Attachment 12 - RKMF210070 - Electrical As-Builts Sunshades 23-24.pdf
PDF 1 MB Posted
- Attached to
- 57 WG Sunshades Nellis AFB
- Solicitation number
- F3G3AA3111AW01
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RKMF 21-0070
NELLIS AIR FORCE BASE
NEVADA
SCHEDULE OF DRAWINGS
SHEET REFERENCE NUMBER SHEET TITLE
G-1 COVER PAGE, HAUL ROUTE
G-2 GENERAL NOTES AND LAYDOWN AREA
G-3 SITE PLAN
C-1 SITE PLAN LAYOUT ROWS 23 & 24
C-2 CIVIL DETAILS
E-1 POWER PLAN ROWS 23 & 24
INSTALL ELECTRICAL POWER
TO SUNSHADES ROW 23 & 24
BASE CIVIL ENGINEERING
(BLDG 812)
NORTH GATE
SECURITY POLICE
(BLDG 2)
MAIN GATE
CONTRACTING OFFICE
(BLDG 588)
TYNDALL GATE
N
E
S
W
FIRE DEPT
(BLDG 277)
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I L E
N
O
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 23 & 24
COVER PAGE, HAUL ROUTE
AS SHOWN
21-0070
RKMF210070G01
WELDIN
WELDIN
WELDIN
WELDIN
G-1
9/30/22
9/30/22
9/30/22
9/30/22
9/30/22
AS-BUILT
RECORD
DRAWINGS
HAUL ROUTE
PROJECT LOCATION
ROWS 23 AND 24
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 23 & 24
GENERAL NOTES
AS SHOWN
21-0070
RKMF210070G02
WELDIN
WELDIN
WELDIN
WELDIN
G-2
9/30/22
9/30/22
9/30/22
9/30/22
9/30/22
AS-BUILT
RECORD
DRAWINGS
3. DESCRIPTIONS OF WORK
Install Electrical Power and Communication lines for Flightline Sunshades Rows 23 & 24. All construction shall meet all Applicable Local, State, and Federal Codes & Standards including
ADA. The Contractor shall provide a 35% design, cost estimate (PDF and E4 Clicks), this Scope of Work (compliant with the SOO), and ABS and LBS survey results (as required). The work to be accomplished includes the following description.
3.1 General Requirements – Division 1
3.1.1 Conduct weekly meetings with 99CES/CENMP Project Manager, and the Contracting Officer (if available).
3.1.2 Weldin will submit 35% design drawings for government review and approval.
3.1.3 Provide and install temporary laydown area beside the designated work area.
3.1.4 Provide temporary restrooms and handwashing station for work crews.
3.1.5 Provide construction debris dumpsters.
3.1.6 Provide daily cleaning and site maintenance to ensure a safe and clean work area.
3.1.7 Provide final cleaning of the construction area.
3.1.8 The construction sites shall be swept daily or as required to keep flight line clear of soil and debris (FOD).
3.1.9 Provide third party security escorts during the duration of the project.
3.2 Existing Conditions – Division 2
3.2.1 Provide low profile barricades at jobsite to ensure that the construction site area is contained and physically separated from the public.
3.2.2 Sawcut and remove existing concrete apron for trenching and conduit placement. The main trench in the apron to be 5’ in width. Minimize trench saw cutting in the apron and roadways. The concrete is 12” ±-(1”) thick in most places.
3.2.3 Provide Hydro-Excavation for the exposing of existing utility lines under the removed concrete on the roadway and taxiways. Hydro-Excavate the entire trench line.
3.2.4 Provide trench plates over open trenches where required for vehicle and airplane crossing during construction.
3.3 Concrete – Division 3
3.3.1 Contractor shall hire a third-party testing personnel for concrete and provide test result to the Government.
3.3.2 Drill 1 ¼” holes at 12” on center into the side of the existing concrete slab to insert 1” plastic sleeves and metal dowels.
3.3.3 Provide and install asphalt expansion joint material between existing concrete and new concrete place on roadways and taxiways.
3.3.4 Provide and install 1” diameter metal dowels, 20” long and 10” plastic sleeves at 12” on center on each side of the trench to anchor existing concrete slab to new concrete slab.
3.3.5 Provide and install #5 rebar reinforcement in electrical & comm service trenches to future sunshades and the side of the new vaults. No additional reinforcement will be installed in trench for concrete preparation.
3.3.6 Replace concrete apron for trenching and conduit placement. Concrete will be 12” thick, #844, 4500-psi 650PSI Flex Design mix and in accordance with specifications for airfield pavements.
3.3.7 Sawcut new expansion joint every 10’ +/- in the newly placed concrete.
3.3.8 Provide and install expansion joint epoxy filler to newly placed concrete.
3.4 Metals – Division 5
3.4.1 Provide and install four (4) conduit cover plates, two (2) at each future sunshade location to protect the newly installed electrical and comm conduit.
3.5 Finishes – Division 9
3.5.1 Paint the required airport striping adjacent to rows 23 & 24 where the service trench concrete is replaced.
3.6 Electrical – Division 26
3.6.1 Provide and install twelve (12) each schedule 40, 4” PVC conduit from the existing vault at Sunshade 22 to rows 22 & 23. One (1) each conduit will be run to the electrical vaults at each sunshade and ten (10) spare conduits will be installed through and past the electrical vault at row 24 and capped for future use. Conduit to be installed a minimum of 12” below bottom of concrete. Use conduit chairs and bracing where needed.
3.6.2 Provide one (1) schedule 40, 2” PVC conduit from each electrical vault to the specified location at rows 23 & 24. Stub up to withing ½” of the elevation of existing concrete.
3.6.3 Provide and install three (3) 1/0Cu and one (1) #2Cu ground from the existing 100A switchboard at Bldg. 253 to each electrical vault which will be placed at Sunshades 23 & 24.
Assume a load of approximately 100A at 208Y/120VAC for each row of sunshades. Use the existing conduit from Bldg. 253 to the existing vault at Sunshade 22. Coil 30’ of new wire in the electrical vaults at each sunshade.
3.6.4 Connect the new electrical wire at the 100A switchboard at Bldg. 256. Testing and the report from testing is required on the new electrical wire.
3.6.5 Provide Lock-Out-Tag-Out at the 100A switchboard for the new electrical wire for Sunshades 23 & 24.
3.7 Communications – Division 27
3.7.1 Provide and install two (2) each 4” schedule 40 PVC conduit from the new vault at Sunshade 22 through the new comm vaults at rows 23 & 24 and capped on the exit side of the vault at row 24 for future use. Conduit to be installed a minimum of 12” below bottom of concrete.
3.7.2 Provide one (1) schedule 40, 2” PVC conduit from each comm vault to the specified location at rows 23 & 24. Stub up to within ½” of the elevation of existing concrete.
3.7.3 No communication fiber will be installed on this project.
3.8 Earthwork – Division 31
3.8.1 Contractor shall hire a third-party testing personnel for soil density testing and provide test result to the Government.
3.8.2 Remove existing sawcut concrete apron, asphalt and landscaping for trenching and haul off site and dispose of. The main trench in the apron to be 5’ in width. The existing concrete is 12” ±-(1”) thick in most places.
3.8.3 Provide Hydro-Excavation for the exposing of existing utility lines under the removed concrete on the roadway and taxiways.
3.8.4 Provide dust control via existing hydrants and or water truck.
3.8.5 Excavate the native material from trench after removal of concrete to a minimum depth of 4’1”. Haul the material off site and store for put back.
3.8.6 Provide a sand bedding and cover for new electrical and communication conduit. Conduit to have a minimal of 3” sand bedding underneath and 6” cover over the conduit.
3.8.7 Backfill trench with the native material that was stored after it was removed from the trench.
3.8.8 Provide and install 4” of Type II road base prior to concrete placement.
3.9 Exterior Improvements – Division 32
3.9.1 Replace any removed asphalt and landscaping rock that was removed during the trenching process.
3.10 Utilities – Division 33
3.10.1Provide and install five (5) 100,000 lbs. rated concrete vaults at rows 22, 23 & 24, three (3) Communication vaults and two (2) Electrical vaults. One (1) comm vault to be installed at
Row 22 near the existing electrical vault, one (1) at each row for electric and one (1) at each row for communications.
SCALE: NTS
OVERALL SITE PLAN
N
ES
W
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 23 & 24
OVERALL SITE PLAN
AS SHOWN
21-0070
RKMF210070G03
WELDIN
WELDIN
WELDIN
WELDIN
G-3
9/30/22
9/30/22
9/30/22
9/30/22
9/30/22
AS-BUILT
RECORD
DRAWINGS
LAYDOWN AREA
AutoCAD SHX Text
BUILDING 276
AutoCAD SHX Text
BUILDING 270
AutoCAD SHX Text
BUILDING 259
AutoCAD SHX Text
BUILDING 262
AutoCAD SHX Text
BUILDING 260
AutoCAD SHX Text
BUILDING 257
AutoCAD SHX Text
BUILDING 253
AutoCAD SHX Text
BUILDING 255
AutoCAD SHX Text
BUILDING 256
AutoCAD SHX Text
BUILDING 252
AutoCAD SHX Text
BUILDING 277
AutoCAD SHX Text
BUILDING 256
AutoCAD SHX Text
BUILDING 253
AutoCAD SHX Text
SUNSHADE 16
AutoCAD SHX Text
SUNSHADE 17
AutoCAD SHX Text
SUNSHADE 18
AutoCAD SHX Text
SUNSHADE 19
AutoCAD SHX Text
SUNSHADE 20
AutoCAD SHX Text
SUNSHADE 21
AutoCAD SHX Text
SUNSHADE 22
AutoCAD SHX Text
FUTURE SUNSHADE 23
AutoCAD SHX Text
FUTURE SUNSHADE 24
AutoCAD SHX Text
FUTURE SUNSHADE 25
AutoCAD SHX Text
FUTURE SUNSHADE 26
AutoCAD SHX Text
FUTURE SUNSHADE 27
ROW 23 ROW 24
EXISTING POWER VAULT
AT SUNSHADE 22
460'±
ROW 23
ROW 24
EXISTING POWER VAULT
AT SUNSHADE 22
NEW COMM VAULT
ROW 23
NEW POWER VAULT
ROW 23
NEW COMM VAULT
ROW 24
NEW POWER VAULT
ROW 24
C1
MAIN TRENCH
C1
COMM TRENCH
POWER TRENCH
C1
C1
MAIN TRENCH
C1
COMM TRENCH
POWER TRENCH
C1
STUB UP PLATES (TYP)
C1
NEW COMM VAULT
ROW 22
SCALE: 1"=60'-0"
DEMOLITION LAYOUT ROWS 23 &24
N
ES
W
SHEET NOTES:
LEGEND
NOT IN CONTRACT
0 60' 120' 180'
SCALE: 1" = 60'
30'
DEMOLITION NOTES
1. CONTRACTOR TO VERIFY LOCATION AND SIZE
OF EXISTING EQUIPMENT FOR DEMOLITION,
RELOCATION AND POINT OF CONNECTION
2. THE CONSTRUCTION SIGHT WILL BE SWEPT
DAILY OR AS NEEDED TO KEEP THE FLIGHT
LINE CLEAR OF SOIL AND DEBRIS (FOD)
3. ESCORTS WILL BE REQUIRED FOR THIS
PROJECT
4. ASPHALT CUTS ARE APPROX. 4" THICK
5. CONCRETE VEHICLE ROAD CUTS ARE APPROX.
8" THICK
6. CONCRETE APRON CUTS ARE APPROX. 12"± 2"
THICK
SAWCUT EXISTING CONCRETE AS NEED TO
TRENCH FOR ELECTRICAL & COMM CONDUIT
2 SAWCUT EXISTING CONCRETE AS NEEDED TO
INSTALL NEW COMM & POWER STUB UP WITH
FLUSH CAPS AT EXISTING CONCRETE LEVEL
SCALE: 1"=60'-0"
SITE LAYOUT ROWS 23 &24
N
ES
W
0 60' 120' 180'
SCALE: 1" = 60'
30'
CONSTRUCTION NOTES
INSTALL NEW CONCRETE AS NEED TO
TRENCH FOR ELECTRICAL & COMM CONDUIT
2 INSTALL NEW CONCRETE AS NEEDED TO
INSTALL NEW COMM & POWER STUB UP WITH
FLUSH CAPS AT EXISTING CONCRETE LEVEL
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 23 & 24
SITE PLAN LAYOUT
AS SHOWN
21-0070
RKMF210070C1
WELDIN
WELDIN
WELDIN
WELDIN
C-1
9/30/22
9/30/22
9/30/22
9/30/22
9/30/22
AS-BUILT
RECORD
DRAWINGS
3 SAWCUT EXISTING CONCRETE AS NEEDED TO
INSTALL NEW COMM & POWER VAULTS
3 PROVIDE AND INSTALL NEW COMM & POWER
VAULTS
4 PROVIDE AND INSTALL NEW COMM & POWER
STUB UP PLATES
AutoCAD SHX Text
BUILDING 270
AutoCAD SHX Text
BUILDING 259
AutoCAD SHX Text
SUNSHADE 20
AutoCAD SHX Text
SUNSHADE 21
AutoCAD SHX Text
SUNSHADE 22
AutoCAD SHX Text
FUTURE SUNSHADE 25
AutoCAD SHX Text
FUTURE SUNSHADE 26
AutoCAD SHX Text
BUILDING 259
AutoCAD SHX Text
BUILDING 277
AutoCAD SHX Text
SUNSHADE 21
AutoCAD SHX Text
SUNSHADE 22
AutoCAD SHX Text
FUTURE SUNSHADE 25
FUTURE SUNSHADE 26
EXISTING
CONCRETE OR
A.C. PAVEMENT
UNDISTURBED
SOIL
COMPACTED SOIL FROM
EXCAVATION SPOILS
SAND BEDDING
4" CONDUIT
2'
NEW
CONCRETE
DEPTH VARIES
12" -16"
MIN.
8"
4" TYPE 2 UNDER
CONCRETE
NOTE: RUN COMM TRENCH 4" DEEPER THAN POWER TRENCH WERE
THEY CROSS EACH OTHER
EXISTING
CONCRETE OR
A.C. PAVEMENT
UNDISTURBED
SOIL
COMPACTED SOIL FROM
EXCAVATION SPOILS
2'
NEW
CONCRETE
DEPTH VARIES
12" MIN.
8"
4" TYPE 2 UNDER
CONCRETE
4" CONDUIT
SAND BEDDING
EXISTING
CONCRETE OR
A.C. PAVEMENT
UNDISTURBED
SOIL
COMPACTED SOIL FROM
EXCAVATION SPOILS
(12) 4" POWER CONDUIT
5'
NEW
CONCRETE
DEPTH VARIES
12" MIN.
4" TYPE 2 UNDER
CONCRETE
(2) 4" COMM CONDUIT
SAND BEDDING
1" DIA DOWELS 20"
LONG @12" O.C.
EXISTING
CONCRETE
NEW 45OO PSI
CONCRETE
CONTROL JOINT
SEE DETAIL A
CONTROL JOINT
SEE DETAIL A
1/2" ± 1/8"
2 1/2"
SAW 1/4" GROOVE
FILL WITH EXPANSION
JOINT EPOXY
DETAIL A
8"
SQ
1" Ø
PICKING
HOLE
NOTE: PLATE IS 8"x8"x
" THICK
8"
3-7/8"Ø OR
1-7/8" Ø
PIPE
(2) 5" DIA THROUGH
HOLES AS SHOWN.
LOCATON MAY VARY TO
AVOID REINFORCEMENT
(2) 5" DIA THROUGH
HOLES AS SHOWN.
LOCATON MAY VARY TO
AVOID REINFORCEMENT
#4 @ 12" OC
ELEVATION VIEW
#4 HORIZ. U-BAR
@ 12" OC
(4) #4 REBAR
VERT. U-BAR
@ 12" O.C.
1 1/2"", CLR
K2S SPRING ASSIST
HATCH LID BY NEENAH
FOUNDRY
(2) 3/4" X 6" FERRULE
LOOP INSERTS FOR
LIFTING
PLAN VIEW
3'-6"
2'-2"8"
8"
8"
8"
PLAN VIEW
8"
8"
8"
8" 2'-2"
3'-6"
(2) 3/4" X 6" FERRULE
LOOP INSERTS FOR
LIFTING
2"
1"
3 1/2"
7"
0"
(4) #4 REBAR
VERT. U-BAR
@ 12" O.C.
(6) #4 HORIZ.
U-BAR @ 10" OC
MAX
ELEVATION VIEW
(1) 3" DIA THROUGH
HOLE, 1/2" CLR FROM
INVERT
(11) 5" DIA THROUGH
HOLES AS SHOWN.
LOCATON MAY VARY TO
AVOID REINFORCEMENT
(10) 5" DIA THROUGH
HOLES AS SHOWN.
LOCATON MAY VARY TO
AVOID REINFORCEMENT
1 1/2", CLR
K2S SPRING ASSIST
HATCH LID BY NEENAH
FOUNDRY
#4 @ 12" OC
1'-9"1'-9"
8", TYP
SIDE VIEW
SCALE: NTS
MAIN TRENCH DETAIL
SCALE: NTS
COMM TRENCH DETAIL
SCALE: NTS
POWER TRENCH DETAIL
SCALE: NTS
CONCRETE DETAIL
SCALE: NTS
CONDUIT STUB UP COVER PLATE DETAIL
SCALE: NTS
PRECAST COMM VAULT DETAIL
SCALE: NTS
PRECAST POWER VAULT DETAIL
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 23 & 24
CIVIL DETAILS
AS SHOWN
21-0070
RKMF210070C2
WELDIN
WELDIN
WELDIN
WELDIN
C-2
9/30/22
9/30/22
9/30/22
9/30/22
9/30/22
AS-BUILT
RECORD
DRAWINGS
ROW 23 ROW 24
EXISTING POWER VAULT
AT SUNSHADE 22
NEW COMM VAULT
ROW 23
NEW POWER VAULT
ROW 23
NEW COMM VAULT
ROW 24
NEW POWER VAULT
ROW 24
NEW COMM VAULT
ROW 22
EXISTING SERVICE
100A SWITCHBOARD
ADJACENT TO BLDG 253
EXISTING POWER
VAULT AT ROW 22
EXISTING 4" CONDUIT
PROVIDE (3) 1/0Cu AND (1)
#2 Cu GROUND TO EACH
NEW POWER VAULT
PROVIDE LOCK
OUT TAG OUT
FOR NEW WIRES
INSTALLED
NEW POWER
VAULT AT ROW 23
NEW POWER
VAULT AT ROW 24
PROVIDE (12) 4" CONDUIT
(11) SPARE WITH PULL STRING
(2) WITH 1/0Cu AND
(1) #2 Cu GROUND
PROVIDE (11) 4" CONDUIT
(10) SPARE WITH PULL STRING
(1) WITH 1/0Cu AND
(1) #2 Cu GROUND
NEW COMM
VAULT ROW 23
STUB UP
PLATE ROW 23
2" COMM
CONDUIT
WITH PULL
STRING
PROVIDE (2)
4" COMM
CONDUIT
STUB UP
PLATE ROW 23
2" POWER
CONDUIT
WITH PULL
STRING
NEW COMM
VAULT ROW 24
STUB UP
PLATE ROW 24
2" COMM
CONDUIT
WITH PULL
STRING
STUB UP
PLATE ROW 24
2" POWER
CONDUIT
WITH PULL
STRING
EXTEND (2) 4"
CONDUIT 10'
AND PLUG
EXTEND (10) 4"
CONDUITS 10'
AND PLUG
NEW COMM
VAULT ROW 22
PROVIDE (2)
4" COMM
CONDUIT
SUNSHADE MDP PANEL SCHEDULE
CKT# DESCRIPTION
25 SUNSHADE 23
27 SUNSHADE 24
AMP
CKT #25 SS 23
CKT #25 SS 24
SCALE: 1"=60'-0"
POWER PLAN ROWS 23 & 24
N
ES
W
SHEET NOTES:
LEGEND
NOT IN CONTRACT
0 60' 120' 180'
SCALE: 1" = 60'
30'
1. CONTRACTOR TO VERIFY LOCATION AND SIZE OF EXISTING
EQUIPMENT FOR DEMOLITION, RELOCATION AND POINT OF
CONNECTION
2. THE CONSTRUCTION SIGHT WILL BE SWEPT DAILY OR AS
NEEDED TO KEEP THE FLIGHT LINE CLEAR OF SOIL AND
DEBRIS (FOD)
3. ESCORTS WILL BE REQUIRED FOR THIS PROJECT
4. ASPHALT CUTS ARE APPROX. 4" THICK
5. CONCRETE VEHICLE ROAD CUTS ARE APPROX. 8" THICK
6. CONCRETE APRON CUTS ARE APPROX. 12"± 2" THICK
CONSTRUCTION NOTES
SCALE: NTS
CONDUIT LAYOUT ROWS 23 & 24
1 INSTALL NEW CONCRETE ELECTRICAL VAULT FOR
EACH ROW
3 INSTALL 4" SCH 40 CONDUIT FOR COMMUNICATIONS
2 INSTALL NEW CONCRETE COMMUNICATION VAULT FOR
EACH ROW
4 INSTALL 4" SCH 40 CONDUIT FOR POWER
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 23 & 24
POWER PLAN
AS SHOWN
21-0070
RKMF210070E1
WELDIN
WELDIN
WELDIN
WELDIN
E-1
9/30/22
9/30/22
9/30/22
9/30/22
9/30/22
AS-BUILT
RECORD
DRAWINGS
5 PROVIDE AND INSTALL POWER WIRE, TERMINATE WITH
LOCK OUT TAG OUT AT SERVICE PANEL BY BLDG 253 AND
COIL OTHER END AT NEW POWER VAULT ROWS 23 & 24
3 3
AutoCAD SHX Text
BUILDING 277
AutoCAD SHX Text
BUILDING 270
AutoCAD SHX Text
BUILDING 259
AutoCAD SHX Text
BUILDING 262
AutoCAD SHX Text
BUILDING 277
AutoCAD SHX Text
SUNSHADE 20
AutoCAD SHX Text
SUNSHADE 21
AutoCAD SHX Text
SUNSHADE 22
AutoCAD SHX Text
FUTURE SUNSHADE 25
AutoCAD SHX Text
FUTURE SUNSHADE 26
AutoCAD SHX Text
FUTURE SUNSHADE 28
FUTURE SUNSHADE 27
| RKMF210070G01 |
| RKMF210070G01-G-1 |
| RKMF210070G02 |
| RKMF210070G02-G-2 |
| RKMF210070G03 |
| RKMF210070G03-G-3 |
| RKMF210070C1 |
| RKMF210070C1-C-1 |
| RKMF210070C2 |
| RKMF210070C2-C-2 |
| RKMF210070E1 |
| RKMF210070E1-E-1 |
File details come from the government source that posted it. Updated .