Paint Solicitation Amendment 003.doc

DOC document 312 KB Posted

Attached to
Protective Coating Maintenance at Peterson AFB, CO and Cheyenne Mountain Air Force Station, CO
Solicitation number
FA2517-11-R-5002
Issued by

About this file

Modified Copy of Solicitation

View the file

Other files

File Type Posted
Synopis of Award.doc DOC document
QA 1 solicitation.docx DOCX document
Attch 1 SOW FINAL 23 MAY 12.docx DOCX document
Pre-Proposal Conference Minutes FA2517-11-R-5002.pdf PDF
Amendment 001.doc DOC document
Attch 4 DBA Heavy.mht MHT file
Attch 1 SOW FINAL 29 MAR 12.docx DOCX document
Attch 7 RMECF.docx DOCX document
Attch 8 Demo Project.xlsx XLSX spreadsheet
SOLICITATION —
Attch 3 DBA Residential.mht MHT file
Attch 2 DBA Building.mht MHT file
Attch 5 DBA Highway.mht MHT file
Attch 6 GPDF Form.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 30-May-2012 02:00 PM to 04-Jun-2012 02:00 PM.

The Issued By organization has changed from

FA2517 - 21 CONS/LGCAA

MARY T YOUNG

580 GOODFELLOW STREET, BLDG 1324

PETERSON AFB CO 80914-1648

to

FA2517 - 21 CONS/LGCAA

TERRI WOLSKI

(719) 556-4875

580 GOODFELLOW ST. BLDG 1324

PETERSON AFB CO 80914-1648

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Peterson Air Force Base (PAFB) In Accordance With (IAW) the Statement of Work (SOW), dated 29 Mar 2012, Section J, Attachment 1. Period of Performance: 23 SEP 12 - 22 Sep 13. ENTER AMOUNT FROM TOTAL FOR BASIC YEAR - PAFB to Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Peterson Air Force Base (PAFB) In Accordance With (IAW) the Statement of Work (SOW), dated 23 May 2012, Section J, Attachment 1. Period of Performance: 23 SEP 12 - 22 Sep 13. ENTER AMOUNT FROM TOTAL FOR BASIC YEAR - PAFB.

CLIN 0002

The CLIN extended description has changed from Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Cheyenne Mountain Air Force Station (CMAFS) In Accordance With (IAW) the Statement of Work (SOW), dated 29 Mar 2012, Section J, Attachment 1. Period of Performance: 23 SEP 12 -22 Sep 13. ENTER AMOUNT FROM TOTAL FOR BASIC YEAR - CMAFS to Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Cheyenne Mountain Air Force Station (CMAFS) In Accordance With (IAW) the Statement of Work (SOW), dated 23 May 2012, Section J, Attachment 1. Period of Performance: 23 SEP 12 -22 Sep 13. ENTER AMOUNT FROM TOTAL FOR BASIC YEAR - CMAFS.

CLIN 1001

The CLIN extended description has changed from Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Peterson Air Force Base (PAFB) In Accordance With (IAW) the Statement of Work (SOW), dated 29 Mar 2012, Section J, Attachment 1. Period of Performance: 23 SEP 13 - 22 Sep 14. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR ONE - PAFB to Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Peterson Air Force Base (PAFB) In Accordance With (IAW) the Statement of Work (SOW), dated 23 May 2012, Section J, Attachment 1. Period of Performance: 23 SEP 13 - 22 Sep 14. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR ONE - PAFB.

CLIN 1002

The CLIN extended description has changed from Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Cheyenne Mountain Air Force Station (CMAFS) In Accordance With (IAW) the Statement of Work (SOW), dated 29 Mar 2012, Section J, Attachment 1. Period of Performance: 23 SEP 13 - 22 Sep 14. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR ONE - CMAFS to Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Cheyenne Mountain Air Force Station (CMAFS) In Accordance With (IAW) the Statement of Work (SOW), dated 23 May 2012, Section J, Attachment 1. Period of Performance: 23 SEP 13 - 22 Sep 14. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR ONE - CMAFS.

CLIN 2001

The CLIN extended description has changed from Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Peterson Air Force Base (PAFB) In Accordance With (IAW) the Statement of Work (SOW), dated 29 Mar 2012, Section J, Attachment 1. Period of Performance: 23 SEP 14 - 22 Sep 15. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR TWO - PAFB to Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Peterson Air Force Base (PAFB) In Accordance With (IAW) the Statement of Work (SOW), dated 23 May 2012, Section J, Attachment 1. Period of Performance: 23 SEP 14 - 22 Sep 15. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR TWO - PAFB.

CLIN 2002

The CLIN extended description has changed from Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Cheyenne Mountain Air Force Station (CMAFS) In Accordance With (IAW) the Statement of Work (SOW), dated 29 Mar 2012, Section J, Attachment 1. Period of Performance: 23 SEP 14 -22 Sep 15. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR TWO - CMAFS. to Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Cheyenne Mountain Air Force Station (CMAFS) In Accordance With (IAW) the Statement of Work (SOW), dated 23 May 2012, Section J, Attachment 1. Period of Performance: 23 SEP 14 -22 Sep 15. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR TWO - CMAFS..

CLIN 3001

The CLIN extended description has changed from Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Peterson Air Force Base (PAFB) In Accordance With (IAW) the Statement of Work (SOW), dated 29 Mar 2012, Section J, Attachment 1. Period of Performance: 23 SEP 15 - 22 Sep 16. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR THREE - PAFB to Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Peterson Air Force Base (PAFB) In Accordance With (IAW) the Statement of Work (SOW), dated 23 May 2012, Section J, Attachment 1. Period of Performance: 23 SEP 15 - 22 Sep 16. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR THREE - PAFB.

CLIN 3002

The CLIN extended description has changed from Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Cheyenne Mountain Air Force Station (CMAFS) In Accordance With (IAW) the Statement of Work (SOW), dated 29 Mar 2012, Section J, Attachment 1. Period of Performance: 23 SEP 15 - 22 Sep 16. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR THREE - CMAFS to Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Cheyenne Mountain Air Force Station (CMAFS) In Accordance With (IAW) the Statement of Work (SOW), dated 23 May 2012, Section J, Attachment 1. Period of Performance: 23 SEP 15 - 22 Sep 16. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR THREE - CMAFS.

CLIN 4001

The CLIN extended description has changed from Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Peterson Air Force Base (PAFB) In Accordance With (IAW) the Statement of Work (SOW), dated 29 Mar 2012, Section J, Attachment 1. Period of Performance: 23 SEP 16 - 22 Sep 17. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR FOUR - PAFB to Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Peterson Air Force Base (PAFB) In Accordance With (IAW) the Statement of Work (SOW), dated 23 May 2012, Section J, Attachment 1. Period of Performance: 23 SEP 16 - 22 Sep 17. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR FOUR - PAFB.

CLIN 4002

The CLIN extended description has changed from Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Cheyenne Mountain Air Force Station (CMAFS) In Accordance With (IAW) the Statement of Work (SOW), dated 29 Mar 2012, Section J, Attachment 1. Period of Performance: 23 SEP 16 - 22 Sep 17. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR FOUR - CMAFS to Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Cheyenne Mountain Air Force Station (CMAFS) In Accordance With (IAW) the Statement of Work (SOW), dated 23 May 2012, Section J, Attachment 1. Period of Performance: 23 SEP 16 - 22 Sep 17. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR FOUR - CMAFS.

