Questions and Answers 2 - Industry Day.pdf

PDF 162 KB Posted

Attached to
Aerospace Materials Processing, Performance and Characterization (AMPPAC) Federal contract opportunity
Solicitation number
FA2394-24-R-B006
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

This document contains Questions and Answers #2 related to an Industry Day for a Call for Proposal on the Aerospace Materials Processing, Performance and Characterization (AMPPAC) contract, Solicitation Number FA2394-24-R-B006.

The key details are:

  • The AMPPAC contract is an IDIQ with a total shared ceiling of $97M. Proposals are due by June 10, 2024 at 4pm local time.
  • The contract requires on-site support at Wright-Patterson AFB, with some potential for off-site or remote work. Security clearance requirements vary by Task Order, with at least a SECRET clearance needed for any Task Order above the Unclassified level.
  • Subcontracting plans are required for the overall IDIQ, not individual Task Orders. Small businesses are exempt from this requirement.
  • Offerors can propose on one or more Task Orders, but the business proposal should address the full IDIQ ceiling amount.
  • A list of Industry Day attendees will not be provided.

View the file

Other files for this federal contract opportunity

Other files attached to Aerospace Materials Processing, Performance and Characterization (AMPPAC), newest first.
File Type Posted
Questions and Answers 3.pdf PDF
Industry Day - MP3 Overview.pdf PDF
Industry Day - Composite Performance Overview.pdf PDF
Industry Day - PMC MP Overview.pdf PDF
Amendment 2_ATCH03_AMPPAC TO-B PMAC SOO.docx DOCX document
Amendment 2_ATCH01_AMPPAC IDIQ SOO.docx DOCX document
Amendment 2_Summary.pdf PDF
Amendment 2_ATCH02_AMPPAC TO-A CAC SOO.docx DOCX document
Amendment 2_ATCH04_AMPPAC TO-C PAMCOMP SOO.docx DOCX document
Questions and Answers 1.pdf PDF
Amendment 1_AMPPAC Call For Proposal_FA2394-24-R-B006.pdf PDF
Amendment 1_Summary.pdf PDF
AMPPAC Call For Proposal_FA2394-24-R-B006.pdf PDF
AMPPAC Industry Day Announcement.pdf PDF
ATCH02_AMPPAC TO-A CAC SOO.docx DOCX document
ATCH04_AMPPAC TO-C PAMCOMP SOO.docx DOCX document
ATCH08_AFRL ANSI_NISO Based Guide to Formatting Tech Reports.pdf PDF
ATCH07_CDRLs.pdf PDF
ATCH13_Base Support.pdf PDF
ATCH14_Model Contract_Section K.pdf PDF
ATCH05_AMPPAC TO-D ACAC SOO.docx DOCX document
ATCH12_Security Program Questionnaire.docx DOCX document
ATCH11_SF424RR_KeyPersonExpanded.pdf PDF
ATCH01_AMPPAC IDIQ SOO.docx DOCX document
ATCH03_AMPPAC TO-B PMAC SOO.docx DOCX document
ATCH06_ SOW Supplemental.docx DOCX document
ATCH09_SF298.pdf PDF
ATCH10_Solicitation DD254.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS #2 – INDUSTRY DAY

Call for Proposal

Aerospace Materials Processing, Performance and Characterization (AMPPAC)

FA2394-24-R-B006

16 May 2024 (Q&A 7-13)

7. Question: The TO-B SOO lists the work being performed as UNCLASSIFIED as per Section 6.1.1 in Attachment 3. If an applicant were to bid specifically for TO-B, does the applicant need to have personnel capable of meeting the TS/SCI and SAP requirements listed in the IDIQ SOO in section

6.1.1 of Attachment 1 for the AMPPAC proposal to meet the security requirements and qualify for technical review?

Answer: If a potential proposer does not have personnel with TOP SECRET or SECRET clearances, you will not be qualified to propose for any TO above the Unclassified level. The clearance level required for each TO is specified in the respective TO SOOs.

8. Question: Is there a pause on the RXN Open BAA for White Papers during this Call for Proposal?

Answer: No. White Papers can still be submitted under the RXN Open BAA, FA8650-18-S-5010.

However, if a White Paper is submitted for the same scope of work or requirement as this Call For Proposal, it shall not be selected.

9. Question: When are proposals due?

Answer: Proposal(s) are due no later than 10 June 2024, 4:00 p.m., Wright-Patterson AFB, OH, local time.

10. Question: Is this a full-time on-site requirement?

Answer: Yes, all the Task Orders (TO-A, TO-B, TO-C, TO-D) are all on site contracts.

As these are on site contracts, we expect the support contractors to work at WPAFB and utilize the labs maintained by the government. It is possible that some work may be done offsite and/or remotely as necessitated by the research and available facilities at WPAFB as long as the objectives of the contract are met. There is no set requirement as to the amount of work that must be done on site or off site.

11. Question: Does the offeror need more than one subcontracting plan: one for the Basic IDIQ proposal and then one each for each task order being proposed?

Answer: Subcontracting Plans shall be submitted in the cost/business proposal. Reference FAR

19.704 and DFARS 219.704 for subcontracting plan requirements. Small business concerns are exempt from this requirement.

Since this is anticipated to be an IDIQ, the basis for the subcontracting plan should reflect the entire shared IDIQ ceiling amount of $97M. Individual Task Order Subcontracting Plans are not required.

12. Question: How does the offeror address the entire IDIQ ceiling amount if they are proposing on one or more task orders but not all task orders?

Answer: The Basic IDIQ Proposal shall contain the following:

1) Basic IDIQ: Technical and Management Proposal

2) Basic IDIQ: Business Proposal (including Subcontracting Plan, if applicable, in accordance with

FAR 19.7)

3) Basic IDIQ: Statement of Work (SOW) in response to applicable SOO

The Business Proposal shall contain the contents listed at Call For Proposal section IV.2.v.e (pgs. 14- 15). The IDIQ Business Proposal does not include a Cost Section/Cost Element Breakdown.

13. Question: Will a list of attendees be provided?

Answer: No, a list of attendees will not be posted.