Attachment 12b - RKMF200084 - Electrical As-Builts Sunshades 41-46.pdf
PDF 2 MB Posted
- Attached to
- 57 WG Sunshades Nellis AFB
- Solicitation number
- F3G3AA3111AW01
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RKMF 20-0084
NELLIS AIR FORCE BASE
NEVADA
SCHEDULE OF DRAWINGS
SHEET REFERENCE NUMBER SHEET TITLE
G-1 COVER PAGE, HAUL ROUTE
G-2 GENERAL NOTES AND LAYDOWN AREA
G-3 SITE PLAN
CD-1 CIVIL DEMO ROWS 40 - 44
C-1 CIVIL DETAILS
E-1 POWER PLAN ROWS 40 - 44
INSTALL ELECTRICAL POWER
FOR FLIGHT LINE SUNSHADES
BASE CIVIL ENGINEERING
(BLDG 812)
NORTH GATE
SECURITY POLICE
(BLDG 2)
MAIN GATE
CONTRACTING OFFICE
(BLDG 588)
TYNDALL GATE
N
E
S
W
FIRE DEPT
(BLDG 277)
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I L E
N
O
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 40-44
COVER PAGE, HAUL ROUTE
AS SHOWN
20-0084
RKMF200084G01
WELDIN
WELDIN
WELDIN
WELDIN
G-1
12/10/21
9/9/19
9/9/19
9/9/19
9/9/19
AS-BUILT
RECORD
DRAWINGS
HAUL ROUTE
PROJECT LOCATION
ROWS 41 THRU 46
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 40-44
GENERAL NOTES
AS SHOWN
20-0084
RKMF200084G02
WELDIN
WELDIN
WELDIN
WELDIN
G-2
12/10/21
9/19/19
9/19/19
9/19/19
9/19/19
AS-BUILT
RECORD
DRAWINGS
SECTION 3: DESCRIPTIONS OF WORK
Install Electrical Power for Flight Line Sunshades. Install all work in accordance with specifications in Nellis SABER Contract. All materials, supplies, and debris shall be completely removed from the job site prior to final inspection. The work to be accomplished includes the following description
3.1 GENERAL REQUIREMENTS – DIVISION 1
3.1.1 Contractor to perform weekly coordination meetings at a convenient time for the user and contractor.
3.1.2 The construction sites shall be swept daily or as required to keep flight line clear of soil and debris (FOD).
3.1.3 If Contractor personnel do not have Restricted Area Badges, then escorts will be required for this project.
3.2 EXISTING CONDITIONS – DIVISION 2
3.2.1 Remove existing concrete apron, asphalt and landscaping for trenching and conduit placement. The main trench in the apron to be 5’ in width. Minimize trench saw cutting in the apron and roadways. The concrete is at least 12” ±-(2”) thick in most places on apron and 6” in roadway.
3.2.2 Provide and install a temporary 6’ fence with entrance and exit gates around work area, one area at a time.
3.2.3 Provide temporary low profile barricades to direct traffic around work site area.
3.3 CONCRETE – DIVISION 3
3.3.1 Remove and replace concrete apron for trenching and conduit placement. Concrete shall be in accordance with specifications for air field pavements.
3.3.2 3” Core through wall and fence where needed in and around Bldg. 878 for 2” PVC conduit to ran out of building and provide power to sunshades.
3.3.3 The concrete for the apron shall be Mix #844 650PSI Flex designed mix.
3.4 ELECTRICAL – DIVISION 26
3.4.1 Remove and replace concrete apron for trenching and conduit placement. Minimize trench saw cutting in the apron. The concrete is at least 12” ±-(2”) thick in most places. Conduit shall be a min. 12” below bottom of concrete.
3.4.2 All conduit in trench shall have sand bedding and cover.
ROWS 40, 41, 42, 43 & 44
3.4.3 Rows 40 thru 44 provide and install one 200A breaker in switchboard in electrical room of Bldg. 878.
3.4.4 Run 4-4/0 in a 2” EMT to a new 75KVA – 208-480v/277v Delta/Wye dry type transformer. From Transformer run 4-#2’s to enclosed 3Pole molded case mounted on wall.
3.4.5 From breaker route 2” schedule 80 PVC conduit and wire out to column of row 44 sunshade.
3.4.6 Provide and install a 200A/3P/4W load center/panelboard at this point. Distribute to the other four sunshades from here.
3.4.7 At the other sunshades on rows 40 - 43 install, 30KVA, 480-208Y120V transformers and a 100A/3P/24 pole panelboard for lights and receptacles on the sunshade.
3.4.8 Provide and install Eaton 2a-LX column type electrical panelboards. Install three at each of the sunshades shall be mounted at approximately 72” to top of panelboard. The panelboard itself shall have a NEMA 12 dustproof enclosure. It shall be a column type along the lines of the Eaton 2a-LX style with 100A/3P copper buss and main breaker.
3.5 COMMUNICATIONS – DIVISION 27
3.5.1 Provide and install one 4” schedule 80 PVC and 100,000 lbs. rated pullboxes in the same trench as electrical conduit for Communications. This conduit shall be run to each sunshade that the electrical conduit is being ran to, however to a separate pole. The conduit will go no further than the last sunshades being provided with power in this project.
3.5.2 Provide and install an 18” x 24” pullbox on an existing pole at each sunshade to terminate the 4” conduit in to.
3.6 EXTERIOR IMPROVEMENTS – DIVISION 32
3.6.1 Provide and install 4 each 6” surface mount, bolt down bollards at each row the electrical and communication conduit will be ran to. Install 3 each bollards for the electrical and 1 each bollard for the communication.
3.6.2 Provide and install 4” asphalt paving where removed for trenching.
SCALE: 1"=300'-0"
OVERALL SITE PLAN
N
ES
W
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 40-44
SITE PLAN
AS SHOWN
20-0084
RKMF200084G03
WELDIN
WELDIN
WELDIN
WELDIN
G-3
12/10/21
9/19/19
9/19/19
9/19/19
9/19/19
AS-BUILT
RECORD
DRAWINGS
SHEET E-3 ROWS 40 - 44
R O
W
R O
W
R
W
R
R O
W
AutoCAD SHX Text
BUILDING 878
AutoCAD SHX Text
BUILDING 880
AutoCAD SHX Text
BUILDING 882
AutoCAD SHX Text
BUILDING 297
AutoCAD SHX Text
BUILDING 295
AutoCAD SHX Text
BUILDING 292
AutoCAD SHX Text
BUILDING 290
AutoCAD SHX Text
BUILDING 285
AutoCAD SHX Text
BUILDING 286
AutoCAD SHX Text
BUILDING 294
AutoCAD SHX Text
BUILDING 284
AutoCAD SHX Text
BUILDING 282
AutoCAD SHX Text
BUILDING 283
AutoCAD SHX Text
BUILDING 277
AutoCAD SHX Text
BUILDING 276
AutoCAD SHX Text
BUILDING 270
AutoCAD SHX Text
BUILDING 259
AutoCAD SHX Text
BUILDING 262
AutoCAD SHX Text
BUILDING 260
AutoCAD SHX Text
BUILDING 257
AutoCAD SHX Text
BUILDING 253
AutoCAD SHX Text
BUILDING 255
AutoCAD SHX Text
BUILDING 256
AutoCAD SHX Text
BUILDING 252
AutoCAD SHX Text
BUILDING 250
AutoCAD SHX Text
BUILDING 245
AutoCAD SHX Text
BUILDING 248
AutoCAD SHX Text
BUILDING 246
AutoCAD SHX Text
BUILDING 244
AutoCAD SHX Text
BUILDING 241
AutoCAD SHX Text
BUILDING 239
AutoCAD SHX Text
BUILDING 237
AutoCAD SHX Text
BUILDING 233
AutoCAD SHX Text
BUILDING 234
AutoCAD SHX Text
BUILDING 236
AutoCAD SHX Text
BUILDING 238
AutoCAD SHX Text
BUILDING 879
AutoCAD SHX Text
BUILDING 877
AutoCAD SHX Text
BUILDING 285
AutoCAD SHX Text
BUILDING 882
AutoCAD SHX Text
BUILDING 290
AutoCAD SHX Text
BUILDING 295
AutoCAD SHX Text
BUILDING 283
AutoCAD SHX Text
BUILDING 277
AutoCAD SHX Text
BUILDING 256
AutoCAD SHX Text
BUILDING 253
AutoCAD SHX Text
BUILDING 244
AutoCAD SHX Text
SUNSHADE 13
AutoCAD SHX Text
SUNSHADE 14
AutoCAD SHX Text
SUNSHADE 15
AutoCAD SHX Text
SUNSHADE 16
AutoCAD SHX Text
SUNSHADE 17
AutoCAD SHX Text
SUNSHADE 18
AutoCAD SHX Text
SUNSHADE 19
AutoCAD SHX Text
SUNSHADE 20
AutoCAD SHX Text
SUNSHADE 21
AutoCAD SHX Text
SUNSHADE 22
AutoCAD SHX Text
SUNSHADE 23
AutoCAD SHX Text
SUNSHADE 32
AutoCAD SHX Text
SUNSHADE 33
AutoCAD SHX Text
SUNSHADE 34
AutoCAD SHX Text
SUNSHADE 40
AutoCAD SHX Text
SUNSHADE 41
AutoCAD SHX Text
SUNSHADE 42
AutoCAD SHX Text
SUNSHADE 43
AutoCAD SHX Text
SUNSHADE 44
AutoCAD SHX Text
FUTURE SUNSHADE 24
AutoCAD SHX Text
FUTURE SUNSHADE 25
AutoCAD SHX Text
FUTURE SUNSHADE 26
AutoCAD SHX Text
FUTURE SUNSHADE 28
AutoCAD SHX Text
FUTURE SUNSHADE 29
AutoCAD SHX Text
FUTURE SUNSHADE 27
AutoCAD SHX Text
FUTURE SUNSHADE 30
AutoCAD SHX Text
FUTURE SUNSHADE 31
AutoCAD SHX Text
FUTURE SUNSHADE 35
AutoCAD SHX Text
FUTURE SUNSHADE 36
AutoCAD SHX Text
FUTURE SUNSHADE 37
AutoCAD SHX Text
FUTURE SUNSHADE 39
AutoCAD SHX Text
FUTURE SUNSHADE 38
POINT OF CONNECTION IN
EXISTING ELECTRICAL
ROOM
ROW 41 ROW 42
R
R
ROW 40
NEW 75 TRANSFORMER
SCALE: 1"=60'-0"
TRENCH LAYOUT ROWS 40 - 44
N
ES
W
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 40-44
CIVIL DEMO PLAN
AS SHOWN
20-0084
RKMF200084CD1
WELDIN
WELDIN
WELDIN
WELDIN
CD-1
12/10/21
9/19/19
9/19/19
9/19/19
9/19/19
AS-BUILT
RECORD
DRAWINGS
SHEET NOTES:
LEGEND
NOT IN CONTRACT
0 60' 120' 180'
SCALE: 1" = 60'
30'
DEMOLITION NOTES
1. CONTRACTOR TO VERIFY LOCATION AND SIZE OF EXISTING
EQUIPMENT FOR DEMOLITION, RELOCATION AND POINT OF
CONNECTION
2. THE CONSTRUCTION SIGHT WILL BE SWEPT DAILY OR AS
NEEDED TO KEEP THE FLIGHT LINE CLEAR OF SOIL AND
DEBRIS (FOD)
3. ESCORTS WILL BE REQUIRED FOR THIS PROJECT
4. ASPHALT CUTS ARE APPROX. 4" THICK
5. CONCRETE VEHICLE ROAD CUTS ARE APPROX. 8" THICK
6. CONCRETE APRON CUTS ARE APPROX. 12"± 2" THICK
DEMOLISH EXISTING CONCRETE, ASPHALT, AND
LANDSCAPING AS NEED TO TRENCH FOR ELECTRICAL
CONDUIT
DEMOLISH EXISTING CONCRETE, ASPHALT AS NEEDED
TO INSTALL NEW COMM & POWER PULL BOX
CORE DRILL EXISTING BLDG AS NEEDED TO INSTALL
SURFACE MOUNT CONDUIT FROM ELECTRICAL ROOM TO
SIDE OF BLDG TO START UNDER GROUND WORK
AutoCAD SHX Text
BUILDING 878
AutoCAD SHX Text
BUILDING 880
AutoCAD SHX Text
BUILDING 882
AutoCAD SHX Text
BUILDING 297
AutoCAD SHX Text
BUILDING 295
AutoCAD SHX Text
BUILDING 879
AutoCAD SHX Text
BUILDING 877
AutoCAD SHX Text
SUNSHADE 40
AutoCAD SHX Text
SUNSHADE 41
AutoCAD SHX Text
SUNSHADE 42
AutoCAD SHX Text
SUNSHADE 43
AutoCAD SHX Text
SUNSHADE 44
FUTURE SUNSHADE 39
6" CONCRETE
FILLED BOLLARD
EXISTING
CONCRETE
" BOLT WITH 4"
MIN EMBEDMENT
10"
SQ
7"
" BOLT (TYP)
EXISTING
CONCRETE OR
A.C. PAVEMENT
UNDISTURBED
SOIL
COMPACTED SOIL FROM
EXCAVATION SPOILS
RED CONCRETE
SLURRY CAP
4" CONDUIT
2'
NEW
CONCRETE
DEPTH VARIES
12" -16"
MIN.
8"
4" TYPE 2 UNDER
CONCRETE
NOTE: RUN COMM TRENCH 4" DEEPER THAN POWER TRENCH WERE
THEY CROSS EACH OTHER
EXISTING
CONCRETE OR
A.C. PAVEMENT
UNDISTURBED
SOIL
COMPACTED SOIL FROM
EXCAVATION SPOILS
2'
NEW
CONCRETE
DEPTH VARIES
12" MIN.
8"
4" TYPE 2 UNDER
CONCRETE
(5) 2" CONDUIT
RED CONCRETE
SLURRY CAP
EXISTING
CONCRETE OR
A.C. PAVEMENT
UNDISTURBED
SOIL
COMPACTED SOIL FROM
EXCAVATION SPOILS
(5) 2" CONDUIT
5'
NEW
CONCRETE
DEPTH VARIES
12" MIN.
8"
4" TYPE 2 UNDER
CONCRETE
(1) 4" CONDUIT
RED CONCRETE
SLURRY CAP
TO POWER
VAULT AT ROW
NEW 100A 3P
PANEL
NEW POWER
SERVICE RACK
NEW BOLLARD
(TYP)
NEW 60A 3P DISCONNECT
NEW 30 KVA 3P
480-208Y/120VAC
TRANSFORMER
EXISTING
SUNSHADE POLE
EXISTING
CONCRETE
NEW COMM
BOX
TO COMM
VAULT AT ROW
NEW CONCRETE PAD
NEW 200A 3P
PANEL
NEW POWER
SERVICE RACK
NEW 75 KVA 3P
208-480Y/277VAC
TRANSFORMER
EXISTING
CONCRETE
AT NEW 75 KVA
TRANSFORMER LOCATION
TO POWER
VAULTS AT ROWS
40 - 43
TO POWER
VAULT AT ROW 44
NEW CONCRETE PAD
1" DIA DOWELS 20"
LONG @12" O.C.
EXISTING
CONCRETE
NEW 45OO PSI
CONCRETE
CONTROL JOINT
SEE DETAIL A
1/2" ± 1/8"
2 1/2"
SAW 1/4" GROOVE
SEAL WITH JOINT
SEALANT
DETAIL A
SCALE: NTS
BOLLARD DETAIL
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 40-44
CIVIL DETAILS
AS SHOWN
20-0084
RKMF200084C01
WELDIN
WELDIN
WELDIN
WELDIN
C-1
12/10/21
9/9/19
9/9/19
9/9/19
9/9/19
AS-BUILT
RECORD
DRAWINGS
SCALE: NTS
MAIN TRENCH DETAIL
SCALE: NTS
COMM TRENCH DETAIL
SCALE: NTS
POWER TRENCH DETAIL
SCALE: NTS
SERVICE / COMM ELEVATION AT SUNSHADES
SCALE: NTS
SERVICE AT NEW 75KVA TRANSFORMER
SCALE: NTS
CONCRETE DETAIL
ROW 42
EXISTING TIE DOWN
NEW TIE DOWN #1
NEW TIE DOWN #2
EXISTING TIE DOWN
EXISTING TIE DOWN
4'-7"
ROW 43
NEW TIE DOWN #3
NEW TIE DOWN #4
5'-5"
ROW 44
NEW TIE DOWN #5
NEW TIE DOWN #6
EXISTING TIE DOWN
EXISTING TIE DOWN
1' CORED HOLE
1'
Ø1.25" EXISTING SURFACE
FIRST LIFT TO WITHIN
5" OF PAVEMENT
SURFACE
BENTONITE ADDITION IF
NECESSARY
PLAN VIEW
SCALE: NTS
ROW 42 TIE DOWN REPLACEMNET
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 40-44
TIE DOWN REPLACEMENT DETAILS
AS SHOWN
20-0084
RKMF200084C02
WELDIN
WELDIN
WELDIN
WELDIN
C-2
12/10/21
9/9/19
9/9/19
9/9/19
9/9/19
AS-BUILT
RECORD
DRAWINGS
SCALE: NTS
ROW 43 TIE DOWN REPLACEMNET
SCALE: NTS
ROW 44 TIE DOWN REPLACEMNET
SCALE: NTS
TIE DOWN DETAIL
POINT OF CONNECTION IN
EXISTING ELECTRICAL
ROOM
ROW 41 ROW 42
R
R
ROW 40
NEW 75 TRANSFORMER
WITH 3'x4' CONCRETE PAD
EXISTING SERVICE
BLDG 878
2.5" CONDUIT
4- 4/0
BLK,RED,BLU,GRN
NEW COMM
PULL BOX
ROW 44
NEW ELEC
PULL BOX
ROW 44
4" COMM
CONDUIT
NEW COMM
BOX ROW 44
NEW
TRANSFORMER
ROW 44
3P 480V
DIST PANEL
NEW COMM
PULL BOX
ROW 41
NEW ELEC
PULL BOX
ROW 41
NEW COMM
BOX ROW 41
4" COMM
CONDUIT
NEW
TRANSFORMER
ROW 41
NEW COMM
PULL BOX
ROW 42
NEW ELEC
PULL BOX
ROW 42
NEW COMM
BOX ROW 42
4" COMM
CONDUIT
NEW
TRANSFORMER
ROW42
NEW COMM
PULL BOX
ROW 43
NEW ELEC
PULL BOX ROW 43
4" COMM
CONDUIT
NEW COMM
BOX ROW 43
NEW
TRANSFORMER
ROW 43
NEW COMM
PULL BOX
ROW 40
NEW ELEC
PULL BOX
ROW 40
NEW COMM
BOX ROW 40
4" COMM
CONDUIT
NEW
TRANSFORMER
ROW 40
NEW
COMM
BOX
4" COMM
CONDUIT
2" POWER
CONDUIT
PNL ROW 44
100A MCB
10KAIC
PNL ROW 43
100A MCB
10KAIC
PNL ROW 42
100A MCB
10KAIC
PNL ROW 41
100A MCB
10KAIC
PNL ROW 40
100A MCB
10KAIC
NEW
DISCONNECT
SWITCH
NEW
DISCONNECT
SWITCH
NEW
DISCONNECT
SWITCH
NEW
DISCONNECT
SWITCH
2" CONDUIT
W #2 GAUGE
2" CONDUIT
W #4 GAUGE
2" CONDUIT
W #4 GAUGE
2" CONDUIT
W #3 GAUGE
2" CONDUIT
W #1 GAUGE
NEW
DISCONNECT
SWITCH
75 KVA
208V-480V
STEP UP
XFMR
3 PH 208V
200A 3P 208V
CKT BREAKER
SCALE: 1"=60'-0"
POWER PLAN ROWS 40 - 44
N
ES
W
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 40-44
POWER PLAN
AS SHOWN
200084
RKMF200084E01
WELDIN
WELDIN
WELDIN
WELDIN
E-1
12/10/21
9/9/19
9/9/19
9/9/19
9/9/19
AS-BUILT
RECORD
DRAWINGS
SHEET NOTES:
LEGEND
NOT IN CONTRACT
0 60' 120' 180'
SCALE: 1" = 60'
30'
1. CONTRACTOR TO VERIFY LOCATION AND SIZE OF EXISTING
EQUIPMENT FOR DEMOLITION, RELOCATION AND POINT OF
CONNECTION
2. THE CONSTRUCTION SIGHT WILL BE SWEPT DAILY OR AS
NEEDED TO KEEP THE FLIGHT LINE CLEAR OF SOIL AND
DEBRIS (FOD)
3. ESCORTS WILL BE REQUIRED FOR THIS PROJECT
4. ASPHALT CUTS ARE APPROX. 4" THICK
5. CONCRETE VEHICLE ROAD CUTS ARE APPROX. 8" THICK
6. CONCRETE APRON CUTS ARE APPROX. 12"± 2" THICK
CONSTRUCTION NOTES
SCALE: NTS
CONDUIT LAYOUT ROWS 40 -44
1 INSTALL NEW DRY TYPE TRANSFORMER FOR EACH ROW
2 INSTALL NEW CONCRETE ELECTRICAL PULL BOX FOR
EACH ROW
4 INSTALL NEW 100A PANEL FOR EACH ROW
5 INSTALL NEW BOLT DOWN BOLLARDS FOR EACH ROW
6 INSTALL 4" SCH 80 CONDUIT FOR COMMUNICATIONS
3 INSTALL NEW CONCRETE COMMUNICATION PULL BOX
FOR EACH ROW
7 INSTALL 2" SCH 80 CONDUIT FOR POWER
8 INSTALL NEW COMM BOX FOR EACH ROW
1 4 5
1 4 5
1 4 5
1 4 5
1 4 5
9 INSTALL NEW 200A LOAD CENTER ON SUNSHADE POLE AT
ROW 44
AutoCAD SHX Text
BUILDING 878
AutoCAD SHX Text
BUILDING 880
AutoCAD SHX Text
BUILDING 882
AutoCAD SHX Text
BUILDING 297
AutoCAD SHX Text
BUILDING 295
AutoCAD SHX Text
SUNSHADE 40
AutoCAD SHX Text
SUNSHADE 41
AutoCAD SHX Text
SUNSHADE 42
AutoCAD SHX Text
SUNSHADE 43
AutoCAD SHX Text
SUNSHADE 44
AutoCAD SHX Text
FUTURE SUNSHADE 39
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
T
| RKMF200084G01 |
| RKMF200084G01-G-1 |
| RKMF200084G02 |
| RKMF200084G02-G-2 |
| RKMF200084G03 |
| RKMF200084G03-G-3 |
| RKMF200084CD1 |
| RKMF200084CD1-CD-3 |
| RKMF200084C01 |
| RKMF200084C01-C-1 |
| RKMF200084C02 |
| RKMF200084C02-C-2 |
| RKMF200084E01 |
| RKMF200084E01-E-3 |
File details come from the government source that posted it. Updated .