DBA WD F17 Rev 15 as of 10 Jul 09.docx
DOCX document 20 KB Posted
- Attached to
- Demolish Various Buildings on Patrick AFB, FL
- Solicitation number
- FA2521-09-R-0064
About this file
DBA Wage Determination
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PAFB Sign In Sheet.pdf | ||
| CCAFS Prebid Site Visit Minutes and Question.docx | DOCX document | |
| Prebid_Signin Sheet.PDF | ||
| question with Answers as of 1 Sep 09.docx | DOCX document | |
| 09R0064 Conformed as of Amend 0003.doc | DOC document | |
| Amendment 0003.doc | DOC document | |
| amend2modcopy.doc | DOC document | |
| Amend2Conformedcopy.doc | DOC document | |
| CCAFS Specs-Drawings other docs.zip | ZIP file | |
| question with Answers as of 20 Aug 09.docx | DOCX document | |
| FA2521-09-R-0064amend1conformed.doc | DOC document | |
| FA2521-09-R-0064Amend1mod.doc | DOC document | |
| SXHT 01-1229 Dwg Sht 2.zip | ZIP file | |
| SXHT 01-1229 Specs Part 3.zip | ZIP file | |
| SXHT 09-1051 Specs Part 2.zip | ZIP file | |
| SXHT 09-1051 Dwg Sheet 3.zip | ZIP file | |
| RFP 09-R-0064.doc | DOC document | |
| Hazardous Waste Generation Form.doc | DOC document | |
| SXHT 05-1252 Dwg Sht 2.zip | ZIP file | |
| SXHT 08-1095 Specs Part 3.zip | ZIP file | |
| SXHT 05-1252 Specs Part 3.zip | ZIP file | |
| SXHT 08-1095 Dwg Sheet 1.zip | ZIP file |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
**CAPE CANAVERAL AIR STATION, PATRICK AIR FORCE BASE KENNEDY SPACE CENTER AND MALABAR RADAR SITE IN BREVARD COUNTY BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and partments up to and including 4 stories) HEAVY AND HIGHWAY CONSTRUCTION PROJECTS
Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 03/21/2008 3 05/30/2008 4 07/04/2008 5 07/25/2008 6 08/15/2008 7 08/29/2008 8 09/05/2008 9 09/19/2008 10 11/28/2008 11 12/05/2008 12 01/23/2009 13 02/20/2009 14 04/10/2009 15 07/10/2009
ASBE0067-001 07/01/2008
Rates Fringes Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)......................... $ 24.87 10.68
ASBE0067-002 07/01/2008
Rates Fringes
HAZARDOUS MATERIAL HANDLER
(Includes preparation, wetting, stripping, removal, scrapping, vacuuming,bagging, and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)......... $ 24.87 10.68
BOIL0199-001 01/01/2009
Rates Fringes
| BOILERMAKER..................... | .$ 27.63 13.96 |
| All other work.............. | $ 25.13 13.96 |
* BRFL0001-001 05/01/2008
Rates Fringes
BRICKLAYER
BRICKLAYERS, BLOCKLAYERS,
PLASTERERS, TERRAZZO
WORKERS, TILE SETTERS AND
CEMENT MASONS:............. .$ 23.15 7.85
INDUSTRIAL work includes: Bulk plants, power houses, chemical plants, missile sites including all work at Cape Canaveral Air Force Station and Kennedy Space Flight Center but excluding work performed at Patrick Air Force Base and Malabar Radar Site, oil refineries, etc., and such other work which is related to and considered a part of the above type projects.
CARP1000-001 07/01/2008
| Rates Fringes | ||
| MILLWRIGHT....................... | $ 26.93 10.49 |
* CARP1765-001 05/01/2008
Rates Fringes Carpenters:
*INDUSTRIAL:
| CARPENTERS................. | $ 23.96 7.21 |
| PILEDRIVERMEN.............. | $ 21.75 8.65 |
COMMERCIAL:
| CARPENTERS................. | $ 22.46 7.21 |
| PILEDRIVERMEN.............. | $ 21.75 8.65 |
ELEC0222-001 09/01/2008
Rates Fringes Line Construction:
| CABLE SPLICER............... | $ 32.72 4.75+23% |
| GROUNDMAN................... | $ 17.76 4.75+23% |
LINEMAN; HEAVY EQUIPMENT
OPERATOR.................... $ 31.16 4.75+23%
ELEC0756-001 09/01/2008
Rates Fringes Electricians:
| Cable Splicer............... | $ 26.25 6.45+4.4% |
| Wireman..................... | $ 26.25 6.45+4.4% |
ELEV0139-001 01/01/2009
| Rates Fringes | ||
| ELEVATOR MECHANIC................ | $ 33.85 18.285+A |
FOOTNOTE:
A. Employer contributions 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; Employer contributions 6% of regular hourly rate to vacation pay credit for employee who has worked in business less than 5 years.
Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; The Day After Thanksgiving and Christmas Day.
ENGI0673-001 05/01/2008
Rates Fringes Power equipment operators:
| GROUP 1..................... | $ 22.50 8.55 |
| GROUP 2..................... | $ 21.95 8.30 |
| GROUP 3..................... | $ 20.41 8.30 |
| GROUP 4..................... | $ 18.77 8.30 |
POWER EQUIPMENT OPERATORS
CLASSIFICATIONS GROUP 1: Tower Crane, Locomotive Crane, Crawler Crane, Truck Crane, Hydro Crane, Piledriver (incluidng auger and boring machine)
GROUP 2: Mechanic/Welder and operators of: Gantry Crane,Bridge Crane, Clam Shell, Dragline, Backhoe, Gradeall, Grader, Sideboom Cat, Hulti-Drum Hoist, Highlift (10' or higher), Locomotive Engineer, Tugboat Captain (150 hp or more), Concrete Pump with boom
GROUP 3: Bulddozers, Forklifts, Straddle Buggy, Single Drum Hoist, Winch Truck, Trenching Machine, Concrete Paver, Scraper, Loader, Asphalt Paving Machine, Lubricating Engineer, Fireman, Concrete Breaking Machine, Concrete Mixer
GROUP 4: Tractors, Wellpoint System Operator and Installer, Air Compressor, Pulver Mixer, Motor boat, Power Boat, Power Sweeper, Welding Machine, Oiler, Mechanic's Helper, Pump, Conveyor, Roller, Watertruck, Asphalt distributor, Concrete Pump (trailer type), Utility Operator
* IRON0808-001 07/01/2009
| Rates Fringes | ||
| IRONWORKER....................... | $ 24.28 9.95 |
LABO0517-001 05/01/2008
Rates Fringes Laborers:
Asbestos Abatement, Hazardous and Toxic Waste Removal Laborers; (On all mechaincal systems: Lead Base Paint Removal;pipes, boilers, ducts, flues, breechings, ect.; that are going to be scrapped, the removal of all insulating materials whether they contain asbestos or not shall be the exclusive work of the laborers;....... $ 17.50 5.47 Carpenter Tender, Cement Mason Tender, Block/ Bricklayer Tender
| Plasterer Tender........... | .$ 17.50 5.47 |
| Demolition Laborers......... | $ 17.50 5.47 |
| General Laborer............. | $ 17.35 5.47 |
Pipelayer Laborer, Laborer engaged in the pouring of concrete, mortar mixers, masonry forklift operator, and operation of power tools....................... $ 16.32 5.47
PAIN0078-001 07/01/2008
| Rates Fringes | ||
| GLAZIER.......................... | $ 22.00 6.95 |
PAIN0078-002 07/01/2008
| Rates Fringes | ||
| PAINTER: Brush Only............. | $ 22.75 9.20 | |
| Painters: Spray, Sandblast....... | $ 22.75 9.20 |
PLUM0295-001 01/01/2009
Rates Fringes Plumber/Pipefitter/Steamfitter COMMERCIAL: Schools, Hospitals, Shopping Centers, and work not listed as Industrial........ $ 29.47 14.87 INDUSTRIAL: Bulk Plants, Power-houses, Chemical Plants, Missile Sites, (Including all Work at Cape Canaveral Air Force Station and Kennedy Space Flight Center but excluding work performed at Patrick Air Force Base and Malabar Radar Site), Oil Refineries, etc., and such other wirk which is related to and considered a part of the above type projects................... $ 29.47 14.87
ROOF0103-001 02/01/2003
Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................ $ 14.50 5.10
* SFFL0821-002 07/01/2009
Rates Fringes
SPRINKLER FITTER
| Commercial.................. | $ 26.80 13.60 |
| Industrial.................. | $ 29.00 13.60 |
SHEE0015-001 09/01/2007
| Rates Fringes | ||
| SHEETMETAL WORKER................ | $ 23.74 12.05 |
TEAM0385-001 05/01/1990
| Rates Fringes | ||
| TRUCK DRIVER..................... | $ 13.00 .80 |
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
| Branch of Construction Wage Determinations |
| Wage and Hour Division |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
| Wage and Hour Administrator |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
| Administrative Review Board |
| U.S. Department of Labor |
| 200 Constitution Avenue, N.W. |
| Washington, DC 20210 |
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
File details come from the government source that posted it. Updated .