F41999-25-R-0005 RFP AFSFMS Oracle Consolidation Project (OCP).pdf

PDF 5 MB Posted

Attached to
RFP AFSFMS Oracle Consolidation Project (OCP)
Solicitation number
F41999-25-R-0005
Issued by

About this file

This is a Request for Proposal (RFP) for the Air Force Services Financial Management System (AFSFMS) Oracle Consolidated Project (OCP). The solicitation seeks an EBS R12.2.X-certified contractor to replace legacy systems by integrating and enhancing Oracle EBS modules, with a focus on Treasury Management, Cash Management, Project Management, iSupplier, Payables, Contract Life-Cycle Management (CLM), and Procurement modules. The project involves developing, configuring, implementing, and providing database administration support to optimize the Oracle EBS platform.

Key details include a solicitation number F41999-25-R-0005, issued on 05 May 2025, with proposals due by 2:00 PM Central Standard Time on 16 June 2025. The contract is for a one-year base period with five one-year option years, totaling a potential six-year performance period. The contract will be awarded using a Best Value Trade-Off selection process, evaluating technical proposal, past performance, and price. The estimated contract value is $500,000.00, and the work will be performed at the Air Force Services Center in Port San Antonio, Texas, supporting a worldwide mission of providing financial management services for Air Force personnel.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NONAPPROPRIATED FUND SOLICITATION, OFFER, AND AWARD NEGOTIATED RFP

1. CONTRACT NUMBER 2. SOLICITATION NUMBER 3. DATE RFP ISSUED 4. PURCHASE REQUEST NUMBER

5. ISSUED BY (No collect calls) 6. ADMINISTERED BY (IF OTHER THAN BLOCK 5)

7. SOLICITATION

Sealed offers in original and copy(ies) for furnishing the supplies or services described in the Schedule will be received at the place specified in block 5, OR IF HAND-CARRIED, at until

(Time, Zone and Date)

8. CAUTION - LATE Submissions, Modifications and Withdrawals: See Section L. All offers are subject to all terms and conditions contained in this Solicitation.

9. FOR INFORMATION CALL (Name and Telephone No.) (No collect calls)

(The following checked sections are contained in the file contract)

(X) SEC

A

B

C

D

E

F

G

H

PART I - THE SCHEDULE PAGE(S) (X) SEC PART II - CONTRACT CLAUSES PAGE(S)

I

J

K

L

M

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

OFFER (Must be fully completed by offeror, including Sections B, F, I & K)

11. In compliance with the above, the undersigned offers and agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered, at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

____% 10 CALENDAR DAYS ____% 20 CALENDAR DAYS ____% 30 CALENDAR DAYS ____%____ CALENDAR DAYS

13. OFFEROR'S NAME AND ADDRESS (Street, City, State or Country) 14. TYPE OR PRINT NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

15. SIGNATURE OF OFFEROR 16. DATE

AREA CODE AND TELEPHONE NO.:

AWARD (TO BE COMPLETED BY NAFI)

17. ACCEPTED AS TO ITEMS NUMBERED 18. AMOUNT

19. SUBMIT INVOICES (Original and 1 copy unless otherwise specified) to address shown in Section G.

20. TYPE OR PRINT NAME OF CONTRACTING OFFICER 24, TYPE OR PRINT NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

APPROVAL

21. SIGNATURE 22. DATE SIGNED

23. APPROVAL: If this contract exceeds manual approval of must be obtained prior to commencing any performance. Without such approval this contract will have neither force nor effect.

F41999-25-R-0005

AFSVC/VPEB

Strategic Business Systems &

Initiatives Branch, 2261 Hughes Ave, Ste 156

JBSA Lackland, TX 78236-9854

Mark Ramirez , Voice: 380-459-1046, Voice: 210-395-7873

N/A 2:00 PM Central Standard Time 16 Jun 2025

Mark A. Ramirez 210-395-7973

SOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

CONTRACT CLAUSES

LIST OF ATTACHMENTS

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

INSTRUCTIONS, CONDITIONS AND NOTICES TO

OFFERORS

EVALUATION FACTORS FOR AWARD

X

X

X

X

X

X

X

X

X

X

X

X

N/A

10.

12. DISCOUNT FOR PROMPT PAYMENT (See Section I)

Director of NAF Procurement

500,000.00$

TABLE OF CONTENTS

٭ CONTROLLED UNCLASSIFIED INFORMATION ٭

05 May 2025

1087289342K Highlight

21 February 2025 Page B-1

SECTION B

SUPPLIES, SERVICE AND PRICES

1. GENERAL

The contractor shall provide all personnel, material, equipment, and transportation to provide a comprehensive suite to telecommunications content and maintenance in accordance with the Statement of Work.

Section B Unit Total Price

CLIN 0001

3.1.1. Deliverable one (1): Analysis of existing processes

3.1.2. Deliverable two (2): A Project Plan and RASCI matrix

3.1.3. Deliverable three (3): Create an implementation plan

SV

CLIN 0002 3.1.4. Deliverable four (4): Analysis of, and merging of ledger set-up

CLIN 0003 3.1.5. Deliverable five (5): Reconfigure the current LOA set-up

CLIN 0004

3.1.6. Deliverable six (6): Develop, configure, integrate and implement Oracle Treasury Management

SV

CLIN 0005 3.1.7. Deliverable seven (7): Transition AFSVC/VF 525 SV

CLIN 0006

3.1.8. Deliverable eight (8): Develop, configure, integrate and implement Oracle’s Cash Management

SV

CLIN 0007

3.1.9. Deliverable nine (9): Develop, configure, integrate and implement full functionality of Oracle’s Project Management.

SV

CLIN 0008

3.1.10. Deliverable ten (10): Transition general ledger and financial statements currently residing on AFSVC/VF 525 to AFSFMS

SV

CLIN 0009

3.1.11. Deliverable eleven (11): Migrate all legacy data from AFSVC/VF 525 database into AFSFMS.

SV

CLIN 0010

3.1.12. Deliverable twelve (12): Develop, configure, integrate and implement Oracle Contracting LifeCycle Management (CLM), Procurement and Procurement Contracts modules.

