question with Answers as of 1 Sep 09.docx
DOCX document 12 KB Posted
- Attached to
- Demolish Various Buildings on Patrick AFB, FL
- Solicitation number
- FA2521-09-R-0064
About this file
Questions with answers as of 1 Sep 09
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PAFB Sign In Sheet.pdf | ||
| CCAFS Prebid Site Visit Minutes and Question.docx | DOCX document | |
| Prebid_Signin Sheet.PDF | ||
| 09R0064 Conformed as of Amend 0003.doc | DOC document | |
| Amendment 0003.doc | DOC document | |
| amend2modcopy.doc | DOC document | |
| Amend2Conformedcopy.doc | DOC document | |
| CCAFS Specs-Drawings other docs.zip | ZIP file | |
| question with Answers as of 20 Aug 09.docx | DOCX document | |
| FA2521-09-R-0064amend1conformed.doc | DOC document | |
| FA2521-09-R-0064Amend1mod.doc | DOC document | |
| SXHT 01-1229 Dwg Sht 2.zip | ZIP file | |
| SXHT 01-1229 Specs Part 3.zip | ZIP file | |
| SXHT 09-1051 Specs Part 2.zip | ZIP file | |
| SXHT 09-1051 Dwg Sheet 3.zip | ZIP file | |
| RFP 09-R-0064.doc | DOC document | |
| Hazardous Waste Generation Form.doc | DOC document | |
| SXHT 05-1252 Dwg Sht 2.zip | ZIP file | |
| SXHT 08-1095 Specs Part 3.zip | ZIP file | |
| DBA WD F17 Rev 15 as of 10 Jul 09.docx | DOCX document | |
| SXHT 05-1252 Specs Part 3.zip | ZIP file | |
| SXHT 08-1095 Dwg Sheet 1.zip | ZIP file |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA2521-09-R-0064
Questions and Answers As of 1 Sep 09
1. Question: I found specs for removing asbestos, mention of asbestos on drawings, and unfortunately, I saw no drawings identifying asbestos and lead paints, and I found no survey for the two forenamed environmental hazards. Are there drawings available identifying the asbestos and lead paints? If not, will there be a change or addendum with these items listed on drawings? And is there a survey for asbestos and lead paint available for the buildings being demolished?
Answer: Asbestos locations are referenced in the project description narrative in section 01110, summary of work. Lead paint is handled by means of the contractor "wetting down" the demo debris. CE Environmental (CEA) approves of this method. There are asbestos surveys available but (per CEA) they are not considered comprehensive since they do not address asbestos in roofing materials so they are not included with the package.
2. Question: If lead paint is on the ceiling supporting how should the old fixtures be addressed and/or handled?
Answer: Contractor shall control lead by constantly wetting down debris.
3. Question: Who will be responsible for cleaning the floor if there is lead paint chips on the floor after installing the new fixtures.
Answer: This is a demolition project. No fixtures are to be installed.
4. Question: Who is responsible for disposing of the old ballasts and the lamps or should the old ballasts and the lamps be treated as hazardous waste?
Answer: This is addressed in section 015720 page 21, paragraph 1.10.5.1.