.237-7023 and DFARS 252.237-7024 will be evaluated to determine each offeror's capability to meet the requirements of the solicitation and the PWS." | ||
| Question: This evaluation element does not appear in Section L. Are there any specific instructions the Government requires the offeror to follow in developing The Mission-Essential Contractor Services Plan? | |||
| Answer: | Please see page 153 of the SF33 - Section L DFARS Clause 252.237-7024 Notice of Continuation of Essential Contractor Services. DFARS Clause 252.237-7024 addresses what is needed in the plan. | ||
| L-04_EWOCS_Cost_Price_Workbook. | 3 / TEP Worksheet | ||
| 72. Question? | Reference: Phase In Period. | ||
| Question: It was brought up at the one-on-ones that the pricing of the phase in is inherently a disadvantage for offerors that do not have any of the incumbents on their team. Since there is the stong probability that one incumbent has placed the other two incumbents on their team, this would mean that their costs would be significantly different for Phase In than for the other competitiors. In fairness to all competitors it was believed that you would exclude the Phase In Period Price from the TEP. Please confirm that this is still your position | |||
| Answer: | The current contracts are being performed by 3 separate contractors. Every offeror will incur phase-in costs. Due to this, the phase-in cost will not be excluded from the TEP. | ||
| L-04_EWOCS_Cost_Price_Workbook. | / Worksheets | ||
| 73. Question? | Reference: Propopsed Total Contract Price and TEP Worksheet (All CLIN Roll-up) | ||
| Question: The Proposed Total Contract Price worksheet does not calculate a total from the individual worksheets for X103, X104, X105, X106, X203, X204, X205 and, X301. However, the "TEP Worksheet (All CLIN Roll-up)" does. Please clarify the difference between how these two sheets are calculated. | |||
| Answer: | The TEP Worksheet (All CLIN Roll-up) worksheet contains the Government Plug Numbers plus the Offeror's applied rates, and the Proposed Total Contract Price worksheet contains the Government Plug Numbers without the Offeror's applied rates. | ||
| L-05_EWOCS_Past_Performance_Questionnaire.docx9._45th_EWOCS_SCA.pdf | 2/1 | ||
| 74. Question? | Reference: L. Contractor’s Role ☐ Prime Contractor ☐ Subcontractor ☐ Key Personnel | ||
| Question: Is the intent of this requirement to have the potential for 2 boxes to be checked (One for either a prime or a subcontract and the other if you provided key personnel as one or the other)? If not, can you please explain what the intent is for the Key Personnel box? | |||
| Answer: | Yes | ||
| L-05_EWOCS_Past_Performance_Questionnaire.docx9._45th_EWOCS_SCA.pdf | 4/4 | ||
| 75. Question? | Reference: T1. How well did the contractor meet the technical requirements of the specification? | ||
| Question: The Government uses the term "specification" within this question. Since this is a services contract, a specification is not a relevant document. Suggest the Government change "specification" to "PWS". | |||
| Answer: | The Government has decided to leave it as it is. | ||
| L-05_EWOCS_Past_Performance_Questionnaire.docx9._45th_EWOCS_SCA.pdf | 8 / Client Authorization Letter | ||
| 76. Question? | Reference: Should you propose to use major subcontractors and/or joint venture members, you must obtain a similar client authorization letter from each entity. | ||
| Question: It is assumed that teaming partners should also be included in this requirement. Is this a correct assumption? | |||
| Answer: | Yes | ||
| L-01_-_EWOCS_Section_L.pdf | 2 / General Instructions f. | ||
| 77. Question? | Reference: ...on the Bureau of Labor Statistics website (www.bls.gov) with the exception of those listed in CBAs, SCAs, or Exempt |