RKMF 20-0083
NELLIS AIR FORCE BASE
NEVADA
SCHEDULE OF DRAWINGS
SHEET REFERENCE NUMBER SHEET TITLE
G-1 COVER PAGE, HAUL ROUTE
G-2 GENERAL NOTES
G-3 SITE PLAN
CD-1 CIVIL DEMO ROWS 31 - 34
C-1 CIVIL DETAILS
E-1 POWER PLAN ROWS 31 -34
INSTALL ELECTRICAL POWER
FOR FLIGHT LINE SUNSHADES
BASE CIVIL ENGINEERING
(BLDG 812)
NORTH GATE
SECURITY POLICE
(BLDG 2)
MAIN GATE
CONTRACTING OFFICE
(BLDG 588)
TYNDALL GATE
N
E
S
W
FIRE DEPT
(BLDG 277)
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I L E
N
O
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 31-34
COVER PAGE, HAUL ROUTE
AS SHOWN
20-0083
RKMF200083G01
WELDIN
WELDIN
WELDIN
WELDIN
G-1
8/11/21
9/19/19
9/19/19
9/19/19
9/19/19
AS-BUILT
RECORD
DRAWINGS
HAUL ROUTE
PROJECT LOCATION
ROWS 31 THRU 34
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 31-34
GENERAL NOTES
AS SHOWN
20-0083
RKMF200083G02
WELDIN
WELDIN
WELDIN
WELDIN
G-2
8/11/21
9/19/19
9/19/19
9/19/19
9/19/19
AS-BUILT
RECORD
DRAWINGS
SECTION 3: DESCRIPTIONS OF WORK
Install Electrical Power for Flight Line Sunshades. Install all work in accordance with specifications in Nellis SABER Contract. All materials, supplies, and debris shall be completely removed from the job site prior to final inspection. The work to be accomplished includes the following description
3.1 GENERAL REQUIREMENTS – DIVISION 1
3.1.1 Contractor to perform weekly coordination meetings at a convenient time for the user and contractor.
3.1.2 The construction sites shall be swept daily or as required to keep flight line clear of soil and debris (FOD).
3.1.3 If Contractor personnel do not have Restricted Area Badges, then escorts will be required for this project.
3.2 EXISTING CONDITIONS – DIVISION 2
3.2.1 Remove existing concrete apron, asphalt and landscaping for trenching and conduit placement. The main trench in the apron to be 5’ in width. Minimize trench saw cutting in the apron and roadways. The concrete is at least 12” ±-(2”) thick in most places on apron and 6” in roadway.
3.2.2 Provide and install a temporary 6’ fence with entrance and exit gates around work area, one area at a time.
3.2.3 Provide temporary low profile barricades to direct traffic around work site area.
3.3 CONCRETE – DIVISION 3
3.3.1 Remove and replace concrete apron for trenching and conduit placement. Concrete shall be in accordance with specifications for air field pavements.
3.3.2 3” Core through wall and fence where needed in and around Bldg. 285 for 2” PVC conduit to run out of building and provide power to sunshades.
3.3.3 The concrete for the apron shall be Mix #844 650PSI Flex designed mix.
3.4 ELECTRICAL – DIVISION 26
3.4.1 Remove and replace concrete apron for trenching and conduit placement. Minimize trench saw cutting in the apron. The concrete is at least 12” ±-(2”) thick in most places. Conduit shall be a min. 12” below bottom of concrete.
3.4.2 All conduit in trench shall have a sand bedding and cover.
ROWS 31, 32, 33 & 34
3.4.3 For rows 31 thru 34 provide and install a 100A/3P disconnect switch the on the side of the terminal compartment of the service transformer to building/hangar 295.
3.4.4 Terminate line side conductors (3#2) on low voltage terminals of the transformer.
3.4.5 Route 2” schedule 80 PVC conduit w/3#2 along wall of building conductors to a 100A/480VAC panelboard 225A enclosure and buss, w/3P-100A main breaker) mounted on wall of the portion of building/hangar 285 next to Flight Line Road.
3.4.6 Contractor to trench for new conduit along the exterior wall of building 290 from transformer to wall at the Flight line. From there the contractor shall feed the four apron sunshades on rows 31, 32, 33 and 34.
3.4.7 Provide and install 3-40A/3P breakers to feed the existing sunshades and one spare 40A/3P breaker.
3.4.8 Provide and install four sets of 2” schedule 80 PVC with 4 #4 in each conduit and route to each of the sunshades on rows 31, 32, 33 and 34.
3.4.9 At each sunshade provide and install a 60A/3p disconnect as well as
3.4.10At each sunshade provide and install a 30KVA 3P/480-208Y/120VAC Dry Type transformer. The Disconnect shall be in a NEMA 12 enclosure. The dry type transformers shall have
NEMA 3R outdoor/weatherproof enclosures
3.4.11The four electrical panelboards at each of the sunshades shall be mounted at approximately 72” to top of panelboard. The panelboard itself shall have a NEMA 12 dustproof enclosure. It shall be a column type along the lines of the Eaton 2a-LX style with 100A/3P copper buss and main breaker.
3.5 COMMUNICATIONS – DIVISION 27
3.5.1 Provide and install one 4” schedule 80 PVC and 100,000 lbs. rated pullboxes in the same trench as electrical conduit for Communications. This conduit will be run to each sunshade that the electrical conduit is being ran to, however to a separate pole. The conduit will go no further than the last sunshades being provided with power in this project.
3.5.2 Provide and install an 18” x 24” pullbox on an existing pole at each sunshade to terminate the 4” conduit in to.
3.5.3 Terminate the communication conduit on the wall in front of building 285 in an 18” x 24” pullbox next to existing communication box.
3.6 EXTERIOR IMPROVEMENTS – DIVISION 32
3.6.1 Provide and install 4 each 6” surface mount, bolt down bollards at each row the electrical and communication conduit will be ran to. Install 3 each bollards for the electrical and 1 each bollard for the communication.
3.6.2 Provide and install 4” asphalt paving where removed for trenching.
SCALE: 1"=300'-0"
OVERALL SITE PLAN
N
ES
W
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 31-34
SITE PLAN
AS SHOWN
20-0083
RKMF200083G03
WELDIN
WELDIN
WELDIN
WELDIN
G-3
8/11/21
9/19/19
9/19/19
9/19/19
9/19/19
AS-BUILT
RECORD
DRAWINGS
SHEET E-2 ROWS 31 - 34
R O
W
R O
W
R O
W
R O
W
AutoCAD SHX Text
BUILDING 878
AutoCAD SHX Text
BUILDING 880
AutoCAD SHX Text
BUILDING 882
AutoCAD SHX Text
BUILDING 297
AutoCAD SHX Text
BUILDING 295
AutoCAD SHX Text
BUILDING 292
AutoCAD SHX Text
BUILDING 290
AutoCAD SHX Text
BUILDING 285
AutoCAD SHX Text
BUILDING 286
AutoCAD SHX Text
BUILDING 294
AutoCAD SHX Text
BUILDING 284
AutoCAD SHX Text
BUILDING 282
AutoCAD SHX Text
BUILDING 283
AutoCAD SHX Text
BUILDING 277
AutoCAD SHX Text
BUILDING 276
AutoCAD SHX Text
BUILDING 270
AutoCAD SHX Text
BUILDING 259
AutoCAD SHX Text
BUILDING 262
AutoCAD SHX Text
BUILDING 260
AutoCAD SHX Text
BUILDING 257
AutoCAD SHX Text
BUILDING 253
AutoCAD SHX Text
BUILDING 255
AutoCAD SHX Text
BUILDING 256
AutoCAD SHX Text
BUILDING 252
AutoCAD SHX Text
BUILDING 250
AutoCAD SHX Text
BUILDING 245
AutoCAD SHX Text
BUILDING 248
AutoCAD SHX Text
BUILDING 246
AutoCAD SHX Text
BUILDING 244
AutoCAD SHX Text
BUILDING 241
AutoCAD SHX Text
BUILDING 239
AutoCAD SHX Text
BUILDING 237
AutoCAD SHX Text
BUILDING 233
AutoCAD SHX Text
BUILDING 234
AutoCAD SHX Text
BUILDING 236
AutoCAD SHX Text
BUILDING 238
AutoCAD SHX Text
BUILDING 879
AutoCAD SHX Text
BUILDING 877
AutoCAD SHX Text
BUILDING 285
AutoCAD SHX Text
BUILDING 882
AutoCAD SHX Text
BUILDING 290
AutoCAD SHX Text
BUILDING 295
AutoCAD SHX Text
BUILDING 283
AutoCAD SHX Text
BUILDING 277
AutoCAD SHX Text
BUILDING 256
AutoCAD SHX Text
BUILDING 253
AutoCAD SHX Text
BUILDING 244
AutoCAD SHX Text
SUNSHADE 13
AutoCAD SHX Text
SUNSHADE 14
AutoCAD SHX Text
SUNSHADE 15
AutoCAD SHX Text
SUNSHADE 16
AutoCAD SHX Text
SUNSHADE 17
AutoCAD SHX Text
SUNSHADE 18
AutoCAD SHX Text
SUNSHADE 19
AutoCAD SHX Text
SUNSHADE 20
AutoCAD SHX Text
SUNSHADE 21
AutoCAD SHX Text
SUNSHADE 22
AutoCAD SHX Text
SUNSHADE 23
AutoCAD SHX Text
SUNSHADE 32
AutoCAD SHX Text
SUNSHADE 33
AutoCAD SHX Text
SUNSHADE 34
AutoCAD SHX Text
SUNSHADE 40
AutoCAD SHX Text
SUNSHADE 41
AutoCAD SHX Text
SUNSHADE 42
AutoCAD SHX Text
SUNSHADE 43
AutoCAD SHX Text
SUNSHADE 44
AutoCAD SHX Text
FUTURE SUNSHADE 24
AutoCAD SHX Text
FUTURE SUNSHADE 25
AutoCAD SHX Text
FUTURE SUNSHADE 26
AutoCAD SHX Text
FUTURE SUNSHADE 28
AutoCAD SHX Text
FUTURE SUNSHADE 29
AutoCAD SHX Text
FUTURE SUNSHADE 27
AutoCAD SHX Text
FUTURE SUNSHADE 30
AutoCAD SHX Text
FUTURE SUNSHADE 31
AutoCAD SHX Text
FUTURE SUNSHADE 35
AutoCAD SHX Text
FUTURE SUNSHADE 36
AutoCAD SHX Text
FUTURE SUNSHADE 37
AutoCAD SHX Text
FUTURE SUNSHADE 39
AutoCAD SHX Text
FUTURE SUNSHADE 38
POINT OF
CONNECTION IN
EXISTING
ELECTRICAL ROOM
ROW 31
ROW 32
ROW 34
ROW 33
START OF
TRENCH
NEW 480V
PANEL ON
WALL
SCALE: 1"=60'-0"
TRENCH LAYOUT ROWS 31 - 34
1 N
ES
W
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 31-34
CIVIL DEMO PLAN
AS SHOWN
20-0083
RKMF200083CD1
WELDIN
WELDIN
WELDIN
WELDIN
CD-1
8/11/21
9/19/19
9/19/19
9/19/19
9/19/19
AS-BUILT
RECORD
DRAWINGS
SHEET NOTES:
LEGEND
NOT IN CONTRACT
0 60' 120' 180'
SCALE: 1" = 60'
30'
DEMOLITION NOTES
1. CONTRACTOR TO VERIFY LOCATION AND SIZE OF EXISTING
EQUIPMENT FOR DEMOLITION, RELOCATION AND POINT OF
CONNECTION
2. THE CONSTRUCTION SIGHT WILL BE SWEPT DAILY OR AS
NEEDED TO KEEP THE FLIGHT LINE CLEAR OF SOIL AND
DEBRIS (FOD)
3. ESCORTS WILL BE REQUIRED FOR THIS PROJECT
4. ASPHALT CUTS ARE APPROX. 4" THICK
5. CONCRETE VEHICLE ROAD CUTS ARE APPROX. 8" THICK
6. CONCRETE APRON CUTS ARE APPROX. 12"± 2" THICK
DEMOLISH EXISTING CONCRETE, ASPHALT, AND
LANDSCAPING AS NEED TO TRENCH FOR ELECTRICAL
CONDUIT
DEMOLISH EXISTING CONCRETE, ASPHALT AS NEEDED
TO INSTALL NEW COMM & POWER PULL BOX
CORE DRILL EXISTING BLDG AS NEEDED TO INSTALL
SURFACE MOUNT CONDUIT FROM ELECTRICAL ROOM TO
SIDE OF BLDG TO START UNDER GROUND WORK
DEMOLISH EXISTING CONCRETE, ASPHALT, AS NEED TO
TRENCH FOR COMMUNICATION CONDUIT
AutoCAD SHX Text
BUILDING 286
AutoCAD SHX Text
BUILDING 294
AutoCAD SHX Text
BUILDING 284
AutoCAD SHX Text
BUILDING 282
AutoCAD SHX Text
BUILDING 283
AutoCAD SHX Text
BUILDING 285
AutoCAD SHX Text
BUILDING 290
AutoCAD SHX Text
SUNSHADE 32
AutoCAD SHX Text
SUNSHADE 33
AutoCAD SHX Text
SUNSHADE 34
AutoCAD SHX Text
FUTURE SUNSHADE 30
AutoCAD SHX Text
FUTURE SUNSHADE 31
AutoCAD SHX Text
FUTURE SUNSHADE 35
FUTURE SUNSHADE 36
6" CONCRETE
FILLED BOLLARD
EXISTING
CONCRETE
" BOLT WITH 4"
MIN EMBEDMENT
10"
SQ
7"
" BOLT (TYP)
EXISTING
CONCRETE OR
A.C. PAVEMENT
UNDISTURBED
SOIL
COMPACTED SOIL FROM
EXCAVATION SPOILS
SAND BEDDING
AND COVER
4" CONDUIT
2'
NEW
CONCRETE
DEPTH VARIES
12" -16"
MIN.
8"
4" TYPE 2 UNDER
CONCRETE
NOTE: RUN COMM TRENCH 4" DEEPER THAN POWER TRENCH WERE
THEY CROSS EACH OTHER
EXISTING
CONCRETE OR
A.C. PAVEMENT
UNDISTURBED
SOIL
COMPACTED SOIL FROM
EXCAVATION SPOILS
2'
NEW
CONCRETE
DEPTH VARIES
12" MIN.
8"
4" TYPE 2 UNDER
CONCRETE
(5) 2" CONDUIT
SAND BEDDING
AND COVER
EXISTING
CONCRETE OR
A.C. PAVEMENT
UNDISTURBED
SOIL
COMPACTED SOIL FROM
EXCAVATION SPOILS
(5) 2" CONDUIT
5'
NEW
CONCRETE
DEPTH VARIES
12" MIN.
8"
4" TYPE 2 UNDER
CONCRETE
(1) 4" CONDUIT
SAND BEDDING
AND COVER
TO POWER
VAULT AT ROW
NEW 100A 3P
PANEL
NEW POWER
SERVICE RACK
NEW BOLLARD
(TYP)
NEW 60A 3P DISCONNECT
NEW 30 KVA 3P
480-208Y/120VAC
TRANSFORMER
EXISTING
SUNSHADE POLE
EXISTING
CONCRETE
NEW COMM
BOX
TO COMM
VAULT AT ROW
NEW CONCRETE PAD
EXISTING
SUNSHADE POLE
NEW BOLLARD
(TYP)
NEW COMM
SERVICE RACK
1" DIA DOWELS 20"
LONG @12" O.C.
EXISTING
CONCRETE
NEW 45OO PSI
CONCRETE
CONTROL JOINT
SEE DETAIL A
CONTROL JOINT
SEE DETAIL A
1/2" ± 1/8"
2 1/2"
SAW 1/4" GROOVE
SEAL WITH JOINT
SEALANT
DETAIL A
SCALE: NTS
BOLLARD DETAIL
SCALE: NTS
MAIN TRENCH DETAIL
SCALE: NTS
COMM TRENCH DETAIL
SCALE: NTS
POWER TRENCH DETAIL
SCALE: NTS
SERVICE / COMM ELEVATION AT SUNSHADES
SCALE: NTS
CONCRETE DETAIL
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 31-34
CIVIL DETAILS
AS SHOWN
20-0083
RKMF200083C01
WELDIN
WELDIN
WELDIN
WELDIN
C-1
8/11/21
9/19/19
9/19/19
9/19/19
9/19/19
AS-BUILT
RECORD
DRAWINGS
POINT OF
CONNECTION IN
EXISTING
ELECTRICAL ROOM
ROW 31
ROW 32
ROW 34
ROW 33
START OF
TRENCH
NEW 480V
PANEL ON
WALL
EXISTING
COMM
MANHOLE
#294
NEW COMM
PULL BOX
ROW 31
NEW ELEC
PULL BOX
ROW 31
NEW COMM
BOX ROW 31
4" COMM
CONDUIT
NEW
TRANSFORMER
ROW 31
NEW COMM
PULL BOX
ROW 32
NEW ELEC
PULL BOX
ROW 32
NEW COMM
BOX ROW 32
4" COMM
CONDUIT
NEW
TRANSFORMER
ROW 32
NEW COMM
PULL BOX
ROW 33
NEW ELEC
PULL BOX
ROW 33
4" COMM
CONDUIT
NEW COMM
PULL BOX
ROW 34
NEW ELEC
PULL BOX
ROW 34
4" COMM
CONDUIT
EXISTING
SERVICE MDS
BLDG 285
NEW
ELEC
LB
NEW
ELEC
LB
NEW
ELEC
LB
NEW 100A/480VAC
PANELBOARD
NEW
BUCKET SWITCH
IN MDS
NEW COMM
BOX ROW 33
NEW
TRANSFORMER
ROW 33
NEW COMM
BOX ROW 34
NEW
TRANSFORMER
ROW 34
4" COMM
CONDUIT
2"
POWER
CONDUIT
4" COMM
CONDUIT
PNL ROW 31
100A MCB
10KAIC
2" CONDUIT
WITH #1 GAUGE
NEW
DISCONNECT
SWITCH
PNL ROW 31
100A MCB
10KAIC
NEW
DISCONNECT
SWITCH
PNL ROW 31
100A MCB
10KAIC
NEW
DISCONNECT
SWITCH
PNL ROW 31
100A MCB
10KAIC
NEW
DISCONNECT
SWITCH
2" CONDUIT
WITH #4 GAUGE
2" CONDUIT
WITH #4 GAUGE
2" CONDUIT
WITH #4 GAUGE
2" CONDUIT
WITH #2 GAUGE
EXISTING
COMM MH294
SCALE: 1"=60'-0"
POWER PLAN ROWS 31 - 34
N
ES
W
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
F I
NELLIS AFB, NEVADA
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
BUILDING OR FACILITY:
DATE APPR
DATE:
DATE:
DATE:
DATE:
DEPARTMENT OF THE AIR FORCE
NELLIS AFB, NEVADA
INSTALL ELEC. PWR FOR SUNSHADES
ROWS 31-34
POWER PLAN
AS SHOWN
20-0083
RKMF200083E01
WELDIN
WELDIN
WELDIN
WELDIN
E-1
8/11/21
9/19/19
9/19/19
9/19/19
9/19/19
AS-BUILT
RECORD
DRAWINGS
SHEET NOTES:
CONSTRUCTION NOTES
LEGEND
NOT IN CONTRACT
0 60' 120' 180'
SCALE: 1" = 60'
30'
1. CONTRACTOR TO VERIFY LOCATION AND SIZE OF EXISTING
EQUIPMENT FOR DEMOLITION, RELOCATION AND POINT OF
CONNECTION
2. THE CONSTRUCTION SIGHT WILL BE SWEPT DAILY OR AS
NEEDED TO KEEP THE FLIGHT LINE CLEAR OF SOIL AND
DEBRIS (FOD)
3. ESCORTS WILL BE REQUIRED FOR THIS PROJECT
4. ASPHALT CUTS ARE APPROX. 4" THICK
5. CONCRETE VEHICLE ROAD CUTS ARE APPROX. 8" THICK
6. CONCRETE APRON CUTS ARE APPROX. 12"± 2"THICK
1 INSTALL NEW DRY TYPE TRANSFORMER FOR EACH ROW
2 INSTALL NEW CONCRETE ELECTRICAL PULL BOX FOR
EACH ROW
SCALE: NTS
CONDUIT LAYOUT 31 - 34
4 INSTALL NEW 100A PANEL FOR EACH ROW
5 INSTALL NEW BOLT DOWN BOLLARDS FOR EACH ROW
6 INSTALL 4" SCH 80 CONDUIT FOR COMMUNICATIONS
3 INSTALL NEW CONCRETE COMMUNICATION PULL BOX
FOR EACH ROW
7 INSTALL 2" SCH 80 CONDUIT FOR POWER
8 INSTALL NEW COMM BOX FOR EACH ROW
9 ROUTE CONDUIT ON EXTERIOR OF BLDG 285 UNTIL
YOU GET TO THE SIDEWALK SIDE IN BETWEEN BLDG
285 & BLDG 290
10 NEW 100A/480VAC PANEL BOARD WITH 225A ENCLOSURE
AND BUS WITH 3P-100A BREAKER
1 4 5
1 4 5
1 4 5
1 4 5
11 INSTALL NEW DISCONNECT SWITCH
12 INSTALL NEW 4" COMMUNICATIONS CONDUIT TO BE
ROUTED BEHIND BLDG 285 TO EXISTING
COMMUNICATIONS MANHOLE #294
AutoCAD SHX Text
BUILDING 286
AutoCAD SHX Text
BUILDING 294
AutoCAD SHX Text
BUILDING 284
AutoCAD SHX Text
BUILDING 282
AutoCAD SHX Text
BUILDING 283
AutoCAD SHX Text
BUILDING 285
AutoCAD SHX Text
BUILDING 290
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
T
| RKMF200083G01 |
| RKMF200083G01-G-1 |
| RKMF200083G02 |
| RKMF200083G02-G-2 |
| RKMF200083G03 |
| RKMF200083G03-G-3 |
| RKMF200083CD1 |
| RKMF200083CD1-CD-1 |
| RKMF200083C01 |
| RKMF200083C01-C-1 |
| RKMF200083E01 |
| RKMF200083E01-E-1 |