SV

SV

21 February 2025 Page B-2

A9 - Section B Unit Total Price

CLIN 0011

3.1.13. Deliverable thirteen (13): Develop, configure, integrate and implement Oracle iSupplier or other system as recommended by contractor

SV

CLIN 0012

3.1.14. Deliverable fourteen (14): Provide MD50/70/120

documentation for deliverables six (6) thru thirteen (13).

SV

CLIN 0013

3.1.15. Deliverable fifteen (15): Provide train-the-trainer material and training for Cash Management, Treasury Management, Project Management, iSupplier, Contract Life Management, Procurement and Procurement Contracts modules.

SV

CLIN 0014

3.1.17. Deliverable seventeen (17): Migrate all active data from current contracting system database.

SV

CLIN 0015

3.1.18. Deliverable eighteen (18): Develop an archiving plan for auditable data from IBPS and AFSVC VF 525 systems.

CLIN 1016 post support year 1 SV

CLIN 2016 post support year 2 SV

CLIN 3016 post support year 3 SV

CLIN 4016 post support year 4 SV

CLIN 5016 post support year 5 SV

CLIN X017 Travel

NOTES: CLIN X017 (including option years): Travel cost will be paid in accordance with the Federal Travel Regulation (FTR) https://www.gsa.gov/policy-regulations/regulations/federal-travel-regulation-ftr. SV stands for : Service

Statement of Objectives Final, 2 May 2025

STATEMENT OF OBJECTIVES (SOO)

FOR

Air Force Services Financial Management System (AFSFMS) Oracle Consolidated Project

AT

Air Force Services Center (AFSVC), Port San Antonio, TX

Statement of Objectives Final, 2 May 2025

Table of Contents

SECTION I

1.0 DESCRIPTION OF SERVICES

1.1. General

1.2. Background

1.3. Scope

SECTION II

2.0 PROBLEM STATEMENT

2.1. Objective(s)

2.2 Final Outcome

SECTION III

3.0 DELIVERABLES AND ACCEPTANCE CRITERIA

3.1. Deliverables

3.2. Acceptance Criteria

SECTION IV

4.0 TERMS OF THE CONTRACT, STAKEHOLDER (collaborating offices)

4.1. Timeline

4.2. Contractor Qualifications

4.3. Stakeholders (Collaborating Offices)

SECTION V

5.0. CONTRACT ADMINISTRATION

5.1. Reporting

5.2. Schedule

5.3. Resource Calendar

5.4. Meetings

5.5. Weekly Status Meetings

5.6. Documentation

SECTION VI

6.0 GENERAL INFORMATION

6.1. Contracting Officer’s Representative (COR) Responsibilities

6.2. Place of Performance

6.3. Government Furnished Equipment (GFE) & Personnel

6.4. Travel

Statement of Objectives Final, 2 May 2025

6.5. Identify Known or Possible Conflicts of Interest

6.6. Security and Training Requirements

6.7. Security Clearances

6.8. Privacy Act

6.9. Cyber Security

6.10. Security Education, Training and Awareness (SETA)

6.11. Section 508: Data Stewardship and Governance

SECTION VII

7.0 APPENDIX

7.1. DEFINITIONS & ABBREVIATIONS

7.2. ACRONYMS

7.4. Sample Weekly Status Reports or as agreed upon by COR

7.5. Sample Contract Progress Report

7.6. NAFI Observed Holidays

Statement of Objectives Final, 2 May 2025

SECTION I

1.0 DESCRIPTION OF SERVICES

1.1. General. The Air Force Services Center (AFSVC), headquartered at Joint Base San Antonio-Lackland, Texas, delivers Services programs and activities to build and sustain ready and resilient Airmen, Guardians and families. AFSVC supports the bases, major commands and air staff by providing technical assistance, new initiatives, developing programs and procedures and managing central support functions. AFSVC ensures successful operation of essential food, fitness, childcare, lodging and recreation opportunities for military members and their families. The Center’s responsibilities include preparing responses to high-level inquiries, providing technical assistance to the field and developing new programs that support major command and installation activities. The Installations Systems Branch (VTEI) manages the Oracle E-Business Suite (EBS) Air Force Services Financial Management System (AFSFMS). AFSFMS supports a worldwide mission providing payroll, human resources, benefits, cash management and financial information to customers.

1.2. Background.

1.2.1. AFSVC needs to enrich their investment in EBS, and to future-proof and modernize AFSFMS by providing agile and responsive tooling, infrastructure, and platforms to accomplish the mission.

1.2.2. Volumetrics:

24x7 System Oracle E-Business Suite R12 (12.2.13) on Red Hat Enterprise Linux release 8.8

(Ootpa) & Red Hat Enterprise Linux Server release 7.9 (Maipo) Oracle Database 19c

Current Modules:

Fixed Assets Accounts Payables Purchasing Accounts Receivables Benefits Cash Management Treasury General Ledger Payroll

Total of 28,448 Users: 1,445 APF; 19,875 NAF; 7,128 Retirees-Beneficiaries 150+ OAS Reports 10,000+ Oracle 6i Base Reports (Monthly) Transactions processed in AFSFMS

11 million transactions per day 330 million transactions per month

Statement of Objectives Final, 2 May 2025

4 billion transactions per year 4TB of data for a database tier - executables + DB (Production) Six (6) instances in Sustainment Production Environments: PROD, DR Testing Environments: DEV, TEST, GOLD, TRAIN

1.3. Scope.

1.3.1. AFSVC seeks an EBS R12.2.X-certified contractor with deep expertise in Oracle EBS modules to replace legacy systems by seamlessly integrating new Oracle EBS modules with existing EBS modules and enhancing existing EBS modules. The contractor will provide development, configuration, implementation, and DBA support, focusing on Treasury Management, Cash Management, Project Management, iSupplier, Payables, Contract Life-Cycle Management (CLM), Procurement, and related modules to fully leverage and optimize the capabilities of the Oracle EBS platform.

