Renewal of the Police Station and Replacement of the Public Restrooms, Pavilion and Site Utilities Solicitation Number: F16SOL10044 ‐ BID AMENDMENT 04 DATED 07/06/16

ITEM QUESTION ANSWER

1 Does an incumbent exists for the above subject requirement and if so, could you please provide the vendor and the corresponding contract number.

No incumbent exists

2 Is this a follow‐on requirement? If so, could you please provide the incumbent contract number for this opportunity?

If not, is this a new requirement?

This is a new requirement, see answer to Question One above.

3 Can the requirements for AISC certified steel fabricator and erector be waived for this project as long as the guidelines are followed?

The AISC certification requirements can be waived provided that the fabricator and erector follow the AISC guidelines. The Special Inspector will need to review the fabrication plant and confirm that these guidelines are met.

4 Our concern is that the tiebacks shown in detail J10 will interfere with where the side channel mounts at the vertical mullion. What is the design intent and how we are supposed to mount the shades? [reference details below]

Design intent is to coordinate shade seam locations with curtainwall tieback locations such that tieback does not occur on grid line B. There is a sill channel to the shade assembly, but no jamb channels. Design intent is to mount shade to horizontal curtainwall mullion with concealed fasteners. Note: tiebacks are NOT permitted to the bottom chord of the wood trusses.

5 N/A N/A 6 Per RFP page 45, article 108, the Contractor will obtain a tax exempt certificate. RFP page 77 item 3 mentions sales tax.

Please confirm that materials permanently incorporated into this project will be sales tax exempt.

As indicated in the clause, the successful offeror may apply for tax exempt certificates which may allow them to purchase materials tax free. Smithsonian shall cooperate with the contractor’s efforts in this regard but cannot guarantee that the appropriate taxing authority will honor such request.

7 Per SF1442 item 13.b indicates that an offer guarantee is not required. Page 42 article 104 calls for a 20%, NTE $3M bid guarantee. Please clarify.

Section 104 52.228-S0014 Bid Guarantee and Bonds (Jun 2000) shall control

8 Per SF1442 item13.a contractors are to submit original plus 5 copies of the offer. Page 71 item L.4 requires 2 copies of price

Submit 2 copies of price proposal and 5 copies of technical proposal and 5 copies of technical. Please confirm we are to submit per Section L.

9 Please reference article L.7 which enumerates the items to be included in our proposal. Please confirm there is no item (4).

Yes that is correct, there is no item (4)

10 Can a follow‐up site visit be allowed? See amendment No. 2 11 Due to the holiday period falling four business days prior to the bid date, we would like to formally request a one week extension to July 19, 2016.

See amendment No. 2

12 Consistent with the note in item J.4, in Section J of the Solicitation (page 66 of 87), there is reference to “Attachment 3”, a Bid Schedule. Section B, item B.5 also references an attached Bid Schedule. We have not been able to find the referenced Bid Schedule in the bid documents. Please clarify where we can find the Bid Schedule in the bid documents.

Please complete the schedule of values as outlined in Section L. Cost Proposal and pricing as detailed in section B along with one attached

13 Subject: Temporary Generator

Reference: Vol. 3 Substation Drg. 3E401 & 2 Notes 2.1, 2, 3 & 4.1 Comment: Notes imply that the temporary generator will need to run 24/7 for the duration if this is the case the temporary generator itself will need regular maintenance.

Question: Will Temporary generator be required to run 24/7?

Can the existing generator be used when temporary generator is under maintenance or will we have to provide an additional temporary generator? What is the load on the Amazonian Building? What days and times will the generator be at 100% load?

Generator is required to run 24 hrs/day, and 7 days/wk; maintenance of the generator is the responsibility of the Contractor. The existing generator cannot be used. If maintenance is required on the temporary generator, the Contractor shall make arrangements to assure uninterrupted temporary power is available for Amazonia.

The peak load on record for the Amazonia building is 463kVA. The existing generator currently serving the full building is 600KW.

14 2Subject: 3‐Way duct bank into new Events Building Reference: 2E002, 2E101 & 02 Comment: The outline for the Event Building reflects the upper floor. The electric room/Panel DR1 is on the lower level to the left of the outline. When the ductbank 90’s away from

Yes, that 3-way duct bank should route directly to DR1.

the 12‐way it then offsets to the right and will then have to 90 to the left to head for the electric room.

Question: Is this the intent or can the 3‐way duct bank be routed straight to Panel DR1 leaving the 12‐way?

15 Subject: SWBD feeding New Event Building Reference: 2E401 Detail 1, 3E601 & 2 Comment: Per Detail 1 DR1 is fed from SWBD MSA‐A. MSA‐A panel schedule not provided. LZSW panel schedule does not indicate DR but does indicate future multi‐use building.

Question: Please confirm panel DR1 is fed from LZSW not

MSA.

DR1 is the service entrance panel to the Multi-Use Building. On 2E401, DR1 will be fed from LZSW.

16 Subject: New manhole (unidentified) Reference: 2E002 Note 14, 2CD121 Comment: Note 14 references a drawing does not exist.

2CD121 lower right indicates “Relocate Electric Manhole” Question: Please confirm size of new MH is per 2E301 Detail

8. Please clarify relocation of existing.

On 2E002, Note 14 should refer to Drawing 2CD121. Note on Civil drawing 2CD121 should read “relocate existing electric handhold”; this note relates to electric handhold for existing exterior lighting fixtures that are also indicated to be moved as a part of scope; see electric drawings. The new manhole detail 2E 301 relates to the new manhole, just east of the new building at the new extended duct bank, to feed a future lower zoo project.

17 Subject: Communication Reference: 2TN002 Site Plan Key Note 5 Comment: Note indicates to install 2” conduit . Drawing does not indicate MPOP Question: Please clarify MPOP and 2” conduit route/terminations

Correct, Note-4 states coming from Police HQ’s to Main Restaurant MPOP; Note-5 states from MPOP to Existing TR on lower level. Note- 6 States TR on Lower Level.

18 Subject: Communication Reference: 2TN002 Site Plan Key Notes and Key Notes Comment: Confused on who F/I’s cable Question: Please clarify who installs cable in 2‐2” PVC and in 4” PVC back to Police Station

Typical throughout Volumes 1 and 2: Contractor to provide and install all conduit pathways with pull strings from the IT switch to all data locations. Owner will provide and install the fiber optic cable and fiber connections.

19 Subject: SWBD feeding Police Station Reference: 1E401 Detail 1, 3E601 & 2

Storm Switch is the service entrance to the Police Station, so references to Storm Switch and Police Station are one and the same in this instance. On 1E401, Storm Switch will be fed from LZSW.

Comment: Per Detail 1 Storm Switch is fed from SWBD MSA‐ A. MSA‐A panel schedule not provided. LZSW panel schedule does not indicate Storm Switch but does indicate future Police Station.

Question: Please confirm Storm switch is fed from LZSW not

MSA.

20 Subject: Duct Bank conduit sizes Reference: 3E10 Note 19 & 20. 1E401 Detail 3. 2E401 Detail 7 Comment: Notes indicate 4” conduit. Details indicate 6” conduit Question: Which is correct Notes or Details? [Reference 3E101 notes 19 & 20]

All concrete encased ductbanks shall be provided with 6" conduits.

'Specific Notes' 19, and 20, as well as 'Specific Notes' on all drawings should be changed to 6" conduits. Similarly, Detail 5, and Detail 6 on 3E-5-01 should be changed to provide 6" conduits.

21 Remove and protect playground shelter and play equipment and re‐install. Is there room at the zoo to store this?

Yes. Coordinate location with COTR.

22 We respectfully request approval of Aquaseal 5000 fluid applied waterproofing. This product meets the criteria of ASTM C‐836 and E‐96 and is VOC compliant.

Please utilize the instructions contained in Clause – L.3 52.211-6 Brand Name or Equal. (AUG 1999) and Specification Section 012500 Substitution Procedures.

23 Are automatic dampers required? I understand they want a space heater located inside the enclosure, so having the automatic dampers will keep that warm are inside the enclosure, instead of leaking out, but the standard package doesn’t include louvers because both the water heater and battery charger are sized for a cold start. You really only see automatic dampers in extremely cold conditions, along with the space heater. Are both details required? [Reference Volume 1 spec section 263213.13]

Provide with automatic dampers as specified.

24 We do not see a field in the bid form (page 6 & 7 of 87), or other area in the Solicitation that accommodates alternate pricing. E.g. for the alternates shown on L402 in the Restrooms and Pavilion drawings.

See attached bid schedule form

25 For the alternates shown on L402 in the Restrooms and

Pavilion drawings, base clarify the base scope for this alternate.

The base scope includes construction of the retaining wall and existing 3 benches to remain; see note 504, landscape drawings 2L201. The alternate includes the undulating bench and its attachment to the retaining wall.

26 Bottom of footing elevations are missing from drawing S100 in the Restrooms and Pavilion drawings. Please provide, or possibly consider providing section views through the perimeter foundation elements at the lower level, showing reference to the FF elevation.

Bottom of footings shall be 2’-6” below the Lower Level slab elevation as shown in detail 1/2S202.

27 Reference Slab Schedule on S100 and S101 in the Restrooms and Pavilion drawings. Marks R2 and R3 do not appear to be concrete slabs. Please clarify.

The slab schedule includes roof deck and plywood decking as well.

28 Reference Detail A on S301 in the Restrooms and Pavilion drawings. The detail suggests beams B1, B2, and B3 are required at column grid lines. However, on drawing S101, Beams B1, B2 and B3 appear to be limited to the perimeter wall areas. Please clarify the intent of the detail on S301, and advise of beams are required along all the column grid lines.

The extents of the concrete beams are shown on plan and concrete beams are not required at each column. Details on S301 shall be used to layout the reinforcement of the concrete beams.

29 Please clarify the extent of the demo scope for existing site concrete base slabs supporting existing electrical equipment for the substation drawings.

Specific Notes 2, and 3 on Drawing 3ED-1-01 indicate removal of existing concrete pads. Add removal of concrete pad to Note 4.

30 Please clarify scope, limits and construction details for new site concrete base slabs supporting new electrical equipment.

Reference Detail 3 on 3E-5-01 for equipment pad details.

31 Details for on‐grade CIP concrete stairs on S200 and on L702 in the Restrooms and Pavilion drawings do not match. Please advise which detail applies.

Use landscape details for sizes and dimensions of stairs. Use structural details for reinforcement sizes and detailing

32 The specification on sheet 093013 of Volume. 1 States that CT‐1 is 6” x 24”. Sheet 1A70 states that CT‐1 is 6”x12”. Please clarify the size.

Clarified in Addendum, dated 6.24.2016 - 6” x 12”.

33 The door schedule on sheet 1A606 references that door 108B has leaf type 7. The detail for the types make no reference to any door type 7. Please provide this detail.

Clarified in Addendum, dated 6.24.2016 – Door type 1.

34 Police Station Civil Drawing 1 CD 101 – Is there any as‐built data indicating depth below existing grade of existing steam lines, steam manholes, underground electric and water main?

Particularly on the NW/SW face of the existing building. It appears that the proposed addition encroaches on the existing steam lines and the proposed retaining wall(s) encroach on the existing steam and underground electric.

The background utilities right up against the building specifically on the Civil demolition drawing are slightly out of date as a project to replace and relocate the existing steam lines was in construction during our design phase, and we received the specific field as built redlines from the contractor toward the very end of our design process. The field redlines will be made available to the contractor. We did attempt to capture the new steam and other utility locations on the new work drawings and indicate existing utilities that need to be moved as a part of this project scope. We believe the existing steam lines do not interfere with the building addition, but may run under the new mechanical pad. The exact location of the small retaining wall footing will need to be coordinated with the depth and location of the relocated steam lines and underground electric.

35 Subject: Manufacturer for the MV Metal Enclosed Switchgear Reference: Spec 261300 2.10 B.

Comment: Square D is not a listed manufacturer for the MV Metal Enclosed Switchgear, however they are listed for the transformer and switchboard.

Question: Can Schneider Electric / Square D be added to the list of approved manufacturers in Spec 261300 2.10 B?

Yes, Square D may be provided as long as physical dimensions, fuse type and construction document requirements are met.

36 Subject: Substation MV SWGR.

Reference: 261300, 1.20 References, D. IEEE C37.20.7 –Guide for testing Comment: If the metal enclosed SWGR is required to be tested to this standard then the gear would have to be constructed as arc resistant.

Question: Is the construction of MV SWGR required to be arc resistant?

Arc resistant construction is not required.

37 Can you please confirm the number of technical and price copies required to be submitted, and if they are in original or copy format?

Offerors are to submit two (2) copies of the price proposal (one (1) original and one (1) copy) and five (5) copies of the technical proposal (one (1) original and four (4) copies).

38 Will the submission be publicly or privately opened? Privately

39 Would you be willing to consider five (5) projects in the Firm’s

Experience and Past Performance section, instead of the noted three (3) projects?

You may add additional examples but must note them as additional.

40 I don’t see the SF 24 Bid Bond This is available on request 41 The SF 25 is not included (while not needed for proposal submission – it’s listed as an attachment) This is available on request

42 The SF 25A (Attachment 6) is not included (while not needed for proposal submission – it’s listed as an attachment)

This is available on request

43 On page 76 of the RFP, under Firm's Experience and Past Performance, a Company Experience form is referenced. Can you please provide this form?

This has been provided

44 The RFP requires that we provide a project‐specific Contractor Quality Control Plan. Can the CQC Plan be excluded from the Technical Proposal's 100 page restriction?

Yes

45 Can the Cover Letter, Title Page, Table of Contents and Tabs be excluded from the Technical Proposal's 100 page restriction?

Yes

46 Page 77 references a "Subcontracting Plan (maximum of three per trade)." Can verification be provided as to what this requirement means? Is it a traditional subcontracting plan or just naming our subcontractors?

This should be considered a request for a traditional subcontracting plan, plus naming proposed subcontractors

47 If we have to submit a Subcontracting Plan in the Technical Proposal, can it be excluded from the Technical Proposal's 100 page restriction?

Yes

48 On sheet 2CD121 there are two notes to "Remove play structure during construction". During the site visit it appears that there is only one play structure and that the area shaped like a pie with a piece missing is actually a concrete wall and fence. Please clarify what is to be done with this area.

The pizza play pieces are to be removed and stored by the contractor at NZP as directed by SI-NZP. The concrete planter is to be demolished. The shade canopy poles are to be preserved. The other movable play and interpretive exhibits are to be removed by and stored as directed by NZP.

49 Drawing 3C010 / Bid Note 2 indicates to provide an additive price for mill & overlay of the full road width for the extent of the project but there is no indication of this additive price

Delete note no added price is required, this isn’t included in the project on the bid form. Please confirm if this separate add price is necessary and if so, what quantity are we to carry for this?

Will you need a separate breakout on the bid form or is this an inclusion in the base bid?

50 Drawing 2CU121 calls for a new water fountain to be installed. Please provide a manufacturer and model of this fountain.

See Plumbing drawing 2P801 (277) – Plumbing Fixture Schedule – designation “4B Outdoor Drinking Fountain”.

51 On sheet 1CE002 there is a note "Landscaped area. Install plantings and stabilize at the end of each work day." Please clarify what is expected to be installed to stabilize the area at the end of each day.

The intent is not to disturb a landscape area larger than can be replanted in one day; the planting may need to be phased as required to provide adequate soil erosion and sediment control.

52 What power / fuel source is required for the specified temp generator indicated in the electrical substation drawings? If diesel, will it be the responsibility of the contractor or owner to carry costs for the fuel to power the temp generator?

Reference Drawing 3E-01-02 'Specific Note 4' for description of 'diesel' generator. The Contractor is responsible for the generator fuel.

53 On sheet 2S100 there is a dashed line 4' off of the wall footing that is identified as the "Extent of Excavation Typ." does this mean that we cannot lay back the excavation in the North and West sides of the building and that sheeting will be required per spec section 315000?

Design intent was that 4 feet was adequate space for layback given that existing adjacent grade drops swiftly as you proceed down Olmsted Walk, making the height of buried wall 3-5 feet. Please note that tree protection is an issue in several areas; the working area is limited.

54 Per wall section 5 on sheet 2A3.12 there is to be motorized roller shades on the East wall. Is this detail typical for the restroom/pavilion structure, or are the shades only to be provided on the eastern wall?

See Interior Elevation D1/2A 211 for extent of motorized shade.

55 No Soap Dispensers currently indicated in Public Restrooms Building gang toilet rooms 102 and 107, per 2A101 and 2A401 Drawings G4, K8, and G1. Please clarify if contractor responsible for furnishing Surface Mounted Soap Dispensers in these toilet rooms.

Soap dispenser is integrated with lavatory in the Public Restrooms.

56 Stainless Steel‐framed mirrors indicated in Police Station toilet rooms 103 and 105, per 1A402 Drawings / details D1 and G1, and in Public Restrooms Building gang toilet rooms 102 and

Mirrors in Rooms 103 & 105 Police and 102 &107 Public Restrooms to be custom size, frameless, and no shelf required; see specification 088300 for detailed requirements.

107, per 2A401 Drawing / details G4, K8, and G1. As these mirrors are not specified as TA‐7 mirrors, please clarify if they must have a 5” deep shelf.

57 For Public Restrooms Building toilet rooms 204 and 205, per 2A401 Drawing A4, please clarify if the mirrors are framed or frameless and if they must have a 5” deep shelf.

Mirrors in Room 204 & 205 to be custom size, frameless, and no shelf required; see specification 088300 for detailed requirements.

58 Please confirm that Stainless Steel Back Panels for behind Electric Hand Dryers not required in Public Restrooms Building toilet rooms.

Panel is not required; clarified in Addendum, dated 6.24.2016.

59 No Electric Hand Dryers or Paper Towel Dispensers currently indicated in Public Restrooms Building gang toilet rooms 102 and 107, per 2A101 and 2A401 Drawings / details G4, K8, and G1. Please clarify if contractor responsible for furnishing either Electric Hand Dryers or Paper Towel Dispensers.

Hand dryer is part of integrated lavatory.

60 Per spec section 015000, please confirm that flagman will only be required for this project when construction activities are being performed during NZP days of operation.

Confirmed as long as clear access to the loading dock is provided

61 Spec section 015000 indicates a requirement for a traffic safety officer. Please confirm that these duties can be performed by the superintendent as long as the person is ATSSA or equivalent certified.

Confirmed

62 As it pertains to parking restrictions on the project per spec section 011000 part 1.11A, will construction personnel be permitted to park in one of the parking lots on the SI Zoo property? If so, will fees be charged to the contractor to park in these locations and if so what is the monthly, weekly or monthly charge?

NO

63 Spec section 015000 parts A & B conflict with each other as far as who is picking up utility usage charges on this project.

Please confirm whether or not the GC or Owner is picking up the utility usage charges for both the project and temp facilities (IE trailers).

Owner

64 Per Spec section 015639 part C, please confirm in the contract arborist be directly contracted through the contractor or owner.

Contract arborist to be contracted through the contractor.

65 Drawing 1S100 indicates to reference detail H / S201 for the retaining wall detail at the police station but this detail is not on S201. Please provide.

Retaining wall detail is D on 1S201.

66 On sheet number 45, Keynote Legend indicates Racks for Data Equipment (11 2813.1). Is it contractor’s responsibility to furnish racks for data equipment? If so, please provide specifications.

See Security Drawing 1 TY 5 04 detail B and Specification Section

280500.10 paragraphs 2.4 and 2.6.for racks in Room 109. See Communication Drawings and Specification Sections for new and existing data racks.

67 On sheet number 47, Keynote Legend indicates Vehicle Parking for T3 Tricycle (10 5600.1), Vehicle Parking for Segway (10 5600.2), Vehicle Parking for Bicycles (10 5600.3), and Vehicle Parking for Moped (10 5600.4). Is it contractor’s responsibility to furnish any equipment/accessories for these vehicle parking locations? If so, please provide specifications.

No accessories or equipment beyond electric power for recharging vehicles and mechanical for room as indicated on MEP drawings and specifications.

68 On sheet number 83, Keynote Legend indicates 36” Diameter Table and 3 Chairs (12 5000.1). Is it contractor’s responsibility to furnish table and chairs? If so, please provide specifications.

Not part of this contract, shown for coordination only.

69 On sheet number 83, Keynote Legend indicates Steel Frame Cell Bed (125000.2). Is it contractor’s responsibility to furnish steel frame cell bed? If so, please provide specifications.

Not part of this contract, shown for coordination only.

70 Drawing 2CD121 indicates the removal, salvage, protection and reinstallation of playground structures. Can you please indicate provide the manufacturer / product information for these pieces of equipment?

This information is not available.

71 1CE 501 Is a truck wash required at the SCE? Truck Wash not required at SCE.

72 1CE 501 Standard Erosion & Sediment Control Note 6 refers to a sediment trap / sediment tank. Is a sediment trap required? If so, is there a detail for this note?

Sediment trap not required.

73 1CD 101 Note says existing wall needs to be evaluated for constructability. Please clarify what this means. What will the contractor need to verify?

Contractor needs to do exploratory work to determine the extents of footer on the existing wall and notify engineer if in conflict with proposed plan.

74 1AD 1 01 Do the entire existing columns stay or only the shaded portions?

All existing columns stay in their entirety; this is a graphic issue with how the demolished interior partition intersects with the column making it appear only partially shaded; see architectural floor plan to see fully shaded columns that will remain along with new work.

75 1S 0 00 Site Preparation Note 4 Is a complete dewater plan required for this project that includes dewater wells that run continuous during the footing excavation?

Per general notes and geo-tech report, adequate drainage at the site must be provided at all times de-watering wells are not required

76 1S 0 02 Special Inspections Program Concrete & Precast Concrete General has “see note 2” but no notes are listed on this page.

The special inspection program notes (including note 2) are indicated at the end of the program on sheet 1S 0 03.

77 1S 0 02 Special Inspections Program Steel Construction other than Structural Steel General has “see note 2” but no notes are listed on this page.

The special inspection program notes (including note 2) are indicated at the end of the program on sheet 1S 0 03.

78 1MD 1 01 Is there an isolation valve for shutting off the steam for the Police Station without affecting any other buildings?

SI to provide isolation valves for the building steam and condensate right inside of the building

79 1MD 1 01 The mechanical equipment and piping is not shown for the existing mechanical equipment outside between column lines X3 & X5.

The existing condensing units (and associated piping) are not explicitly shown on the demolition plan, but are intended to be removed as part of the removal of the associated air handling units (AHU-1 & AHU-2).

80 1FX 1 01 and 1FX 6 01 New 6” incoming combination domestic/fire service note says refer to Civil (1CU 101) which shows a 4” water line. Does the 4” feed the 6”?

New incoming line is shall be 6” on both civil and fire protection drawings

81 Specification 024119 Volume 1 is in the Volume 2 Specifications Book. Does this spec section have the wrong header or is the spec section wrong?

Volume 2 specification 024119 heading is incorrectly labeled as “Volume 1 – Police”. Specification 024119 information within Volume 2 is correct for Volume 2. Specification 024119 Volume 2, change heading from “Volume 1 – Police” to “Volume 2 - Restrooms”.

82 2S 0 00 Existing Building/ Structure Notes #5 The last sentence states that the contractor shall provide an allowance in their bid/pricing for this work. Are allowances permitted?

Contractor’s cost should be inclusive with their bid proposal. Change the last sentence of Note 5 from “The contractor shall provide an allowance in their bid/pricing for this work.” to “The contractor shall include this work in their bid/pricing.”

83 2S 0 00 Existing Building/Structure Notes #6 The last sentence states that the masonry sub‐contractor shall provide an allowance in their bid/pricing for this work. Are allowances permitted?

Contractor’s cost should be inclusive with their bid proposal. Change the last sentence of Note 6 from “The masonry sub-contractor shall provide an allowance in their bid/pricing for this work.” to “The masonry sub-contractor shall include this work in their bid/pricing.”

84 2S 0 02 Structural Testing & Inspection Program note 1 states that the Owner shall engage an independent inspection agency. Is that correct?

2S001 and 2S002. The contractor shall engage an independent inspection agency, not the Owner. Change second sentence of Note 1 from “Owner shall engage independent special inspection agency.” to “Contractor shall engage independent special inspection agency.”

85 2FA 1 01 and 2P 1 01 Note 25 shows the FACP in Room 103 but 2A 1 01 shows FACP in Room 108. Which is correct?

FACP is to be located in room 103.

86 2TN 0 01 Wire & Cable note 1 Does all cable need to be in conduit?

All new cable needs to be in conduit.

87 2TN 0 02 Note 1 and 2 Is the Owner also providing their own path or will the conduit pathway be provided by the Contractor?

Typical throughout Volumes 1 and 2: All fiber optic cable to be installed in conduit. Contractor to provide and install all conduit pathways with pull strings from the IT switch to all data locations. Owner will provide and install the fiber optic cable and fiber connections.

88 2TN002 through 2TN102 Clarify who provides fiber and conduit.

Typical throughout Volumes 1 and 2: All fiber optic cable to be installed in conduit. Contractor to provide and install all conduit pathways with pull strings from the IT switch to all data locations. Owner will provide and install the fiber optic cable and fiber connections.

89 1CS 501 Temporary chain‐linked fence detail says submit to the University for review and approval. Is this a typo?

Replace “University” with “Smithsonian”.

90 1CW 101 Will the Owner get the signatures for the 3 storm water certifications? Will the Owner be doing the As‐built?

Owner will obtain the signatures indicated on 1CW101. Owner will provide storm water management BMP as-builts.

91 1CW 501 and 1 CW 502 Note 7 Is the cost of the bio‐retention as‐built survey being covered by the Owner or does the contractor need to include this cost?

The as-built survey will be an Owner cost. Contractor to provide markups of the stormwater management plant reflecting revisions during construction as indicated.

92 1AD 1 01, 1AD 1 02, 1AD 2 01 and 1AD 2 02 Note D9, Who is the construction manager?

1AD101 and 1AD102, note D9 change “CONSTRUCTION MANAGER” to “GENERAL CONTRACTOR”.

93 1S 0 00 Reinforced Concrete Note 23 Is the Owner hiring the independent testing agency or is this the contractors responsibility?

2S001 and 2S002. The contractor shall engage an independent inspection agency, not the Owner. Change second sentence of Note 1 from “Owner shall engage independent special inspection agency.” to “Contractor shall engage independent special inspection agency.”

94 1S 0 01 Post‐Installed Anchors Note 13 Is the Owner hiring the independent testing laboratory and if not what are the requirements for this?

1S001 and 1S002. The contractor shall engage an independent inspection agency, not the Owner.

95 1FA 0 01 Note 2 Is SI providing a hazardous material report? See Amendment #1.

96 1FA 0 01 Note 21 Is there a drawing showing what the ambient sound levels are in the current spaces?

SI will provide ambient sound levels or decibel level requirements prior to final testing.

97 1FA 0 01 Note 22 Does the existing fire alarm need to stay active until the new system is installed and operational if this building won’t be occupied and the building is being gutted?

Per SI AHJ, the existing fire alarm system only needs to remain operational until the building is unoccupied by staff and turned over to the Contractor. Sheet 1FA001, replace note 22 in its entirety with

“EXISTING FIRE ALARM EQUIPMENT SHALL BE MAINTAINED

FULLY OPERATIONAL WHILE THE BUILDING IS OCCUPIED by SI.”

98 1FA 1 01 Note 10 is a bell required, or just a speaker/strobe? 1FA101 Keynote 10, Per SI AHJ, only a speaker/strobe is required.

Replace “BELL” with “SPEAKER/STROBE”.

99 1FX 0 01 Note 24 Does the existing sprinkler system need to remain fully operational until the new equipment has been tested and accepted?

Per SI AHJ, the existing sprinkler system only needs to remain operational until the building is unoccupied by staff and turned over to the Contractor. Sheet 1FX001, replace note 24 in its entirety with

“EXISTING SPRINKLER EQUIPMENT SHALL BE MAINTAINED

FULLY OPERATIONAL WHILE THE BUILDING IS OCCUPIED by SI.”

100 1TN 0 01 Conduit & Pathway Note 6 Says conduit stubbed out above ceiling. Is a longer conduit pathway required?

Contractor to provide conduit pathway to the nearest cable tray or to the appropriate switch.

101 Specification 024119 Volume 1 1.6.D How many photos are required

See spec section 013233 Photographic Documentation.

102 Clarify size of new 15 KV feeders All new 15 KV feeders shall be 250 KCMIL 103 What are the temporary power requirements for work involving 15 KV feeders Contractor shall provide full building service with temporary generators and fuel for all outages exceeding two (2) hours within any 24 hr.

period. Generator Requirements (a) Mane Restaurant Service 400KW

(b) Amazonian 600KW Red Blue Feeder Service shall be limited to (2) two (4) four hour shut downs.

Base Bid BASE BID: All work associated with Renew Police Station, Replace Public Restrooms, Pavilion, and Substation as described in the specifications and drawings both dated 5/5/16.

Description Material Labor Equipment Total Div. 1 General Conditions $ - Div. 2 Existing Conditions $ -

HAZMAT $ -

Div. 3 Concrete $ - Div. 4 Masonry $ - Div. 5 Metals $ - Div. 6 Wood, Plastics and Composites

Div. 7 Thermal and Moisture Prot. $ - Div. 8 Openings $ - Div. 9 Finishes $ - Div. 10 Specialties $ - Div. 11. Equipment $ - Div. 12 Furnishings $ - Div. 13 Special Construction $ - Div. 14 Conveying Systems $ - Div. 21 Fire Suppression $ - Div. 22 Plumbing $ - Div. 23 HVAC $ -

Div. 26 Electrical $ - Div. 27 Communications $ - Div. 28 Electronic Safety & Security $ - Div. 31. Earthwork $ - Div. 32 Exterior Improvements $ - Div. 33 Utilities $ -

BASE BID SUBTOTAL $ -

Overhead and Profit

Performance Bond

Total $ -

BASE BID

Total

Option 1 Option 1: All work associated with Undulating Wooden Bench as described in the specifications and drawings both dated 5/5/16.

Description Material Labor Equipment Total Div. 1 General Conditions $

Subcontractor Work $ - $ -

HAZMAT $

Subtotal $

Overhead and Profit

Performance Bond

Total $