CLIN 5001

The CLIN extended description has changed from Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Peterson Air Force Base (PAFB) In Accordance With (IAW) the Statement of Work (SOW), dated 29 Mar 2012, Section J, Attachment 1. Period of Performance: 23 SEP 17 - 22 Sep 18. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR FIVE - PAFB to Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Peterson Air Force Base (PAFB) In Accordance With (IAW) the Statement of Work (SOW), dated 23 May 2012, Section J, Attachment 1. Period of Performance: 23 SEP 17 - 22 Sep 18. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR FIVE - PAFB.

CLIN 5002

The CLIN extended description has changed from Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Cheyenne Mountain Air Force Station (CMAFS) In Accordance With (IAW) the Statement of Work (SOW), dated 29 Mar 2012, Section J, Attachment 1. Period of Performance: 23 SEP 17 - 22 Sep 18. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR FIVE - CMAFS to Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Cheyenne Mountain Air Force Station (CMAFS) In Accordance With (IAW) the Statement of Work (SOW), dated 23 May 2012, Section J, Attachment 1. Period of Performance: 23 SEP 17 - 22 Sep 18. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR FIVE - CMAFS.

CLIN 6001

The CLIN extended description has changed from Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Peterson Air Force Base (PAFB) In Accordance With (IAW) the Statement of Work (SOW), dated 29 Mar 2012, Section J, Attachment 1. Period of Performance: 23 SEP 18 - 22 Sep 19. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR FIVE - PAFB to Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Peterson Air Force Base (PAFB) In Accordance With (IAW) the Statement of Work (SOW), dated 23 May 2012, Section J, Attachment 1. Period of Performance: 23 SEP 18 - 22 Sep 19. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR FIVE - PAFB.

CLIN 6002

The CLIN extended description has changed from Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Cheyenne Mountain Air Force Station (CMAFS) In Accordance With (IAW) the Statement of Work (SOW), dated 29 Mar 2012, Section J, Attachment 1. Period of Performance: 23 SEP 18 - 22 Sep 19. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR FIVE - CMAFS to Provide all personnel, equipment, tools, materials, supplies, transportation, supervision and other items and services necessary to perform Protective Coating Maintenance (PCM) for Cheyenne Mountain Air Force Station (CMAFS) In Accordance With (IAW) the Statement of Work (SOW), dated 23 May 2012, Section J, Attachment 1. Period of Performance: 23 SEP 18 - 22 Sep 19. ENTER AMOUNT FROM TOTAL FOR OPTION YEAR FIVE - CMAFS.

The following have been modified:

REFERENCE NUMBERS

Section B - Supplies or Services and Prices

SPECIAL INSTRUCTIONS

Schedules of Prices. Prices must be proposed as specified in the Schedule of Prices for the basic year and option years in Section B.

BASIC YEAR PRICE LIST - PAFB

ITEM 0001 PAFB BASIC YEAR PROPOSED PRICES (23 SEPTEMBER 2012, OR DATE OF AWARD, WHICHEVER IS LATER, THROUGH 22 SEPTEMBER 2013)

OFFEROR MUST FILL IN THE BLANKS WITH UNIT AND TOTAL PRICES.

REFERENCE NUMBERS A01 THROUGH A36 ARE INTERIOR PAINTING TASKS

REF#

DESCRIPTION

EST. QTY.

UNIT PRICE

TOTAL

A01

GYPSUM WALL BOARD AND

300,000

SF

PLASTER, PREVIOUSLY

PAINTED SURFACES.

INCLUDES HOLES UP TO

1" IN DIAMETER

A02

GYPSUM WALL BOARD AND

10,000 SF

PLASTER, MUD (APPLY

JOINT COMPOUND), TAPE,

UNPAINTED SURFACES

A03

ONE COAT PRIMER

20,000 SF

A04

MULTISPEC FINE FLECK

3,000 SF

PAINT

A05

WATER BASED MULTISPEC

2,000 SF

FINE FLECK PAINT

A06

CLEAR COAT

6,000 SF

A07

TEXTURE INNER WALL

1,000 SF

SURFACE STOMP FINISH

A08

TEXTURE INNER WALL

2,000 SF

SURFACE ORANGE PEEL

A09

ACOUSTIC COMPOUND TO

500 SF

CEILINGS

A10

PATCH HOLES IN SHEET

200 SF

ROCK. LARGER THEN 1"

TO 1 SF IN SIZE, 1 SF

MAX EACH

A11

REPLACE GYPSUM WALL

400 SF

BOARD, INCLUDES JOINT

COMPOUND, MUD, TAPE 1

SF AND LARGER IN SIZE

A12

WOOD, UNPAINTED, UNDER

3,000 SF

20 FT HIGH

A13

WOOD, PREVIOUSLY

4,000 SF

PAINTED, UNDER 20 FT

HIGH

A14

WOOD TRIM, UNPAINTED

2,000 SF

UNDER 20 FT HIGH

A15

WOOD TRIM, PREVIOUSLY

3,000 SF

A16

WOOD, UNPAINTED, OVER

200 SF

A17

PAINTED, OVER 20 FT

400 SF

A18

WOOD TRIM, OVER 20 FT

100 SF

A19

RE-SCREEN WOOD FLOORS

1,000 SF

A20

REFINISH WOOD FLOOR AND

1,000 SF

REPLACE WOOD SLATS AS

NEEDED

A21

METAL, PREVIOUSLY

30,000 SF

PAINTED SURFACES, UNDER

A22

15,000 SF

PAINTED SURFACES, OVER

A23

METAL, UNPAINTED

2,000 SF

SURFACES, UNDER 20 FT.

A24

500 SF

SURFACES, OVER 20 FT

A25

SPLATTERED WALL PAINT

1,000 SF

WITH ELASTOMERIC

PROPERTIES, SUCH AS

TEX-COTE, ORANGE PEEL FINISH

A26

SPLATTERED WALL PAINT

1,000 SF

PROPERTIES, STOMP FINISH

A27

SPLATTERED WALL PAINT

1,000 SF

PROPERTIES, KNOCKDOWN FINISH

A28

SPLATTERED WALL PAINT

500 SF

PROPERTIES, EACH ADDITIONAL COLOR ADDED

A29

MASONRY BLOCK WALL,

2,000 SF

PREVIOUSLY PAINTED

SURFACES

A30

MASONRY BLOCK WALL,

500 SF

A31

VARNISH

1,000 SF

A32

STAIN

A33

SKIM COAT SURFACES

LEVEL 5 FINISH

A34

DOOR, ONE SIDE

300 EA

A35

DOOR JAM, ONE SIDE

A36

WINDOW SASH, ONE SIDE

200 EA

A SASH SHALL BE 3x5 FT

LARGER WINDOWS SHALL BE

TASKED IN MULTIPLES OF 15 SQ FT

REFERENCE NUMBERS A37 THROUGH A58 ARE EXTERIOR PAINTING TASKS

A37

EXTERIOR WOOD,

3,000 SF

INCLUDING TRIM,

UNDER 20 FT

A38

OVER 20 FT

A39

100 SF

UNPAINTED UNDER 40 FT

A40

50 SF

UNPAINTED OVER 20 FT

A41

EXTERIOR PAINT SECOND

5,000 SF

COAT ON WOOD, UNDER

20 FT

A42

EXTERIOR, PAINT SECOND

200 SF

COAT ON WOOD, OVER

A43

EXTERIOR CONCRETE,

500 SF

STUCCO AND BLOCK,

PREVIOUSLY PAINTED,

A44

EXTERIOR CONCRETE,

A45

EXTERIOR SURFACES,

CONCRETE, STUCCO AND

BLOCK, UNPAINTED,

A46

EXTERIOR CONCRETE,

200 SF

UNPAINTED SURFACES,

A47

EXTERIOR PAINT SECOND

500 SF

COAT ON CONCRETE,

A48

EXTERIOR PAINT SECOND

200 SF

A49

EXTERIOR METAL,

100,000 SF

A50

A51

5,000 SF

UNPAINTED UNDER 20 FT,

PRIME COAT

A52

2,500 SF

UNPAINTED OVER 20 FT,

A53

EXTERIOR METAL

UNPAINTED UNDER 20 FT

A54

A55

EXTERIOR METAL TRIM,

1,000 LF

UNPAINTED, UNDER 20 FT

A56

EXTERIOR METAL TRIM,

1,000 LF

UNPAINTED, OVER 20 FT

A57

EXTERIOR METAL TRIM,

1,000 LF

A58

EXTERIOR METAL TRIM,

1,000 LF

REFERENCE NUMBERS A59 THROUGH A81 ARE PAINTING NON-STRUCTURAL SURFACES TASKS

A59

CROSSWALKS

15,000 LF

A60

STOP LINES,

3,000 LF

12 INCHES WIDE

A61

"YIELD" - STENCILED

50 EA

A62

TURN ARROW - STENCILED

50 EA

A63

ADA DISABLED PARKING -

75 EA

STENCILED

A64

METAL FENCING 7' HIGH

300 LF

A65

CHAIN LINK FENCING

300 LF

4' HIGH

A66

FLIGHT LINE STENCILS,

TO INCLUDE LAYOUT

100 EA

A67

STENCILS OVER

3 1/2 FT HIGH

A68

PARKING LOT, STREET

50,000 LF

STRIPING OR BLACK OUT

LINES

A69

100,000 LF

LINES TO INCLUDE GLASS

BEADS ON REQUEST

A70

PARKING LOT OR STREET

40 HR

STRIPING, LABOR FOR

LAYOUT (UNIT PRICE TO

INCLUDE COSTS, OVERHEAD

AND PROFIT ONLY)

A71

REMOVE EXISTING LINES

2,000 LF

ON FLIGHT LINE, STREETS,

CURBS AND PARKING LOTS

A72

FLIGHT LINE STRIPING

150,000 SF

A73

HAND RAILINGS

5,000 LF

A74

FIRE HYDRANT,

20 EA

REFLECTIVE PAINT

(GLASS BEADS) AND

STENCILED NUMBER

A75

EPOXY PRIMER PAINTING

3,000 SF

REQUIREMENTS, UNPAINTED

A76

EPOXY PAINTING

REQUIREMENTS,

PREVIOUSLY PAINTED SURFACES

A77

PAINT INTERIOR CONCRETE

3,000 SF

FLOORS, PREVIOUSLY

PAINTED

A78

PRIME COAT INTERIOR

500 SF

CONCRETE FLOORS,

UNPAINTED

A79

SEAL COAT CONCRETE

100 SF

FLOORS

A80

PRIMER APPLICATION ON

20,000 SF

UNCOATED HANGER FLOORS

PER ETL 96-5

A81

APPLICATION OF

REFLECTIVE CHEMICAL

RESISTANT COATING ON

EXISTING COATED HANGER

FLOORS PER ETL 96-5

REFERENCE NUMBERS A82 THROUGH A85 ARE MATERIAL REQUIREMENTS ASSOCIATED WITH NEW SIGN DESIGNS

A82

HIGH PERFORMANCE

REFLECTIVE SHEETING

NO LESS THAN 7 MIL

A83

PREMIUM SHEETING NO

100 SF

LESS THAN 2 MIL TO

INCLUDE COLOR CARTRIDGES

A84

MAGNETIC MATERIAL NO

25 SF

LESS THAN 15 MIL

A85

LABOR FOR LAYOUT

50 HR

REFERENCE NUMBERS A86 THROUGH A130 ARE SIGN REQUIREMENTS WITH NO DESIGN TIME

A86 12" X 12"

5 EA

REFLECTIVE TWO COLOR

A87

12" X 12" NON

12 EA

A88

REFLECTIVE 1 COLOR

A89

12" X 12" ALUMINUM

3 EA

SIGN BLANK 1.5”

RADIUS CORNERS

A90

12" X 18" REFLECTIVE

TWO COLOR

A91

12" X 18" NON

A92

A93

12" X 18" ALUMINUM

A94

18" X 18" REFLECTIVE

A95

18" X 18" NON

6 EA

A96

A97

18" X 18" ALUMINUM

A98

24" X 18" REFLECTIVE

A99

24" X 18" NON

A100

24” X 18" NON

A101

24" X 18" ALUMINUM

SIGN BLANK 1.5” RADIUS

CORNERS

A102

24" X 24" REFLECTIVE

A103

24" X 24" NON

A104

A105

24" X 24" ALUMINUM

A106

24" X 30" REFLECTIVE

A107

24" X 30" NON

A108

A109

24" X 30" ALUMINUM

A110

27" X 27" NON

REFLECTIVE FACILITY

SIGN WITH 6" X 6"

COLOR DECAL

A111

27" X 27" ALUMINUM

SIGN BLANK WITH 1.5”

A112 30" x 30" REFLECTIVE

A113

30" X 30" NON

A114

A115

30" X 30" ALUMINUM

A116

30" YIELD SIGN

REFLECTIVE

A117

30" YIELD SIGN NON

A118

REFLECTIVE TO INCLUDE

ALUMINUM AND NON

REFLECTIVE BACKING

A119

30" STOP SIGN

A120

30" STOP SIGN NON

A121

A122

36" X 36" REFLECTIVE

A123

36" X 36” NON

A124

36" X 36" NON

A125

36” X 36" ALUMINUM

A126

36" YIELD SIGN

A127

36" YIELD SIGN NON

A128

A129

30" X 6" REFLECTIVE

STREET SIGN WITH

A130

RESERVED PARKING SIGN

200 EA

FOR CURB TO INCLUDE

PLACEMENT

REFERENCE NUMBERS A131 THROUGH A148 ARE PAINT REMOVAL/CLEANING REQUIREMENT TASKS

A131

SHOT BLASTING TO

INCLUDE REMOVAL OF

ALL WASTE

A132

SLURRY BLAST TO

A133

ABRASIVE BLASTING TO

200 SF

INCLUDE REMOVAL OF ALL

WASTE AND SET UP OF

CONTAINMENT STRUCTURE

A134

REMOVE WALLCOVERINGS

100 SF

A135

INSTALL FURNISHED

WALLCOVERING

A136

INSTALL CORNER GUARD

25 LF

A137

PAINT REMOVAL

(CHEMICAL)

A138

REMOVE BASE COVE

1,000 LF

A139

BASE COVE

A140

CONCRETE CLEANING,

500 SF

ABRASIVE

A141

CONCRETE CLEANING,

200 SF

ACID

A142

CLEANING,

200 SF

ACID WASH (CHEMICAL)

A143

CLEANING, DETERGENT

500 SF

WASH

A144

POWER WASH NON

STRUCTURAL SURFACES

A145

POWER WASH UNDER

30 FT HIGH

A146

POWER WASH OVER

A147

POWER WASH STATIC

2 EA

DISPLAY

A148

WATER-REPELLENT SEALER

500 SF

FOR BRICK, CONCRETE,

AND BLOCK

REFERENCE NUMBERS A149 THROUGH A153 ARE PAINT CAULKING TASKS

A149

CAULKING REMOVAL

250 SI

A150

CAULK, BOND BREAKER

250 SI

A151 CAULK, Structural

250 CI

Silicone (ASTM C1184)

A152 CAULK, Acoustical

(ASTM C919)

A153

CAULK, FLIGHT LINE,

250 LF

Oil and Resin based

(ASTM C570)

REFERENCE NUMBERS A154 THROUGH A155 ARE HAZARDOUS PAINT REMOVAL TASKS

A154

LEAD BASED PAINT

REMOVAL AND DISPOSAL

A155

ENCAPSULATION

A156

BOND COST (YEARLY)

1 EA

A157

PREMIUM PAY

(TO BE USED WHEN

APPROVED BY THE

CONTRACTING OFFICER)

TOTAL FOR BASIC YEAR - PAFB

BASIC YEAR PRICE LIST - CMAFS

ITEM 0002 CMAFS BASIC YEAR PROPOSED PRICES (23 SEPTEMBER 2012, OR DATE OF AWARD, WHICHEVER IS LATER, THROUGH 22 SEPTEMBER 2013)

OFFEROR MUST FILL IN THE BLANKS WITH UNIT AND TOTAL PRICES.

TOTAL

B01

GYPSUM WALL BOARD AND

30,000 SF

B02

GYPSUM WALL BOARD AND

500 SF

B03

GYPSUM WALLBOARD AND

1,000 SF

PLASTER, MUD (APPLY JOINT

COMPOUND), TAPE AND SIZE

FOR WALLPAPER INSTALLATION

B04

TEXTURE INNER WALL SURFACE

1,500 SF

B05

PAINT SECOND COAT ON GYPSUM

30,000 SF

SURFACE

B06

PATCH HOLES IN SHEET ROCK

225 SF

UP TO 1 SF EA IN SIZE, 1 SF MIN

EACH TASK

B07

WOOD, UNPAINTED

250 SF

B08

WOOD TRIM

B09

PAINT SECOND COAT ON WOOD,

250 SF

UNDER 40 FT HIGH

B10

METAL, PREVIOUSLY PAINTED

10,000 SF

SURFACES, UNDER 40 FT HIGH

B11

1,000 SF

SURFACES, OVER 40 FT HIGH

B12

METAL, UNPAINTED SURFACES

250 SF

B13

METAL, UNPAINTED SURFACES

250 SF

OVER 40 FEET HIGH

B14

PAINT SECOND COAT ON

10,000 SF

METAL, UNDER 40 FEET HIGH

B15

PAINT SECOND COAT ON

1,000 SF

METAL, OVER 40 FT HIGH

B16

MASONRY BLOCK WALL,

5,000 SF

B17

MASONRY BLOCK WALL,

0 SF

PREVIOUSLY PAINTED SURFACES,

B18

MASONRY BLOCK WALL,

500 SF

B19

MASONRY BLOCK WALL,

0 SF

UNPAINTED SURFACES, OVER

40 FEET HIGH

B20

PAINT SECOND COAT ON

500 SF

MASONRY, UNDER 40 FT HIGH

B21

PAINT SECOND COAT ON

0 SF

MASONRY, 0VER 40 FT HIGH

B22

REMOVE AND INSTALL

1,000 LF

COVE BASE

B23

WOOD, INCLUDING TRIM,

1,000 SF

PREV. PAINTED SURFACES, SEMI

OR TRANSPARENT STAIN OIL OR

WATER BASE, CLEAR WOOD FINISH

OR CLEAR SEALER

B24

WOOD, INCLUDING TRIM,

500 SF

B25

PAINT SECOND COAT

ON WOOD

B26

CONCRETE, STUCCO AND

5,000 SF

BLOCK, PREVIOUSLY

PAINTED SURFACES

B27

CONCRETE, STUCCO AND

0 SF

BLOCK, PREVIOUSLY PAINTED

SURFACES OVER 40 FT HIGH

B28

CONCRETE, STUCCO AND

500 SF

BLOCK, UNPAINTED SURFACES

B29

CONCRETE, STUCCO AND

0 SF

OVER 40 FT HIGH

B30

PAINT SECOND COAT ON

5,000 SF

BLOCK UNDER 40 FT HIGH

B31

PAINT SECOND COAT ON

0 SF

BLOCK OVER 40 FT HIGH

B32

B33

METAL, PREVIOUSLY PAINTED

250 SF

B34

METAL, UNPAINTED, UNDER

500 SF

40 FEET HIGH, PRIME COAT

B35

METAL, UNPAINTED,

OVER 40 FEET, PRIME COAT

B36

PAINT FIRST COAT,

UNPAINTED METAL UNDER

B37

UNPAINTED METAL OVER

B38

PAINT FIRST COAT ON

B39

ON METAL, UNDER 40 FEET HIGH

B40

METAL TRIM

4,000 LF

B41

METAL TRIM, OVER

200 LF

40 FT HIGH

B42

ON METAL TRIM, UNDER

B43

PAINT SECOND COAT ON

200 LF

METAL TRIM, OVER 40 FT HIGH

B44

NON-STRUCTURAL

1,500 LF

SURFACES, CROSSWALKS

B45

NON-STRUCTURAL SURFACES,

100 LF

STOP LINES

B46

NON-STRUCTURAL SURFACES,

150 LF

WOOD FENCINGT

B47

NON-STRUCTURAL SURFACES,

200 EA

STENCILS

B48

NON-STRUCTURAL SURFACES,

70,000 LF

PARKING LOT OR STREET

STRIPING (PERFORMED ON

WEEKENDS)

B49

NON-STRUCTURAL SURFACES,

2,000 LF

EXPOSED SUSPENDED PIPE

B50

NON-STRUCTURAL SURFACES,

2,000 LF

B51

MATERIAL REQUIREMENTS,

500 SF

HIGH INTENSITY REFLECTIVE

SHEETING BASE

B52

MATERIAL REQUIREMENTS,

500 SF

ENGINEER GRADE REFLECTIVE BASE

B53

MATERIAL REQUIREMENTS,

500 SF

PRESSURE SENSITIVE

NON-REFLECTIVE BASE

B54

10 EA

B55

REQUIREMENTS, FIRST COAT

B56

REQUIREMENTS, SECOND COAT

B57

PAINT INTERIOR CONCRETE

5,000 SF

FLOOR, PREVIOUSLY PAINTED

B58

PAINT INTERIOR CONCRETE

750 SF

FLOOR, UNPAINTED

B59

REMOVE EXISTING LINES

750 LF

ON STREETS AND PARKING LOTS

B60

BLACK OUT EXISTING

LINES ON STREETS AND

PARKING LOTS

B61

WALLPAPER (UNIT PRICE TO

INCLUDE LABOR COSTS,

OVERHEAD AND PROFIT ONLY)

B62

LABOR AND SIGN BLANKS

100 LF

FOR SIGN PAINTING

B63

250 EA

B64

DOOR JAMB, ONE SIDE

B65

WINDOW SASH, ONE SIDE,

50 EA

A SASH SHALL BE 3FT X 5FT.

LARGER WINDOWS SHALL

BE TASKED IN MULTIPLES OF 15 SQ FT.

B66

DOOR, ONE SIDE, SECOND COAT

250 EA

B67

DOOR JAMB, ONE SIDE,

250 EA

SECOND COAT

B68

DOOR, TOUCH-UP

B69

DOOR JAMB, TOUCH-UP

50 EA

B70

WINDOW SASH, ONE SIDE,

50 EA

B71

WOOD, UNPAINTED (INTERIOR)

500 SF

B72

REMOVE LOOSE PAINT CHIPS

1,000 SF

CONTAINING LBP & ENCAPSULATE

B73

SANDBLASTING

B74

HIGH PRESSURE WATER BLASTING

5,000 SF

B75

SANDBLASTING AND HIGH

500 SF

PRESSURE WATER BLASTING

PROTECTIVE MEASURES

B76

B77

24 HR

(TO BE USED WHEN APPROVED

BY THE CONTRACTING OFFICER)

TOTAL FOR BASIC YEAR - CMAFS

OPT YEAR 1 PRICE LIST - PAFB

ITEM 1001 PAFB OPTION YEAR 1 PROPOSED PRICES. (23 SEPTEMBER 2013 THROUGH 22 SEPTEMBER 2014)

OFFEROR MUST FILL IN THE FOLLOWING BLANKS WITH UNIT AND TOTAL PRICES.

REFERENCE NUMBERS C01 THROUGH C36 ARE INTERIOR PAINTING TASKS

TOTAL

C01

GYPSUM WALL BOARD AND

300,000

SF

C02

GYPSUM WALL BOARD AND

10,000 SF

C03

C04

MULTISPEC FINE FLECK

3,000 SF

C05

WATER BASED MULTISPEC

2,000 SF

C06

C07

TEXTURE INNER WALL

1,000 SF

C08

TEXTURE INNER WALL

2,000 SF

C09

ACOUSTIC COMPOUND TO

500 SF

C10

PATCH HOLES IN SHEET

200 SF

C11

REPLACE GYPSUM WALL

400 SF

C12

WOOD, UNPAINTED, UNDER

3,000 SF

C13

C14

WOOD TRIM, UNPAINTED

2,000 SF

C15

WOOD TRIM, PREVIOUSLY

3,000 SF

C16

WOOD, UNPAINTED, OVER

200 SF

C17

C18

100 SF

C19

RE-SCREEN WOOD FLOORS

1,000 SF

C20

REFINISH WOOD FLOOR AND

1,000 SF

C21

C22

C23

C24

C25

SPLATTERED WALL PAINT

1,000 SF

C26

SPLATTERED WALL PAINT

1,000 SF

C27

SPLATTERED WALL PAINT

1,000 SF

C28

SPLATTERED WALL PAINT

500 SF

C29

MASONRY BLOCK WALL,

2,000 SF

C30

MASONRY BLOCK WALL,

500 SF

C31

C32

C33

C34

C35

C36

WINDOW SASH, ONE SIDE

200 EA

REFERENCE NUMBERS C37 THROUGH C58 ARE EXTERIOR PAINTING TASKS

C37

C38

C39

C40

C41

EXTERIOR PAINT SECOND

5,000 SF

C42

EXTERIOR, PAINT SECOND

200 SF

C43

EXTERIOR CONCRETE,

500 SF

C44

C45

C46

EXTERIOR CONCRETE,

200 SF

C47

EXTERIOR PAINT SECOND

500 SF

C48

EXTERIOR PAINT SECOND

200 SF

C49

C50

C51

C52

C53

C54

C55

EXTERIOR METAL TRIM,

1,000 LF

C56

EXTERIOR METAL TRIM,

1,000 LF

C57

EXTERIOR METAL TRIM,

1,000 LF

C58

EXTERIOR METAL TRIM,

1,000 LF

REFERENCE NUMBERS C59 THROUGH C81 ARE PAINTING NON-STRUCTURAL SURFACES TASKS

C59

C60

C61

C62

TURN ARROW - STENCILED

50 EA

C63

ADA DISABLED PARKING -

75 EA

C64

METAL FENCING 7' HIGH

300 LF

C65

C66

C67

C68

C69

C70

PARKING LOT OR STREET

40 HR

C71

REMOVE EXISTING LINES

2,000 LF

C72

FLIGHT LINE STRIPING

150,000 SF

C73

C74

C75

EPOXY PRIMER PAINTING

3,000 SF

C76

C77

PAINT INTERIOR CONCRETE

3,000 SF

C78

PRIME COAT INTERIOR

500 SF

C79

SEAL COAT CONCRETE

100 SF

C80

PRIMER APPLICATION ON

20,000 SF

C81

REFERENCE NUMBERS C82 THROUGH C85 ARE MATERIAL REQUIREMENTS ASSOCIATED WITH NEW SIGN DESIGNS

C82

C83

PREMIUM SHEETING NO

100 SF

C84

MAGNETIC MATERIAL NO

25 SF

C85

REFERENCE NUMBERS C86 THROUGH C130 ARE SIGN REQUIREMENTS WITH NO DESIGN TIME

C86

C87

C88

C89

C90

C91

C92

C93

C94

C95

C96

C97

C98

C99

C100

C101

C102

C103

C104

C105

C106

C107

C108

C109

C110

C111

C112

C113

C114

C115

C116

C117

C118

C119

C120

C121

C122

C123

C124

C125

C126

C127

C128

C129

C130

RESERVED PARKING SIGN

200 EA

REFERENCE NUMBERS C131 THROUGH C148 ARE PAINT REMOVAL/CLEANING REQUIREMENT TASKS

C131

C132

C133

ABRASIVE BLASTING TO

200 SF

C134

REMOVE WALLCOVERINGS

100 SF

C135

C136

INSTALL CORNER GUARD

25 LF

C137

C138

C139

C140

CONCRETE CLEANING,

500 SF

C141

CONCRETE CLEANING,

200 SF

C142

C143

CLEANING, DETERGENT

500 SF

C144

C145

C146

C147

C148

WATER-REPELLENT SEALER

500 SF

REFERENCE NUMBERS C149 THROUGH C153 ARE PAINT CAULKING TASKS

C149

C150

CAULK, BOND BREAKER

250 SI

C151

C152

C153

REFERENCE NUMBERS C154 THROUGH C155 ARE HAZARDOUS PAINT REMOVAL TASKS

C154

C155

C156

C157

TOTAL FOR OPTION 1 - PAFB

OPT YEAR 1 PRICE LIST - CMAFS

OPT YR 1 PRICE LIST - CMAFS

ITEM 1002 CMAFS OPTION YEAR 1 PROPOSED PRICES. (23 SEPTEMBER 2013 THROUGH 22 SPETEMBER 2014)

OFFEROR MUST FILL IN THE FOLLOWING BLANKS WITH UNIT AND TOTAL PRICES.

TOTAL

D01

GYPSUM WALL BOARD AND

30,000 SF

D02

GYPSUM WALL BOARD AND

500 SF

D03

GYPSUM WALLBOARD AND

1,000 SF

D04

1,500 SF

D05

PAINT SECOND COAT ON GYPSUM

30,000 SF

D06

225 SF

D07

D08

D09

PAINT SECOND COAT ON WOOD,

250 SF

D10

10,000 SF

D11

1,000 SF

D12

METAL, UNPAINTED SURFACES

250 SF

D13

METAL, UNPAINTED SURFACES

250 SF

D14

PAINT SECOND COAT ON

10,000 SF

D15

PAINT SECOND COAT ON

1,000 SF

D16

MASONRY BLOCK WALL,

5,000 SF

D17

MASONRY BLOCK WALL,

0 SF

D18

MASONRY BLOCK WALL,

500 SF

D19

MASONRY BLOCK WALL,

0 SF

D20

PAINT SECOND COAT ON

500 SF

D21

PAINT SECOND COAT ON

0 SF

D22

REMOVE AND INSTALL

1,000 LF

D23

WOOD, INCLUDING TRIM,

1,000 SF

D24

WOOD, INCLUDING TRIM,

500 SF

D25

D26

CONCRETE, STUCCO AND

5,000 SF

D27

CONCRETE, STUCCO AND

0 SF

D28

CONCRETE, STUCCO AND

500 SF

D29

CONCRETE, STUCCO AND

0 SF

D30

PAINT SECOND COAT ON

5,000 SF

D31

PAINT SECOND COAT ON

0 SF

D32

D33

METAL, PREVIOUSLY PAINTED

250 SF

D34

METAL, UNPAINTED, UNDER

500 SF

D35

D36

D37

D38

D39

D40

D41

D42

D43

PAINT SECOND COAT ON

200 LF

D44

D45

NON-STRUCTURAL SURFACES,

100 LF

D46

NON-STRUCTURAL SURFACES,

150 LF

D47

NON-STRUCTURAL SURFACES,

200 EA

D48

NON-STRUCTURAL SURFACES,

70,000 LF

D49

NON-STRUCTURAL SURFACES,

2,000 LF

D50

NON-STRUCTURAL SURFACES,

2,000 LF

D51

MATERIAL REQUIREMENTS,

500 SF

D52

MATERIAL REQUIREMENTS,

500 SF

D53

MATERIAL REQUIREMENTS,

500 SF

D54

D55

D56

D57

PAINT INTERIOR CONCRETE

5,000 SF

D58

PAINT INTERIOR CONCRETE

750 SF

D59

REMOVE EXISTING LINES

750 LF

D60

D61

D62

LABOR AND SIGN BLANKS

100 LF

D63

D64

D65

WINDOW SASH, ONE SIDE,

50 EA

D66

DOOR, ONE SIDE, SECOND COAT

250 EA

D67

DOOR JAMB, ONE SIDE,

250 EA

D68

D69

DOOR JAMB, TOUCH-UP

50 EA

D70

WINDOW SASH, ONE SIDE,

50 EA

D71

WOOD, UNPAINTED (INTERIOR)

500 SF

D72

REMOVE LOOSE PAINT CHIPS

1,000 SF

D73

D74

HIGH PRESSURE WATER BLASTING

5,000 SF

D75

SANDBLASTING AND HIGH

500 SF

D76

D77

TOTAL FOR OPTION 1 - CMAFS

OPT YEAR 2 PRICE LIST - PAFB

ITEM 2001 PAFB OPTION YEAR 2 PROPOSED PRICES. (23 SEPTEMBER 2014 - 22 SEPTEMBER 2015)

OFFEROR MUST FILL IN THE FOLLOWING BLANKS WITH UNIT AND TOTAL PRICES.

REFERENCE NUMBERS E01 THROUGH E36 ARE INTERIOR PAINTING TASKS

TOTAL

E01

GYPSUM WALL BOARD AND

300,000

SF

E02

GYPSUM WALL BOARD AND

10,000 SF

E03

E04

MULTISPEC FINE FLECK

3,000 SF

E05

WATER BASED MULTISPEC

2,000 SF

E06

E07

TEXTURE INNER WALL

1,000 SF

E08

TEXTURE INNER WALL

2,000 SF

E09

ACOUSTIC COMPOUND TO

500 SF

E10

PATCH HOLES IN SHEET

200 SF

E11

REPLACE GYPSUM WALL

400 SF

E12

WOOD, UNPAINTED, UNDER

3,000 SF

E13

E14

WOOD TRIM, UNPAINTED

2,000 SF

E15

WOOD TRIM, PREVIOUSLY

3,000 SF

E16

WOOD, UNPAINTED, OVER

200 SF

E17

E18

100 SF

E19

RE-SCREEN WOOD FLOORS

1,000 SF

E20

REFINISH WOOD FLOOR AND

1,000 SF

E21

E22

E23

E24

E25

SPLATTERED WALL PAINT

1,000 SF

E26

SPLATTERED WALL PAINT

1,000 SF

E27

SPLATTERED WALL PAINT

1,000 SF

E28

SPLATTERED WALL PAINT

500 SF

E29

MASONRY BLOCK WALL,

2,000 SF

E30

MASONRY BLOCK WALL,

500 SF

E31

E32

E33

E34

E35

E36

WINDOW SASH, ONE SIDE

200 EA

REFERENCE NUMBERS E37 THROUGH E58 ARE EXTERIOR PAINTING TASKS

E37

E38

E39

E40

E41

EXTERIOR PAINT SECOND

5,000 SF

E42

EXTERIOR, PAINT SECOND

200 SF

E43

EXTERIOR CONCRETE,

500 SF

E44

E45

E46

EXTERIOR CONCRETE,

200 SF

E47

EXTERIOR PAINT SECOND

500 SF

E48

EXTERIOR PAINT SECOND

200 SF

E49

E50

E51

E52

E53

E54

E55

EXTERIOR METAL TRIM,

1,000 LF

E56

EXTERIOR METAL TRIM,

1,000 LF

E57

EXTERIOR METAL TRIM,

1,000 LF

E58

EXTERIOR METAL TRIM,

1,000 LF

REFERENCE NUMBERS E59 THROUGH E81 ARE PAINTING NON-STRUCTURAL SURFACES TASKS

E59

E60

E61

E62

TURN ARROW - STENCILED

50 EA

E63

ADA DISABLED PARKING -

75 EA

E64

METAL FENCING 7' HIGH

300 LF

E65

E66

E67

E68

E69

E70

PARKING LOT OR STREET

40 HR

E71

REMOVE EXISTING LINES

2,000 LF

E72

FLIGHT LINE STRIPING

150,000 SF

E73

E74

E75

EPOXY PRIMER PAINTING

3,000 SF

E76

E77

PAINT INTERIOR CONCRETE

3,000 SF

E78

PRIME COAT INTERIOR

500 SF

E79

SEAL COAT CONCRETE

100 SF

E80

PRIMER APPLICATION ON

20,000 SF

E81

REFERENCE NUMBERS E82 THROUGH E85 ARE MATERIAL REQUIREMENTS ASSOCIATED WITH NEW SIGN DESIGNS

E82

E83

PREMIUM SHEETING NO

100 SF

E84

MAGNETIC MATERIAL NO

25 SF

E85

REFERENCE NUMBERS E86 THROUGH E130 ARE SIGN REQUIREMENTS WITH NO DESIGN TIME

E86

E87

E88

E89

E90

E91

E92

E93

E94

E95

E96

E97

E98

E99

E100

E101

E102

E103

E104

E105

E106

E107

E108

E109

E110

E111

E112

E113

E114

E115

E116

E117

E118

E119

E120

E121

E122

E123

E124

E125

E126

E127

E128

E129

E130

RESERVED PARKING SIGN

200 EA

REFERENCE NUMBERS E131 THROUGH E148 ARE PAINT REMOVAL/CLEANING REQUIREMENT TASKS

E131

E132

E133

ABRASIVE BLASTING TO

200 SF

E134

REMOVE WALLCOVERINGS

100 SF

E135

E136

INSTALL CORNER GUARD

25 LF

E137

E138

E139

E140

CONCRETE CLEANING,

500 SF

E141

CONCRETE CLEANING,

200 SF

E142

E143

CLEANING, DETERGENT

500 SF

E144

E145

E146

E147

E148

WATER-REPELLENT SEALER

500 SF

REFERENCE NUMBERS E149 THROUGH E153 ARE PAINT CAULKING TASKS

E149

E150

CAULK, BOND BREAKER

250 SI

E151

E152

E153

REFERENCE NUMBERS E154 THROUGH E155 ARE HAZARDOUS PAINT REMOVAL TASKS

E154

E155

E156

EC157

TOTAL FOR OPTION 2 - PAFB

OPT YEAR 2 PRICE LIST - CMAFS

ITEM 2001 CMAFS OPTION YEAR 2 PROPOSED PRICES. (23 SEPTEMBER 2014 THROUGH 22 SEPTEMBER 2015)

OFFEROR MUST FILL IN THE FOLLOWING BLANKS WITH UNIT AND TOTAL PRICES.

REFERENCE NUMBERS F01 THROUGH F36 ARE INTERIOR PAINTING TASKS

TOTAL

F01

GYPSUM WALL BOARD AND

30,000 SF

F02

GYPSUM WALL BOARD AND

500 SF

F03

GYPSUM WALLBOARD AND

1,000 SF

F04

1,500 SF

F05

PAINT SECOND COAT ON GYPSUM

30,000 SF

F06

225 SF

F07

F08

F09

PAINT SECOND COAT ON WOOD,

250 SF

F10

10,000 SF

F11

1,000 SF

F12

METAL, UNPAINTED SURFACES

250 SF

F13

METAL, UNPAINTED SURFACES

250 SF

F14

PAINT SECOND COAT ON

10,000 SF

F15

PAINT SECOND COAT ON

1,000 SF

F16

MASONRY BLOCK WALL,

5,000 SF

F17

MASONRY BLOCK WALL,

0 SF

F18

MASONRY BLOCK WALL,

500 SF

F19

MASONRY BLOCK WALL,

0 SF

F20

PAINT SECOND COAT ON

500 SF

F21

PAINT SECOND COAT ON

0 SF

F22

REMOVE AND INSTALL

1,000 LF

F23

WOOD, INCLUDING TRIM,

1,000 SF

F24

WOOD, INCLUDING TRIM,

500 SF

F25

F26

CONCRETE, STUCCO AND

5,000 SF

F27

CONCRETE, STUCCO AND

0 SF

F28

CONCRETE, STUCCO AND

500 SF

F29

CONCRETE, STUCCO AND

0 SF

F30

PAINT SECOND COAT ON

5,000 SF

F31

PAINT SECOND COAT ON

0 SF

F32

F33

METAL, PREVIOUSLY PAINTED

250 SF

F34

METAL, UNPAINTED, UNDER

500 SF

F35

F36

F37

F38

PAINT FIRST COAT ON

500 SF

F39

F40

F41

F42

F43

PAINT SECOND COAT ON

200 LF

F44

F45

NON-STRUCTURAL SURFACES,

100 LF

F46

NON-STRUCTURAL SURFACES,

150 LF

WOOD FENCING

F47

NON-STRUCTURAL SURFACES,

200 EA

F48

NON-STRUCTURAL SURFACES,

70,000 LF

F49

NON-STRUCTURAL SURFACES,

2,000 LF

F50

NON-STRUCTURAL SURFACES,

2,000 LF

F51

MATERIAL REQUIREMENTS,

500 SF

F52

MATERIAL REQUIREMENTS,

500 SF

F53

MATERIAL REQUIREMENTS,

500 SF

F54

F55

F56

F57

PAINT INTERIOR CONCRETE

5,000 SF

F58

PAINT INTERIOR CONCRETE

750 SF

F59

REMOVE EXISTING LINES

750 LF

F60

F61

F62

LABOR AND SIGN BLANKS

100 LF

F63

F64

F65

WINDOW SASH, ONE SIDE,

50 EA

F66

DOOR, ONE SIDE, SECOND COAT

250 EA

F67

DOOR JAMB, ONE SIDE,

250 EA

F68

F69

DOOR JAMB, TOUCH-UP

50 EA

F70

WINDOW SASH, ONE SIDE,

50 EA

F71

WOOD, UNPAINTED (INTERIOR)

500 SF

F72

REMOVE LOOSE PAINT CHIPS

1,000 SF

F73

F74

HIGH PRESSURE WATER BLASTING

5,000 SF

F75

SANDBLASTING AND HIGH

500 SF

F76

F77

TOTAL FOR OPTION 2 - CMAFS

OPTION YEAR 3 PRICE LIST - PAFB

ITEM 3001 PAFB BASIC YEAR PROPOSED PRICES (23 SEPTEMBER 2015 THROUGH 22 SEPTEMBER 2016)

OFFEROR MUST FILL IN THE BLANKS WITH UNIT AND TOTAL PRICES.

