Attachment 11 - RKMF200146 - Flood Lights and Receptacles for Sunshades.pdf

PDF 2 MB Posted

Attached to
57 WG Sunshades Nellis AFB
Solicitation number
F3G3AA3111AW01
Issued by

View the file

Other files

File Type Posted
Attachment 8 - Conduit Fill Calculation.pdf PDF
Attachment 7 - Sunshades Q and A 8 June 2023.pdf PDF
Attachment 12a - RKMF200083 - Electrical As-Builts Sunshades 31-34.pdf PDF
Attachment 10a - Electrical Power for Sunshades 20-22.pdf PDF
Attachment 5a - Sunshade Locations 23 and 24.pdf PDF
Attachment 5b - Sunshade Locations 23 24 39.pdf PDF
Combo - F3G3AA3111AW01 Sunshades - Amendment 4.pdf PDF
Attachment 10 - Electrical Power for Sunshades 17-19.pdf PDF
Attachment 9 - MSB One Line for Sunshades 13-34.pdf PDF
Attachment 12b - RKMF200084 - Electrical As-Builts Sunshades 41-46.pdf PDF
Attachment 12 - RKMF210070 - Electrical As-Builts Sunshades 23-24.pdf PDF
Attachment 1a - Statement of Work 31 May 23.pdf PDF
Combo - F3G3AA3111AW01 Sunshades - Amendment 3.pdf PDF
Attachment 6 - Sunshades Q and A 2 Sep 2022 Amendment 1.pdf PDF
Attachment 3a - Drawings for Reference.PDF PDF
Attachment 2 - Lighting Spec Sheet.pdf PDF
Combo - F3G3AA3111AW01 Sunshades.pdf PDF
Attachment 6 - Sunshades Q and A 2 Sep 2022.pdf PDF
Attachment 5 - Sunshade Rows Map Location.PNG PNG image
Attachment 1 - Statement Of Work 29 March 23.pdf PDF
Attachment 3 - As Built for Reference.pdf PDF
Attachment 4 - UFC 3.575.01 July 1 2012.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RKMF 20-0146

NELLIS AIR FORCE BASE

NEVADA

SCHEDULE OF DRAWINGS

SHEET REFERENCE NUMBER SHEET TITLE

G-1 COVER PAGE, HAUL ROUTE

G-2 GENERAL NOTES

G-3 OVERALL SITE PLAN

CD-1 DEMOLITION PLAN HANGAR 190

C-1 NEW SITE PLAN HANGAR 190

C-2 CIVIL DETAILS

E-1 ELECTRICAL SITE PLAN HANGAR 190

E-2 ELECTRICAL DETAILS HANGAR 190

CONSTRUCT LIGHTS AND

RECEPTACLES FOR APRON

SUNSHADES

BASE CIVIL ENGINEERING

(BLDG 812)

NORTH GATE

SECURITY POLICE

(BLDG 2)

MAIN GATE

CONTRACTING OFFICE

(BLDG 588)

SIMMONS GATE

N

E

S

W

FIRE DEPT

(BLDG 277)

A B C D E F G H

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

F I L E

N

O

NELLIS AFB, NEVADA

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PROJ. ENG.

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

BUILDING OR FACILITY:

DATE APPR

DATE:

DATE:

DATE:

DATE:

DEPARTMENT OF THE AIR FORCE

NELLIS AFB, NEVADA

CONSTRUCT LIGHT & RECEPTACLES

FLIGHT LINE

COVER PAGE, HAUL ROUTE

AS SHOWN

20-0146

RKMF200146G01

WELDIN

WELDIN

WELDIN

WELDIN

G-1

4/26/22

9/17/20

9/17/20

9/17/20

9/17/20

AS-BUILT

RECORD

DRAWINGS

HAUL ROUTE

PROJECT LOCATION

HANGAR 190

A B C D E F G H

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

F I

NELLIS AFB, NEVADA

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PROJ. ENG.

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

BUILDING OR FACILITY:

DATE APPR

DATE:

DATE:

DATE:

DATE:

DEPARTMENT OF THE AIR FORCE

NELLIS AFB, NEVADA

CONSTRUCT LIGHT & RECEPTACLES

FLIGHT LINE

GENERAL NOTES

AS SHOWN

20-0146

RKMF200146G02

WELDIN

WELDIN

WELDIN

WELDIN

G-2

4/22/22

9/17/20

9/17/20

9/17/20

9/17/20

AS-BUILT

RECORD

DRAWINGS

3. DESCRIPTIONS OF WORK

Upgrade Hanger 190 sunshade with a new transformer, electrical panel surge suppressor incorporated in the panel, electrical circuits, and LED lighting. All construction shall meet all

Applicable Local, State, and Federal Codes & Standards including ADA. The Contractor shall provide a 10% design, cost estimate (PDF and E4 Clicks), this Scope of Work (compliant with the SOO), and ABS and LBS survey results (as required). The work to be accomplished includes the following description.

3.1 General Requirements – Division 1

3.1.1 Weldin shall ensure during this project that the construction site area is contained and physically separated from the public.

3.1.2 The construction sites shall be swept daily or as required to keep flight line clear of soil and debris (FOD).

3.1.3 Provide escorts on the flight line for the duration of this project, as escorts are required.

3.1.4 Provide temporary portable restroom facility and COVID concern hand washing station for contractor use for duration of project.

3.1.5 Provide construction debris dumpster.

3.2 Existing Conditions – Division 2

3.2.1 Saw cut the apron concrete and demolish it for electrical trenching and conduit placement at Hangar 190 sunshade.

3.2.2 Core drill through the CMU wall of the wash rack control building for new electrical supply to the Hangar 190 sunshade.

3.2.3 Provide temporary low-profile barricades to direct traffic around work site area.

3.3 Concrete – Division 3

3.3.1 Contractor shall hire a third-party testing personnel for concrete and provide test result to the Government.

3.3.2 Provide and install a 4” concrete housekeeping pad for the new transformer at Hangar 190 sunshade.

3.3.3 Provide and install concrete to replace the demolished apron sections for trenching.

3.3.4 Provide a broom finish to new concrete.

3.4 Metals – Division 5

3.4.1 Provide and install #4 rebar in the concrete housekeeping pad for the new transformer at Hangar 190 sunshade.

3.4.2 Provide and install rebar tied into the concrete apron for the top of the electrical trench at Hangar 190 sunshade.

3.4.3 Provide and install three (3) each 6” surface mount, bolt down bollards at Hangar 190 sunshade to protect the new transformer and electrical panel. Provide and install yellow bollard sleeves on all new bollards.

3.5 Electrical – Division 26

Hangar 190 Sunshade

3.5.1 Provide and install a 3P/50A breaker in the 480/277V panel board in the wash rack control building room 204.

3.5.2 Provide and install two (2) each 2” schedule 40 PVC conduit from the wash rack control building to the 60A/3P disconnect at the location on the sunshades. One (1) of the 2” conduit to be a spare.

3.5.3 Provide and install a 60A/3P disconnect equipped with 40A fuses in a NEMA 12 enclosure.

3.5.4 Provide and install a new 30KVA 480V-208Y/120VAC dry-type transformer at Hangar 190 sunshade. The transformer to include copper windings in an all-weather enclosure rated for 220 Deg C, Transformer with five (5) taps, two (2) taps above nominal, two (2) taps below at ½% increments. Install the transformer between the second column and the edge of the apron.

3.5.5 Provide and install a 1”x 8’ grounding rod adjacent to the transformer and attach it to the sunshade structure. Attach a #2 grounding conductor to the rod with XFMR grounding lug.

Provide grounding well with metal cover to protect grounding rod.

3.5.6 Provide and install 100A/3P, 208Y/120VAC electrical panel in a NEMA 4 enclosure. Panel to have 24 1/P bolt on breakers, tin plated copper busses and inline Eaton FD frame surge suppressor on the incoming line.

3.5.7 Provide and install screw on EMT conduit and couplings for electrical runs around the aircraft bays above the wing of the aircraft. All EMT couplings to be set screw fittings, compression couplings are not acceptable.

3.5.8 Provide and install IMC conduit at or below the wing of the aircraft. All couplings to be set screw fittings, compression couplings are not acceptable.

3.5.9 Provide and install waterproof junction boxes.

3.5.10Provide and install fourteen (14) Hubbell Ratio Flood RFL2 LED Light fixtures or equivalent to each bay, a total of seventy (70). New lights to be installed in a pattern similar to sunshade rows 17 thru 22 and as shown on drawings.

3.5.11Provide and install Hubbell CRN LED (or equal) wet location high bay fixtures in the ceiling with approximately 30fc at two feet above the concrete. Install four (4) each per bay, a total of twenty (20). Overhead LED lights and side LED lights to be operated on the same switch per bay.

3.5.12Provide and install 20A/1P duplex receptacles and light switch combination for each bay. Provide and install receptacles/switches in weatherproof boxes with hinged covers.

3.6 Earthwork – Division 31

3.6.1 Hire a third-party testing personnel for soil and compaction testing and provide test result to the Government.

3.6.2 Provide all equipment necessary to excavate and backfill for new electrical line services from the wash rack control building to the Hangar 190 sunshade.

3.6.3 Provide 8” of sand bedding around new electrical line.

3.6.4 Provide compacted soil above sand bedding.

3.6.5 Provide and install 4” of type 2 road base under concrete.

3.6.6 For backfill, soil to be compacted to 95% compaction in all excavated trench areas.

3.6.7 Remove and replace landscaping materials between concrete aprons at Hangar 190 sunshade excavation area

SCALE: NTS

OVERALL SITE PLAN

N

ES

W

A B C D E F G H

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

F I

NELLIS AFB, NEVADA

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PROJ. ENG.

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

BUILDING OR FACILITY:

DATE APPR

DATE:

DATE:

DATE:

DATE:

DEPARTMENT OF THE AIR FORCE

NELLIS AFB, NEVADA

CONSTRUCT LIGHT & RECEPTACLES

FLIGHT LINE

OVERALL SITE PLAN

AS SHOWN

20-0146

RKMF200146G03

WELDIN

WELDIN

WELDIN

WELDIN

G-3

4/22/22

9/17/20

9/17/20

9/17/20

9/17/20

AS-BUILT

RECORD

DRAWINGS

HANGAR 190

AutoCAD SHX Text

BUILDING 226

AutoCAD SHX Text

BUILDING 224

AutoCAD SHX Text

BUILDING 222

AutoCAD SHX Text

BUILDING 220

AutoCAD SHX Text

BUILDING 192

AutoCAD SHX Text

BUILDING 191

AutoCAD SHX Text

BUILDING 194

AutoCAD SHX Text

BUILDING 2152

AutoCAD SHX Text

BUILDING 180

AutoCAD SHX Text

SUNSHADE

AutoCAD SHX Text

SUNSHADE

AutoCAD SHX Text

SUNSHADE

AutoCAD SHX Text

SUNSHADE

AutoCAD SHX Text

SUNSHADE

AutoCAD SHX Text

WASH RACK

AutoCAD SHX Text

ELECTRICAL 204

WASH

RACK

ELECTRICAL

ROOM 204

SUNSHADE 190

BLDG 190

BLDG 180

BAY 1

BAY 2

BAY 3

BAY 4

BAY 5

CONCRETE

APRON

CONCRETE

APRON

CONCRETE

APRON

SCALE: 1"=20'-0"

SITE PLAN DEMOLITION LAYOUT

SHEET NOTES:

NOT IN CONTRACT

LEGEND

1. CONTRACTOR TO VERIFY LOCATION AND SIZE OF EXISTING

EQUIPMENT FOR DEMOLITION, RELOCATION AND POINT OF

CONNECTION

2. PROVIDE TEMP PORTABLE RESTROOM FACILITY AND COVID

CONCERN HAND WASHING STATION FOR DURATION OF

PROJECT

3. PROVIDE ESCORTS ON THE FLIGHT LINE FOR THE

DURATION OF THE PROJECT

4. PROVIDE LOW PROFILE BARRICADES TO DIRECT TRAFFIC

AROUND WORK SITE AREA

DEMOLISH EXISTING CONCRETE AS NEEDED TO INSTALL

POWER TRENCH

DEMOLITION NOTES

N

ES

W

A B C D E F G H

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

F I

NELLIS AFB, NEVADA

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PROJ. ENG.

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

BUILDING OR FACILITY:

DATE APPR

DATE:

DATE:

DATE:

DATE:

DEPARTMENT OF THE AIR FORCE

NELLIS AFB, NEVADA

CONSTRUCT LIGHT & RECEPTACLES

FLIGHT LINE

DEMOLITION PLAN HANGAR 190

AS SHOWN

20-0146

RKMF200146CD1

WELDIN

WELDIN

WELDIN

WELDIN

CD-1

4/22/22

9/17/20

9/17/20

9/17/20

9/17/20

AS-BUILT

RECORD

DRAWINGS

0 20' 40' 60'

SCALE: 1" = 20'

10'

DEMOLISH EXISTING LANDSCAPE AS NEEDED TO INSTALL

POWER TRENCH

CORE DRILL THROUGH THE CMU WALL OF THE WASH

RACK CONTROL BLDG FOR NEW ELECTRICAL SUPPLY TO

THE HANGAR 190 SUNSHADE

ELECTRICAL

ROOM 204

SUNSHADE 190

BLDG 190

BLDG 180

BAY 1

BAY 2

BAY 3

BAY 4

BAY 5

CONCRETE

APRON

CONCRETE

APRON

CONCRETE

APRON

U

G

E

SCALE: 1"=20'-0"

SITE PLAN LAYOUT

SHEET NOTES:

NOT IN CONTRACT

LEGEND

1. CONTRACTOR TO VERIFY LOCATION AND SIZE OF EXISTING

EQUIPMENT FOR DEMOLITION, RELOCATION AND POINT OF

CONNECTION

INSTALL NEW BOLT DOWN BOLLARDS

CONSTRUCTION NOTES

N

ES

W

A B C D E F G H

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

F I

NELLIS AFB, NEVADA

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PROJ. ENG.

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

BUILDING OR FACILITY:

DATE APPR

DATE:

DATE:

DATE:

DATE:

DEPARTMENT OF THE AIR FORCE

NELLIS AFB, NEVADA

CONSTRUCT LIGHT & RECEPTACLES

FLIGHT LINE

NEW SITE PLAN HANGAR 190

AS SHOWN

20-0146

RKMF200146C01

WELDIN

WELDIN

WELDIN

WELDIN

C-1

4/22/22

9/17/20

9/17/20

9/17/20

9/17/20

AS-BUILT

RECORD

DRAWINGS

0 20' 40' 60'

SCALE: 1" = 20'

10'

INSTALL NEW 4" CONCRETE PAD FOR TRANSFORMER

PATCH CONCRETE AREA OF TRENCH AS NEED

PATCH LANDSCAPE AREA OF TRENCH AS NEED

6" CONCRETE

FILLED BOLLARD

EXISTING

CONCRETE

" BOLT WITH 4"

MIN EMBEDMENT

10"

SQ

7"

" BOLT (TYP)

EXISTING

CONCRETE OR

A.C. PAVEMENT

UNDISTURBED

SOIL

COMPACTED SOIL FROM

EXCAVATION SPOILS

2'

NEW

CONCRETE

DEPTH VARIES

12" MIN.

8"

4" TYPE 2 UNDER

CONCRETE

2 EA. 2" PVC SCHEDULE

40 CONDUIT

SAND BEDDING

AND COVER

3.5" CONCRETE SLAB

ON EXISTING

CONCRETE FLOOR

#4 REBAR

3 1/2"

BROOM FINISH

2'-4"±

EXISTING

CONCRETE

APRON

EXISTING

LANDSCAPE

UNDISTURBED

SOIL

COMPACTED SOIL FROM

EXCAVATION SPOILS

2'

NEW

LANSCAPE

DEPTH VARIES

12" MIN.

8"

4" TYPE 2 UNDER

CONCRETE

SAND BEDDING

AND COVER

2 EA. 2" PVC SCHEDULE

40 CONDUIT

SCALE: NTS

BOLLARD DETAIL

SCALE: NTS

POWER TRENCH AT CONCRETE AREA DETAIL

SCALE: NTS

TRANSFORMER PAD AT SUNSHADE HANGAR 190

A B C D E F G H

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

F I

NELLIS AFB, NEVADA

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PROJ. ENG.

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

BUILDING OR FACILITY:

DATE APPR

DATE:

DATE:

DATE:

DATE:

DEPARTMENT OF THE AIR FORCE

NELLIS AFB, NEVADA

CONSTRUCT LIGHT & RECEPTACLES

FLIGHT LINE

CIVIL DETAILS

AS SHOWN

20-0146

RKMF200146C02

WELDIN

WELDIN

WELDIN

WELDIN

C-2

4/22/22

9/17/20

9/17/20

9/17/20

9/17/20

AS-BUILT

RECORD

DRAWINGS

SCALE: NTS

POWER TRENCH AT LANDSCAPE AREA DETAIL

ELECTRICAL

ROOM 204

S U

N S

H A

D

BLDG 190

BLDG 180

BAY 1

BAY 2

BAY 3

BAY 4

BAY 5

CONCRETE

APRON

CONCRETE

APRON

CONCRETE

APRON

TO EXISTING

PNL "HP3"

U

G

E

2" PVC SPARE

J

CKT 2

CKT 1

" EMT FOR

LIGHTING

(2)

" CONDUIT

12x12 J BOX

J

J

J

CKT 9

CKT 10

" EMT FOR

LIGHTING

CKT 7

CKT 8

" EMT FOR

LIGHTING

12x12 J BOX

12x12 J BOX

CKT 5

CKT 6

" EMT FOR

LIGHTING

CKT 3

CKT 4

" CONDUIT

(MAIN HOME

RUN)

1- 100A,3PH,120/208V, NEMA PNL

1- 30 KVA,480V-208Y/120VAC XFME (T30-2)

1- 60A, 3-POLE, NEMA 3 DISCONNECT

W/40A FUSE,FEED FROM HP3

SCALE: 1"=20'-0"

ELECTRICAL LAYOUT HANGAR 190

SHEET NOTES:

NOT IN CONTRACT

LEGEND

1. CONTRACTOR TO VERIFY LOCATION AND SIZE OF EXISTING

EQUIPMENT FOR DEMOLITION, RELOCATION AND POINT OF

CONNECTION

2. USE EMT FOR MOST OF THE RUNS AROUND THE AIRCRAFT

BAYS ABOVE THE WING OF THE AIRCRAFT, ANY RUNS AT

OR BELOW THE WINGS REQUIRES IMC.

3.

PROVIDE AND INSTALL 3P/50A BREAKER IN EXISTING

480/277V PANEL IN WASH RACK BLDG ROOM 204

CONSTRUCTION NOTES

N

ES

W

A B C D E F G H

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

F I

NELLIS AFB, NEVADA

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PROJ. ENG.

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

BUILDING OR FACILITY:

DATE APPR

DATE:

DATE:

DATE:

DATE:

DEPARTMENT OF THE AIR FORCE

NELLIS AFB, NEVADA

CONSTRUCT LIGHT & RECEPTACLES

FLIGHT LINE

ELECTRICAL SITE PLAN HANGAR 190

AS SHOWN

20-0146

RKMF200146E01

WELDIN

WELDIN

WELDIN

WELDIN

E-1

4/22/22

9/17/20

9/17/20

9/17/20

9/17/20

AS-BUILT

RECORD

DRAWINGS

0 20' 40' 60'

SCALE: 1" = 20'

10'

PROVIDE AND INSTALL 60A/3P DISCONNECT WITH 40A

FUSES IN NEMA 12 ENCLOSURE

PROVIDE AND INSTALL 30KVA 480V-208Y/120VAC DRY

TYPE TRANSFORMER

PROVIDE AND INSTALL 100A/3P 208Y/120VAC PANELIN A

NEMA 4 ENCLOSURE PANEL TO HAVE 24 1/P BOLT ON

BREAKERS, TIN PLATED COPPER BUSSES AND INLINE

EATON FD FRAME SURGE SUPPRESSOR ON THE

INCOMING LINE

PROVIDE AND INSTALL (70) HUBBELL RATIO FLOOD RFL2

LED LIGHT FIXTURES OR EQUIVALENT

PROVIDE AND INSTALL HUBBELL CRN OR EQUIVALENT

WET LOCATION HIGH BAY FIXTURES IN CEILING (THE

INTENT IS TO PROVIDE APPROX. 30FC AT TWO FEET

ABOVE CONCRETE APRON)

PROVIDE AND INSTALL DUPLEX RECEPTACLE AND LIGHT

SWITCH FOR EACH BAY

PROVIDE A 1"x8' GROUNDING ROD ADJACENT TO THE

TRANSFORMER AND CONNECT XFMR GROUNDING LUG TO

THE ROD WITH #2 GROUNDING CONDUCTOR. PROVIDE A

GROUNDING WELL TO PROTECT THE GROUNDING ROD.

PROVIDE AND INSTALL (2) HUBBELL CRN LED (OR EQUAL)

WET LOCATION HIGH BAY FIXTURES IN THE CEILING WITH

APPROX. 30FC AT TWO FEET ABOVE THE CONCRETE.

INSTALL (4) EACH PER BAY. OVERHEAD LED LIGHTS AND

SIDE LED LIGHTS TO BE OPERATED ON THE SAME SWITCH

PER BAY

TO POWER

IN WASH RACK

BLDG

NEW 100A 3P

PANEL

NEW POWER

SERVICE RACK

NEW BOLLARD

(TYP)

NEW 60A 3P DISCONNECT

NEW 30 KVA 3P

480-208Y/120VAC

TRANSFORMER

EXISTING

SUNSHADE POLE

EXISTING

CONCRETE

NEW CONCRETE PAD

EXISTING

STRUCTURE

NEW HIGH

BAY LIGHT

FIXTURE

NEW HIGH

BAY LIGHT

FIXTURE

NEW FLOOD

LIGHT FIXTURE

NEW FLOOD

LIGHT FIXTURE

NEW FLOOD

LIGHT FIXTURE

NEW RECEPTACLE

AND LIGHT SWITCH

NEW DOUBLE

FLOOD LIGHT

FIXTURE

NEW DOUBLE

FLOOD LIGHT

FIXTURE

NEW 30KVA

TRANSFORMER

PANEL WITH

SURGE

PROTECTOR

60A / 3P

DISCONNECT

SWITCH

WASH RACK

BLDG 204

EXISTING

PANEL

NEW 3P 50A

BREAKER

3/4" CONDUIT

8' GROUND ROD

3/4" CONDUIT

3/4" CONDUIT

SCALE: NTS

ELECTRICAL LAYOUT HANGAR 190

A B C D E F G H

SHEET

REFERENCE

NUMBER

ANSI

D

AF PROJECT NUMBER:

AEC FILE NAME:

DRAWING SCALE:

PLOT SCALE:

SYMBOL DATE DESCRIPTION

REVISIONS

F I

NELLIS AFB, NEVADA

DESIGNED BY:

DRAWN BY:

CHECKED BY:

PROJ. ENG.

1:1

AF CONTRACT NUMBER:

INV. NUMBER:

BUILDING OR FACILITY:

DATE APPR

DATE:

DATE:

DATE:

DATE:

DEPARTMENT OF THE AIR FORCE

NELLIS AFB, NEVADA

CONSTRUCT LIGHT & RECEPTACLES

FLIGHT LINE

ELECTRICAL DETAILS HANGAR 190

AS SHOWN

20-0146

RKMF200146E02

WELDIN

WELDIN

WELDIN

WELDIN

E-2

4/22/22

9/17/20

9/17/20

9/17/20

9/17/20

AS-BUILT

RECORD

DRAWINGS

SCALE: NTS

TYP LIGHTING ELEVATION HANGAR 190

SCALE: NTS

ELECTRICAL ONELINE HANGAR 190

1 2

3 4

5 6

7 8

9 10

11 12

13 14

15 16

17 18

19 20

21 22

23 24

25 26

27 28

29 30

CIRCUIT DIRECTORY

PANEL: FUEL BARN WELDING

SPARE

SPARE

BAY 1 GFCI RECAP

BAY 2 GFCI RECAP

BAY 3 GFCI RECAP

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

BLANK

BLANK

SPARE

BLANK

SPARE

SPARE

SPARE

BAY 5 GFCI RECAP

BAY 4 GFCI RECAP

BAY 1 LIGHTS

BAY 2 LIGHTS

BAY 3 LIGHTS

BAY 4 LIGHTS

BAY 5 LIGHTS

RKMF200146G01
RKMF200146G01-G-1
RKMF200146G02
RKMF200146G02-G-2
RKMF200146G03
RKMF200146G03-G-3
RKMF200146CD1
RKMF200146CD1-CD-1
RKMF200146C01
RKMF200146C01-C-1
RKMF200146C02
RKMF200146C02-C-2
RKMF200146E01
RKMF200146E01-E-1
RKMF200146E02
RKMF200146E02-E-2

File details come from the government source that posted it. Updated .