This document is an Owner's Manual for an Armag Corporation Arc Vault modular building system. The manual provides comprehensive assembly, maintenance, and operational instructions for a multi-unit modular structure featuring advanced security and technological capabilities. Key components include raised flooring systems, lockable network racks, HVAC units (Mitsubishi split-type ductless), soundmasking systems, emergency exits, and specialized electrical systems with transfer switches and grounding requirements. The building is constructed with ballistics-resistant exterior, ceramic Super Therm paint coating, and includes features like workbenches, fiber optic networks, and multiple security doors with specialized locking hardware.

The manual details technical specifications for installation, including crane and forklift requirements for unit placement, electrical and network connection procedures, and grounding protocols. Each unit is equipped with multiple sophisticated systems, such as 24" and 48" lockable network racks, fiber optic and CAT-6 networks, emergency escape hatches, intrusion detection system prep work, and white noise sound masking. The units are designed with ICD 705 compliance and include extensive documentation for maintenance, including MSDS sheets, technical data sheets, and instruction manuals for various integrated components and systems.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Owner’s Manual

Table of Contents Ballistics Certification

Warranty

Maintenance

Anchor brackets

Assembly Instructions

Components and Features

Drawings

Wiring Diagrams

Electrical Systems

Grounding Information

Emergency Exit

Intrusion Detection Systems

Closed Circuit Television

ICD 705 Compliance

Parts Manufacturer Contact and Ordering Information

Component Manuals and Schematics

VI-SO Clamp Connector Schematic

Super Therm Primer MSDS

Super Therm Primer Technical Data Sheet

Super Therm Top Coat MSDS

Super Therm Top Coat Technical Data Sheet

Touch Up Spray Paint MSDS

LKM7000 Instruction Manual

X-09 Instruction Manual

In-Floor Electrical Box Specifications

Soundmasking System Instruction Manual

Light Fixture Spec Sheet

HVAC Installation Manual

HVAC Interface Connection

Forms for Ordering Doors

Thank you for your purchase of this Armag® Corporation Arc Vault . We hope that this product meets your expectations and if you have questions or comments please let us know by contacting us at 800-443-9994 or at info@armagcorp.com.

Ballistics Certification CFR Title 27, part 555 SECTION 555.208 requires exterior magazines to be "bullet-resistant". This is defined by the ATF in ATF Rul. 76-18 as “being resistant to penetration of a bullet of 150 grain M2 ball ammunition having a nominal muzzle velocity of 2700 feet per second fired from a .30 caliber rifle from a distance of 100 feet perpendicular to the wall or door.” This ATF definition is referenced in DOD 5100.76M. This Arc-Vault meets these requirements.

Warranty Armag® Corporation warrants that the items in which it is the original equipment manufacturer

(OEM) will be free from defects in material and workmanship for a period of 12 months from date of shipment. Paint is warranted against flaking and peeling for same period provided it is maintained in accordance with provisions of this Owner’s Manual. Items in which Armag Corporation is not the OEM are subject to the warranty of that manufacturer.

Maintenance Armag® Corporation products require very little maintenance. We strongly recommend the exterior steel security door hinges be greased every 60 days, or as required, with Chevron Ultra EP#2, or equivalent. This will ensure years of life for the proper function of the door. Failure to grease regularly can cause the hinges to bind, thereby making it very difficult to open or close the door properly.

Each hinge is equipped with a small grease fitting. Should this fitting need to be replaced it can be obtained at a hardware store. The drive fitting is an Alemite 3009 and is to be installed with a 5253 driver.

The ISO block connectors also need to be greased as needed. There is grease fitting on the drive screw and another on the fastening section of the block. The manufacturer recommends using Sta-Lube grease: Premium Red. The part number on the container is SL3190 and should be able to be found at a hardware store.

The filters of your air conditioning units should be removed and cleaned on a regular basis. More information about these units can be found in their owner’s manual found at the end of this one.

Units are equipped with a battery operated exit light. These should be tested for functionality once a month. Hold down the button located on the front of the unit for 30 seconds. When pressed the light on the exit sign should come on, if it does not then a new battery may be needed.

Anchor brackets Your unit is outfitted with anchor brackets (welded to the four outer corners of the building) we suggest a ¾” hole 5” deep be drilled into the concrete pad, and then install ¾” x 6” anchor bolts.

mailto:info@armagcorp.com

Assembly Instructions

Tools needed: socket wrench, 1” socket, 3/8” Socket, 6” socket extension, caulk gun

Hardware needed: Adequate quantities of required hardware are provided for the assembly of the units.

Crane Service: The crane lift capacity will be determined based on the weight of each unit and on the distance the crane will need to swing the load. A professional rigging company should be consulted to make this determination. One or two 36,000 lb or greater forklifts will also be needed.