REFERENCE NUMBERS G01 THROUGH G36 ARE INTERIOR PAINTING TASKS

TOTAL

G01

GYPSUM WALL BOARD AND

300,000

SF

G02

GYPSUM WALL BOARD AND

10,000 SF

G03

G04

MULTISPEC FINE FLECK

3,000 SF

G05

WATER BASED MULTISPEC

2,000 SF

G06

G07

TEXTURE INNER WALL

1,000 SF

G08

TEXTURE INNER WALL

2,000 SF

G09

ACOUSTIC COMPOUND TO

500 SF

G10

PATCH HOLES IN SHEET

200 SF

G11

REPLACE GYPSUM WALL

400 SF

G12

WOOD, UNPAINTED, UNDER

3,000 SF

G13

G14

WOOD TRIM, UNPAINTED

2,000 SF

G15

WOOD TRIM, PREVIOUSLY

3,000 SF

G16

WOOD, UNPAINTED, OVER

200 SF

G17

G18

100 SF

G19

RE-SCREEN WOOD FLOORS

1,000 SF

G20

REFINISH WOOD FLOOR AND

1,000 SF

G21

G22

G23

G24

G25

SPLATTERED WALL PAINT

1,000 SF

G26

SPLATTERED WALL PAINT

1,000 SF

G27

SPLATTERED WALL PAINT

1,000 SF

G28

SPLATTERED WALL PAINT

500 SF

G29

MASONRY BLOCK WALL,

2,000 SF

G30

MASONRY BLOCK WALL,

500 SF

G31

G32

G33

G34

G35

G36

WINDOW SASH, ONE SIDE

200 EA

REFERENCE NUMBERS G37 THROUGH G58 ARE EXTERIOR PAINTING TASKS

G37

G38

G39

G40

G41

EXTERIOR PAINT SECOND

5,000 SF

G42

EXTERIOR, PAINT SECOND

200 SF

G43

EXTERIOR CONCRETE,

500 SF

G44

G45

G46

EXTERIOR CONCRETE,

200 SF

G47

EXTERIOR PAINT SECOND

500 SF

G48

EXTERIOR PAINT SECOND

200 SF

G49

G50

G51

G52

G53

G54

G55

EXTERIOR METAL TRIM,

1,000 LF

G56

EXTERIOR METAL TRIM,

1,000 LF

G57

EXTERIOR METAL TRIM,

1,000 LF

G58

EXTERIOR METAL TRIM,

1,000 LF

REFERENCE NUMBERS G59 THROUGH G81 ARE PAINTING NON-STRUCTURAL SURFACES TASKS

G59

G60

G61

G62

TURN ARROW - STENCILED

50 EA

G63

ADA DISABLED PARKING -

75 EA

G64

METAL FENCING 7' HIGH

300 LF

G65

G66

G67

G68

G69

G70

PARKING LOT OR STREET

40 HR

G71

REMOVE EXISTING LINES

2,000 LF

G72

FLIGHT LINE STRIPING

150,000 SF

G73

G74

G75

EPOXY PRIMER PAINTING

3,000 SF

G76

G77

PAINT INTERIOR CONCRETE

3,000 SF

G78

PRIME COAT INTERIOR

500 SF

G79

SEAL COAT CONCRETE

100 SF

G80

PRIMER APPLICATION ON

20,000 SF

G81

REFERENCE NUMBERS G82 THROUGH G85 ARE MATERIAL REQUIREMENTS ASSOCIATED WITH NEW SIGN DESIGNS

G82

G83

PREMIUM SHEETING NO

100 SF

G84

MAGNETIC MATERIAL NO

25 SF

G85

REFERENCE NUMBERS G86 THROUGH G130 ARE SIGN REQUIREMENTS WITH NO DESIGN TIME

G86

G87

G88

G89

G90

G91

G92

G93

G94

G95

G96

G97

G98

G99

G100

G101

G102

G103

G104

G105

G106

G107

G108

G109

G110

G111

G112

G113

G114

G115

G116

G117

G118

G119

G120

G121

G122

G123

G124

G125

G126

G127

G128

G129

G130

RESERVED PARKING SIGN

200 EA

REFERENCE NUMBERS G131 THROUGH G148 ARE PAINT REMOVAL/CLEANING REQUIREMENT TASKS

G131

G132

G133

ABRASIVE BLASTING TO

200 SF

G134

REMOVE WALLCOVERINGS

100 SF

G135

G136

INSTALL CORNER GUARD

25 LF

G137

G138

G139

G140

CONCRETE CLEANING,

500 SF

G141

CONCRETE CLEANING,

200 SF

G142

G143

CLEANING, DETERGENT

500 SF

G144

G145

G146

G147

G148

WATER-REPELLENT SEALER

500 SF

REFERENCE NUMBERS G149 THROUGH G153 ARE PAINT CAULKING TASKS

G149

G150

CAULK, BOND BREAKER

250 SI

G151

G152

G153

REFERENCE NUMBERS G154 THROUGH G155 ARE HAZARDOUS PAINT REMOVAL TASKS

G154

G155

G156

G157

TOTAL FOR OPTION 3 - PAFB

OPTION YEAR 3 PRICE LIST - CMAFS

ITEM 3002 CMAFS OPTION YEAR 3 PROPOSED PRICES (23 SEPTEMBER 2015 THROUGH 22 SEPTEMBER 2016)

OFFEROR MUST FILL IN THE BLANKS WITH UNIT AND TOTAL PRICES.

TOTAL

H01

GYPSUM WALL BOARD AND

30,000 SF

H02

GYPSUM WALL BOARD AND

500 SF

H03

GYPSUM WALLBOARD AND

1,000 SF

H04

1,500 SF

H05

PAINT SECOND COAT ON GYPSUM

30,000 SF

H06

225 SF

H07

H08

H09

PAINT SECOND COAT ON WOOD,

250 SF

H10

10,000 SF

H11

1,000 SF

H12

METAL, UNPAINTED SURFACES

250 SF

H13

METAL, UNPAINTED SURFACES

250 SF

H14

PAINT SECOND COAT ON

10,000 SF

H15

PAINT SECOND COAT ON

1,000 SF

H16

MASONRY BLOCK WALL,

5,000 SF

H17

MASONRY BLOCK WALL,

0 SF

H18

MASONRY BLOCK WALL,

500 SF

H19

MASONRY BLOCK WALL,

0 SF

H20

PAINT SECOND COAT ON

500 SF

H21

PAINT SECOND COAT ON

0 SF

H22

REMOVE AND INSTALL

1,000 LF

H23

WOOD, INCLUDING TRIM,

1,000 SF

H24

WOOD, INCLUDING TRIM,

500 SF

H25

H26

CONCRETE, STUCCO AND

5,000 SF

H27

CONCRETE, STUCCO AND

0 SF

H28

CONCRETE, STUCCO AND

500 SF

H29

CONCRETE, STUCCO AND

0 SF

H30

PAINT SECOND COAT ON

5,000 SF

H31

PAINT SECOND COAT ON

0 SF

H32

H33

METAL, PREVIOUSLY PAINTED

250 SF

H34

METAL, UNPAINTED, UNDER

500 SF

H35

H36

H37

H38

H39

H40

H41

H42

H43

PAINT SECOND COAT ON

200 LF

H44

H45

NON-STRUCTURAL SURFACES,

100 LF

H46

NON-STRUCTURAL SURFACES,

150 LF

H47

NON-STRUCTURAL SURFACES,

200 EA

H48

NON-STRUCTURAL SURFACES,

70,000 LF

H49

NON-STRUCTURAL SURFACES,

2,000 LF

H50

NON-STRUCTURAL SURFACES,

2,000 LF

H51

MATERIAL REQUIREMENTS,

500 SF

H52

MATERIAL REQUIREMENTS,

500 SF

H53

MATERIAL REQUIREMENTS,

500 SF

H54

H55

H56

H57

PAINT INTERIOR CONCRETE

5,000 SF

H58

PAINT INTERIOR CONCRETE

750 SF

H59

REMOVE EXISTING LINES

750 LF

H60

H61

H62

LABOR AND SIGN BLANKS

100 LF

H63

H64

H65

WINDOW SASH, ONE SIDE,

50 EA

H66

DOOR, ONE SIDE, SECOND COAT

250 EA

H67

DOOR JAMB, ONE SIDE,

250 EA

H68

H69

DOOR JAMB, TOUCH-UP

50 EA

H70

WINDOW SASH, ONE SIDE,

50 EA

H71

WOOD, UNPAINTED (INTERIOR)

500 SF

H72

REMOVE LOOSE PAINT CHIPS

1,000 SF

H73

H74

HIGH PRESSURE WATER BLASTING

5,000 SF

H75

SANDBLASTING AND HIGH

500 SF

H76

H77

TOTAL FOR OPTION 3 - CMAFS

OPT YEAR 4 PRICE LIST - PAFB

ITEM 4001 PAFB OPTION YEAR 4 PROPOSED PRICES. (23 SEPTEMBER 2016 THROUGH 22 SEPTEMBER 2017)

OFFEROR MUST FILL IN THE FOLLOWING BLANKS WITH UNIT AND TOTAL PRICES.

REFERENCE NUMBERS I01 THROUGH I36 ARE INTERIOR PAINTING TASKS

TOTAL

I01

GYPSUM WALL BOARD AND

300,000

SF

I02

GYPSUM WALL BOARD AND

10,000 SF

I03

I04

MULTISPEC FINE FLECK

3,000 SF

I05

WATER BASED MULTISPEC

2,000 SF

I06

I07

TEXTURE INNER WALL

1,000 SF

I08

TEXTURE INNER WALL

2,000 SF

I09

ACOUSTIC COMPOUND TO

500 SF

I10

PATCH HOLES IN SHEET

200 SF

I11

REPLACE GYPSUM WALL

400 SF

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .