Attch 8 Demo Project.xlsx

XLSX spreadsheet 99 KB Posted

Attached to
Protective Coating Maintenance at Peterson AFB, CO and Cheyenne Mountain Air Force Station, CO
Solicitation number
FA2517-11-R-5002
Issued by

About this file

Attachment 8 of 8 Demonstration Project

View the file

Other files

File Type Posted
Synopis of Award.doc DOC document
Paint Solicitation Amendment 003.doc DOC document
QA 1 solicitation.docx DOCX document
Attch 1 SOW FINAL 23 MAY 12.docx DOCX document
Pre-Proposal Conference Minutes FA2517-11-R-5002.pdf PDF
Amendment 001.doc DOC document
Attch 4 DBA Heavy.mht MHT file
Attch 1 SOW FINAL 29 MAR 12.docx DOCX document
Attch 7 RMECF.docx DOCX document
SOLICITATION —
Attch 3 DBA Residential.mht MHT file
Attch 2 DBA Building.mht MHT file
Attch 5 DBA Highway.mht MHT file
Attch 6 GPDF Form.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope and job description History and Scope (Job XXX): The office area was recently renovated and a wall was added to divide the existing area. The contractor has installed the wall and has placed sheet rock accordingly. The building manager would like the entire interior area to match the new color scheme to that of the rest of the facility. Currently, even before the new wall, the paint scheme was outdated and didn't match the rest of the facility. The existing walls have orange peel texture and that is the standard for all interior walls. The doors and door jams (interior only) require some touch-up and one coat of paint. The existing cove base/ base board needs to be removed and replaced with new (provided by building manager).

The customer has no idea how long this type of work will take and would like an estimate and a rough project time line. The facility is completely available at anytime Monday through Friday from 8:00 am to 4:00 pm.
Using the Estimate sheet provided, the Demonstration Diagram, and provided Item Sheet: 1. Give a brief job description in the estimate sheet 2. Give a rough time line of events in the comment section on the estimate sheet 3. Fill out the estimate sheet using the provided item sheet 4. The total cost will include all tasks associated with this demonstration and all unit costs can be found in the provided Item Sheet under the respective item numbers 5. The prices in the Item Sheet are used only for the purpose of this Demonstration. 6. Use only the line items that apply.
(14 November 2011)

Diagram

&"Times New Roman,Regular"&12 14 November 2011

Estimate Sheet

Estimate for Protective Coating Maintenance
Job Order # XXXDate:XXX
Facility #XXX
Job Description:

Item # Description Unit Unit Cost Total Units Total

Total Cost0
Comments:
Estimate Accpmplished By:
14-Nov-11

Item #

REFERENCE NUMBERS ARE FOR INTERIOR PAINTING TASKS
REF#DESCRIPTIONEST. QTY.UNIT PRICE
1GYPSUM WALL BOARD AND50,000 SF$0.50
PLASTER, PREVIOUSLY
PAINTED SURFACES.
INCLUDES HOLES UP TO
1" IN DIAMETER
2GYPSUM WALL BOARD AND2,000 SF$1.00
PLASTER, MUD (APPLY
JOINT COMPOUND), TAPE,
UNPAINTED SURFACES

3 ONE COAT PRIMER 5,000 SF $0.50

4MULTISPEC FINE FLECK1,000 SF$1.00
PAINT
5WATER BASED MULTISPEC200 SF$1.50
FINE FLECK PAINT

6 CLEAR COAT 1,000 SF $0.50

7TEXTURE INNER WALL1,000 SF$1.00
SURFACE STOMP FINISH
8TEXTURE INNER WALL2,000 SF$0.75
SURFACE ORANGE PEEL
9ACOUSTIC COMPOUND TO500 SF$0.50
CEILINGS
10PATCH HOLES IN SHEET100 SF$10.00
ROCK. LARGER THEN 1"
TO 1 SF IN SIZE, 1 SF
MAX EACH
11REPLACE GYPSUM WALL200 SF$2.00
BOARD, INCLUDES JOINT
COMPOUND, MUD, TAPE 1
SF AND LARGER IN SIZE
12WOOD, UNPAINTED, UNDER1,000 SF$0.50
20 FT HIGH
13WOOD, PREVIOUSLY2,000 SF$0.75
PAINTED, UNDER 20 FT
HIGH
14WOOD TRIM,UNPAINTED1,000 SF$1.00
UNDER 20 FT HIGH
15WOOD TRIM, PREVIOUSLY1,000 SF$0.50
PAINTED, UNDER 20 FT
HIGH
16WOOD, UNPAINTED, OVER200 SF$1.00
20 FT HIGH
17WOOD, PREVIOUSLY
PAINTED, OVER 20 FT400 SF$1.00
HIGH
18WOOD TRIM, OVER 20 FT100 SF$1.00
HIGH

19 RE-SCREEN WOOD FLOORS 1,000 SF $1.50

20REFINISH WOOD FLOOR AND1,000 SF$1.50
REPLACE WOOD SLATS AS
NEEDED
21METAL, PREVIOUSLY10,000 SF$0.60
PAINTED SURFACES, UNDER
20 FT HIGH
22METAL, PREVIOUSLY5,000 SF$0.75
PAINTED SURFACES, OVER
20 FT HIGH
23METAL, UNPAINTED2,000 SF$0.50
SURFACES, UNDER 20 FT.
HIGH
24METAL, UNPAINTED500 SF$1.00
SURFACES, OVER 20 FT
HIGH
25SPLATTERED WALL PAINT1,000 SF$1.00
WITH ELASTOMERIC
PROPERTIES, SUCH AS
TEX-COTE, ORANGE PEEL FINISH
26SPLATTERED WALL PAINT1,000 SF$2.00
WITH ELASTOMERIC
PROPERTIES,STOMP FINISH
27SPLATTERED WALL PAINT1,000 SF$2.00
WITH ELASTOMERIC
PROPERTIES, KNOCKDOWN FINISH
28SPLATTERED WALL PAINT500 SF$1.00
WITH ELASTOMERIC
PROPERTIES, EACH ADDITIONAL COLOR ADDED
29MASONRY BLOCK WALL,2,000 SF$0.25
PREVIOUSLY PAINTED
SURFACES
30MASONRY BLOCK WALL,500 SF$1.50
UNPAINTED SURFACES

31 VARNISH 1,000 SF $0.75

32 STAIN 500 SF $0.75

33SKIM COAT SURFACES500 SF$2.50
LEVEL 5 FINISH

34 DOOR, ONE SIDE 100 EA $18.00

35 DOOR JAM, ONE SIDE 100 EA $18.00

36WINDOW SASH, ONE SIDE100 EA$18.00
A SASH SHALL BE 3x5 FT
LARGER WINDOWS SHALL BE
TASKED IN MULTIPLES OF 15 SQ FT
37REMOVE BASE COVE1,000 LF$0.50
38INSTALL FURNISHED1,000 LF$2.00
BASE COVE

&"Times New Roman,Regular"&12 14 November 2011

Microsoft_Office_PowerPoint_Presentation1.pptx Demonstration Diagram

20’

6’

7’

10’

All walls are 8’ tall

All doors are standard size

All door jams are standard size

New wall is sheet rocked w/o mud//tape

All interior walls (existing and new) call for new color paint

Ceiling is a drop ceiling design

Orange Peel texture is on current walls

Orange Peel texture is need on all interior walls

Patch all holes

Doors

Doors

Existing Walls

Existing Walls

New Wall

= 1” hole

= 3/4” hole image1.emf