SECTION II

2.0 PROBLEM STATEMENT

AFSVC needs to make significant investments to modernize and deliver the rock-solid Oracle E- Business Suite necessary to meet the demands of AFSVC. The purpose of this SOO, utilizing industry best practices, is to:

• Review, analyze and implement the current legal entity set-up and determine the best legal entity mapping following R12 recommended functionality.

• Reconfigure the current LOA set-up to ensure full functionality of each segment within the Oracle LOA are properly formatted to ensure the modules and the entire system functions correctly.

• Develop, configure, integrate and implement Oracle’s Project Management.

• Develop, configure, integrate, and implement full functionality of the Cash Management and Treasury Management modules into the current AFSFMS for the Financial Management & Comptroller Directorate replacing the current legacy Cash Management and Investment Program (CMIP) (AFSVC/VF 525).

• Develop, configure, integrate and implement Contracting LifeCycle Management (CLM), Procurement and, iSupplier (or other system as recommended by contractor) replacing the current customized legacy Internet Based Purchasing System (IBPS).

The Contractor shall provide all services, travel, and project supervision, as required in connection with this Statement of Objective (SOO).

2.1. Objective(s).

2.1.1. AFSVC requires an analysis of existing processes, source document submission and data exchanges; and a recommendation on implementation and sequencing of all objectives.

2.1.2. Review, analyze and implement the current Ledger set-up and determine the best mapping and recommended functionality.

Statement of Objectives Final, 2 May 2025

2.1.3. Reconfigure the AFSVC current line of accounting (LOA) to allow the full capability of the inter/intra accounting segments.

2.1.4. Develop, configure, integrate and implement Oracle’s Projects Management and develop, configure, integrate, and implement full functionality of Oracle’s, Cash Management, and Treasury Management.

2.1.5. Transition all AFSVC/VF 525 legacy cash management and accounting system, transactions and all reports. Develop, configure and code to transition into the AFSFMS.

2.1.6. Migrate all legacy accounting data from AFSVC/VF 525 database into AFSFMS.

2.1.7. Develop, configure, integrate and implement Contracting LifeCycle Management (CLM), Procurement and iSupplier (or other system as recommended by contractor).

2.1.8. Develop, configure, integrate and implement the Procurement and Procurement Contracts module integrated with CLM. Migrate all active data from current contracting system database.

2.1.9. Prepare the environment for System Integration Testing (SIT)/ User Acceptance Testing (UAT) environments.

2.1.10. Complete retrofitting, break/fix troubleshooting, SIT/UAT, and update implementation plan with any defect resolution(s) and timings

2.1.11. Contractor conducts an initial Smoke test in SIT/UAT, and release instance to users for final acceptance testing.

2.2 Final Outcome.

2.2.1. At the end of the contract performance, AFSVC AFSFMS environments will have Objectives 2.1.2. thru 2.1.8 fully tested and operational in the Production environment.

2.2.2. Post support and sustainment in place for each module, for up to five (5) Option years.

SECTION III

3.0 DELIVERABLES AND ACCEPTANCE CRITERIA

The Contractor shall provide deliverable(s) in a format mutually agreed upon by the Government and the Contractor. The following deliverables are not expected to change. Due Date intervals are not expected to change but actual dates may need to be revised depending on actual contract start date. The Contractor shall provide its list of deliverables based on its proposed technical solution. This section will be updated based on the proposed technical solution selected by the Government.

Contractor must have experience with replacing legacy systems with Oracle solutions, to include development, configuration, implementation, and DBA support.

Contractors must provide the below for each of the deliverables for the bid process:

• Experience on implementation of each deliverable with Points of Contact (POC)

• Number, type and amount of time for FTE to implement each deliverable

• Labor Rates of each person assigned to each deliverable

Statement of Objectives Final, 2 May 2025

• Implementation timeline for each deliverable, if concurrent with another deliverable, please annotate

• Full implementation timeline of all deliverables combined w/ Total cost of project

3.1. Deliverables

3.1.1. Deliverable one (1): Analysis of existing processes, source document submission and data exchanges; and a recommendation on implementation and sequencing of all objectives stated above and all current module implementations. Within 90 days from start of project.

3.1.1.1. Contractor shall provide an analysis (matrix) of AFSVC’s current ERP (Oracle E-Business Suites). Analyze benefits received from the integration and provide maximum optimization. If something cannot be fully integrated, an analysis of why will be required. Estimated at 30 days from paragraph 3.1.1.

3.1.2. Deliverable two (2): A Project Plan and RASCI matrix will be created by the Contractor, with AFSVC input, to identify all the roles and responsibilities of each stakeholder on the project. Within 30 days after deliverable one (1).

3.1.3. Deliverable three (3): Create an implementation plan for entire project. Within 30 days after deliverable two (2).

3.1.4. Deliverable four (4): Analysis and implementation (merge) of the ledger set-up, determine ledger mapping and recommendation of functionality.

3.1.5. Deliverable five (5): Reconfigure the current LOA set-up to ensure full functionality of each segment within the Oracle LOA are properly formatted to ensure the modules and the entire system functions correctly. Correct the current LOA set-up to ensure full functionality and reconfigure current reports to align with the new LOA structure. Note: Central AF NAFIs are considered parent companies and AF installation NAFIs are considered subsidiaries to those parent companies.

3.1.6. Deliverable six (6): Analysis of current Oracle Treasury Management setup, then develop, configure, integrate and implement full functionality of Oracle’s Treasury Management to include reporting and Cash Management functionality

3.1.7. Deliverable seven (7): Transition AFSVC/VF 525: Develop, configure, integrate, and implement an in-house banking feature to act as a custodian bank to AF NAFI subsidiaries. All transactional activity for each AF NAFI subsidiary account from accounts payable, payroll, deposits, cash transfers between AF NAFI subsidiaries, interest paid/received from custodian bank to AF NAFI subsidiaries, associated accounting entries, incoming and outgoing transactional activities, all transactions in the legacy AFSVC/VF 525, and all daily cash-in-bank activity to be captured for each AF NAFI subsidiary to include calculations. Varied daily reporting functionality required.

