DBA WD F17 Rev 15 as of 10 Jul 09.docx

DOCX document 20 KB Posted

Attached to
Demolish Various Buildings on Patrick AFB, FL
Solicitation number
FA2521-09-R-0064
Issued by

About this file

DBA Wage Determination

View the file

Other files

File Type Posted
PAFB Sign In Sheet.pdf PDF
CCAFS Prebid Site Visit Minutes and Question.docx DOCX document
Prebid_Signin Sheet.PDF PDF
question with Answers as of 1 Sep 09.docx DOCX document
09R0064 Conformed as of Amend 0003.doc DOC document
Amendment 0003.doc DOC document
amend2modcopy.doc DOC document
Amend2Conformedcopy.doc DOC document
CCAFS Specs-Drawings other docs.zip ZIP file
question with Answers as of 20 Aug 09.docx DOCX document
FA2521-09-R-0064amend1conformed.doc DOC document
FA2521-09-R-0064Amend1mod.doc DOC document
SXHT 01-1229 Dwg Sht 2.zip ZIP file
SXHT 01-1229 Specs Part 3.zip ZIP file
SXHT 09-1051 Specs Part 2.zip ZIP file
SXHT 09-1051 Dwg Sheet 3.zip ZIP file
RFP 09-R-0064.doc DOC document
Hazardous Waste Generation Form.doc DOC document
SXHT 05-1252 Dwg Sht 2.zip ZIP file
SXHT 08-1095 Specs Part 3.zip ZIP file
SXHT 05-1252 Specs Part 3.zip ZIP file
SXHT 08-1095 Dwg Sheet 1.zip ZIP file
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

**CAPE CANAVERAL AIR STATION, PATRICK AIR FORCE BASE KENNEDY SPACE CENTER AND MALABAR RADAR SITE IN BREVARD COUNTY BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and partments up to and including 4 stories) HEAVY AND HIGHWAY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 02/08/2008 1 02/15/2008 2 03/21/2008 3 05/30/2008 4 07/04/2008 5 07/25/2008 6 08/15/2008 7 08/29/2008 8 09/05/2008 9 09/19/2008 10 11/28/2008 11 12/05/2008 12 01/23/2009 13 02/20/2009 14 04/10/2009 15 07/10/2009

ASBE0067-001 07/01/2008

Rates Fringes Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems)......................... $ 24.87 10.68

ASBE0067-002 07/01/2008

Rates Fringes

HAZARDOUS MATERIAL HANDLER

(Includes preparation, wetting, stripping, removal, scrapping, vacuuming,bagging, and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)......... $ 24.87 10.68

BOIL0199-001 01/01/2009

Rates Fringes

BOILERMAKER......................$ 27.63 13.96
All other work..............$ 25.13 13.96

* BRFL0001-001 05/01/2008

Rates Fringes

BRICKLAYER

BRICKLAYERS, BLOCKLAYERS,

PLASTERERS, TERRAZZO

WORKERS, TILE SETTERS AND

CEMENT MASONS:............. .$ 23.15 7.85

INDUSTRIAL work includes: Bulk plants, power houses, chemical plants, missile sites including all work at Cape Canaveral Air Force Station and Kennedy Space Flight Center but excluding work performed at Patrick Air Force Base and Malabar Radar Site, oil refineries, etc., and such other work which is related to and considered a part of the above type projects.

CARP1000-001 07/01/2008

Rates Fringes
MILLWRIGHT.......................$ 26.93 10.49

* CARP1765-001 05/01/2008

Rates Fringes Carpenters:

*INDUSTRIAL:

CARPENTERS.................$ 23.96 7.21
PILEDRIVERMEN..............$ 21.75 8.65

COMMERCIAL:

CARPENTERS.................$ 22.46 7.21
PILEDRIVERMEN..............$ 21.75 8.65

ELEC0222-001 09/01/2008

Rates Fringes Line Construction:

CABLE SPLICER...............$ 32.72 4.75+23%
GROUNDMAN...................$ 17.76 4.75+23%

LINEMAN; HEAVY EQUIPMENT

OPERATOR.................... $ 31.16 4.75+23%

ELEC0756-001 09/01/2008

Rates Fringes Electricians:

Cable Splicer...............$ 26.25 6.45+4.4%
Wireman.....................$ 26.25 6.45+4.4%

ELEV0139-001 01/01/2009

Rates Fringes
ELEVATOR MECHANIC................$ 33.85 18.285+A

FOOTNOTE:

A. Employer contributions 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; Employer contributions 6% of regular hourly rate to vacation pay credit for employee who has worked in business less than 5 years.

Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; The Day After Thanksgiving and Christmas Day.

ENGI0673-001 05/01/2008

Rates Fringes Power equipment operators:

GROUP 1.....................$ 22.50 8.55
GROUP 2.....................$ 21.95 8.30
GROUP 3.....................$ 20.41 8.30
GROUP 4.....................$ 18.77 8.30

POWER EQUIPMENT OPERATORS

CLASSIFICATIONS GROUP 1: Tower Crane, Locomotive Crane, Crawler Crane, Truck Crane, Hydro Crane, Piledriver (incluidng auger and boring machine)

GROUP 2: Mechanic/Welder and operators of: Gantry Crane,Bridge Crane, Clam Shell, Dragline, Backhoe, Gradeall, Grader, Sideboom Cat, Hulti-Drum Hoist, Highlift (10' or higher), Locomotive Engineer, Tugboat Captain (150 hp or more), Concrete Pump with boom

GROUP 3: Bulddozers, Forklifts, Straddle Buggy, Single Drum Hoist, Winch Truck, Trenching Machine, Concrete Paver, Scraper, Loader, Asphalt Paving Machine, Lubricating Engineer, Fireman, Concrete Breaking Machine, Concrete Mixer

GROUP 4: Tractors, Wellpoint System Operator and Installer, Air Compressor, Pulver Mixer, Motor boat, Power Boat, Power Sweeper, Welding Machine, Oiler, Mechanic's Helper, Pump, Conveyor, Roller, Watertruck, Asphalt distributor, Concrete Pump (trailer type), Utility Operator

* IRON0808-001 07/01/2009

Rates Fringes
IRONWORKER.......................$ 24.28 9.95

LABO0517-001 05/01/2008

Rates Fringes Laborers:

Asbestos Abatement, Hazardous and Toxic Waste Removal Laborers; (On all mechaincal systems: Lead Base Paint Removal;pipes, boilers, ducts, flues, breechings, ect.; that are going to be scrapped, the removal of all insulating materials whether they contain asbestos or not shall be the exclusive work of the laborers;....... $ 17.50 5.47 Carpenter Tender, Cement Mason Tender, Block/ Bricklayer Tender

Plasterer Tender............$ 17.50 5.47
Demolition Laborers.........$ 17.50 5.47
General Laborer.............$ 17.35 5.47

Pipelayer Laborer, Laborer engaged in the pouring of concrete, mortar mixers, masonry forklift operator, and operation of power tools....................... $ 16.32 5.47

PAIN0078-001 07/01/2008

Rates Fringes
GLAZIER..........................$ 22.00 6.95

PAIN0078-002 07/01/2008

Rates Fringes
PAINTER: Brush Only.............$ 22.75 9.20
Painters: Spray, Sandblast.......$ 22.75 9.20

PLUM0295-001 01/01/2009

Rates Fringes Plumber/Pipefitter/Steamfitter COMMERCIAL: Schools, Hospitals, Shopping Centers, and work not listed as Industrial........ $ 29.47 14.87 INDUSTRIAL: Bulk Plants, Power-houses, Chemical Plants, Missile Sites, (Including all Work at Cape Canaveral Air Force Station and Kennedy Space Flight Center but excluding work performed at Patrick Air Force Base and Malabar Radar Site), Oil Refineries, etc., and such other wirk which is related to and considered a part of the above type projects................... $ 29.47 14.87

ROOF0103-001 02/01/2003

Rates Fringes ROOFER, Including Built Up, Composition and Single Ply Roofs............................ $ 14.50 5.10

* SFFL0821-002 07/01/2009

Rates Fringes

SPRINKLER FITTER

Commercial..................$ 26.80 13.60
Industrial..................$ 29.00 13.60

SHEE0015-001 09/01/2007

Rates Fringes
SHEETMETAL WORKER................$ 23.74 12.05

TEAM0385-001 05/01/1990

Rates Fringes
TRUCK DRIVER.....................$ 13.00 .80

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .