Attch 7 RMECF.docx
DOCX document 23 KB Posted
- Attached to
- Protective Coating Maintenance at Peterson AFB, CO and Cheyenne Mountain Air Force Station, CO
- Solicitation number
- FA2517-11-R-5002
About this file
Attachment 7 of 8 Recovered Materials Estimate and Certification Form (RMECF)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Synopis of Award.doc | DOC document | |
| Paint Solicitation Amendment 003.doc | DOC document | |
| QA 1 solicitation.docx | DOCX document | |
| Attch 1 SOW FINAL 23 MAY 12.docx | DOCX document | |
| Pre-Proposal Conference Minutes FA2517-11-R-5002.pdf | ||
| Amendment 001.doc | DOC document | |
| Attch 4 DBA Heavy.mht | MHT file | |
| Attch 1 SOW FINAL 29 MAR 12.docx | DOCX document | |
| Attch 8 Demo Project.xlsx | XLSX spreadsheet | |
| SOLICITATION | — | |
| Attch 3 DBA Residential.mht | MHT file | |
| Attch 2 DBA Building.mht | MHT file | |
| Attch 5 DBA Highway.mht | MHT file | |
| Attch 6 GPDF Form.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Recovered Materials Estimate and Certification Form (RMECF) (As required by FAR 23.4, 52.223-4, and 52.223-9)
Date:
| Project Title: | CE Construction Mgmt Insp.: | |
| Project #: | Contractor Company Name: | |
| Contractor Rep & Phone # |
The Contractor, for contracts exceeding $100,000, shall: (1) Estimate the percentage of the total recovered material used in contract performance including, if applicable, the percentage of post-consumer material content; and (2) Submit this estimate through 21 CONS to CE Environmental.
ESTIMATE
RECYCLED OR RECOVERED
PRODUCT
% REQUIRED
(MINIMUM)
% AVAIL
(ACTUAL)
QUANTITY
USED
EXEMPTED
1,2,3,4
| ROCK WOOL INSUL |
| 75% |
| FIBERGLASS INSUL |
| 20-25% |
| LOOSE FILL/SPRAY ON |
| 75% |
| PERLITE COMP BOARD |
| 23% |
| PLASTIC RIGID FORAM |
| 9% |
| GLASS FIBER REINF |
| 6% |
| PHENOLIC RIGID FOAM |
| 5% |
| STRUCTURAL FIBER BD |
| 80-100% |
| LAMINATED PAPER BD |
| 100% |
| CEMENT/CONCRETE (FLYASH) |
| SEE SPEC* |
| CARPET (PET) |
| 25-100% |
| PATIO BLOCKS/RUBBER |
| 90-100% |
| PATIO BLOCKS/PLASTIC |
| 90-100% |
| FLOOR TILES/RUBBER |
| 90-100% |
| FLOOR TILES/PLASTIC |
| 90-100% |
| TRAFFIC CONES |
| 50-100% |
| TRAFFIC BARRICADES |
| 80-100% |
| PLAYGROUND SURFACES |
| 90-100% |
| RUNNING TRACKS |
| 90-100% |
| COMPOST |
| 100% |
| WOOD-BASED HYDRAULIC MULCH |
| 100% |
| PAPER-BASED HYDRAULIC MULCH |
| 100% |
| REPROCESSED WHITE, OFF-WHITE & PASTEL COLORS |
| 20% |
| REPROCESSED GREY, BROWN, EARTHTONES & OTHER DARK COLORS |
| 50-99% |
| CONSOLIDATED LATEX PAINT |
| 100% |
| PLASTIC/RUBBER PARKING STOPS |
| 100% |
| CONCRETE CONTAINING COAL FLY ASH PARKING STOPS |
| 20-40% |
CONCRETE CONTAINING GGBF
PARKING STOPS
25-70%
| PLASTIC SHOWER & RESTROOM DIVIDERS/PARTITIONS |
| 20-100% |
* Reference the Peterson AFB Construction Specification
Recovered Materials Estimate and Certification Form (continued)
* "Post-consumer material" means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Post-consumer material is a part of the broader category of "recovered material."
* "Recovered material" means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
* The following exemptions may apply to the non-procurement of recycled/recovered content materials:
| 1) The product does not meet appropriate performance standards |
| 2) The product is not available within a reasonable time frame |
| 3) The product is not available competitively (from two or more sources) |
4) The product is only available at an unreasonable price (compared with a comparable non-recycled content product.)
CERTIFICATION
I hereby certify I am an employee responsible for the performance of this contract and hereby certify that the percentage of recovered material content for EPA-designated products met the applicable contract specifications.
[Signature of the Contractor] [Typed Name of the Contractor] [Title] [Name of Company, Firm, or Organization] [Date]
RETURN Copy TO:
Phil Chase
21 CES/CEANQ
580 Goodfellow St.
Peterson AFB, CO 80914-2370 Phone (719) 556-7707 Fax (719) 556-5201 Email: donald.chase@us .af.mil
File details come from the government source that posted it. Updated .