Banking feature of “custodian bank” held within general ledger transitioned from AFSVC/VF 525 to AFSFMS. Each AF NAFI subsidiary’s cash balance must be auditable and satisfy audit requirement for cash balancing/reconciliation to general ledger control account.

Statement of Objectives Final, 2 May 2025

3.1.8. Deliverable eight (8): Analysis of current Oracle’s Cash Management setup, then develop, configure, integrate and implement full functionality of Oracle’s Cash Management.

3.1.8.1. Analysis of existing capabilities of legacy cash management system and ensure capability, functionality, and internal controls are provided in new module(s).

Existing capabilities and functionalities may need to be gained in more than one module in new environment.

3.1.8.2. Determine and implement relevant configurations and interfaces to support integration with other modules and cash inflows/outflows i.e. accounts payable, payroll, revenue processing, merchant processing, etc. and other internal payment processes (i.e., workers’ comp) along with associated accounting entries.

3.1.9. Deliverable nine (9): Develop, configure, integrate and implement full functionality of Oracle’s Project Management.

3.1.9.1. Migrate/convert transactional and related data for existing projects from various sources and file types into Oracle’s Project Management.

3.1.9.2. Develop and configure supporting sub-ledgers to each project general ledger control account. Sub-ledger must be auditable and satisfy audit requirement for balancing/reconciling general ledger project control accounts on balance sheet.

3.1.9.3. Develop and configure RICE reporting requirements in addition to modifying seeded reports and develop new reports as directed by COR. (Add RICE Attachment)

3.1.10. Deliverable ten (10): Transition general ledger and financial statements currently residing on AFSVC/VF 525 to AFSFMS and develop, configure, integrate necessary coding to capture all cash management related activity into AFSFMS general ledger/financial statements. This general ledger/financial statement holds custodian bank account referred to in 3.1.7. above.

3.1.11. Deliverable eleven (11): Migrate all legacy data from AFSVC/VF 525 database into AFSFMS.

3.1.12. Deliverable twelve (12): Develop, configure, integrate and implement Oracle Contracting LifeCycle Management (CLM), Procurement and Procurement Contracts modules.

3.1.13. Deliverable thirteen (13): Develop, configure, integrate and implement Oracle iSupplier or other system as recommended by contractor.

3.1.13.1. If different system recommended, need Total System Cost, Implementation cost Training costs, and Yearly Maintenance License Fees.

3.1.14. Deliverable fourteen (14): Provide MD50/70/120 documentation for deliverables six (6) thru thirteen (13).

3.1.15. Deliverable fifteen (15): Provide train-the-trainer material and training for Oracle Cash Management, Oracle Treasury Management, Oracle Project Management, Oracle

Statement of Objectives Final, 2 May 2025 iSupplier, Oracle Contract Life Management, Oracle Procurement and Procurement Contracts modules.

3.1.16. Deliverable sixteen (16): Post implementation support for all modules available for five (5) option years which will be costed separately for the entire system.

3.1.17. Deliverable seventeen (17): Migrate all active data from current contracting system database.

3.1.18. Deliverable eighteen (18): Develop an archiving plan for auditable data from IBPS and AFSVC VF 525 systems.

3.2. Acceptance Criteria.

3.2.1. All deliverables, technical services, and products must be functionally tested to ensure compatibility with Air Force systems. They must be approved by the Contracting Officer’s Representative (COR) and designated representatives from AFSVC before acceptance and must be capable of obtaining a viable assessment and authorization.

3.2.1.1. Weekly/Monthly status reports/meetings to the government with the following information:

3.2.1.1.1. Contract funds expended during the reporting period (monthly).

3.2.1.1.2. Description of the activities of the past week/month.

3.2.1.1.3. Any issues or problems affecting project progress along with proposed resolution (weekly/monthly).

3.2.1.1.4. Schedule of activities planned for next reporting period (weekly/monthly).

3.2.1.1.5. Acceptance criteria for metrics, trip reports, and technical presentation requirements are as specified in the Deliverables section.

3.2.1.1.6. Quarterly Total Quality Management (TQM) reports.

3.2.1.1.7. Documented recommendations, system configurations/set-up and guidance identified/discussed in meetings or collaborative sessions.

3.2.2. All data or work products generated in the support and development effort shall be property of AFSVC.

3.2.3. Acceptance or rejection of named deliverables will occur within 14 business days after receipt by the COR.

SECTION IV

4.0 TERMS OF THE CONTRACT, STAKEHOLDER (collaborating offices)

4.1. Timeline (Contractor proposed). The customer intends to award based on deliverables.

The Contractor shall support all implementation, any modifications necessary, to ensure all processes are without errors or downtime for a base period of the implementation timeline after contract kick-off meeting, followed by five (5) option years.

Period of Performance: Shall not exceed six (6) years.

Statement of Objectives Final, 2 May 2025

Each optional CLIN separates recommendations. Ensure each recommendation has a timeline, deliverables, and cost/payment.

Example:

CLIN 0001 - program deliverables 1 thru 3 CLIN 0002 - program deliverable 4 CLIN 0003 - program deliverable 5 CLIN 0004 - program deliverable 6 CLIN 0005 - program deliverable 7 CLIN 0006 - program deliverable 8 CLIN 0007 - program deliverable 9 CLIN 0008 - program deliverable 10 CLIN 0009 - program deliverable 11 CLIN 0010 - program deliverable 12 CLIN 0011 - program deliverable 13 CLIN 0012 - program deliverable 14 CLIN 0013 - program deliverable 15 CLIN 0014 - program deliverable 16 CLIN 0015 - program deliverable 17 CLIN 0016 – program deliverable 18 CLIN 0017 – post support year 1 CLIN 0018 – post support year 2 CLIN 0019 – post support year 3 CLIN 0020 – post support year 4 CLIN 0021 – post support year 5 CLIN 0022 - Travel

4.2. Contractor Qualifications.

The Contractor shall provide the experience necessary to complete the task outlined in the SOO. The Contractor shall utilize established policies, standards, and sound management principles in the performance of the SOO requirements and deliverables.