Lift hooks: Each unit has four lift hooks welded to the top. The hooks are engineered to lift more than the building weighs. We suggest the rigger use slings to attach to the hooks to lift the unit. We used 30’ slings when assembling these units at our facility. The lift hooks on top are on a 20’ x 12’ pattern.

Instructions: We recommend placing the units on a concrete or asphalt pad in order to provide a flat and level surface. If pad is uneven, the units are more difficult to assemble and cribbing or support shims may be required to level the units. Raising and support shimming may be necessary on outside edges in order to close seams on uneven pads.

1. Using the lift hooks, lift dock section (also referred to as the mother ship) and place on the pad.

This could also be placed using two 36,000 lb or larger forklifts.

2. Before placing any of the other sections, move the floor tile centered on the door. Use the 3/8” socket to remove the nuts from the back side of the small plate under the door. Lay this plate flat and replace the floor tile. Repeat this process for both the dock and non dock units. This will allow access for hooking up the electric later.

3. Lift the non dock unit that you wish to place, orienting it where the door will lineup properly with the corresponding door on the dock unit. These units are individually labeled L1, L2, R1 and R2 respectively. Place closely with crane, using forklift on the pockets at the rear of unit to finish pushing it into place. Lining up the ISO connector blocks while still positioning the unit, tighten the ISO connectors with the 1” Socket and extension (if needed).

4. Repeat steps 2 and 3 until all units that are being connected are in place.

5. Remove the first full floor tile centered on the door on the dock unit. Below you will find an electrical connection. The corresponding non dock unit will have the male end to this connection under center floor tile on its door. Push the connection through the plate under the door that you opened and connect it to the female part of the connection as seen below.

Non dock unit section

Dock unit section

6. Network patch cables to connect all the units must also be put into place. This process is similar to that of connecting the power. Inside the lockable server racks you will find these patch cables. Below the same tile as the power connection, to the left hand side if looking into the non dock unit, you will see the network connection receptacle. Connect one connecting cable of each color/type to this unit. Run these cables through the same hole that the power is connected through and into the other box. Remove the tile that is against the wall behind the tile you removed to connect the power. Under this tile you will find a piece of conduit that runs into the next room. Feed your network cables through this conduit. Then remove the corresponding tile on the side of the wall which the ends of the network cable are now located.

You should find a network connection receptacle under this tile as well. Connect the network cables to their respective connections. Replace all floor tiles. (If the tiles will no longer sit level see the components and features section of this manual for instruction on how to make adjustments.)

Locate Connection Box Make 1st connections

Run into non dock unit Through this conduit

Into this section Make 2nd connections

7. These units come with removable aluminum thresholds that can now be placed in the doorways connecting the dock unit to the non dock units.

8. To prevent rainwater from leaking into the space between doorways. Use the caulk gun to caulk the top seam where the units are connected to one another

9. Ground rods are to be installed by a qualified electrician. Generally, the 10’ copper rod is to be connected to the supplied copper cable. The cable is then attached to the duplex ground bracket. Typically, ground rods are to be driven into the ground so that the top of the rod is at least 1’ below grade level. Consult NEC codes in your area for specific instructions. Further information about grounding these units can be found in the grounding information section of this manual.

10. Touch up exterior paint as needed with the included spray paint. The MSDS for this paint can be found in the Components Manuals and Specifications portion of this manual.

Caulk along the seam where the boxes come together here.

11. On the interior of each of the non dock pieces tracks can be found on the ceiling and walls.

These tracks hold a removable aluminum divider wall. Assembly of this wall is as follows.

Step 1: Lay the floor tracks in place. Make sure to align the groves in with the track attached to the wall.

Step 2: Pick up the first solid aluminum section. Any section without the door should suffice as they are designed to be interchangeable. Be careful not to hit the overhead lights as you move it around. Tilt it slightly and place the top into the track on the ceiling. It should stand upright in the center and then slide into the track on the floor until it is flush with the wall. The flat end should be against the wall.

Step 3: Repeat step 2 on the opposite side.

Step 4: Repeat step 2 only this time the piece you place should be flush with the first piece on either side. The pieces should align as seen below. Repeat this process for the other side as well.

Step 5: Using the same method of lifting and tilting the section into the top track. Place the section with the door into the center of the divider wall. There are pegs under the aluminum threshold that line up with slots in the floor track. The door should open away from the server room.

For disassembly repeat the above steps in reverse order.

Components and Features

Each box is fitted with several ISO blocks and connecting plates. These will be used to assemble the 5 units into a single unit and also when stacking pieces for transport purposes. They are operated by tightening or loosening the top screw once the pieces are aligned. A detailed schematic of the connector can be found in the components manuals section of this manual.

Each unit has a 12” raised flooring system installed. Most conduit and wiring is run beneath this flooring. Each tile is capable of being removed for access to network and electrical systems for maintenance and repair. If tiles need to be cut or modified they can be cut with an upright bandsaw with a bi-metal blade. Installers typically use a blade with 14 TPI. The panels can also be cut with a jigsaw, again with a bi-metal blade and with a circular saw with a diamond tipped blade. During shipping and use these floor tiles may become unlevel. In order to make adjustments, you will need a Phillip’s head screw driver. Unscrew the bracing from the pedestal portion of the flooring found at the corner of each tile. Once this bracing is unhooked the plate they are attached to is setting on a screw. This plate can be rotated to move this screw up or down. Make adjustments until the floor is leveled out. You can use any flat object ran between these pedestal points to see how level they are without replacing the tile.

Remove these screws and adjust plate to level flooring.

Each unit is equipped with two 24” lockable network racks and a single 48” lockable network rack. Separate fiber optic networks are run to each of the smaller racks. The larger rack holds a fiber optic network and a copper CAT 6 network.

Work areas are equipped with several aluminum workbenches. When not in use they can be collapsed to allow for more interior space.

Along the walls there are panels below the aluminum workbenches. These panels each contain two receptacles, three fiber optic lines (Yellow, Red, Green) and one CAT-6 line (Grey). The empty space on the end allows for the future addition of other network or electrical components.

Each unit is equipped with 4 Split-Type Ductless Mitsubishi HVAC units (MSZ-GE35VA-E1 and MSZ- GE71VA) which feed from the 2 Mitsubishi Multi Zone Ductless Heat Pump Condensers (MXZ- 5C100VA-E5) on the outside of the unit. Manuals for the installation and care of these units can be found at the end of this user’s manual.

Each unit is equipped with several doors rated to STC53. One of these doors will be equipped with the LKM7000 and X-09 hardware seen above. More information and schematics on these locks can be found by referencing the Component Manual’s and Schematics chapter of this user’s manual.

Each unit is equipped with an electrical transfer switch found on the rear of the unit.

Depending on the electrical source connected to unit, the lever will need to be in different locations. They are clearly labeled. More information about these transfer switches can be found in the electrical systems portion of this manual.

The server room of each unit has an escape hatch in the corner in case a hasty exit is needed and the main doors are unusable. Detailed instruction on the use of these hatches can be found in the chapter labeled Emergency Exit.

Battery operated exit lights show the main exit doors. In the absence of power these lights should come on providing direction towards the main exit.

The paint on these units is a ceramic coating known as Super Therm®. This adds a layer of insulation to the box, reflecting a high percentage of UV rays allowing for less energy usage and better air conditioning function. MSDS’s and specification sheets on both the primer and the top coat can be found in the components manuals and schematics section of this user’s manual.

For area’s that may be vulnerable to sound escaping each unit is equipped with 40W speakers and an amplifier to produce white noise. The speakers are found in the vestibule area of the non dock units and in the server room on the dock unit. The amp/controller for this white noise is located in the 48” Network cabinet. Each amplifier is plugged into a step down transformer that is necessary for proper function. More information can be found about this system in the electrical systems section of this manual.

There is a small aluminum box located on the rear of each unit. This box has an entry way to connect the units to an exterior network.

D raw ings

Wiring Diagrams

Electrical Systems When making electrical connections and for any electrical problems and issues Armag®

Corporation advises using a licensed electrician.

Each of these units is equipped with a transfer switch. These are located at the rear of the unit next to the breaker box. The upward on position is reserved for auxiliary power (i.e. generator hookup).

The downward on position is reserved for utility power. When these units are connected as a group the transfer switches should be in the downwards on position. Center positioning of the lever is the off position.

Each unit is also equipped with a main power disconnect. The main disconnect for the non dock units can be found in the breaker box, which is located in the server room portion of the unit. The main disconnect for the dock unit is located at the rear of the unit in the breaker box next to the transfer switch. The rest of the breakers for this unit are located in the server room as with the other units. All breaker boxes have a directory. In the case that this directory is lost, damaged, or becomes illegible for any reason a copy has been provided in the wiring diagram portion of this user’s manual.

Disconnect, labeled MAIN, on non dock units.

Main lug panel/disconnect on dock unit.

Grounding Information Consult a licensed electrician for instructions on proper installation of your ground kit. Local soil conditions and other such criteria will dictate the best way to properly ground the building. We strongly recommend the box be grounded. The unit is equipped with multiple copper bonding plate welded to it.

See the following illustration for installation instructions. NOTE: the attached NFPA guidelines suggest the rod be placed at least 2 feet away from the building, but some branches of DoD are requiring a minimum of 3 feet.

Grounding

1. Each down conductor shall terminate in a ground terminal.

2.Each ground terminal shall be solid wire or rod, or solid plate. The use of stranded cable as a ground terminal shall be confined to a loop conductor.

3. Each ground terminal rod shall be not less than ½” (12.7 mm) in diameter and not less than 8 feet (2.4m) long and shall be made of copper-clad steel, solid copper, stainless steel, or stainless steel clad.

4.Ground rod connections shall be made by welding, brazing, or clamping. Clamps shall make contact with the ground rod and conductor for a distance of not less than 1-1/2 inches (38 mm) measured parallel to the axis of the ground rod. Clamps shall be secured with at least two bolts or machine screws. Welded connections shall have a weld area at least two times the cross sectional area of the conductor.

5.The size, depth, form and number of ground terminals used shall be as specified in paragraphs

8.6 – 8.9. 9

6.Ground terminals shall be located at least 2 feet (610 mm) from the foundation wall and shall extend vertically not less than 10 feet (3m) into the earth. The earth shall be compacted and made tight against the full length of the conductor or ground terminal. See figure below.

Sand or Gravel Soil

8.7 Two or more ground terminal rods, at least 10 feet (3m) apart, shall be driven vertically to a depth of 10 feet or more below grade.

NFPA-780 GENERAL NOTES

1.The design and details shown here meet all requirements of NFPA-780 for lightning protection systems.

2.Conductor bends shall not form a sharper angle than 90 degrees or have a radius less than 8 inches.

3.Connections to ground shall be made at point no less than 1 foot below grade and a minimum of

2 feet away from foundation wall.

4. Job conditions may dictate slight variations in air terminal and ground rod locations.

5.Air terminals shall be placed at the locations indicated, not more than 2 feet from the ends of ridges, outside corners, or outside edges of main roofs and must extend a minimum of 10 feet above the object to be protected.

6.Copper lightning protection materials shall not be placed on aluminum surfaces, nor shall aluminum materials be placed on copper surfaces.

Emergency Exit Each unit is equipped with an emergency escape hatch in the corner of the server room. In the instance this hatch needs to be used, Push all for red handles in towards the hatch. This will unhook the hatch then push the hatch itself outwards to create the opening.

Intrusion Detection Systems Armag® was responsible for prep work and wiring only for IDS on these units. Contact the parties responsible for installing these systems for further information.

Closed Circuit Television Armag ®was responsible for prep work and wiring only for CCTV system on these units. Contact the parties responsible for installing these systems for further information.

ICD 705 Compliance Armag ® Corporation guarantees compliance with ICD 705. We will gladly supply any information needed to get these units accredited as well as provide assistance in the accreditation process.

Parts M anufacturer Contact and

O rdering Inform ation

Com ponentM anuals and Schem atics

VI-SO

Clam p ConnectorSchem atic

Super Therm Primer MSDS

Super Therm Primer Technical Data Sheet

Super Therm Top Coat MSDS

Super Therm Top Coat Technical Data Sheet

Touch U p Spray

PaintM

SD

S

LKM7000 Instruction Manual

X-09 Instruction Manual

In-Floor Electrical Box Specifications

Soundmasking System Instruction Manual

Light Fixture Spec Sheet

HVAC Installation Manual

H

VAC

Interface Connection

Form sforO rdering D oors

Slide Number 1
Slide Number 2
Slide Number 3
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9
Slide Number 10
Slide Number 11
Slide Number 12
Slide Number 13
Slide Number 14
Slide Number 15
Slide Number 16
Slide Number 17
Slide Number 18
Slide Number 19
Slide Number 20
Slide Number 21
Slide Number 22
Slide Number 23
Slide Number 24
Slide Number 25
Slide Number 26
Slide Number 27
Slide Number 28
Slide Number 29
Slide Number 30
Slide Number 31
Slide Number 32
Slide Number 33
Slide Number 34
Slide Number 35
Slide Number 36
Slide Number 37
Slide Number 38
Slide Number 39
Slide Number 40
Slide Number 41
Slide Number 42
Slide Number 43
Slide Number 44
Slide Number 45
Slide Number 46
Slide Number 47
Slide Number 48
Slide Number 49
Slide Number 50
Slide Number 51
Slide Number 52
Slide Number 53
Slide Number 54
Slide Number 55
Slide Number 56
Slide Number 57
Slide Number 58
Slide Number 59
Slide Number 60
Slide Number 61
Slide Number 62
Slide Number 63
Slide Number 64
Slide Number 65
Slide Number 66
Slide Number 67
Slide Number 68
Slide Number 69
Slide Number 70
Slide Number 71
Slide Number 72
Slide Number 73
Slide Number 74
Slide Number 75
Slide Number 76
Slide Number 77
Slide Number 78
Slide Number 79
Slide Number 80
Slide Number 81
Slide Number 82
Slide Number 83
Slide Number 84
Slide Number 85
Slide Number 86
Slide Number 87
Slide Number 88
Slide Number 89
Slide Number 90

File details come from the government source that posted it. Updated .