Hazardous Waste Generation Form.doc

DOC document 39 KB Posted

Attached to
Demolish Various Buildings on Patrick AFB, FL
Solicitation number
FA2521-09-R-0064
Issued by

About this file

Hardous Waster Generation Form

View the file

Other files

File Type Posted
PAFB Sign In Sheet.pdf PDF
CCAFS Prebid Site Visit Minutes and Question.docx DOCX document
Prebid_Signin Sheet.PDF PDF
question with Answers as of 1 Sep 09.docx DOCX document
09R0064 Conformed as of Amend 0003.doc DOC document
Amendment 0003.doc DOC document
amend2modcopy.doc DOC document
Amend2Conformedcopy.doc DOC document
CCAFS Specs-Drawings other docs.zip ZIP file
question with Answers as of 20 Aug 09.docx DOCX document
FA2521-09-R-0064amend1conformed.doc DOC document
FA2521-09-R-0064Amend1mod.doc DOC document
SXHT 01-1229 Dwg Sht 2.zip ZIP file
SXHT 01-1229 Specs Part 3.zip ZIP file
SXHT 09-1051 Specs Part 2.zip ZIP file
SXHT 09-1051 Dwg Sheet 3.zip ZIP file
RFP 09-R-0064.doc DOC document
SXHT 05-1252 Dwg Sht 2.zip ZIP file
SXHT 08-1095 Specs Part 3.zip ZIP file
DBA WD F17 Rev 15 as of 10 Jul 09.docx DOCX document
SXHT 05-1252 Specs Part 3.zip ZIP file
SXHT 08-1095 Dwg Sheet 1.zip ZIP file
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORECAST OF CONTRACTOR’S HAZARDOUS WASTE GENERATION

PROJECT #:
SXHT
PROJECT TITLE:

CONTRACTOR:

CONTRACT #

POINT OF CONTACT:

FA2521- - -

PHONE:

FAX:

HAZARDOUS MATERIAL:
DESCRIPTION OF PROCESS(ES) INVOLVING MATERIAL

(INCLUDE METHOD OF APPLICATION)

DESCRIPTION OF WASTE:
QUANTITY:

Purpose: The Forecast of Contractor’s Hazardous Waste Generation is required to assist the installation to identify processes using hazardous materials and regulate the generation and disposal of hazardous waste.

Instructions: The Forecast of Contractor’s Hazardous Waste Generation form must be completed by any contractor who:

1) Must remove and dispose of paints, building components, or equiptment containing hazardous materials (lead, mercury, etc.)

2) Submits an MSDS for approval of use of a material known to be hazardous.

On multi contractor projects, each contractor (sub-contractor) must specify each process requiring the use of hazardous materials and the potential waste to be generated.

1. Project #: Provide installation project number.

2. Project Title: Provide installation project title.

3. Contractor: Enter complete name of contractor performing process.

4. Point of Contact: Provide name of individual knowledgable on requirements of materials listed.

5. Phone/Fax: Provide phone and fax numbers for point of contact.

6. Hazardous Material: Provide common name of each hazardous material

7. Description of Process(es) Requiring Material: Describe each process in which the material will be used (Thinning paint, cleaning tools, etc.). Describe methods of application where appropriate (applied to rag, sprayed gun, etc.).

8. Description of Waste: Provide description of anticipated waste stream or enter “none” if no waste is anticipated to be generated.

9. Quantity: Estimate quantity of waste to be generated

10. Sign and date each form at bottom

CONTRACTOR’S SIGNATURE ______________________________________ DATE ________________

File details come from the government source that posted it. Updated .