ATCH06_ SOW Supplemental.docx

DOCX document 40 KB Posted

Attached to
Aerospace Materials Processing, Performance and Characterization (AMPPAC) Federal contract opportunity
Solicitation number
FA2394-24-R-B006
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

This document is an Attachment 6, Statement of Work (SOW) Supplemental Requirements, related to a federal contract opportunity titled "Aerospace Materials Processing, Performance and Characterization (AMPPAC)".

The key details are as follows: The SOW outlines additional requirements for the contractor, including implementation of disclosure of information, packaging and marking instructions, identification of the government program manager and focal points, provisions for base support, implementation of the patent rights clause, and requirements regarding non-U.S. citizens assigned to the project. It also specifies requirements for Science and Technology (S&T) protection, including the need to provide an initial, annual, and new SF 424 form for senior/key personnel, as well as adhere to the S&T Protection Plan. The related federal contract opportunity is a solicitation issued by the Department of the Air Force Materiel Command Research Laboratory, with the primary objective of researching, assessing, developing, testing, evaluating, prototyping, demonstrating, and transitioning technologies that support the processing, behavior characterization, and performance prediction of advanced aerospace materials.

View the file

Other files for this federal contract opportunity

Other files attached to Aerospace Materials Processing, Performance and Characterization (AMPPAC), newest first.
File Type Posted
Questions and Answers 3.pdf PDF
Industry Day - Composite Performance Overview.pdf PDF
Industry Day - PMC MP Overview.pdf PDF
Questions and Answers 2 - Industry Day.pdf PDF
Industry Day - MP3 Overview.pdf PDF
Amendment 2_Summary.pdf PDF
Amendment 2_ATCH02_AMPPAC TO-A CAC SOO.docx DOCX document
Amendment 2_ATCH04_AMPPAC TO-C PAMCOMP SOO.docx DOCX document
Amendment 2_ATCH01_AMPPAC IDIQ SOO.docx DOCX document
Amendment 2_ATCH03_AMPPAC TO-B PMAC SOO.docx DOCX document
Questions and Answers 1.pdf PDF
Amendment 1_Summary.pdf PDF
Amendment 1_AMPPAC Call For Proposal_FA2394-24-R-B006.pdf PDF
ATCH01_AMPPAC IDIQ SOO.docx DOCX document
ATCH03_AMPPAC TO-B PMAC SOO.docx DOCX document
ATCH09_SF298.pdf PDF
ATCH10_Solicitation DD254.pdf PDF
ATCH07_CDRLs.pdf PDF
ATCH13_Base Support.pdf PDF
ATCH14_Model Contract_Section K.pdf PDF
ATCH05_AMPPAC TO-D ACAC SOO.docx DOCX document
ATCH12_Security Program Questionnaire.docx DOCX document
ATCH11_SF424RR_KeyPersonExpanded.pdf PDF
AMPPAC Call For Proposal_FA2394-24-R-B006.pdf PDF
AMPPAC Industry Day Announcement.pdf PDF
ATCH02_AMPPAC TO-A CAC SOO.docx DOCX document
ATCH04_AMPPAC TO-C PAMCOMP SOO.docx DOCX document
ATCH08_AFRL ANSI_NISO Based Guide to Formatting Tech Reports.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA2394-24-R-B006

Attachment 6

Statement of Work (SOW) Supplemental Requirements (AFRL/PZL)

The following paragraphs are also considered be a part of the SOW/PWS requirements and the Contractor is responsible for compliance to the same extent as the rest of the SOW/PWS.

1. Implementation of Disclosure of Information:

In order to comply with DFARS 252.204-7000, Disclosure of Information, the following copies of the information to be released are required at least 50 days prior to the scheduled release date:

a. One (1) copy(ies) to: Kelsey Emory, kelsey.emory@us.af.mil, Contracting Officer

b. One (1) copy(ies) to: Erik Ripberger, erik.ripberger@us.af.mil, Program Manager

c. One (1) copy(ies) to: Craig Przybyla, craig.przybyla@us.af.mil, Program Engineer

2. Packaging and Marking:

a. All hardware deliverable contract items shall be packaged in accordance with established commercial practices.

b. When special delivery and/or handling instructions are required, all boxes and/or crates must contain the following statement in plain sight and in bold letters:

INSTRUCTION TO RECEIVING OFFICE – DO NOT OPEN; CONTENTS ARE SENSITIVE TO DAMAGE WHEN IMPROPERLY OPENED OR HANDLED. CONTACT THE RESPONSIBLE TECHNICAL PROJECT OFFICER IMMEDIATELY UPON RECEIPT.

CONTACT INFORMATION: Craig Przybyla, craig.przybyla@us.af.mil

3. Program Manager:

a. The Government Program Manager for this effort is Erik Ripberger, erik.ripberger@us.af.mil

4. Program Focal Points:

a. The individuals listed below are identified as focal points for this contract.

I. Principal Investigator: TBD

II. Technical Contract Manager: TBD

III. Alternate: TBD

5. Base Support:

a. Base support may be provided by the Government to the Contractor in accordance with this SOW/PWS.

b. The Contractor will require use of base support on a rent-free, non-interference basis to include Government-controlled working space, material, equipment, services (including automatic data processing), or other support (excluding use of the Defense Switched Network (DSN)) which the Government determines can be made available at, or through, any Air Force installation where this contract shall be performed.

c. Unless otherwise stipulated in the contract schedule, the Contractor will use base support on a no-charge-for-use basis and the value shall be a part of the Government’s contract consideration.

d. The Contractor will immediately report (with a copy to the cognizant contract administration office (CAO)) inadequacies, defective base support, or nonavailability of support stipulated by the contract schedule, together with a recommended plan for obtaining the required support. Facilities are not to be purchased under this contract by the Contractor. Additionally, the Contractor (or authorized representative) will not purchase or otherwise furnish any base support requirement provided by the SOW/PWS (or authorize others to do so), without prior written approval of the Contracting Officer regarding the price, terms, and conditions of the proposed purchase, or approval of other arrangements.

e. The following are installations where base support will be provided: Wright-Patterson AFB

f. The base support to be furnished under this contract is See Base Support Attachment to the Call for Proposal. Because of the nature and location(s) of the work performed, the value of such support is undeterminable. The Contractor is not authorized to incur any costs resulting from non-support prior to Contracting Officer direction.

6. Contracting Monitor (CM) for Sensitive Compartmented Information (SCI) Security Administration:

a. The Government CM for SCI Security Administration on behalf on the Contracting Officer for this effort is Erik Ripberger, erik.ripberger@us.af.mil, Program Manager.

7. Implementation of Patent Rights Clause:

a. Interim or Final Invention Reports 1) listing the subject invention(s) and stating that all subject inventions have been disclosed, or 2) stating that there are no such inventions, shall be sent to both the Administrative Contracting Officer and to AFRL/PZL Patent Reporting at afmclo.jaz@us.af.mil within the timeframes specified in the Patent Rights clause of this contract.

b. Contractors shall use DD Form 882, Report of Inventions and Subcontracts, to submit these reports. The DD Form 882 shall also be used for the notification of an award of any subcontract(s) for experimental, developmental, or research work which contain a “Patent Rights” clause.

c. All other notifications required by the contract shall also be sent to the individuals in paragraph a. This provision also constitutes the request for the following information for any subject invention for which the Contractor has retained ownership: (1) the filing date, (2) the serial number and title, (3) a copy of the patent application, and (4) the patent number and issue date. Submittal shall be to AFRL/PZL Patent Reporting at afmclo.jaz@us.af.mil.

8. Information Regarding Non-U.S. Citizens Assigned to this Project:

a. Contractor employees requiring access to USAF bases, AFRL facilities, and/or access to U.S. Government Information Technology (IT) networks in connection with the work on this contract must be U.S. citizens. For the purpose of base and network access, possession of a permanent resident card (“Green Card”) does not equate to U.S. citizenship. This requirement does not apply to foreign nationals approved by the U.S. Department of Defense or U.S. Department of State under international personnel exchange agreements with foreign governments. It also does not apply to dual citizens who possess U.S. citizenship, to include Naturalized citizens. Any waivers to this requirement must be granted in writing by the Contracting Officer prior to providing access. Specific format for a waiver request will be provided upon request to the Contracting Officer. The above requirements are in addition to any other contract requirements related to obtaining a Common Access Card (CAC).

b. For purposes of paragraph a above, if an IT network/system does not require AFRL to endorse a Contractor’s application to said network/system in order to gain access, the organization operating the IT network/system is responsible for controlling access to its system. If an IT network/system requires a U.S. Government sponsor to endorse the application in order for access to the IT network/system, AFRL will only endorse the following types of applications, consistent with the requirements above:

I. Contractor employees who are U.S. citizens performing work under this contract.

II. Contractor employees who are non-U.S. citizens and who have been granted a waiver.

Any additional access restrictions established by the IT network/system owner apply.

9. Science and Technology (S&T) Protection:

The requirements below are in accordance with Air Force Research Laboratory Instruction (AFRLI) 61-113, “Science and Technology (S&T) Protection for the Air Force Research Laboratory”.

a. Initial/Annual/New SF 424, Research and Related Senior/Key Person Profile (Expanded) Form, Requirement: In accordance with CDRL TBD, the Contractor shall provide an SF 424 with the following information: 1) an initial report of all Senior/Key Personnel at the time of award; 2) an annual report of all Senior/Key Personnel providing support; and 3) a report for any new Senior/Key Personnel who join the contract, agreement, grant, or OT. Any updated SF 424s for new Senior/Key Personnel supporting the award require coordination from the Government prior to the Contractor employee receiving access to S&T information.

b. S&T Protection Plan Requirement: The Contractor shall support the USG in the planning, development, and implementation of the S&T Protection Plan as required and adhere to the S&T Protection Plan in the course of executing this requirement, incorporating any previous planning conducted on the baseline system. The Contractor shall adhere to and be compliant with the guidance established in the S&T Protection Plan found at Attachment XX.

File details come from the government source that posted it. Updated .