RKMF 20-0146
NELLIS AIR FORCE BASE
NEVADA
SCHEDULE OF DRAWINGS
SHEET REFERENCE NUMBER SHEET TITLE
G-1 COVER PAGE, HAUL ROUTE
G-2 GENERAL NOTES
G-3 OVERALL SITE PLAN
CD-1 DEMOLITION PLAN HANGAR 190
C-1 NEW SITE PLAN HANGAR 190
C-2 CIVIL DETAILS
E-1 ELECTRICAL SITE PLAN HANGAR 190
E-2 ELECTRICAL DETAILS HANGAR 190
CONSTRUCT LIGHTS AND
RECEPTACLES FOR APRON
SUNSHADES
BASE CIVIL ENGINEERING
(BLDG 812)
NORTH GATE
SECURITY POLICE
(BLDG 2)
MAIN GATE
CONTRACTING OFFICE
(BLDG 588)
SIMMONS GATE
N
E
S
W
FIRE DEPT
(BLDG 277)
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I L E
N
O
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
CONSTRUCT LIGHT & RECEPTACLES
FLIGHT LINE
COVER PAGE, HAUL ROUTE
AS SHOWN
20-0146
RKMF200146G01
WELDIN
WELDIN
WELDIN
WELDIN
G-1
4/26/22
9/17/20
9/17/20
9/17/20
9/17/20
AS-BUILT
RECORD
DRAWINGS
HAUL ROUTE
PROJECT LOCATION
HANGAR 190
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
CONSTRUCT LIGHT & RECEPTACLES
FLIGHT LINE
GENERAL NOTES
AS SHOWN
20-0146
RKMF200146G02
WELDIN
WELDIN
WELDIN
WELDIN
G-2
4/22/22
9/17/20
9/17/20
9/17/20
9/17/20
AS-BUILT
RECORD
DRAWINGS
3. DESCRIPTIONS OF WORK
Upgrade Hanger 190 sunshade with a new transformer, electrical panel surge suppressor incorporated in the panel, electrical circuits, and LED lighting. All construction shall meet all
Applicable Local, State, and Federal Codes & Standards including ADA. The Contractor shall provide a 10% design, cost estimate (PDF and E4 Clicks), this Scope of Work (compliant with the SOO), and ABS and LBS survey results (as required). The work to be accomplished includes the following description.
3.1 General Requirements – Division 1
3.1.1 Weldin shall ensure during this project that the construction site area is contained and physically separated from the public.
3.1.2 The construction sites shall be swept daily or as required to keep flight line clear of soil and debris (FOD).
3.1.3 Provide escorts on the flight line for the duration of this project, as escorts are required.
3.1.4 Provide temporary portable restroom facility and COVID concern hand washing station for contractor use for duration of project.
3.1.5 Provide construction debris dumpster.
3.2 Existing Conditions – Division 2
3.2.1 Saw cut the apron concrete and demolish it for electrical trenching and conduit placement at Hangar 190 sunshade.
3.2.2 Core drill through the CMU wall of the wash rack control building for new electrical supply to the Hangar 190 sunshade.
3.2.3 Provide temporary low-profile barricades to direct traffic around work site area.
3.3 Concrete – Division 3
3.3.1 Contractor shall hire a third-party testing personnel for concrete and provide test result to the Government.
3.3.2 Provide and install a 4” concrete housekeeping pad for the new transformer at Hangar 190 sunshade.
3.3.3 Provide and install concrete to replace the demolished apron sections for trenching.
3.3.4 Provide a broom finish to new concrete.
3.4 Metals – Division 5
3.4.1 Provide and install #4 rebar in the concrete housekeeping pad for the new transformer at Hangar 190 sunshade.
3.4.2 Provide and install rebar tied into the concrete apron for the top of the electrical trench at Hangar 190 sunshade.
3.4.3 Provide and install three (3) each 6” surface mount, bolt down bollards at Hangar 190 sunshade to protect the new transformer and electrical panel. Provide and install yellow bollard sleeves on all new bollards.
3.5 Electrical – Division 26
Hangar 190 Sunshade
3.5.1 Provide and install a 3P/50A breaker in the 480/277V panel board in the wash rack control building room 204.
3.5.2 Provide and install two (2) each 2” schedule 40 PVC conduit from the wash rack control building to the 60A/3P disconnect at the location on the sunshades. One (1) of the 2” conduit to be a spare.
3.5.3 Provide and install a 60A/3P disconnect equipped with 40A fuses in a NEMA 12 enclosure.
3.5.4 Provide and install a new 30KVA 480V-208Y/120VAC dry-type transformer at Hangar 190 sunshade. The transformer to include copper windings in an all-weather enclosure rated for 220 Deg C, Transformer with five (5) taps, two (2) taps above nominal, two (2) taps below at ½% increments. Install the transformer between the second column and the edge of the apron.
3.5.5 Provide and install a 1”x 8’ grounding rod adjacent to the transformer and attach it to the sunshade structure. Attach a #2 grounding conductor to the rod with XFMR grounding lug.
Provide grounding well with metal cover to protect grounding rod.
3.5.6 Provide and install 100A/3P, 208Y/120VAC electrical panel in a NEMA 4 enclosure. Panel to have 24 1/P bolt on breakers, tin plated copper busses and inline Eaton FD frame surge suppressor on the incoming line.
3.5.7 Provide and install screw on EMT conduit and couplings for electrical runs around the aircraft bays above the wing of the aircraft. All EMT couplings to be set screw fittings, compression couplings are not acceptable.
3.5.8 Provide and install IMC conduit at or below the wing of the aircraft. All couplings to be set screw fittings, compression couplings are not acceptable.
3.5.9 Provide and install waterproof junction boxes.
3.5.10Provide and install fourteen (14) Hubbell Ratio Flood RFL2 LED Light fixtures or equivalent to each bay, a total of seventy (70). New lights to be installed in a pattern similar to sunshade rows 17 thru 22 and as shown on drawings.
3.5.11Provide and install Hubbell CRN LED (or equal) wet location high bay fixtures in the ceiling with approximately 30fc at two feet above the concrete. Install four (4) each per bay, a total of twenty (20). Overhead LED lights and side LED lights to be operated on the same switch per bay.
3.5.12Provide and install 20A/1P duplex receptacles and light switch combination for each bay. Provide and install receptacles/switches in weatherproof boxes with hinged covers.
3.6 Earthwork – Division 31
3.6.1 Hire a third-party testing personnel for soil and compaction testing and provide test result to the Government.
3.6.2 Provide all equipment necessary to excavate and backfill for new electrical line services from the wash rack control building to the Hangar 190 sunshade.
3.6.3 Provide 8” of sand bedding around new electrical line.
3.6.4 Provide compacted soil above sand bedding.
3.6.5 Provide and install 4” of type 2 road base under concrete.
3.6.6 For backfill, soil to be compacted to 95% compaction in all excavated trench areas.
3.6.7 Remove and replace landscaping materials between concrete aprons at Hangar 190 sunshade excavation area
SCALE: NTS
OVERALL SITE PLAN
N
ES
W
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
CONSTRUCT LIGHT & RECEPTACLES
FLIGHT LINE
OVERALL SITE PLAN
AS SHOWN
20-0146
RKMF200146G03
WELDIN
WELDIN
WELDIN
WELDIN
G-3
4/22/22
9/17/20
9/17/20
9/17/20
9/17/20
AS-BUILT
RECORD
DRAWINGS
HANGAR 190
AutoCAD SHX Text
BUILDING 226
AutoCAD SHX Text
BUILDING 224
AutoCAD SHX Text
BUILDING 222
AutoCAD SHX Text
BUILDING 220
AutoCAD SHX Text
BUILDING 192
AutoCAD SHX Text
BUILDING 191
AutoCAD SHX Text
BUILDING 194
AutoCAD SHX Text
BUILDING 2152
AutoCAD SHX Text
BUILDING 180
AutoCAD SHX Text
SUNSHADE
AutoCAD SHX Text
SUNSHADE
AutoCAD SHX Text
SUNSHADE
AutoCAD SHX Text
SUNSHADE
AutoCAD SHX Text
SUNSHADE
AutoCAD SHX Text
WASH RACK
AutoCAD SHX Text
ELECTRICAL 204
WASH
RACK
ELECTRICAL
ROOM 204
SUNSHADE 190
BLDG 190
BLDG 180
BAY 1
BAY 2
BAY 3
BAY 4
BAY 5
CONCRETE
APRON
CONCRETE
APRON
CONCRETE
APRON
SCALE: 1"=20'-0"
SITE PLAN DEMOLITION LAYOUT
SHEET NOTES:
NOT IN CONTRACT
LEGEND
1. CONTRACTOR TO VERIFY LOCATION AND SIZE OF EXISTING
EQUIPMENT FOR DEMOLITION, RELOCATION AND POINT OF
CONNECTION
2. PROVIDE TEMP PORTABLE RESTROOM FACILITY AND COVID
CONCERN HAND WASHING STATION FOR DURATION OF
PROJECT
3. PROVIDE ESCORTS ON THE FLIGHT LINE FOR THE
DURATION OF THE PROJECT
4. PROVIDE LOW PROFILE BARRICADES TO DIRECT TRAFFIC
AROUND WORK SITE AREA
DEMOLISH EXISTING CONCRETE AS NEEDED TO INSTALL
POWER TRENCH
DEMOLITION NOTES
N
ES
W
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
CONSTRUCT LIGHT & RECEPTACLES
FLIGHT LINE
DEMOLITION PLAN HANGAR 190
AS SHOWN
20-0146
RKMF200146CD1
WELDIN
WELDIN
WELDIN
WELDIN
CD-1
4/22/22
9/17/20
9/17/20
9/17/20
9/17/20
AS-BUILT
RECORD
DRAWINGS
0 20' 40' 60'
SCALE: 1" = 20'
10'
DEMOLISH EXISTING LANDSCAPE AS NEEDED TO INSTALL
POWER TRENCH
CORE DRILL THROUGH THE CMU WALL OF THE WASH
RACK CONTROL BLDG FOR NEW ELECTRICAL SUPPLY TO
THE HANGAR 190 SUNSHADE
ELECTRICAL
ROOM 204
SUNSHADE 190
BLDG 190
BLDG 180
BAY 1
BAY 2
BAY 3
BAY 4
BAY 5
CONCRETE
APRON
CONCRETE
APRON
CONCRETE
APRON
U
G
E
SCALE: 1"=20'-0"
SITE PLAN LAYOUT
SHEET NOTES:
NOT IN CONTRACT
LEGEND
1. CONTRACTOR TO VERIFY LOCATION AND SIZE OF EXISTING
EQUIPMENT FOR DEMOLITION, RELOCATION AND POINT OF
CONNECTION
INSTALL NEW BOLT DOWN BOLLARDS
CONSTRUCTION NOTES
N
ES
W
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
CONSTRUCT LIGHT & RECEPTACLES
FLIGHT LINE
NEW SITE PLAN HANGAR 190
AS SHOWN
20-0146
RKMF200146C01
WELDIN
WELDIN
WELDIN
WELDIN
C-1
4/22/22
9/17/20
9/17/20
9/17/20
9/17/20
AS-BUILT
RECORD
DRAWINGS
0 20' 40' 60'
SCALE: 1" = 20'
10'
INSTALL NEW 4" CONCRETE PAD FOR TRANSFORMER
PATCH CONCRETE AREA OF TRENCH AS NEED
PATCH LANDSCAPE AREA OF TRENCH AS NEED
6" CONCRETE
FILLED BOLLARD
EXISTING
CONCRETE
" BOLT WITH 4"
MIN EMBEDMENT
10"
SQ
7"
" BOLT (TYP)
EXISTING
CONCRETE OR
A.C. PAVEMENT
UNDISTURBED
SOIL
COMPACTED SOIL FROM
EXCAVATION SPOILS
2'
NEW
CONCRETE
DEPTH VARIES
12" MIN.
8"
4" TYPE 2 UNDER
CONCRETE
2 EA. 2" PVC SCHEDULE
40 CONDUIT
SAND BEDDING
AND COVER
3.5" CONCRETE SLAB
ON EXISTING
CONCRETE FLOOR
#4 REBAR
3 1/2"
BROOM FINISH
2'-4"±
EXISTING
CONCRETE
APRON
EXISTING
LANDSCAPE
UNDISTURBED
SOIL
COMPACTED SOIL FROM
EXCAVATION SPOILS
2'
NEW
LANSCAPE
DEPTH VARIES
12" MIN.
8"
4" TYPE 2 UNDER
CONCRETE
SAND BEDDING
AND COVER
2 EA. 2" PVC SCHEDULE
40 CONDUIT
SCALE: NTS
BOLLARD DETAIL
SCALE: NTS
POWER TRENCH AT CONCRETE AREA DETAIL
SCALE: NTS
TRANSFORMER PAD AT SUNSHADE HANGAR 190
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
CONSTRUCT LIGHT & RECEPTACLES
FLIGHT LINE
CIVIL DETAILS
AS SHOWN
20-0146
RKMF200146C02
WELDIN
WELDIN
WELDIN
WELDIN
C-2
4/22/22
9/17/20
9/17/20
9/17/20
9/17/20
AS-BUILT
RECORD
DRAWINGS
SCALE: NTS
POWER TRENCH AT LANDSCAPE AREA DETAIL
ELECTRICAL
ROOM 204
S U
N S
H A
D
BLDG 190
BLDG 180
BAY 1
BAY 2
BAY 3
BAY 4
BAY 5
CONCRETE
APRON
CONCRETE
APRON
CONCRETE
APRON
TO EXISTING
PNL "HP3"
U
G
E
2" PVC SPARE
J
CKT 2
CKT 1
" EMT FOR
LIGHTING
(2)
" CONDUIT
12x12 J BOX
J
J
J
CKT 9
CKT 10
" EMT FOR
LIGHTING
CKT 7
CKT 8
" EMT FOR
LIGHTING
12x12 J BOX
12x12 J BOX
CKT 5
CKT 6
" EMT FOR
LIGHTING
CKT 3
CKT 4
" CONDUIT
(MAIN HOME
RUN)
1- 100A,3PH,120/208V, NEMA PNL
1- 30 KVA,480V-208Y/120VAC XFME (T30-2)
1- 60A, 3-POLE, NEMA 3 DISCONNECT
W/40A FUSE,FEED FROM HP3
SCALE: 1"=20'-0"
ELECTRICAL LAYOUT HANGAR 190
SHEET NOTES:
NOT IN CONTRACT
LEGEND
1. CONTRACTOR TO VERIFY LOCATION AND SIZE OF EXISTING
EQUIPMENT FOR DEMOLITION, RELOCATION AND POINT OF
CONNECTION
2. USE EMT FOR MOST OF THE RUNS AROUND THE AIRCRAFT
BAYS ABOVE THE WING OF THE AIRCRAFT, ANY RUNS AT
OR BELOW THE WINGS REQUIRES IMC.
3.
PROVIDE AND INSTALL 3P/50A BREAKER IN EXISTING
480/277V PANEL IN WASH RACK BLDG ROOM 204
CONSTRUCTION NOTES
N
ES
W
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
CONSTRUCT LIGHT & RECEPTACLES
FLIGHT LINE
ELECTRICAL SITE PLAN HANGAR 190
AS SHOWN
20-0146
RKMF200146E01
WELDIN
WELDIN
WELDIN
WELDIN
E-1
4/22/22
9/17/20
9/17/20
9/17/20
9/17/20
AS-BUILT
RECORD
DRAWINGS
0 20' 40' 60'
SCALE: 1" = 20'
10'
PROVIDE AND INSTALL 60A/3P DISCONNECT WITH 40A
FUSES IN NEMA 12 ENCLOSURE
PROVIDE AND INSTALL 30KVA 480V-208Y/120VAC DRY
TYPE TRANSFORMER
PROVIDE AND INSTALL 100A/3P 208Y/120VAC PANELIN A
NEMA 4 ENCLOSURE PANEL TO HAVE 24 1/P BOLT ON
BREAKERS, TIN PLATED COPPER BUSSES AND INLINE
EATON FD FRAME SURGE SUPPRESSOR ON THE
INCOMING LINE
PROVIDE AND INSTALL (70) HUBBELL RATIO FLOOD RFL2
LED LIGHT FIXTURES OR EQUIVALENT
PROVIDE AND INSTALL HUBBELL CRN OR EQUIVALENT
WET LOCATION HIGH BAY FIXTURES IN CEILING (THE
INTENT IS TO PROVIDE APPROX. 30FC AT TWO FEET
ABOVE CONCRETE APRON)
PROVIDE AND INSTALL DUPLEX RECEPTACLE AND LIGHT
SWITCH FOR EACH BAY
PROVIDE A 1"x8' GROUNDING ROD ADJACENT TO THE
TRANSFORMER AND CONNECT XFMR GROUNDING LUG TO
THE ROD WITH #2 GROUNDING CONDUCTOR. PROVIDE A
GROUNDING WELL TO PROTECT THE GROUNDING ROD.
PROVIDE AND INSTALL (2) HUBBELL CRN LED (OR EQUAL)
WET LOCATION HIGH BAY FIXTURES IN THE CEILING WITH
APPROX. 30FC AT TWO FEET ABOVE THE CONCRETE.
INSTALL (4) EACH PER BAY. OVERHEAD LED LIGHTS AND
SIDE LED LIGHTS TO BE OPERATED ON THE SAME SWITCH
PER BAY
TO POWER
IN WASH RACK
BLDG
NEW 100A 3P
PANEL
NEW POWER
SERVICE RACK
NEW BOLLARD
(TYP)
NEW 60A 3P DISCONNECT
NEW 30 KVA 3P
480-208Y/120VAC
TRANSFORMER
EXISTING
SUNSHADE POLE
EXISTING
CONCRETE
NEW CONCRETE PAD
EXISTING
STRUCTURE
NEW HIGH
BAY LIGHT
FIXTURE
NEW HIGH
BAY LIGHT
FIXTURE
NEW FLOOD
LIGHT FIXTURE
NEW FLOOD
LIGHT FIXTURE
NEW FLOOD
LIGHT FIXTURE
NEW RECEPTACLE
AND LIGHT SWITCH
NEW DOUBLE
FLOOD LIGHT
FIXTURE
NEW DOUBLE
FLOOD LIGHT
FIXTURE
NEW 30KVA
TRANSFORMER
PANEL WITH
SURGE
PROTECTOR
60A / 3P
DISCONNECT
SWITCH
WASH RACK
BLDG 204
EXISTING
PANEL
NEW 3P 50A
BREAKER
3/4" CONDUIT
8' GROUND ROD
3/4" CONDUIT
3/4" CONDUIT
SCALE: NTS
ELECTRICAL LAYOUT HANGAR 190
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
CONSTRUCT LIGHT & RECEPTACLES
FLIGHT LINE
ELECTRICAL DETAILS HANGAR 190
AS SHOWN
20-0146
RKMF200146E02
WELDIN
WELDIN
WELDIN
WELDIN
E-2
4/22/22
9/17/20
9/17/20
9/17/20
9/17/20
AS-BUILT
RECORD
DRAWINGS
SCALE: NTS
TYP LIGHTING ELEVATION HANGAR 190
SCALE: NTS
ELECTRICAL ONELINE HANGAR 190
1 2
3 4
5 6
7 8
9 10
11 12
13 14
15 16
17 18
19 20
21 22
23 24
25 26
27 28
29 30
CIRCUIT DIRECTORY
PANEL: FUEL BARN WELDING
SPARE
SPARE
BAY 1 GFCI RECAP
BAY 2 GFCI RECAP
BAY 3 GFCI RECAP
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
BLANK
BLANK
SPARE
BLANK
SPARE
SPARE
SPARE
BAY 5 GFCI RECAP
BAY 4 GFCI RECAP
BAY 1 LIGHTS
BAY 2 LIGHTS
BAY 3 LIGHTS
BAY 4 LIGHTS
BAY 5 LIGHTS
| RKMF200146G01 |
| RKMF200146G01-G-1 |
| RKMF200146G02 |
| RKMF200146G02-G-2 |
| RKMF200146G03 |
| RKMF200146G03-G-3 |
| RKMF200146CD1 |
| RKMF200146CD1-CD-1 |
| RKMF200146C01 |
| RKMF200146C01-C-1 |
| RKMF200146C02 |
| RKMF200146C02-C-2 |
| RKMF200146E01 |
| RKMF200146E01-E-1 |
| RKMF200146E02 |
| RKMF200146E02-E-2 |