4.2.1. Bidders should be members of the “Oracle Certified Partner Network” to qualify for bidding.

4.2.2. The Contractor’s personnel, at a minimum, shall have the following experience as required per module:

4.2.2.1. Must have Oracle Cloud development and Oracle APEX experience.

4.2.2.2. Must have Oracle E-Business Suite R12 experience.

4.2.2.3. Must have line of accounting (LOA) implementation experience.

4.2.2.4. Must have Oracle EBS core financial accounting knowledge with a concentration in Projects Management, Cash Management, and Treasury Management modules experience to include financial accounting experience for transition of legacy financial statements and interrelated data functionality from legacy system to the modules within the AFSFMS

Statement of Objectives Final, 2 May 2025

4.2.2.5. Must have Contracting LifeCycle Management (CLM), Procurement, iSupplier (or similar product), and Purchasing modules experience.

4.3. Stakeholders (Collaborating Offices).

4.3.1 Lead organization for this effort: AFSVC/VT

4.3.2 Collaborating organizations: AFSVC/CC, AFSVC/VI, AFSVC/VIS, AFSVC/VP, AFSVC/VPE, AFSVC/VF, AFSVC/VFT, AFSVC/VFA, AFSVC/VT, AFSVC/VTOI, AFSVC/VTEI, AFSVC/VMX, AFSVC/VBL and others as needed (i.e., impacted Major Commands/Field Commands).

4.3.3 Risks created by multiple stakeholders:

4.3.3.1 Decentralized management/oversight of AFSVC and AFSVC/VTEI portfolio

4.3.3.2 Multiple process owners or co-process owners (which could be conflicting);

lack of structure and business rules governing/guiding the recent re-assignment of roles/responsibilities

4.3.3.3 Multiple requirement owners/generators; no mechanism or process implemented to accurately capture, validate, and prioritize requirements across the Enterprise

SECTION V

5.0. CONTRACT ADMINISTRATION

5.1. Reporting.

5.1.1. The Contractor shall provide weekly status reports (See 7.4. Weekly Status Report) and/or other updates as needed to provide the Contracting Officer’s Representative (COR) with the current status of the tasks completed for the week. The status report must identify action and/or items completed by individual contract resources, planned task/activities, risks and status updates.

5.1.2. Provide a list of planned task/activities for the week in the status report.

Subsequent status reports shall include completed percentage of completion of the previous week’s planned task/activities and a new list of planned activities for the following week.

5.1.3. The Contractor shall provide a monthly contract progress report, with their monthly invoice, that shall be consistent with the submitted and COR approved weekly status reports. (See 8.5. Contract Progress Report)

5.2. Schedule.

5.2.1. A detailed contract plan that shall outline major tasks such as discovery/ramp up time, and environment configuration, validation/review, development and required support activities. The Contractor shall deliver in accordance with (IAW) the approved schedule.

5.2.1.1. The Contractor shall provide, at the scheduled kick-off meeting, a detailed contract plan (i.e. Gantt Chart) outlining major tasks such as discovery/ramp up time, Statement of Objectives Final, 2 May 2025 environment configuration, validation/review, development and required support activities.

5.2.1.2. The Contractor shall provide, thirty (30) days, after the kick-off meeting, a realistic detailed project plan outlining the tasks and subtasks for both the AF and the Contractor based on the deliverables and requirements listed in the SOO. Once the submitted plan/schedule is approved by the COR, the Contractor shall deliver IAW the approved schedule.

5.2.1.3. All forecasted or unexpected delays to the schedule must be reported to the COR within one (1) business day of discovery. The Contractor shall provide reason for delay and proposed resolutions to the COR no later than 1600 CST the same day.

5.2.1.4. If a delay occurs and is the result of Contractor error, the Contractor shall submit a revised schedule to the COR for review and approval within two workdays of recognition of delay.

5.3. Resource Calendar.

5.3.1. At a minimum of 21 business days in advance, the Contractor shall provide the COR, in writing, the projected days the Contractor’s resources will be unavailable. This information is necessary to help plan for critical support task/activities like patching, system upgrades but not limited to these activities. This will allow AFSVC to coordinate and plan for resource availability.

5.4. Meetings.

5.4.1. Kick-Off Meeting. A kick-off meeting will be held after contract award on a date and time agreeable by both parties. The meeting will be held at the Place of Performance. The Contractor shall designate a primary Point of Contact (POC) for the contract for the kick-off meeting.

5.5. Weekly Status Meetings.

5.5.1. The day and time of the weekly status meeting shall be determined by the COR and the Contractor after contract award. Meetings will be held virtually unless otherwise coordinated between COR & Contractor.

5.5.2. Recommendations identified or discussed in meetings or collaborative sessions shall be provided in writing within two (2) business days of initial recommendations.

Contractor shall provide any recommendations, alternate options, scenarios or configurations in writing in MS Word format or COR approved format.

5.6. Documentation. All recommendations, configurations, and guidance must be provided in writing in MS Word format or COR approved format.

5.6.1. Provide guidance and instruction for existing documentation provided such as setup and configuration documents.

5.6.2. Provide guidance and instruction to develop system documentation provided such as setup and configuration documents.

SECTION VI

Statement of Objectives Final, 2 May 2025

6.0 GENERAL INFORMATION

6.1. Contracting Officer’s Representative (COR) Responsibilities.

6.1.1. The Contracting Officer (CO) will designate an individual as the Contracting Officer’s Representative (COR).

6.1.2. The COR is responsible for monitoring the performance of work under this contract. In no event, shall any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the contracting customer unless formalized by proper contractual documents executed by the CO prior to the completion of the contract.

6.1.3. This designation shall remain in effect throughout the life of the contract, unless terminated sooner in writing by the CO or due to reassignment. Primary responsibilities of the COR may include, but are not limited to, the following:

6.1.3.1. The COR is responsible for performing post award administrative functions necessary to ensure performance of services required by this contract. If the COR believes performance by the Contractor has not met the level required by the contract, the problem shall be referred to the CO for resolution.

6.1.3.2. The COR shall maintain and approve the list of all products required to be delivered by the Contractor as well as when the product is delivered and its acceptability status, this includes the project schedule.

6.1.3.3. The COR will maintain a record of all contract deliverables and a copy of the email message or cover letter used to deliver the deliverables.

6.1.3.4. The COR will work with CO to ensure the following responsibilities are adhered to:

6.1.3.4.1. Verify that the Contractor performs the technical requirements of the contract in accordance with the terms, conditions, and specifications therein.

Specific emphasis shall be placed on the quality provisions, for both adherences to the contract provisions and to the Contractor's own quality control program.

6.1.3.4.2. Perform acceptance for the customer of services performed under this contract.

6.1.3.4.3. Communication will be the key to success of this effort. Maintain liaison and direct communications with the Contractor and the CO. Written communications with the Contractor and other documents pertaining to the contract shall be signed by the COR and a copy shall be furnished to the CO.

6.3.4.4. Monitor the Contractor's performance, notify the Contractor of deficiencies observed and direct appropriate action to effect correction. Record and report to the CO incidents of faulty or non-conforming work, delays, or problems.

6.2. Place of Performance

Statement of Objectives Final, 2 May 2025

3515 South General McMullen Bldg. 1, San Antonio, TX 78236-9854. Remote work is authorized for a majority of the contract, however in office work may be required as recommended by COR & Contractor.

6.3. Government Furnished Equipment (GFE) & Personnel

6.3.1. AFSVC will provide all software currently approved by the Air Force to develop and sustain the current AFSFMS environment and required on the PCs. The software will be installed on the GFE-owned PCs and will be operational at the start of this contract.

6.3.2. If the GFE malfunctions, the Contractor shall notify the COR immediately.

6.3.3. GFE Updates. Any updates or additional required software, security patches, or maintenance will be accomplished by AFSVC. If required, AFSVC will provide other GFE as resources permit during this timeframe.

6.3.4. AFSVC will provide GFE-owned PCs to do the required work and to access the applications.

6.4. Travel

Contractor shall include in their price for the assigned team to travel to San Antonio, TX for the kick-off meeting, to pick-up & turn-in Government Furnished Laptops (turn-in will include a Contract Closeout Meeting). All other travel must be mutually coordinated & reimbursed by AFSVC in accordance with the Federal Travel Regulations (FTR see Clause 29 of the SEC I – NAF Standard Clauses).

6.5. Identify Known or Possible Conflicts of Interest

Contractor will have access to the Department of Air Force execution data from financial systems, contracts, and pricing data at the CLIN level. Contractor shall identify any known or possible conflicts of interests to the COR.

6.6. Security and Training Requirements

Highest level: UNCLASSIFIED. The preponderance of work will be at the unclassified level.

6.6.1. Building Access. Unescorted access to the AFSVC/Building 1 is approved and shall be coordinated through the COR and AFSVC’s Security Manager. Any other locations shall be approved on a case-by-case basis.

6.6.2 Training. Cyber Awareness Challenge Training, Controlled Unclassified Information (CUI) Training (one-time) and Privileged User Cybersecurity Responsibilities (if server access required). All Government required training shall be provided at no cost by the Government.

6.7. Security Clearances

6.7.1. The Contractor shall ensure that personnel requiring access to AFSVC information systems, or its data have the proper and current cybersecurity certifications as determined by AFSVC cybersecurity teams to perform cybersecurity functions in accordance with

Statement of Objectives Final, 2 May 2025

DoDM 8140.03, Cyberspace Workforce Qualification and Management Program located at https://dodcio.defense.gov/Portals/0/Documents/Library/DoDM-8140-03.pdf.

6.7.2. The Contractor shall meet the following contract/security clearance requirements, including:

6.7.2.1. The Contractor shall safeguard and comply with the rules and regulations issued under DoDI 5200.02, DoD Personnel Security Program (PSP), 21 Mar 2014;

AFMAN 16-1405, Air Force Personnel Security Program; AFM 33-152, User Responsibilities and Guidance For Information Systems; DoDD 8500.01 security, 14 Mar 2014; AFI 17-130, Air Force Cybersecurity Program Management; and DoDM 8140.03, Information Assurance Workforce Improvement Program requirements and respective updates to the listed rules and regulations. The Contractor shall follow the DoD Privacy Office guidelines for submittal of Information Assurance Technical (IAT) security clearances and ensure all personnel are designated as IAT-II, or IAT- III where duties meet the criteria of the position sensitivity designations as stated in the DoDM 8140.03.

6.7.2.2. Contractor personnel assigned to perform duties within IAT-II or IAT-III, and or requiring “Limited Privileged Access” such as system or database administration rights, to the application or network are subject to investigation to determine whether they are and will remain reliable, trustworthy, of good conduct and character, and loyal to the United States and whether granting or continuing national security eligibility is clearly consistent with the national interest (Ref. DoDI 5200.02, DoD Personnel Security Program (PSP), 21 Mar 2014; AFMAN 16-1405, Personnel Security Program, Para 3.1). Documentation for a Tier 1 or Tier 3 investigation must be submitted to the Unit Security Manager within 10 business days after award.

6.7.3. Tier 1 requests are initiated using the Standard Form (SF) 85. Tier 3 requests are initiated using the Standard Form (SF) 86 and are submitted to the installation Information Protection Office through the Unit Security Manager. The initiation of the Tier 1 or Tier 3 shall include the submission of all required information and verified through the Department of Defense (DoD) Defense Information System for Security (DISS) database. The Contractor shall comply with the rules and regulations under DMDC Trusted Associate Sponsor System Overview Guide, Version 5.7, Sept 2018 and associated updates; all CAC holders must, at minimum, have an initiated a favorable completion of an FBI fingerprint check, or a DoD determined equivalent investigation.

The NAFI may grant a waiver to allow the Contractor to start work after submitting all required information, passes a successful FBI fingerprint check and DISS.

6.7.4. All Contractor personnel requiring system access must be adjudicated with a Favorable determination in DISS.

6.7.5. The Contractor shall ensure all FISMA, NIST, Department of Defense (DoD), Air Force certification, accreditation/assessment and authorization, data protection and security standards are met and renewed on a continuing basis throughout the contract period.

Statement of Objectives Final, 2 May 2025

6.7.6. Information Systems (IS)/Networks Physical Security. The Contractor shall employ physical security safeguards for IS/Networks and applications involved in processing or storage of U.S. customer data to prevent the unauthorized access, disclosure, modification, destruction, use, etc. at any time, and to otherwise protect the confidentiality and ensure use conforms with DoD regulations. In addition, the Contractor shall support a physical security audit performed by the U.S. customer of the Contractor's internal information management infrastructure that is used in development.

The Contractor shall correct any deficiencies identified by the customer of the Contractor's physical security posture. The Contractor shall be required to follow all requirements in applicable DoD Information Assurance directives and policies.

6.7.7. All Contractor personnel requiring system access must respond to the AFSVC Security Manager’s inquiries within three business days (excluding federal holidays), not to exceed 72 hours. If Contractor personnel does not respond to the AFSVC Security Manager’s inquires within three business days, their non-action on this matter provides grounds for termination.

6.8. Privacy Act

The Contractor shall safeguard and comply with the agency rules and regulations issued under Public Law 110-53 (42 U.S.C. § 2000ee-1) Section 803; Air Force Policy Directive (AFPD) 33-3, Information Management; Department of Defense Directive (DoDD) 5400.11, Department of Defense Privacy Program; Department of Defense Regulation (DoDR) 5400.11-R, Department of Defense Privacy Program; Department of Defense Instruction (DoDI) 5400.16, DoD Privacy Impact Assessment (PIA) Guidance; DoDI 1000.30, Reduction of Social Security Number (SSN) Use Within DoD; and DoDI 1000.29, and DoD Civil Liberties Program, Privacy Act of 1974, 5 U.S.C. § 552a, E-Government Act of 2002, 44 U.S.C. §3601, Safeguarding and Responding to Personally Identifiable Information (PII) breaches, Reduction of Social Security Number (SSN) and AFI 33-332, AF Privacy and Civil Liberties Program and associated updates to the agency rules and regulations. Penalties are applied for the misuse or unauthorized disclosure of PII. The Act (5 U.S.C. 552a) provides for civil remedies for injured parties, including actual damages, attorney fees, and litigation costs.

6.9. Cyber Security

6.9.1 The Contractor shall comply with Risk Management Framework requirements and cybersecurity policies and instructions outlined in Department of Defense Instructions (DODI): 1015.16, 5205.13, 8520.02, 8551.01, DAFI 34-101; 2019 National Defense Authorization Act Sections 881, 1631-1657; current versions of National Institutes of Standards and Technology (NIST) publications 800-53, 800-37, 800-161, 800-34, 800-60 Vol 1 and 2, 800-122, 800-171; 800-172, 800-128; 800-63A; current DOD CIO policies located at https://dodcio.defense.gov/Library/; and current version of PCI-DSS.

6.9.1.1 The Contractor shall comply with applicable Security Technical Implementation Guide (STIG) and Security Requirements Guides (SRG) under purview of the NAFI. Applicable Correlating Control Indicators (CCI) are available on the DoD Cyber Exchange (https://public.cyber.mil/stigs/cci/).

Statement of Objectives Final, 2 May 2025

6.9.1.2. The Contractor shall provide pertinent administrative, technical documentation support, data, topologies, hardware, software, firmware listings and inventory to the NAFI for review and acceptance to support a successful identify management, cloud access/internet access point, cybersecurity service provider, and Payment Card Industry Data Security Standards (if applicable).

6.9.1.3. Pursuant to the Office of Management and Budget (OMB) Memorandum M-21-07, contractors shall ensure that information systems using internet protocol (IP) technologies will be IPv6-enabled before implementation and operational use.

6.9.2. The contractor shall provide cyber security for systems according to the DFARS clauses incorporated by reference below:

252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information.

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. (DEVIATION 2024-O0013) 252.204-7021 Cybersecurity Maturity Model Certification Requirements.

252.239-7001 Information Assurance Contractor Training and Certification.

252.239-7010 Cloud Computing Services.

6.9.3. Where applicable, the Contractor shall ensure all components in the contractor solution, any applications that process, store, and/or transmit credit card information/cardholder data are thoroughly assessed and meet the most current version of the Payment Card Industry Data Security Standards (PCI DSS). The solution must meet all PCI DSS compliance requirements identified by the Payment Card Industry Security Standards Council. The Contractor shall provide to the NAFI sufficient evidence of PCI DSS Compliance certification regarding the solution’s PCI DSS compliance status.

6.9.3.1. The PCI DSS assessment and compliance validation of the appropriate Self- Assessment Questionnaire (SAQ) control identified and must be completed by a certified Qualified Security Assessor (QSA) with sufficient expertise. Qualified Security Assessor (QSA) companies are organizations that have been qualified by the PCI Council to have their employees assess compliance to the most current version of PCI DSS standard. Qualified Security Assessors are employees of these organizations who have been certified by the Council to validate an entity's adherence to the most current version of PCI DSS.

6.9.3.2. If payment applications are used within the solution, the applications must be PCI certified applications as derived from the PCI Data Security Standard requirements and Security Assessment Procedures. Contractor shall comply with all PCI annual requirements.

6.10. Security Education, Training and Awareness (SETA) and Operations Security (OPSEC) Training

Statement of Objectives Final, 2 May 2025

6.10.1. Contractor employees will complete initial and annual refresher SETA and OPSEC training within five days of on-boarding for initial, and annually as dictated by the unit security manager.

6.11. Section 508: Data Stewardship and Governance

6.11.1. All electronic and information technology (EIT) procured through this contract must meet the applicable accessibility standards at 36 CFR 1194. 36 CFR 1194 implements Section 508 of the Rehabilitation Act of 1973, as amended. Further information on section 508 is available via the internet at http://www.section508.gov

6.11.2. The NAFI will have unlimited rights to all technical data unless the Contractor takes specific actions and includes prescribed legends in the proposal, contract, and/or data products to limit or restrict such NAFI rights for particular identified items.

“Technical data” refers to recorded information and includes (but is not limited to) research and engineering data and drawings, specifications, standards, process sheets, manuals, technical reports and computer software documentation. It does not include computer software or financial, cost/pricing or other contract and grant administrative data but does include any developed intellectual property not specific to the data.

6.11.3. Data and information generated during this agreement is owned by the NAFI.

Data must be physically separated from the data of other users, on separate drives or computers, and appropriate firewalls be established to prevent other users from accessing NAFI data.

6.11.4. Should the NAFI elect to not execute option years or at the end of the contract period, whichever is sooner, data must at all times be promptly accessible until converted to the new system with no additional separation fee.

SECTION VII

7.0 APPENDIX

7.1. DEFINITIONS & ABBREVIATIONS

Contracting Officer (CO). The duly appointed Government agent authorized to award or administer contracts. The contracting officer is the only person authorized to contractually obligate the Government.

Contracting Officer’s Representative (COR). The COR is responsible for monitoring the performance of work under this contract. In no event, shall any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the contracting customer unless formalized by proper contractual documents executed by the CO prior to the completion of the contract.

Statement of Objective (SOO). A formal contracting document used to describe the goals and objectives expected from soliciting Contractor work.

AFSFMS environments. AFSFMS has fourteen environments: (10) Oracle EBS Environments and four (4) Oracle APEX environments.

http://www.section508.gov.data/

Statement of Objectives Final, 2 May 2025

7.2. ACRONYMS

AFSFMS - Air Force Services Financial Management System AFSVC - Air Force Services Center APEX – Application Express ATO - Authorization to Operate BAN - Business Area Network CC – Commander ConOps – Continuity of Operations, see DR CO – Contracting Officer COR – Contracting Officer Representative DBCS - Oracle Database Cloud Service DISS - Defense Information System for Security (legacy JPAS) DNS - Domain Name Server DOD - Department of Defense DR - Disaster Recovery EBS - Oracle E-Business Suite FTE – Full Time Equivalents GAT - General Acceptance Testing GFE – Government Furnished Equipment NAFI - Nonappropriated Fund Instrumentality OAC – Oracle Analytics Cloud OAS - Oracle Analytics Server OBDS – Oracle Base Database Service (formerly known as DBCS) OCI – Oracle Cloud Infrastructure OC2 - Government Oracle Cloud Infrastructure ODA - Oracle Database Appliance POC - Point of Contact RASCI - Responsible, Accountable, Supporting, Consulted and Informed SI - System Integrator SIT - System Integration Testing UAT - User Acceptance Testing VF – Financial Management & Comptroller Directorate VFA – Analysis & Central Accounting Division VBL - Lodging VFT - Treasury Management Division VI- Installation Support Division VIS - Shared Services Center VM - Mission Operations Directorate VMX- Capital Improvement VP – NAF Procurement Directorate VPE - Contracting VT – Business Information Technology Systems Directorate VTEI - Installation Systems Branch

VTOI - IT Infrastructure Operations Branch 7.3.AFSFMS Change Management Process

Statement of Objectives

Statement of Objectives

7.4. Sample Weekly Status Reports or as agreed upon by COR

Statement of Objectives

7.5. Sample Contract Progress Report

Statement of Objectives

7.6. NAFI Observed Holidays

Holiday New Year’s Day Birthday of Martin Luther King, Jr.

Washington’s Birthday Memorial Day Juneteenth National Independence Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day

E-1 Oracle Consolidated Project (OCP)

SECTION E

INSPECTION AND ACCEPTANCE

1. POINT OF INSPECTION AND ACCEPTANCE.

COR is responsible for performing inspection and acceptance of the servicesrendered under the terms and conditions of this contract on behalf of the NAFI.

2. FINAL INSPECTION AND ACCEPTANCE.

Final inspection and acceptance will be accomplished in accordance with Section C.

3. POINT OF CONTACT.

Mailing Address:

POC will be provided at award 2261 Hughes Avenue, Suite #156 JBSA Lackland, TX 78236-9854 Telephone:

Email:

F-1 Oracle Consolidated Project (OCP)

SECTION F

DELIVERIES OR PERFORMANCES

1. Period of Performance (XX months after receipt of award).

1.1. The NAFI requires delivery to be made according to the following schedule:

DELIVERY SCHEDULE

Oracle Consolidated Project

CLIN Description NAFI proposed

Delivery Schedule

Contractor Proposed Delivery Schedule

0001 3.1.1. Deliverable one (1):

Analysis of existing processes

3.1.2. Deliverable two (2): A

Project Plan and RASCI matrix

3.1.3. Deliverable three (3):

Create an implementation plan

Within 90 days from start of project.

Within 30 days after deliverable one (1).

Within 30 days after deliverable two (2)

0002 3.1.4. Deliverable four (4):

Analysis of the current ledger set-up

Per Contractors Project Plan

0003 3.1.5. Deliverable five (5):

Reconfigure the current LOA set-up

0004 3.1.6. Deliverable six (6):

Analysis of current Oracle Treasury Management

F-2 Oracle Consolidated Project (OCP)

CLIN Description NAFI proposed

Delivery Schedule

Contractor Proposed Delivery Schedule

0005 3.1.7. Deliverable seven (7):

Transition AFSVC/VF 525

0006 3.1.8. Deliverable eight (8):

Analysis of current Oracle’s Cash Management

0007 3.1.9. Deliverable nine (9):

Develop, configure, integrate and implement full functionality of Oracle’s Project Management.

00…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .