MSCC_QAs_dtd_26_Apr17.pdf

PDF 70 KB Posted

Attached to
MODELING, SIMULATION, AND ANALYSIS (MS&A) FOR SPACE AND CYBERSPACE CAPABILITIES Federal contract opportunity
Solicitation number
FA2517-17-R-7003
Issued by
Department of the Air Force Space Command

About this file

MSCC Draft RFP QAs dtd 26 Apr 17.

View the file

Other files for this federal contract opportunity

Other files attached to MODELING, SIMULATION, AND ANALYSIS (MS&A) FOR SPACE AND CYBERSPACE CAPABILITIES, newest first.
File Type Posted
Attch_17_-_Solicitation_Cross_Reference_Matrix.docx DOCX document
Attch_2_-_MSCC_DD254_-_Gov't_to_Prime_MSSC_(IDIQ)_Contractor_(Original_Unsigned)_-_1_Mar_17.pdf PDF
Attch_3__-_Proposal_Questionnaire_Form.docx DOCX document
Attch_1a_-_TO_0001_-_PWS_-_Contract-TO_Management_-_5Jun17.pdf PDF
Attch_9_-_Relevancy_Matrix_Final.doc DOC document
Attch_1_-_MSCC_PWS_-_19JUL17.pdf PDF
Attch_6_-_OCI_Disclosure_and_Analysis_Form.xlsx XLSX spreadsheet
Attch_1.1.1_-_DIDs_to_MSCC_CDRLs_and_List_of_Publications.pdf PDF
Attch_10__-_Position_Description.docx DOCX document
MSCC_QAs__7JUN17.pdf PDF
MSCC_QAs_dtd__22May17.pdf PDF
MSCC_RFP_FA2517-17-R-7003_DRAFT_25APR17.pdf PDF
5._FOUO_Guidance.pdf PDF
Attch_17_-_Preaward_Survey.pdf PDF
IDIQ_CDRL_A027_(dd1423-1)_-_Software_Requirements_Specification_(SRS)_-_1_Feb_17.pdf PDF
IDIQ_CDRL_A041_(dd1423-1)_-_Software_Programmer's_Guide_-_1_Feb_17.pdf PDF
MSCC_RFP_FA2517-17-R-7003_DRAFT_24APR17.pdf PDF
Attch_4__Past_Performance_Information_Tool.accdb —
Attch_7__-_Staffing_Matrix_template.docx DOCX document
IDIQ_CDRL_A034_(dd1423-1)_-_Software_Test_Report_-_1_Feb_17.pdf PDF
4._DD2345_MSCC_Requirements_and_Instructions.pdf PDF
Attch_3__-_Pre-Bid_Pre-Proposal_Conference_Questionnaire_Form.docx DOCX document
Attch_10__-_Position_Description.docx DOCX document
IDIQ_CDRL_A029_(dd1423-1)_-_Software_Design_Description_(SDD)_-_1_Feb_17.pdf PDF
3._MSCC_DD2345_Checklist.pdf PDF
A100_DID_(DI-MISC-80508B)_-_3_Feb_17.pdf PDF
IDIQ_CDRL_A031_(dd1423-1)_-_Database_Design_Description_(DBDD)_-_1_Feb_17.pdf PDF
IDIQ_CDRL_A027_(dd1423-1)_-_Software_Requirements_Specification_(SRS)_-_1_Feb_17.pdf PDF
Attch_1.__MSCC_-_Contract_PWS__(IDIQ)_-_24Apr17.pdf PDF
IDIQ_CDRL_A099_(dd1423-1)_-_Technical_and_Management_Work_Plan_-_1_Feb_17.pdf PDF
A034_DID_(DI-IPSC-81440A)_-_3_Feb_17.pdf PDF
IDIQ_CDRL_A008_(dd1423-1)_-_Contractor's_Configuration_Mgmt_Plan_-_1_Feb_17.pdf PDF
MSCC_DIDs_Document_for_CDRLs.pdf PDF
Attch_13_-_Consent_Letter.docx DOCX document
Attch_1a_-_TO_0001_-_PWS_-_Contract-TO_Management__Phase-In_PWS_24Apr17.pdf PDF
Attch_9_-_Relevancy_Matrix.doc DOC document
2._DD2345_form.pdf PDF
A041_DID_(DI-IPSC-81633)_-_3_Feb_17.pdf PDF
A099_DID_(DI-MGMT-81117)_-_3_Feb_17.pdf PDF
Attch_1c_-_TO_0003-_Sample_Technical_PWS_24Apr17.pdf PDF
A045_DID_(DI-AVCS-80700)_-_3_Feb_17.pdf PDF
Attch_19_-_Solicitation_Cross_Reference_Matrix.docx DOCX document
Industry_Day_Slides_3APR17.ppt PPT presentation
Attch_14_-_Consent_Letter.docx DOCX document
Attch_3__-_Visitor_Access_Request_Form.docx DOCX document
Attch_6__Past_Performance_Information_Tool_Instructions.docx DOCX document
Attch_17_-_Task_Order_SubK_Template.xlsx XLSX spreadsheet
Attch_1_-_MSCC_PWS_-_4_Feb_17.docx DOCX document
Attch_10_-_Relevancy_Matrix.doc DOC document
Attch_16_-_Cost_Template.xlsx XLSX spreadsheet
Show all 50

MODELING, SIMULATION, AND ANALYSIS (MS&A) FOR SPACE AND CYBERSPACE CAPABILITIES has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MSCC - Q&As in response to DRAFT RFP Posted 25APR17

Item Question Government Response

1 Page 85, L6.6: Should this be a subsection to L6.3? Or are you saying you want L6.6-L6.9 in the Total Compensation Plan tab?

No, this should not be a subsection of L.6.3. The Total Compensation Plan is applicable to the entire contract. As instructed in the RFP, review FAR 22.1103 and Provision 52.222-46 for guidance.

2 Page 86, L7: Should this be L6.7? Yes, a correction will be made prior to release of the final RFP.

Page 87, L6.10: Should this be Tab 6? Is it appropriate to this level or just the TO level?

Yes, a correction will be made prior to release of the final RFP.

Page 87, L7 and L7.3: It says the Task Orders are a subsection to Volume

1. Are the 15 pages per TO from L7.3 included in 50 pages for Volume 1 as called out in L.6 on page 85?

No, the 15 pages per TO are not included in the 50 pages for Volume 1 as called out in L.6 on page 85.

PP 87-90: The required tab #s for TOPs do not appear to correspond to the template in Attachment 11. Recommend that required content be aligned to the Attachment 11 sections.

Attachment 11 is the preferred format for Task Order Proposals (TOPs) in order to streamline Government evaluations. Please use this format as much as possible when submitting TO proposals.

6 Page 89, L7.3.3: Is the text under Tab 3 correct? Yes, as part of sample TO 0003.

INDUSTRY DAY Q&As

The following questions and answers are documented notes received in response to the DRAFT RFP posted 25 APR 17.

Sheet1

File details come from the government source that posted it. Updated .